HomeMy WebLinkAbout20150859 Ver 1_CAMA Major Renewal_20190218Permit Class
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
er4,M t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Clifton & Shelly Spencer, PO Box 240, Wanchese, NC 27981
Permit Number
118-15
Authorizing development in Dare County at adjacent to Croatan Sound, 31 Beverly Drive
in Wanchese , as requested in the permittee's application dated letter
This permit, issued on February 18, 2019 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
Je suoJect to noes, imprisonment or crvtt action; or may cause me permit to oe nuu ana vola.
1) This renewal shall be attached to Permit No. 118-15, which was issued to the permittee on 10/19/15,
and copies of both documents shall be readily available on site when a Division representative
inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
15-0859.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2015-01857.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
V
Braxton C. Davis. Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee