HomeMy WebLinkAbout20190210 Ver 1_Site 12 plans_A0011C_Hyd_PSH2D-1 and PSH2D-2_20190214N
z
0
>
W
�
�
�
�
�
�
�
�
�,
�
0
�
_
�
�
�
�
z
�
�
�
�
�
�
��
��a
o��
N � LC
�o�
���
��r
1,870
1,860
1,850
1,840
�
W
�
H
t/�
C�
�
�
O
w��
+
���
��oo
W H J
H cn w
1,830 --
��+�0
��� �I I
�
%
U
�
W
Z
�
�
cn
�/`�I�
U + �j
� o •o
UQ�
� N W
N ���
L� � � �
� = U
� , �
�� S�� P� � z
� � o ,�p�� �� � a
�� � _ _ °� �`�-���I�r �`-� >
���� �`�€ � IM�A���L R� K �
��
, �,�\ z EN RGY DISSI� TO�
; 1��4��RAL ROCK EE PSH 2-2 Y
�
ENER�Y�`�ISSIPATO " o
--����EE��� 2D-2
`� �
� ��
, ,
���
, ,
�,-�� ,
, �, �, �A
�,� �, � �
� �, a �, \ '
BEGIN RELO��1`Jp I� C __ --�
� �\ -
STA 10+00 � , ` ,��
�
� � � P �� �` q P �
� �
\ 4 �'��
__ � A�� �
RE � � � � �CR�g F
� �
� �
� �
�
i � � ,� — -�� —
� ��v
F �/
----,/
�nE�P
>
U
�
w
Q
�
c/i
�
�N00
U + ri
���o
� �
O�J
�cnW
N
>
U
�
W
Z
a
>
�
�
O
�
U
Y
U
O
�
� ___ C
,—
__—
� _-
_- _-
_ _—
__
�__—
�
�
_ ���
- o , 503 a
�z
_ �
_ _o
v �
� ;
- - -� � � � -.
l•J
� � + ��
� -�-�
F
v
�
C�� �o - �� ����3,�
�� �� i�
__ __— � c,�.U- ,
i — — — — � — �
M
U
�
W
Q
>
�
�
���
U +�
���0
��
O�J
�v�w
�
>
U
�
w
z
Q
>
�
�
0
�
U
Y
U
O
�
�,
��
� C
�
�
����� �.
� ,
� ,
�� �
�
M —
—r•�.
� 2 + ��
13 + 00
1��
Zo
NAD 83 Ivq 2 0
11
ROCK CROSS VANE
SEE PSH 2 D-2
�
� �
�
� � nry
�
�,``\ `
��S � ��
--- JS �
TING R/W
— _I _ _ _ — — — v,
—M— —
�s i
� /
� �� SCRUB �
�, k25 � STREAM PLUG, o
� TYP �
a �` �,�F SEE PSH -2 ���----
, - - �Q �
� -z _- __ --L -
p - - - - - -�-1
— — —
— — —
_ �
� � - �'-- � � �� _— — — — / — � — _-----
_ _ — —
� -r - - � � -------
„ �11.#—� �-� T s — — �� I �� � � - - - - - - —__---
�fi"�''�=
50
HORIZONTAL
o �o
�
w
�
t~
�
H
�
��o
W � O�
+
ON�
�rco
W H J
H cn w
END RELOCATION
STA 12 + 45
EX
150
,,
�- �� z
, � � • I II
•.•..:
PRO�ILE LEGEIUD
EXIST lNG GROUND ELEV AT lON — — — — — — — -
PROPOSED GROUND ELEVATION ----��----��----��----
PROJECT REFERENCE NO. SHEET NO.
A-0011 C 2 D-1
RrW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
�N������ �' ��.���
�� ��� ��� ��� � � �����������
PROPOSED BANKFULL
PROPOSED ROCK CROSS VANE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
== M A Engineering N�
License:
// Consultants� �n�. F-0160
598 East Chatham Street Suite 137 Cary, NC 27511
Phone: 919.297.0220 Fax: 919.297.0221
SUMMARY OF QUANTITIES
ITEM NUMBER SECT DESCRIPTION QUANTITY UNIT
6133000000-N SP CONSTRUCTION SURVEYING 1 LS
6133000000-N SP GRADING 1 LS
1077000000-E SP #57 STONE 55 TON
3656000000-E 876 GEOTEXTILE FOR DRAINAGE, TYPE 2 115 SY
3651000000-E SP BOULDER 90 TON
3642000000-E 876 RIP RAP, CLASS A 6 TON
3659000000-N 873 PERFORMED SCOUR HOLES WITH 1 EA
LEVEL SPREADER APRON
APPROXIMATE QUANTITIES ONLY.
