Loading...
HomeMy WebLinkAbout20000846 Ver 5_PTAA to DEQ_Basin B4-A RFAI_20190208T fp T1 PIEDMONT TRIAD AIRPORT AUTHORITY February 6, 2019 Ms. Karen Higgins N.C. Department of Environmental Quality Division of Water Resources 1617 Mail Service Center Raleigh, N.C. 27699-1617 Ms. Sue Homewood N.C. Department of Environmental Quality Division of Water Resources 450 W. Hanes Mill Rd, Suite 300 Winston Salem, N.C. 27105 RE: PTI — Stormwater Management Plan Modification — Removal of Existing Stormwater Basin 134-A and Replacement with Alternative Authorized Stormwater BMPs Dear Ms. Higgins and Ms. Homewood: I am writing in response to your January 11, 2019 letter request for additional information (RFAI) regarding the plan of the Piedmont Triad Airport Authority (PTAA) to remove Basin 134-A (attached as Exhibit 1) to construct our new Crossfield Taxiway. Specific responses to the RFAI's six requests are set forth below and in the attached Jacobs/CH2M report dated February 1, 2019, which is attached as Exhibit 2 (the "Jacobs Report"). This report was developed in response to the RFAI and supplements Jacobs previous report dated December 6, 2018. However, before addressing the specifics of the RFAI, I would like to convey PTAA's view of the regulatory and permitting context to better explain PTAA's position and with the understanding that DEQ may disagree with some of our views. Regulatory and Permitting Context As an initial matter, it appears to PTAA that the removal of Basin 134-A has already been approved by DEQ per the issuance of WQC004053 dated March 11, 2016 for PTAA's taxiway construction project (Exhibit 3), which expressly incorporated the taxiway construction plans and made the plans an enforceable part of the certification, and the Corps of Engineer's issuance of 404 Permit SAW -2012- 01547 dated March 15, 2016 (Exhibit 4). 1 understand that DEQ disagrees with this view and maintains that additional written authorization is needed for the removal of Basin 134-A because the Basin is part of the Stormwater Management Plan required in Condition 8 of WQC 3428 dated November 10, 2003 (Exhibit 5). PTAA respects DEQ's view on this issue and is certainly willing, without waiving its own position, to provide information necessary to satisfy DEQ that removal of the Basin complies with all stormwater and water quality regulations. 4836-4878-8102.v1 1000A Ted Johnson Parkway • Greensboro, North Carolina 27409 • Phone: 336.665.5600 • Fax: 336.665.1425 • www.flyfrompti.com SPT/ PIEDMONT TRIAD AIRPORT AUTHORITY Second, PTAA respectfully submits that no formal modification of WQC 3428 is necessary since Condition 8 of WQC 3428 allows changes to be made in the required stormwater management plans with the "written authorization of the Division." Since provision is made in WQC 3428 to make changes in the stormwater plan, there should be no need to modify the certificate to make the changes but only the "written authorization" that is contemplated by the certificate. Finally, in PTAA's view, the applicable stormwater control requirements for runways and taxiways are controlled by N.C. Gen. Stat. §§ 143-214.7(c3) and (c4), under which alternatives to Basin 134-A should be "deemed permitted" and approved by DEQ if the alternative measures comply with DEQ's Stormwater Design Manual Parts E-4 and C-10. Nevertheless, in addition to the design measures, the information provided by PTAA's consultants, including in the Jacobs Report and the additional information provided below, demonstrates that the planned removal of Basin B4 -A and replacement with alternative stormwater control measures will not result in any violation of water quality standards. Response to RFAI Requests Below (in bold text) are the information requests in the RFAI, along with corresponding responses (in normal text), which largely rely on and refer to the Jacobs Report for a more detailed analysis. 1. Please provide a detailed overall drawing that clearly shows the location of Basin 1134-A within the airport facility. See Appendix A "Basin 64-A Location Map" in the Jacobs Report. 