Loading...
HomeMy WebLinkAboutfinal signed Corps comments R 5850.pdfDEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 (electronically transmitted) Deceinber 27, 2018 Regulatory Division Action ID No. SAW-2018-02339 Pender County STIP# R-5850 Mr. Eric Murray NCDOT Division 3— Project Manager Ms. Colista Freeman, PE CALYX Planning Senior Project Manager Dear Mr. Murray: Reference is made to your letter of December 17, 2018, regarding the start of study to widen NC 53 to three lanes from US 117 Bypass to SR 1509 (Stag Park Road) in Burgaw, Pender County. (R-5850). The letter requested any information the Corps may be able to supply to evaluate potential environmental impacts of the project. We have reviewed the subject documents and determined that, based upon a review of the information provided and available maps, the Corps has had limited history in the project area. The Burgaw Creek watershed is near this location but there may be limited resources in the project area. Please be aware that impacts associated with the discharge of fill into jurisdictional waters of the United States including wetlands are subject to our regulatory authority pursuant to Section 404 of the Clean Water Act. Any discharge of excavated or fill material into waters of the United States and/or any adjacent wetlands would require Department of the Army (DA) permit authorization. The type of DA authorization required (i.e., general or individual permit) will be determined by the location, type, and eXtent of jurisdictional area impacted by the project, and by the project design and construction limits. Until additional data is furnished which details the extent of the construction limits of the proposed project, and an onsite inspection is completed with regard to determinations of the presence of jurisdictional waters on the project properry, we are unable to verify that the project will not have jurisdictional impacts, or to provide specific comments concerning DA permit requirements or a recommendation of alternatives. To assist you with determining permitting -2- requirements, we recommend that you perform a detailed delineation of the streams and/or wetlands present on the project site. When this information becomes available, it should be forwarded to our office for review and comment, as well as a determination of DA permit eligibility. 4611. Should you have any further questions for this project, please contact me at 910-251- Sincerely, Digitally signed by SH AV E R. B RA D SHAVER.BRAD.E.1276601756 DN: c=US, o=U.S. Government, .�.1276601756 On=SDHADVER.BRAID.E.1276601756 Date: 2018.12.27 12:12:12 -OS'00' Brad Shaver Regulatory Project Manager Wilmington Regulatory Field Office cc (electronic): NCDENR-DWR attn: Ms. Joanne Steenhuis NCDOT-Division 3 attn: Mr. Mason Herndon