HomeMy WebLinkAboutNCG140469_Application_20190219Division of Energy, Mineral and Land Resources
Stormwater Program
National Pollutant Discharge Elimination System
}
Environmental Y ' `� E C 1 V 1
Quality NCG140000
FE6 11 201
FOR AGENCY USE ONLY
Date Received
Year
Month
Da
Certificate of Covera e
NOCs_l..
Check #
.
Amount
p
oo
Permit Assigned to
I
NOTICE OF INTENT
DENR-LAND QUALITY
National Pollutant Discharge Elimination System application for cog{li ,r,t I it NCG140000:
STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as:
SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete
This NOI may be an application to discharge process wastewater. NCG140000 contains effluent limitations
for process wastewater discharges. Wastewater discharges must meet the requirements of these effluent
limitations. An exceedance of any of these limitations will result in a violation of the permit conditions.
For questions, contact the DEMLR Central Office or Regional Office in your area. (Seepage 8)
1)
2)
(Please print or type)
Mailing address of owner/operator (official address to which all permit correspondence will be
mailed):
Legal Company Name McCarthy Improvement Company, Inc.
(Please attach the most recent Annual Report to the NC Secretary of State showing the current legal name. Alternatively
this permit can be given to an individual.)
Signee's Name (as signed for in question 28 below) Julio A. Laris
Street Address 70 St. Mark Road
City Taylors
Telephone No. (864)918-6126
Alternate ContactName Julio Laris
Alternate Contact Telephone (if different)
Location of facility producing discharge:
Facility Name
Street Address
City
County Facility
Contact
Telephone No.
(281) 923-0037
McCarthy RDU Concrete Batch Plant
State SC ZIP Code 29687
Email jlaris@mccarthyimprovement.com
Email (if different)
975 Corporate Street
Morrisville State NC ZIP Code 27560
Wake County
Julio Laris
(281) 923-0037
3) Physical location information:
Emaililaris(a�mccarthyiml)rovement.com
Please provide narrative directions to the facility (use street names, state road numbers, and distance and
direction from a roadway intersection). SeeAttachmentA
(A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.)
4) Latitude 35 53' 10.86" Longitude -78 47' 01.82" (deg., min, sec or decimal)
Page 1 of 8
SWU-NCG14-NO] Last revised 9/01/2017
NCG140000 N.O.I.
5) This NPDES Permit Application applies to the following (check all that apply):
e New or Proposed Facility Date operation is to begin March 1, 2019
❑ Existing Facility Date operation began
6) Consultant's application information:
Consultant: Jacki Congleton
Consulting Firm: Terra Consulting, LLC
Mailing Address: P.O. Box 1738
City: Carrollton
State: GA Zip Code: 30112
Phone: 77( 0 ) 573-3055
Email: lacki@terraconsultingllc.com
(Optional)
Staple Business Card Here:
7) Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary
industrial activity at this facility:
SIC Code: 3 2 7 3
8) Provide a brief description of the types of industrial activities and products produced at this facility:
(Attach a site diagram showing the process areas present at this facility.)
See Attachment A and Site Mar).
Stormwater Discharge, Wastewater Treatment & Discharge and Permitting Information
9) Discharge points / Receiving waters:
What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater
and/or wastewater discharges will end up in? Little Brier Creek which flows into Bier Creek Reservior
To find the waterbody, please see the NC Surface Waterbody Classifications map at
https://deq.nc.gov/about/divisions/water-resources/water-resources-science-data
Receiving water classification(s) for the waters: Classification C; NSW
If the site will discharge to a separate storm sewer system, name the operator of the separate storm sewer
system (e.g. City of Raleigh municipal storm sewer). NA
Page 2 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
List discharge points (outfalls) that convey discharge from the site (both on -site and off -site) and location
coordinates. Attach additional sheets if necessary, or note that this information is specified on the site plan.
Be sure to indicate a type for each outfall listed below as Stormwater only, Wastewater only or Wastewater
Commingled with Stormwater
Outfall No. 1 Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
❑ Wastewater only m Wastewater Commingled with Stormwater
35 53' 10.53" N
-78 46' 59.48" W
❑ Wastewater only
Wastewater only
❑ Wastewater only
❑ Wastewater only
❑ Wastewater only
❑ Wastewater only
T
W
_ N
W
_ N
W
_ N
W
_ N
W
_ N
W
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Will this facility discharge wastewater to SA (Shellfish) waters? ❑ Yes OFNo
Note: Discharge of process wastewater to receiving waters classified as Critical Area (CA) must be
reviewed by the N.C. Division of Water Resources, Public Water Supply Section ahead of
approval. No new discharges of process wastewater are permitted in receiving waters
classified as WS-1 or freshwater ORW.
