Loading...
HomeMy WebLinkAbout20161069 Ver 2_NCDEQ Plans Review Responses_20190220 Alabama Georgia North Carolina Tennessee Virginia Two Centre Plaza Clinton, TN 37716 865-457-3701 phone 865-457-5476 fax t h e o n e s t o p f o r e v e r y i n d u s t r i a l n e e d w w w . h o l l i n g s w o r t h c o s . c o m February 19, 2019 Ms. Chonticha McDaniel 401 Stormwater Engineer 401 & Buffer Permitting Branch Division of Water Resources Department of Environmental Quality chonticha.mcdaniel@ncdenr.gov 1617 Mail Service Center, Raleigh, North Carolina, 27699-1617 RE: Industrial Park Road Extension SouthPoint Business Park – Mocksville, North Carolina Dear Ms. McDaniel: Please see the itemized responses to the comments received for the above referenced project. Responses in red text. 1. According to plan sheet C-201 of each pond, stormwater flows from the following roof drain lines and headwalls are not discharged directly into the wet ponds. Please explain how each of these flow outfalls are (or will be) conveyed to the wet pond. a. Pond #1 (Lot 9 - Eastern Property Line); Line M and HW4 HW4 discharges on rip-rap and then by way of grass lined ditch, providing an adequate channel, running from west to east on the north side of the building and then into Forebay 2, as indicated on ND-156 Sheet C201, Site Grading Plan Building 1. b. Pond #2 (Lot 10 - SW of Building 2); Line H and HW3 HW3 discharges on rip-rap and then by way of grass lined ditch, providing an adequate channel, running from north to south on the west side of the building and then into Forebay 1 as indicated on ND-157 Sheet C201, Site Grading Plan Building 2. c. Pond #3 (Lot 11 - SW of Building 3); Line N and HW4 HW4 discharges on rip-rap and then by way of grass lined ditch, providing an adequate channel, running from north to south on the west side of the building and then into the Forebay, as indicated on ND-158 Sheet C201, Site Grading Plan Building 3. Alabama Georgia North Carolina Tennessee Virginia Two Centre Plaza Clinton, TN 37716 865-457-3701 phone 865-457-5476 fax t h e o n e s t o p f o r e v e r y i n d u s t r i a l n e e d w w w . h o l l i n g s w o r t h c o s . c o m 2. Pond #4, plan sheet C-505 (Drawing #1 - Wet Pond Landscape & Easement Plan), please depict stormwater pipe coming from the roof drain and HW2 that are also discharged into the forebay. Please see attached revised ND-170 Sheet 201, Site Grading Plan Building 4, Rev. 1 2-15-19 which now shows the HW2 discharging into the Forebay. Sincerely, Tom Wortham, SVP