Loading...
HomeMy WebLinkAboutNC0033227_NOD-2018-PC-0327 Response_20190215February 14, 2019 G. Landon Davidson, P.G., Regional Supervisor Care of: Linda Wiggs, Senior Specialist — Asheville Regional Office Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ Subject: NOTICE OF DEFICIENCY (NOD-2018-PC-0327) Permit No. NC0033227 TE Connectivity WWTP Buncombe County Dear Linda, This letter is in response to the Notice of Deficiency (NOD-2018-PC-0327 dated November 28, 2018) that was issued following the inspection on November 7, 2018. TE Connectivity acknowledges that this response is being submitted past the 30-day requirement. This delay is due to an administrative oversight and should not be construed as a lack of concern over the need to address the issues identified in the Notice. Actions that were taken immediately after the inspection ensured that the plant was fully compliant. We have reviewed all the findings from your inspection and either have already corrected them or have a plan to address as follows: Inspection Area Description of Deficiency Operations & Maintenance Influent overflowed/splashed over plant. Plant is high in solids Action: A temporary splash guard was added to prevent overflows. We use routine reminders and posted notices to prevent the introduction of paper towels and other non -soluble material that clog the bar grate causing the overflow condition. Daily cleaning of the bar grate area will also continue. Plant solids were pumped on November 13,- 2018 and again on January 10, 2019 by James and James. We will continue to monitor and pump solids as needed to keep the plant levels as low as possible. We will engage a wastewater engineer to review the facility design and operation. ECD: June 2019. Secondary Clarifier The blankets in the clarifier were too high at 7' and 8' of 10' water depth. Solids need to be removed. Plant needs to be able to waste solids. Action: Solids have been removed via pumping and we will continue to monitor and pump the solids by our plant operator, James and James. We will engage a wastewater engineer to review the facility design and operation to ensure adequate solid wasting. ECD: June 2019. Inspection Area Description of Deficiency Bar Screens The bar screen had excessive debris allowing influent to spill out of plant onto adjacent ground. Action: As a temporary measure to alleviate the overflow, the bar grate has been altered by removing one of the bars to allow more pass through. We will engage a wastewater engineer to review the facility design and operation to determine a permanent solution. ECD: June 2019. Effluent Pipe The streambank at the domestic wastewater effluent pipe (#1) has eroded from recent storms and compromised the effluent pipe and its structure. Action: Plan is to cut off the cement support structure at the end of the pipe since reinforcement of the streambank is not allowed. This repair work is out for quote. ECD: June 2019. In addition, the following issues was identified during the inspection: Compliance Issues: Unknown Plumbing: The WWTP appears to possibly have plumbing for wasting solids (WAS). There is also an unknown pipe in the chlorine contact chamber. This possible WAS plumbing and the unknown pipe in the chlorine contact chamber need to be assessed and verified. Action: The plumbing in question has been inspected by our WWTP operator and we were unable to identify the purpose of this piping. This piping is not currently being used to process any liquid or waste in the WWTP. We will engage a wastewater engineer to identify this piping. ECD: June 2019. If you have any questions about our current actions, or our future plans, or if I may be of assistance in any way, feel free to contact me directly. Jeff Gordon Plant Manager