You must show all discharge points clearly on the submitted site plan. Be advised that
NCDEQ may require you to apply for an individual permit, based on proposed discharge rates
and receiving stream conditions (low flows, impairments, etc.)
Page 3 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
10) Each applicant shall provide the following information (attach additional sheets as necessary):
• Two (2) site plans depicting the facility or site with numbered outfalls which indicate stormwater and
wastewater outfalls. The plans shall legibly show. at a minimum, (existing or proposed):
o Outline of drainage areas with topographical lines and features
o Stormwater/wastewater treatment structures
o Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas)
o Runoff conveyance structures
o Areas and acreage where materials are stored
o Impervious area acreages
o Location(s) of streams and/or wetlands the site is draining to, and any applicable buffers
o Site property lines, North Arrow, and bar scale
o If applicable, the 100-year floodplain line
o Acreage of each stormwater and wastewater topographical area
o Each of the facilities' wastewater or stormwater source and discharge structures and each of its
hazardous waste treatment, storage, or disposal facilities
o Site location (insert)
Site plans shall be 24" x 36" in size.
• Line drawing and description: Aline drawing of the water flow through the facility. A pictorial description
of the nature and amount of any sources of water and any collection and treatment measures.
• A narrative description and identification of each type of process, operation, or production area which
contributes wastewater to the effluent for each outfall, and a description of the treatment the wastewater
receives (or will receive), including the ultimate disposal of any solid or fluid wastes other than by
discharge. Processes, operations, or production areas may be described in general terms (e.g. "ash
silo").
11) Does the applicant have any unresolved Notice of Violations (NOVs)?
8 No ❑ Yes
Wastewater:
12) What types of wastewater does your facility generate or discharge?
Type of Authorized Wastewater
Generate
Discharge
Sent to WW
Treatment
System
Vehicle and equipment cleaning VE
I]
❑
Wetting of raw material stockpiles RM
0
El
❑
Mixing drum cleaning MD
❑✓
❑
Further explanation, if necessary: see Attachment A
13) Will your facility spray -down or actively wet aggregate piles?
❑ No Q Yes
14) Does the facility use any of the following on site?
❑ Phosphorus -containing Detergents
❑ Brighteners ❑ Other Cleaning Agents
❑ Non -Phosphorus -containing Detergents
❑ Other:
Page 4of8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
15) Are wastewater treatment facilities planned in the 100-year flood plain?
❑✓ No ❑ Yes
—( 16) Will your facility build a closed -loop recycle system (CLRSs) that meets design requirements in 15A
NCAC 02T .1000 and hold your facilities' working volume'?
❑ Yes ❑✓ No
If Yes, STOP COMPLETION of this permit. Contact DWR Non -Discharge Permitting Program for permitting
requirements.
17) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or
expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets.
a) What wastewaters were considered for this alternatives review? N VE IN RM 0 MD
b) Connection to a Municipal or Regional Sewer Collection System:
i) Are there existing sewer lines within a one -mile radius? ..................................... ❑✓ Yes 11 No
(1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ❑✓ Yes ❑
(a) If No, please attach a letter documenting that the WWTP will not accept the wastewater.
(b) If Yes, is it feasible to connect to the WWTP? Why or why not?*
See Attachment A (17.b)
c) Surface or Subsurface Disposal System (e.g., spray irrigation):
Is a surface or subsurface disposal technologically feasible (possible)?
Why or Why not? See Attachment A
No
.................. ❑ Yes IN No
ii) Is a surface or subsurface disposal system feasible to implement?* ...........................❑ Yes ❑ No
Why or Why not? See Attachment A
iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct
discharge to surface waters?* See Attachment A.
d) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound
alternative of all reasonably cost-effective options of the wastewaters being considered?*... N Yes ❑ No
i) If No, contact DEMLR's Land Application Unit to determine permitting requirements.
e) If this review included all wastewater discharge types, would excluding some types (e.g. raw
stockpile wetting) make any of the above non -discharge options feasible? ..............❑ Yes N No
* You may be asked to provide further information to support your answers to these questions after the initial review.
Feasibility should take into account initial and recurring costs.
Page 5of8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
Stormwater:
18) Does this facility employ any best management practices for Stormwater control? ❑ No p Yes
If yes, please briefly describe: see Attachment A
19) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No 111 Yes
If yes, when was it implemented? The SPPP will be completely implemented before the commencement of operations.
20) Are vehicle maintenance activities (VMA) occurring or planned at this facility? p No ❑Yes
If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes
Other/Permitting:
21) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit?
❑✓ No ❑ Yes
If yes, list the permit numbers for all current E&SC permits for this facility:
22) Is your facility subject to Phase II Post -Construction Area? p No ❑ Yes
If yes, who is the permitting authority?
23) Is your facility located in one of the 20 Coastal Counties? ❑ Yes 0 No
Is your facility adding more than 10,000 ft2 of built -upon area or CAMA Major Permit? ❑ Yes ❑ No
24) Is your facility discharging wastewater (treated or untreated) such as water from wetting of aggregate piles, drum
rinse -out, or vehicle and equipment cleaning to a stormwater BMP? ❑ No ❑p Yes
If yes, please attach your approval from the permitting authority to do so. See Attachment A
25) Does this facility have any other NPDES permits? 0 No ❑ Yes
If yes, list the permit numbers for all current NPDES permits for this facility:
26) Does this facility have any Non -Discharge permits (ex: recycle permits)? ❑✓ No El Yes
If yes, list the permit numbers for all current Non -Discharge permits for this facility:
27) Hazardous Waste:
a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility?
❑✓ No ❑ Yes
b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of
hazardous waste?
0✓ No ❑Yes
c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of
hazardous waste?
R1 No ❑ Yes
d) Type(s) of waste:
How Is material stored: Used maintenance oils and fluids are removed from the site at the time of the maintenance.
Where is material stored:
Page 6 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
How many disposal shipments per year:
Name of transport / disposal vendor: _
Vendor address:
Final Checklist
This application will be returned as incomplete unless all of the following items have been included:
V' Check for $100 made payable to NCDEQ.
�i Er' --This completed application and all supporting documentation. See Question 10.
` ❑ If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or
local designee: documentation verifying applicant has developed and submitted that Plan to the governing
agency (required per 15A NCAC 02H .0138).
=� B—Two (2) site plans depicting the site plan with numbered outfalls which indicate stormwater and wastewater
outfalls. See Question 10.
i2'*�_ A county map or USGS quad sheet with location of facility clearly marked.
28) Signatory Requirements (per 40 CFR 122.22)
All applications, reports, or information submitted to the Director shall be signed and certified.
a. All notices of intent to be covered under this General Permit shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a
president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who
performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or
operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter
1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
(2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
(3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected
official.
Certification: North Carolina General Statute 143-215.6 B(i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of
a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate
any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental
Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten
thousand dollars ($10,000).
hereby request coverage under the referenced General Permit. I understand that coverage under this permit will
constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual
permit.
I certify that I am familiar with the information contained in this application and that to the best of my knowledge
and belief such information is true, complete, and accurate.
Printed Name of Person Signing: ,Julio A. Laris
Title: Project Manager
A . LAmt'r V • Z /c -) / ,
(Signature of Applicant) (Date Signed)
V�5 c%
FEB
DENR-LAMD 0UALIT`(
STORMWATER PERWI ]t�`�G
Page 7 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDEQ
Mail the entire package to:
DEMLR - Stormwater Program
Dept. of Environmental Quality
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Note
The submission of this document does not guarantee the issuance of an NPDES permit.
For questions, please contact the DEMLR Regional Office for your area.
DEMLR Regional Office Contact Information:
Asheville Office ......
(828) 296-4500
Fayetteville Office ...
(910) 433-3300
Mooresville Office ...
(704) 663-1699
Raleigh Office ........
(919) 791-4200
Washington Office ...
(252) 946-6481
Wilmington Office ...
(910) 796-7215
Winston-Salem ......
(336) 771-5000
Central Office .........
(919) 807-6300
Page 8 of 8
SWU-NCG14-NOI Last revised 8/01/2017
Attachment A
NCG140000 N.O.I. Additional Information for Questions
McCarthy Improvement Company, Inc.
McCarthy Raleigh Durham Airport Concrete Batch Plant
3. Physical location information:
The facility is located at Raleigh -Durham International Airport (RDU), north of Raleigh on I-40. Driving
directions to the site: exit I-40 at Airport Blvd. and travel approximately 2 miles to W. International Drive and
turn right. Travel approximately 0.6 mile to the site, approximately 200 feet to the left.
8. Description of Industrial Activities
This batch plant will provide the concrete for taxiway and runway rehabilitation projects.
This facility will manufacture concrete, which is transported by dump truck to the taxiways and runways being
paved. The primary components of the facility include the production plant; aboveground storage tanks that contain
diesel fuel and concrete admixtures, storage trailers and a silo that contain cement and fly ash, as well as sand and
aggregate stored in open stockpiles. The manufacturing process requires moving aggregate and sand from
stockpiles to the processing plant using front-end loaders and conveyors. Cement and fly ash are pneumatically
added to the sand and aggregate and processed in the mixing drum. The concrete is then loaded into dump trucks
for delivery to the paving project.
12. Type of Wastewater
A combination of wastewater and stormwater will be discharged from this facility's outfall intermittently during
the approximately 24 months the plant is expected to be located at this site. Wastewater from the truck bed and
drum washout will be comingled with stormwater only when the plant is in operation. On the days the plant is
operating, the wastewater described in Attachment B will be generated.
17. Wastewater Treatment Alternatives Review
(b) This facility will be located at this site for less than 2 years. Because of the cost involved and potential
disruption to airport activities by the construction required to temporarily direct the wastewater from the identified
sources to the sewer system, this option is not considered feasible.
(c) Surface or Subsurface Disposal Systems
(i) It is technically possible to use the recycled water from the truck bed washout recycling system for
dust suppression. It is also possible to treat and dispose of wastewater from the site through the existing
airport stormwater detention pond, which will reduce solids in the water discharged.
(ii) It is possible to use the recycled water from the truck bed washout recycling system for dust
suppression as well as for re -use in the washout system. It is also possible to implement the treatment and
disposal of the wastewater from the site through the existing airport stormwater detention pond.
(iii) These methods of surface disposal and re -use are feasible and will be implemented.
18. Best Management Practices (BMP)
(1) Compost socks will be placed at the downslope perimeter of the site.
(2) Inlet protection at the drop inlets to the airport underground storm drain system will be provided with
compost socks and sediment fencing.
(3) An existing airport stormwater detention pond will contain the combined stormwater and wastewater to allow
a significant portion of the suspended solids to settle out of the water before being discharged.
(4) Currently, grass -covered surfaces disturbed during the installation of the settling pits will be stabilized with 4
to 6 inches of graded aggregate base (GAB) or vegetated with permanent vegetation.
(5) All parts and maintenance oil, grease, and fluids will be stored in closed containers inside the parts trailer at
all times.
(6) Diesel fuel kept on site to fuel material handling equipment will be stored in a 1,000 gallon double -wall tank
inside of a portable containment dike.
(7) The double -wall steel diesel storage tank used to store fuel for the generator is located inside the generator
trailer.
(8) Regular inspections of potential sources of pollution are conducted.
24. Discharging wastewater to a BMP
The operation of this facility is an airport -contracted project and will be discharging to an existing airport
detention pond through the airport's existing infrastructure.
2
Attachment B
NCG140000 N.O.I. Additional Information for Questions
McCarthy Improvement Company, Inc.
McCarthy Raleigh Durham Airport Concrete Batch Plant
Description of Processes Producing Wastewater
Three processes at this facility will potentially contribute wastewater to the effluent from the outfall.
Wastewater Source 1:
Wastewater Source 1 is the concrete batch plant mixing drum. The drum on the plant will be washed out
once per day, on days the plant is operating. The wastewater produced from each washout is
approximately 800 gallons per day. This wastewater is captured in the upturned bucket of a front end
loader and transported to the closest truck bed washout recycling pit located on the site, where it is
discharged from the bucket.
