Loading...
HomeMy WebLinkAbout20190197 Ver 1_PCN Form Submission_20190213D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190197 Is a payment required for this project?* f• No payment required f Fee received f Fee needed - send electronic notification Select Project Reviewer" Garcy Ward:eads\gpward Information for Initial Review 1a. Name of project: Arlington Boulevard Improvements 1a. Who is the PrimaryContact?* Todd Tripp, The East Group 1b. PrimaryContact Email:* todd.tripp@eastgroup.com Date Submitted 2/13/2019 Nearest Body of Water Greens Mill Run Basin Tar-Pamlico Water Classification C-NSW Site Coordinates Latitude: 35.592067 A. Processing Information County (or Counties) where the project is located: Pitt Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* C' Yes r No 1a. Type(s) of approval sought from the Corps: ,r! Section 404 Permit (w�etlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? Longitude: -77.383442 Ve rsion# * 1 Reviewing Office * Washington Regional Office - (252) 946-6481 1c. PrimaryContact Phone:* (252)341-0159 :: �J Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? G Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 03 1d. Type(s) of approval sought from the DWR: �J 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after-the-fact permit application?" f Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? l' Yes r No B. Applicant Information 1d. Who is applying for the permit? rJ Owner rJ Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: City of Greenville 2b. Deed book and page no.: None- COG Evans Park-No Deed Available- Apparent Land Donation 1972 2c. Responsible party: City of Greenville 2d. Address Street Address PO Box 7207 Greenville NC 27835, Public Works is 1500 Beatty Street, Greenville, NC 27834 Address Line 2 Site is at 625 West Arlington Boulevard �Y Greenville Fbstal / Zip Code 27534 2e. Telephone Number: (252)329-4620 2g. Email Address:* LKirby@GREENVILLENC.GOV r 401 Water Quality Certification - 6cpress r Riparian Buffer Authorization State / Rovince / f�gim NG Pitt County Country USA 2f. Fax Number: (252)329-4535 * r Yes r No C' Yes r No 3. Applicant Information (if different from owner) 3a. Name: Same as Owner 3b. Business Name: Same as Owner 3c.Address Street Address Same as Owner Address Line 2 Same as Owner �Y Same as Owner Fbstal / Zip Code Same as Owner 3d. Telephone Number: (252)329-4620 3f. Email Address:* LKirby@G REENVILLENC. GOV C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (rf appropriate) NA 1 c. Nearest municipality l town: Greenville, NC 2. Project Identification 2a. Propertyldentification Number: 29000 2c. Project Address Street Address 625 West Arlington Boulevard Address Line 2 �Y Greenville Postal / Zip Code 27835 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Greens Mill Run 3b. Water Resources Classification of nearest receiving water:* C-NSW 3c. What river basin(s) is your project located in?* Tar-Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201030403 4. Project Description and History S[ate / FYwince I Region Same as Owner Country Same as Owner 3e. Fax Number: 2b. Propertysize: 24.46 S[ate / Awince / Region NC- Pitt County Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* This site is adjacent to Arlington Boulevard. A Storm drain trunk line discharges to a unnamed tributary of GreensMill Run. The land adjacent is a City park called Evans Park. The cover is trees and lawn adjacent to the stream banks neut to a large parking lot for the park. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes �' No G Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS Online Mapping Excerpt.pdf 168.75KB �, � 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soil Map_ Arlington Boulevard Improvements- Culvert Maintenance.pdf 373.25KB 4f. List the total estimated acreage of all existing wetlands on the property: Unknown 4g. List the total estimated linear feet of all existing streams on the property: Unknown 4h. Explain the purpose of the proposed project:* Replace Rusted out 54-inch CMP Pipe with new60-inch RCP. 4i. Describe the overell project in detail, including indirect impacts and the type of equipment to be used:* The project includes replacement of pavement for approbmately 6,400 LF of 4 lane and 5 lane roadway in the City of Greenville. Approxmately 1,000 LF of storm drain trunk line, which lies partially under the roadway is to be replaced. The majority of this piping exits through an existing 54-inch storm drain into the stream wfiich is the subject of this permit application. The existing pipe is rusted through at most of its corrugations in sections of this pipe. The replacement pipe is to be a 60-inch reinforced concrete pipe to eliminate the corrosion problem and to alleviate an upstream flooding problem. 4j. Please upload project drawings for the proposed project. Typical Condition 54-inch CMP.pdf 163.14KB C4.1.pdf 2.93MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: NCDEQ has determined that the outfall is a stream Sb. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary r Approved C' Not Verified r Unknown C' WA Corps AID Number: NA Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Chris Pullinger Agency/Consultant Company: NCDEQ Other: Sd1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* � Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�R None D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands II� Streams-tributaries r Buffers � Open Waters I� Pond Construction 3. Stream Impacts 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 30 0 3i. Total stream and ditch impacts: 30 3j. Comments: Keep the Pipe termination at the existing location- No lengthening except the width of a new headwall. Will provide rip rap apron to control outlet velocity. That is the reason for the length of the impact. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Minimize the length of impacL The width is just that required by hydraulics. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: Equipment to excavate and demo and lift pipe will be set on uplands. E&S Plan to control Sedimentation approved through the COG. COG and consultant construction observation to review compliance. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? � Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Belowthe threshold impact and it is a maintenance action F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? G Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen fJ Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C' Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? C' Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state-approved local government stormwater program? � Yes r No 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters." � Stormwater Management � Antidegradation Plan Calculations 3b. Stormwater Management Plan 3c. Antidegradation Calculations: Comments: This project does not create impervious surfaces. It does not increase runoff quantity or quality. All pavement replacements lie within the limits of exsting pavements. I G. Supplementary Information � � � 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?" � Yes r No Comments:" As a maintenance action with project limits contained within the roadways (except this culvert construction) it does not require an environmental document. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* C' Yes r• No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * C' Yes r No 3b. If you answered "no," provide a short narrative description. Arlington Boulevard as it currently exists is not changed by this project. Broken pavements are replaced and drainage which currently floods withln the street rights-of-way is improved by the project. It does not open new lands to development not already served. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r No � WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat?* C' Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes r No 5d. Is another Federal agency involved?* C' Yes r No Se. Is this a DOT project located within Division's 1-8? f Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? C' Yes r No Sg. Does this project involve bridge maintenance or removal? f Yes r No Sh. Does this project involve the construction/installation of a wind turbine(s)?* C' Yes r No C' Unknown Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? We are working in street and park property limits and will not be moving beyond current culvert limits except as required to install a rip rap outlet apron. Center for Biological Diversity lists 4 potential species in the area which we do not believe could be impacted by this v�,nrk. The list of possible species includes: Red-Cockaded Woodpecker, Tar River Spinymussel, Atlantic Sturgeon, and Manatee. We will not impact any cavity trees, the spinymussel is rare and with highly scattered populations. USFWS says that the Spinymussel is found in high velocity v�,�ll oxygenated reaches of the River, and that does not match the site characteristics. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www. habitat. noaa.gov/p rotection/efh/efh ma pper/ Doesn't list Sturgeon, doesn't list inland areas. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federel or tribal governments have designated as having historic or cultural preservation status?" � Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* I've reached out to the NC SHPO to confirm 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?" � Yes r No 8c. What source(s) did you use to make the floodplain determination?" https://msc.fema. gov/portal/search#search resultsa nchor Miscellaneous Comments Miscellaneous attachments not previouslyrequested. Signature * CJ By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Artide 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP'); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Todd Tripp, PE Signature rn� r�pp . Date 2/13/2019