SUMMARY OF EARTHWORK
UNCLASSIFIED
LOCATION EXCAV. EMBANKMENT BORROW WASTE
(CU.YD.) (CU.YD.) (CU.YD.)
Y16CHANNEL 177 2 0 175
DESC STATION NORTHING EASTING ELEV. RADIUS
Rl 498210.93 555141.70 30
R2 498214.42 555082.80 25
RCVI 10 + 61 498234.43 555100.27 1865.79
R3 498257.31 555115.61 25
RCV2 11 + 22 498292.09 555081.36 1863.84
R4 498295.25 555117.44 35
R5 498333.26 555125.95 35
RCV3 11 + 83 498351.62 555094.53 1861.89
VERTICAL
N
Z
�
N
�
W
�
�
�
�
�
�
�
BED
ROCKS IN VANE ARM SHOULD
NOT BE GAPPED OR HAVE ANY
SIGNIFICANT SPACES
Fi
Ri
BANKFULL
� U
���:
2' MI ,
(TYP.)
EXCAVATED
POOL, TYP.
mAX. STEP
DEPTH 0.5'
SET HEADER ROCK BACK 1/3
WIDTH OF FOOTER ROCK
FILTER FABRIC J �— POOL DEPTH,
SEE PHOFILE
SECTION A-A
1/3 1/3 1/3
BANKFULL BANKFULL BANKFULL
WIDTH i WIDTH i WIDTH
�
LL
z
¢
m
FLOW
20° TO �
�
30° Y
z
� m
#57 STONE
NOTES:
1) STEPS TO BE SHOHT� FREQUENT� AND
CLOSELY SPACED.
2) POOL SPACING SHALL BE INVERSELY
PHOPOHTIONAL TO STHEAM SLOPE,
AND DIRECTLY PHOPOHTIONAL TO
BANKFULL WIDTH.
3) POOL DEPTHS AT BANKFULL ELEVATION
SHALL BE TYPICALLY 2 TO 3 TIMES
DEEPER THAN STEP DEPTHS AT
BANKFULL ELEVATION.
4) ADEQUATE NUMBEH OF FOOTER BOULDERS
TO BE USED IN ORDEH TO HOLD UP THE
BOULDERS AT HEAD OF STEPS DURING
HIGH ENERGY/HIGH FLOW EVENTS.
5) STEP POOL DEPTH SHOULD BE 2 TO 3
TIMES BANKFULL DEPTH.
HEADER ROCK� TYP. SET HEADEH ROCK BACK
SEE PROFILE FOR p MINIMUM OF 1/3 WIDTH
ELEVATION OF THE FOOTEH ROCK
FLOW �
�—... _ ••-
��\���\���\��� ��� ��\��\��� ��� J • • n • • •
�`�-'�- BED
� r�=�,`;
BACKFILL, TYP. �; > >���
c� EXCAVATED POOL
'i. �-r� � �
#57 STONE� TYP. 2� MIN. FOOTER ROCK� TYP.
ROCKS IN VANE ARM SHOULD
NOT BE GAPPED OR HAVE ANY
EXCAVATED TRENCH SIGNIFICANT SPACES
#57 STONE FOR ROCK CROSS VANE
CONSTRUCTION FILTER FABRIC, TYP.
� FILTER FABRIC S E C T I 0 N A� A
POOL '
— HEADEH.
ROCK
FOOTER � POOL EXCAVATED PER
HOCK � DIRECTION OF ENGINEEH
A
—''-�T�-.�.7�I7�
BACKFILL CHANNEL WITH NATIVE MATEHIAL OF
MIXTURE OF MATEHIAL PER CHANNEL SUBSTHATE
STANDARD OR AS DIRECTED ENGINEER
4 e TO 10% SLOPE
'— KEY IN VANE TO BANK —
MINIMUM OF 6.0' AT AN �'�
ELEVATION EQUAL TO y�l
BANKFULL OR SLIGHTLY BACKFILL, TYP. FOOTER BED
LOWEH ROCKS
P LAN V I EW #57 STONE� TYP. z HOCKS IN VANE ARM SHOULD
MIN. FILTER FABRIC, TYP. NOT BE GAPPED OR HAVE ANY
SIGNIFICANT SPACES
BOULDER DIMENSIONS (FT) S E C T I O N B� B
STATION HEIGHT LENGTH WIDTH
10+61 2' 4' 3' NOTES:
�7+pp p' 4' 3' 1) DEEPEST PART OF POOL TO BE IN LINE WITH WHERE
��+a3 2 4 3 R 0 C K C R 0 S S VA N E D E TA I L VANE ARM TIES INTO BANKFULL.
2) DO NOT EXCAVATE POOL T00 CLOSE TO FOOTER BOULDEHS.
3) CLASS "A" STONE CAN BE USED TO REDUCE VOIDS
F 0 R S T E P P O O L S BETWEEN HEADERS AND FOOTEHS.
4) COMPACT BACKFILL TO EXTENT POSSIBLE OR AT THE
DIRECTION OF THE ENGINEER.
NOT TO SCALE 5) POOL DEPTH SHOULD BE 2 TO 3 TIh1ES BANKFULL DEPTH.
USE MOST IMPERVIOUS
MATENIAL AVAILABLE
NATURAL GHOUND 1
F�ow ���/
PLAN VIEW
COMPACTED
BACKFILL
STREAM PLUG
NOT TO SCALE
TIE VANE ARM INTO
BANKFULL ELEVATION
— HEADER
HOCKS
UNCOMPACTED
BACKFILL
5' Min. 10�
SECTION A-A
� COMPACTED
BACKFILL
IMPERVIOUS SELECT
MATERIAL (SEE PROJECT
SPECIAL PROVISIONS)
NOTES:
1) CHANNEL BLOCK SHALL BE INSTALLED IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS.
2) BLOCK SHOULD BE INSTALLED AT THE INTERFACE BETWEEN EXISTING
CHANNEL AND PROPOSED CHANNEL.
3) BOTTOM OF BLOCK SHOULD BE A MINIMUM OF 2.0' BELOW THE INVERT
OF THE EXISTING CHANNEL.
4) BLOCK SHOULD EXTEND A MINIMUM OF 2.0' BEYOND THE LIMITS OF THE
EXISTING STREAM CHANNEL.
5) INSTALL EROSION CONTROL MATTING AND SEED IN ACCORDANCE WITH
THE PROJECT SPECIFICATIONS IMMEDIATELY AFTER GRADING.
6) COMPACT BACKFILL TO EXTENT POSSIBLE OR AT THE DIRECTION OF
THE ENGINEER.
l�I�SS�l.IR4.1
FLO�
CULVEN'
2' MIN.
PROJECT REFERENCE NO. SHEET NO.
A-0011 C 2 D-2
RrW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
�1�I ���1C��� � ���A�I �
�� �T�°d° �1�� ��� � W A���Td�d°d°b��
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
== M A Engineering N�
License:
�� Consultants, Inc. F-0160
598 East Chatham Street Suite 137 Cary, NC 27511
Phone: 919.297.0220 Fax: 919.297.0221
ADDITIONAL NOTES:
BACKFILL CHANNEL WITH NATIVE MATERIAL OF
MIXTURE OF MATERIAL PER CHANNEL SUBSTRATE
STANDARD OR AS DIRECTED ENGINEER
CUWERT
OUTLET
SECTION B-B
� J�Pv
GR�JaO
�P
FILTER FABRIC
BASIN CULVERT flIP HAP BASIN
NUMBER STATION SIZE A B C D E F G H
15.4 10+00 48" RCP 2.0 2.0 6.0 2.0 2.0 0.2 12.0 3.0
ALL DIMENSIONS APPROXIMATE IN FEET
�
�1
�
O
C�l
Z
CI�
�
�
T
I
�
�
�
�
Q
/
�
�
r� Q
��
o ��
c� L r
�or
�i�
m�r
PLAN VIEW
G H
i "F" ABOVE INVERT
ACTICABLE
HEADER ROACK FOR CROSS VANE
�.. =
tOCK
FOR CHOSS VANE
NOTE: DISSIPATOR ROCKS SHOULD BE NATIVE
STONE OR SHOT ROCK, ANGULAR AND OBLONG
WITH AN APPROXIMATE d50 SIZE OF g„
NATURAL ROCK ENERGY DISSIPATOR
(NOT TO SCALE)
NEW STREAMBANK SHALL
BE TREATED AS
SPECIFIED IN PLANS
EXTEND CHANNEL BLOCK
IN. OF BEYOND INVERT
F EXISTING CHANNEL FLOW
�
CHANNEL
INVERT � .
MIN.
LENGTH
COMPACTED
BACKFILL
UNCOMPACTED
BACKFILL
-HEADER ROCK� TYP.
SEE PROFILE FOR ELEVATION
FLOW
��
�\ BACKFILL TYP.
`#57 STONE�'TYP.
` FOOTEH ROCK� TYP.
SECTION B-B
1.5'
FINISH GRADE
SEE ROCK CROSS VANE
DETAIL FOR SPECIFICS S T E P P 0 0 L D E TA I L
NOT TO SCALE
EXTEND CHANNEL BLOCK � ��
MIN. OF 5 FT BEYOND LIMITS
OF EXISTING CHANNEL
SECTION A-A