Wastewater Source 2:
Wastewater Source 2 is the truck bed washout used to washout the beds of the dump trucks used to
transport the concrete to the taxiway or runway being paved. The plant anticipates producing a
maximum of 250 truckloads per day and the trucks will be washed out after every second trip. Each
washout will use approximately 50 gallons of water. The anticipated volume of wash water generated
will be approximately 6,250 gallons per day. The wash water will be contained and recycled through a
series of three settling pits designed to allow suspended particles to settle out of the wash water. The
dimensions of each pit will be 25 feet by 25 feet by 8 feet deep. The combined holding capacity of the
pits is approximately 84,000 gallons. The water in the third pit will be recycled as wash water or used for
dust suppression on the site. Solids will be removed from each pit when the volume occupied by the
solids equals one half of the designed holding capacity of the pit. The solids are allowed to dry and are
properly disposed of. If wash water is spilled or leaks from the recycling system or the washout area, it
would flow to one of the airport stormwater detention ponds where it would ultimately be discharged to
Little Brier Creek. Fifteen inches of freeboard will be maintained in the third washout pit at all times to
accommodate a 10 year rain event (4.9 inches) over the three ponds.
Wastewater Source 3:
Wastewater Source 3 includes the aggregate stockpiles. The aggregate stockpiles will be wetted using a
lawn sprinkler and hose. The sprinkler will be rotated around each stockpile during the day to cover all
parts of each pile. Wetting the aggregate stockpiles is done to produce evaporative cooling of the stone.
The evaporation of the water during this sprinkling process reduces the volume of water that ultimately
flows away from the stockpiles. Wetting is not used on the sand stockpile. Per DOT specifications, both
the aggregate and sand are washed prior to being delivered to the site, reducing the potential fines in
stormwater runoff from the area covered by the stockpiles. Wetting of the aggregate stockpile will be
conducted up to 24 hours per day when the plant is operating during summer months. The wastewater
from the aggregate stockpile will consist of water from the wetting of the stone and stormwater that falls
on the pile. Wastewater from the sand stockpile will consist of only stormwater that falls on the pile.
Stormwater and wastewater from both stockpiles will flow to the airport detention pond and ultimately be
discharged to the surface.
nntrt7t.]1_1111,
BUSINESS CORPORATION ANNUAL REPORT
10-2017
NAME OF BUSINESS CORPORATION: McCarthy Improvement Company
SECRETARY OF STATE ID NUMBER: 0626758 STATE OF FORMATION: IA
REPORT FOR THE FISCAL YEAR END: 1 2/31 /201 7
SECTION A: REGISTERED AGENT'S INFORMATION
1. NAME OF REGISTERED AGENT: Corporation Service Company
2. SIGNATURE OF THE NEW REGISTERED AGENT:
3. REGISTERED OFFICE STREET ADDRESS & COUNTY
2626 Glenwood Avenue,
Raleigh, NC 27608 Wake County
SECTION B: PRINCIPAL OFFICE INFORMATION
E-Filed Annual Report
1805400789
1018 12:47
7 Changes
SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT
4. REGISTERED OFFICE MAILING ADDRESS
2626 Glenwood Avenue„ Suite 550
Raleigh, NC 27608
1. DESCRIPTION OF NATURE OF BUSINESS: Construction
2. PRINCIPAL OFFICE PHONE NUMBER: (563) 359-0321 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction
4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY
5401 Victoria Avenue
Davenport, IA 52807-3932
5. PRINCIPAL OFFICE MAILING ADDRESS
5401 Victoria Avenue
Davenport, IA 52807-3932
6. Select one of the following if applicable. (Optional see instructions)
❑ The company is a veteran -owned small business
The company is a service -disabled veteran -owned small business
SECTION C: OFFICERS (Enter additional officers in Section E.)
NAME: Sonia Lyn Sundstedt
TITLE: Secretary
ADDRESS:
5401 VICTORIA AVENUE
DAVENPORT, IA 52807
NAME: Lawrence P Bush
TITLE: Treasurer
ADDRESS:
5401 VICTORIA AVENUE
Davenport, IA 52807
NAME: Joseph D Bush
TITLE: Chief Operating Officer
ADDRESS:
5401 VICTORIA AVENUE
Davenport, IA 52807
SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business
entSonia
Lyn Sundstedt
2/23/2018
SIGNATURE
DATE
Form must be signed by an officer listed under Section C of this form.
Sonia Lyn Sundstedt
Secretary
Print or Type Name of Officer
Print or Type Title of Officer
MAIL TO: Secretary of State, Business Registration Division, Post Office Box 29525, Raleigh, NC 27626-0525
SECTION E: ADDITIONAL OFFICERS
NAME: Scott E Hutter
TITLE. President
ADDRESS:
5401 Victoria Avenue
Davenport, IA 52807
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS:
Name:
TITLE:
ADDRESS:
NAME:
TITLE:
ADDRESS: