Loading...
HomeMy WebLinkAbout20190210 Ver 1_A0011C_Permit Drawings_pages 44-45 table_20190214WETLAND AND SURACE WATER IMPACTS SUMMARY proposed Hand Existing Existing culvert Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel new and Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts channel channel No./ (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. length losses NCSAM JD ID (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) (ft) rating 1/ SAA L 27+51 to L 28+45 60" Pipe < 0.01 < 0.01 106 35 106 HI BANK STABILIZATION < 0.01 18 2/SCC L 40+37 to L 41+g8 42" RCP 0.01 < 0.01 123 39 123 LOW BANK STABILIZATION < 0.01 15 3/Hyatt L 78+49 to L 78+79 48" RCP < 0.01 < 0.01 20 12 20 LOW 4/SEE L83+27 to L 83+41 36" RCP < 0.01 < 0.01 47 17 41 LOW BANK STABILIZATION < 0.01 15 5/Hyatt L 89+11 to L 94+81 Channel Change� 0.07 605 633 0 MED 5A(T)/WAA L 89+39 to L 90+80 FILL 0.06 SB/WBB L 90+57 to L 91+15 FILL 0.01 6/Cole./Hyatt L 94+77 to L 95+17 2@ 10' x 7' RCBC (BURIED 1') 0.02 0.02 76 116 76 MED BANK STABILIZATION 0.01 44 7(T)/WDD L 95+27 to L 95+g4 FILL 0.06 8/SF L 117+57 to L 118+49 48" RCP < 0.01 < 0.01 707 5 107 MED BANK STABILIZATION < 0.01 18 9/SD L 131+53 to L 132+17 30" CSP < 0.01 62 62 MED BANK STABILIZATION < 0.01 25 70/SB I-P L 138+24 to L 143+27 Channel Change2 0.04 555 547 8 LOW 10A/WC L 138+51 to L 139+38 FILL 0.04 10B(T)/WD L 142+39 to L 143+06 FILL 0.04 11/SB-P L 145+39 to L 148+03 Channel Changez and culvert 0.02 < 0.01 200 106 115 85 LOW 12/SB-P Y16 11+76 to L 160+67 Channel Change' 0.01 234 247 0 LOW 13/SB-P Y16 12+62 to Y16 12+gg 2@ 48" RCP < 0.01 < 0.01 11 33 11 LOW BANK STABILIZATION < 0.01 10 TOTALS': 0.21 0.21 0.04 2285 363 1542 *Rounded totals are sum of actual impacts NOTES: (T) Indicates Total Take Channel Change� = functional uplift due to natural design techniques and/or buffers = no compenstory mitigation reccomended Channel Change 2= no functional uplift, but channel already largely impacted by rip rap and/or no buffers = 0.25:1 reccommended except for channel length loss, as applicable, at the 1:1 ratio 639 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY proposed Hand Existing Existing culvert Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel new and Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts channel channel No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. length losses NCSAM JD ID (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) (ft) rating 14/Blair L 178+03 to L 181+63 3@ 10' x 8' RCBC (BURIED 1') 0.03 0.07 60 210 60 LOW BANK STABILIZATION 0.03 88 15/SA L 186+20 to L 187+99 8' x 5' RCBC < 0.01 < 0.01 57 35 57 LOW Channel ChangeZ 0.02 126 114 12 LOW BANK STABILIZATION < 0.01 39 16/SA L 197+g5 to L 200+50 60" RCP 0.01 < 0.01 180 55 180 LOW 17/SA L 201+34 to L 202+84 Channel Change2 0.01 0.05 127 85 83 44 LOW 17A/SA L 202+g1 to L 204+06 42" RCP < 0.01 < 0.01 80 51 80 LOW BANK STABILIZATION < 0.01 15 TOTALS": 0.21 0.32 0.17 3058 799 1682 433 "Rounded totals are sum of actual impacts NOTES: TOTALS ARE CONTINUED FROM SHEET Recommended Mitigation based on NCSAM and proposed conditions: 106 feet at 3:1 (High Quality) 245 feet at 2:1 (Medium Quality) 721 feet at 1:1 (Low Qality) 859 feet at 0.25:1 (Stream relocations not involving natural design techniques and/or buffering) 2018 Feb