2. Provide a detailed analysis of all existing stormwater currently directed to Basin B4 -A and include clear description of stormwater sources and how they are conveyed to the basin. This should include a description/discussion of all potential pollutants to be present within the existing stormwater. Please see Appendix A and Appendix B of the Jacobs Report. Appendix B graphically depicts the watershed from which stormwater is currently conveyed into Basin 134-A. Also see Section 2 of the Jacobs Report, which provides a detailed written description of the stormwater sources and conveyance to Basin 134-A. As to a description of all potential pollutants, please note that Chapter E-4 of the NCDEQ Stormwater Design Manual, which is also summarized in Section 3.1 of the Jacobs Report, identifies the following typical pollutants of concern at airports: Pollutants of concern at airports include typical urban pollutants (nitrogen, phosphorus, sediment, hydrocarbons, and heavy metals) and airport -specific pollutants (de-icing fluid, urea, and aviation fuels such as avgas and jet fuel). It is not expected that there will be any potential pollutants in stormwater in the Basin 64-A drainage area other than those identified above. Please also note that no aircraft de-icing activities occur within the drainage area of Basin 134-A as shown in Figure 3-1 in the Jacobs Report, and so no 4836-4878-8102.v1 irrPT/ PIEDMONT TRIAD AIRPORT AUTHORITY glycol or other pollutants related to aircraft de-icing are expected to be present in the stormwater within the drainage area. 3. Please provide a drawing that shows any NPDES outfall sampling points that are currently tributary to this basin or below the outfall of this basin. For any such locations please provide all sampling results for each location for the last year. No NPDES stormwater discharge outfall (SDO) sampling points are currently tributary to Basin 134-A or below the outfall of this basin. In -Stream (IS, not outfall) sampling locations (#05 and #06) are set in Brush Creek, downstream of Basin 134-A. Attached as Exhibit 6 are the monitoring results at these In -Stream locations in the past year. These results do not indicate any exceedance of the water quality standards (DO, turbidity, PH and acute toxicity) that are monitored at those locations. All of the results are from winter months since NPDES permit only calls for in -stream monitoring following de-icing events. 4. Please clarify if this basin is addressed within your Individual NPDES stormwater permit. If so, please provide documentation from the Division of Energy, Mineral and Land Resources (DEMLR) that removal of this basin would be allowed under the NPDES program. Basin 134-A is not currently sampled, or otherwise addressed, in the Airport's Individual NPDES Stormwater Permit (NCS000508) (Exhibit 7) or in the Stormwater Pollution Prevention Plan that was adopted by PTAA as required by the NPDES permit. Part I, Section A of the NPDES permit states that "Discharges covered in this permit are the stormwater discharges from the current airport operations (001 through 066) as well as additional stormwater discharge points that may be created by further modification or expansion of airport operations." It is PTAA's understanding that modification of the NPDES Discharge Monitoring program to add potential sampling locations at the basins adjacent to Runway 5L/23R will not be required until there is additional industrial development in that area. S. Please provide a detailed analysis of all proposed stormwater drainage areas and conveyance methods for the proposed grading once Basin 134-A is removed, including delineation of the receiving vegetated areas, storm water discharge volume and velocity. For any new impervious surfaces please provide an analysis of the potential for pollutants to be present within the stormwater (de-icing activities is of particular concern). Please refer to Section 4 of the Jacobs Report for a detailed analysis of the proposed grading and stormwater conveyance after the removal of Basin B4 -A, including conveyance through the vegetated area bordering Runway 5L/23R, the new vegetated area that will border the new taxiway, and a new grass swale that will be created within the former Basin 134-A site. Graphic representations are shown Appendices C, D, and E of the report. The same typical airport pollutants would be expected as detailed in Section 3.1 of the Report. As pointed out above, aircraft de-icing activities will not occur in this vicinity, so there should be no glycol or other aircraft de-icing agents in the stormwater runoff within the Basin 64-A watershed. 4836-4878-8102.v1 SPT/ PIEDMONT TRIAD AIRPORT AUTHORITY 6. Provide a detailed analysis to show that after removal of Basin 134-A all stormwater will meet the criteria outlined Part E-4 (Airports) and Part C-10 (Disconnected Impervious Surface) of the Stormwater Design Manual. Please refer to Jacobs Report, Sections 4.4 "Additional BMP's," demonstrating compliance with the applicable provisions of the Stormwater Design Manual. Thank you both and DEQ for your attention and consideration. We would like to schedule a meeting and site visit with you at your earliest convenience so that we may cooperatively and efficiently discuss any issues, questions, or concerns that you may have, and provide any further information necessary for DEQ to concur that PTAA may proceed with its planned removal of Basin B4 -A. Sincerely, PIEDMONT TRIAD AIRPORT AUTHORITY J. x Rosser, PE Deputy Executive Director 4836-4878-8102.v 1 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Piedmont Triad Airport Authority Attn: Mr. Alex Rosser 1000A Ted Johnson Parkway Greensboro NC 27409 EXHIBIT 1 NORTH CAROLINA Environmental Quality January 11, 2019 D W R # 20000846 v5 Guilford County Subject: REQUEST FOR ADDITIONAL INFORMATION PTI — Stormwater Management Plan Modification — Removal of Basin B4 -A Dear Mr. Rosser: On December 11, 2018, the Division of Water Resources —Water Quality Programs (Division) received your request to modify the Stormwater Management Plan (SMP) approved under 401 Individual. Certification # WQC003428. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Please provide a detailed overall drawing that clearly shows the location of Basin B4 -A within the airport facility. 2. Provide a detailed analysis of all existing stormwater currently directed to Basin 64-A and include clear description of stormwater sources and how they are conveyed to the basin. This should include a description/discussion of all potential pollutants to be present within the existing stormwater. 3. Please provide a drawing that shows any NPDES outfall sampling points that are currently tributary to this basin or below the outfall of this basin. For any such locations please provide all sampling results for each location for the last year. 4. Please clarify if this basin is addressed within your Individual NPDES stormwater permit. If so, please provide documentation from the Division of Energy, Mineral and Land Resources (DEM LR) that removal of this basin would be allowed under the NPDES program. 5. Please provide a detailed analysis of all proposed Stormwater drainage areas and conveyance methods for the proposed grading once Basin B4 -A is removed, including delineation of the receiving vegetated areas, stormwater discharge volume and velocity. L_[nq?iA North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 Piedmont Triad Airport Authority DWR# 20000846 v5 Request for Additional Information Page 2 of 2 For any new impervious surfaces please provide an analysis of the potential for pollutants to be present within the stormwater (de-icing activities is of particular concern). 6. Provide a detailed analysis to show that after removal of Basin B4 -A all stormwater will meet the criteria outlined Part E-4 (Airports) and Part C-10 (Disconnected Impervious Surface) of the Stormwater Design Manual. Once the Division has received this information we will contact you to schedule an on-site meeting and site visit. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https://edocs.deg.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Contact Sue Homewood at 336-776-9693 or Sue. Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins, Superviso 401 & Buffer Permitting Branch cc: Richard Darling, Michael Baker International (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit Filename: 20000846vSPTl(Guilford)_SMP MOD—HOLD EXHIBIT 2 JACOBS' C142M* Crossfield Taxiway Basin B4 -A Water Quality Report February 1, 2019 Prepared for: ,AOPTI PIEDMONT TRIAD INTERNATIONAL AIRPORT JACOBS Ct241V Crossfield Taxiway — Phase I Project No: 703494CH Document Title: Basin 64-A Water Quality Report Date: 2/1/2019 Client Name: Piedmont Triad International Airport Project Manager. Matt Wright Author: Brock Burns CH2M Hill, Inc./Jacobs Engineering Group Inc 111 Corning Rd., Suite 116 Cary, North Carolina 27518 United States T +1.919.859.5001 www.jacobs.com Basin B4 -A Water Quality Report © Copyright 2018 Jacobs Engineering Group Inc. The concepts and information contained in this document are the property of Jacobs Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs' client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Document