February 19, 2019
Ms. Chonticha McDaniel
401 Stormwater Engineer
401 & Buffer Permitting Branch
Division of Water Resources
Department of Environmental Quality
chonticha.mcdaniel@ncdenr.gov
1617 Mail Service Center, Raleigh, North Carolina, 27699-1617
RE: Industrial Park Road Extension
SouthPoint Business Park – Mocksville, North Carolina
Dear Ms. McDaniel:
Please see the itemized responses to the comments received for the above
referenced project. Responses in red text.
1. According to plan sheet C-201 of each pond, stormwater flows from
the following roof drain lines and headwalls are not discharged directly
into the wet ponds. Please explain how each of these flow outfalls are
(or will be) conveyed to the wet pond.
a. Pond #1 (Lot 9 - Eastern Property Line); Line M and HW4 HW4
discharges on rip-rap and then by way of grass lined ditch, providing an
adequate channel, running from west to east on the north side of the
building and then into Forebay 2, as indicated on ND-156 Sheet C201,
Site Grading Plan Building 1.
b. Pond #2 (Lot 10 - SW of Building 2); Line H and HW3 HW3 discharges
on rip-rap and then by way of grass lined ditch, providing an adequate
channel, running from north to south on the west side of the building
and then into Forebay 1 as indicated on ND-157 Sheet C201, Site
Grading Plan Building 2.
c. Pond #3 (Lot 11 - SW of Building 3); Line N and HW4 HW4 discharges
on rip-rap and then by way of grass lined ditch, providing an adequate
channel, running from north to south on the west side of the building
and then into the Forebay, as indicated on ND-158 Sheet C201, Site
Grading Plan Building 3.
Alabama
Georgia
North Carolina
Tennessee
Virginia
Two Centre Plaza
Clinton, TN 37716
865-457-3701 phone
865-457-5476 fax
t h e o n e s t o p f o r e v e r y i n d u s t r i a l n e e d
w w w . h o l l i n g s w o r t h c o s . c o m
2. Pond #4, plan sheet C-505 (Drawing #1 - Wet Pond Landscape &
Easement Plan), please depict stormwater pipe coming from the roof
drain and HW2 that are also discharged into the forebay. Please see
attached revised ND-170 Sheet 201, Site Grading Plan Building 4, Rev. 1
2-15-19 which now shows the HW2 discharging into the Forebay.
Sincerely,
Tom Wortham, SVP