Loading...
HomeMy WebLinkAbout20190089 Ver 1_Approval Letter_20190213ROY COOPER Governor MICHAEL S. REGAN Seaemry LINDA CULPBPPER Direcfor NORTH CAROLINA Environmenml QuaUty February 13, 2019 Watauga County NCDWR Project No. 20190089 Bridge 83 on SR 1340 Project 17BP.11. R.118 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr. Heath Slaughter NCDOT DEO, Division 11 801 Statesville Road North Wilkesboro, NC 28659 Dear Mr. Slaughter: You have o�r approval, in accordance with the conditions listed below, for the following impacts for replacing Bridge 83 with a new bridge over the North Fork of the New River in Watauga County: Stream t Site Totals Permanent Fill in Perennial Stream (linear ft) in Temporary Fill in Perennial Stream (linear ft) Stream Impacts Requiring M itigation (linear ft) Relocation Bank Stabilization Dewatering - 95 28 ]07 - - 107 95 28 Total Stream Impact for Projech 230 linear feet. The project shall be constructed in accordance with your applica[ion dated January 16, 2019. After reviewing your application, we have decided that the proposed impacts are covered by General Water Quality Cenification (GC) Number 4135. This GC corresponds to US Army Corps of Engineers Nationwide Permit 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Wacer Supply Watershed regulations. This approval will expire with the corcesponding 404 permit. This approval is valid solety for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total D_E Q�� North Carolina Department of Environmental Quality I Divislon of Water Resources 512 North Salisbury Street I I617 Mail Service Center I Raleigh, North Carolina 2 76 9 9-1617 :.�„o_i�.a "04`�.',e,".,,,irm��,,..ww+m 919707.9000 impacts to streams (now or in the future) exceed 300 linear feet,. compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Condition(s) of Certification: ' Project Specific Conditions 1. The post-construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. [15A NCAC 02H .0506(b)(2) 2. All work in or adjacent to stream waters shall be conducted per approved BMP measures from the most current version ofNCDOT Construction and Maintenance Activities manual. [15A NCAC 02H.0506(b)(3) and (c)(3)] 3. NCDOT shall be in compliance with NPDES Permit No. NCS000250, including applicable requirements of General Permit for Construction Activities NCGO10000. Please note the extra protections for sensitive watersheds as the North Fork of the New River is classified as C, Trout and Outstanding Resource Waters (ORW) [(15ANCAC 4B.0124[a]-[e])] 4. Bridge demolition and construction must be accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 5. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be pre-treated through site- appropriate means (grassed swales, pre-formed scour holes, rip-rap deck drain pads, vegetated buffers, etc.) before entering the stream. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5). General Conditions 1. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] 2. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)] . 3. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 4. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 5. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this cert�cation. [15A NCAC 02H.0506(b)(3)] 6. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adj acent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 7. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 8. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certifcation. [15A NCAC 02H.0506(b)(2)] 9. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 10. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 11. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. ` 12. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 13. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer (or appointee) shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502( fl] 14. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [15A NCAC 02H.0506(b)(3) and (c)(3)] 15. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3)] 16. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 17. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidable, they shall be removed, and the natural grade restored upon completion of the project. [15A NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain [he petirion form from the office of Administrative hearings. You must file the petition with the office of Adminishative Hearings within sixry (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during nortnal office hours. The Office of Administrafive Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy ofthe petition must be filed with the Office of Administrative Hearings. The petition may be faxed-providing the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the fa�ced transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Bill F. Lane, General Counsel Department of Envirorunental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources mder Section 40 ] of the Clean Water Act. If you have auy quesrions, please contact Dave Wanucha at (336) 776-9703 or dave.wanucha@ncdenr.gov. Sincerely, Linda epper, D'uect � � Division of Water Resources Electronic copy only distribution: Steve Kichefsky, US Army Corps of Engineers, Asheville Field Office Marella Buncick, US Fish and Wildlife Service Mazla Chambers, NC Wildlife Resources Commission File Copy ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Direcfor NORTH CAROLINA Environmental Quality NCDWR Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Qualiry Certification or applicable Baffer Rules, and any subsequent modifications, the applicant is reqoired to retum this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the projec[ engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 40l Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certificafion I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction soch that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby s[ate that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and i�te�t of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date ��,..,�AAE�:�D_E Q�� u.o.�m�.nm mmwoWu� /`� �J Registration No. North Carolina Department of Environmental Quality I Division of Water Resources SI2 North Salisbury Street I I61� Mail Service Center I Raleigh, North Carolina 2 76 9 9-1617 919707.9000