History and Status 0 1/17/19 Basin 64-A Water Quality Report 1 1/24/19 Internal QC 2 1/25/2019 Review with PTAA BCB MRW MRW BCB MRW MRW BCB MRW MRW Basin B4 -A Water Quality Report JACOBS ChZM- Contents Acronyms and Abbreviations................................................................................................................... iii 1. Introduction....................................................................................................................................1 2. Existing Stormwater Management Basin 134-A...........................................................................1 2.1 Existing Stormwater Runoff to Basin 134-A......................................................................... 1 3. Justification to Remove Stormwater Management Basin 134-A ................................................2 3.1 Potential Airfield Pollutants................................................................................................. 2 4. Proposed Crossfield Taxiway Project..........................................................................................3 4.1 Phase 1............................................................................................................................... 3 4.2 Phase 2............................................................................................................................... 4 4.3 Swale 1............................................................................................................................... 4 4.4 Additional BMP's................................................................................................................. 5 5. Conclusion......................................................................................................................................6 Appendix A Basin 64-A Location Map B Existing Basin B4 -A Drainage Area C Proposed Basin 134-A Drainage Area (Phase 1) D Proposed Basin B4 -A Drainage Area (Phase 2) E Basin 64-A Removed (Enlarged) F Greensboro Rainfall Intensity (IDF) Tables G Swale 1 - Hydrology Calculations H Maximum Allowable Design Velocities for Vegetated Channels Basin B4 -A Water Quality Report Acronyms and Abbreviations BMP CFS DEQ NC PTAA PTI RSA TSA TSS JACOBS CCS+ Z M - Best Management Practices Cubic Feet Per Second North Carolina Department of Environmental Quality North Carolina Piedmont Triad Airport Authority Piedmont Triad International Airport Runway Safety Area Taxiway Safety Area Total Suspended Solids Basin B4 -A Water Quality Report JACOBS Ch2 U- 1. Introduction This report was created to serve as an addendum to the original report "Basin B4 -A Report" dated December 6, 2018 and is intended to focus on the water quality aspect associated with Basin B4 -A and its existing watershed. This report was drafted in response to questions received in a letter dated January 11, 2019 from the North Carolina Department of Environmental Quality (DEQ) and subsequent discussion with DEQ staff on January 15, 2019. 2. Existing Stormwater Management Basin 134-A Basin B4 -A is one (1) of thirteen (13) basins that were installed to satisfy the then existing stormwater quality requirements as part of the project to construct Runway 5L/23R in the early 2000's. Basing B4 -A is shown in Appendix A "Basin B4 -A Location Map" of this report. 2.1 Existing Stormwater Runoff to Basin B4 -A Appendix B "Existing Basin B4 -A Drainage Area" graphically shows the drainage area and existing infrastructure associated with Basin B4 -A. Currently stormwater runoff runs from the crown of Runway 5L - 23R across 75' of runway pavement and an additional 35' of shoulder pavement before reaching a vegetated receiving area for disconnected pavement known as the Runway Safety Area (RSA). The RSA is turfed, 140' wide, and runs the entire length of the runway. Based on FAA specifications the safety area cannot exceed 3% in grade. Once the water exits the safety area it is collected into a series of drop inlets and pipes, before being directed to Basin B4 -A. Additionally, there is a portion of the airport service road runoff that is controlled by Basin B4 -A. As a private airport road, the traffic and resulting pollutants created by use of this road are extremely minor. The service road is only used sparingly for airport personnel. (Section 3.1 of this report lists the typical pollutants from airport operations) This report also analyzes the peak runoff to the basin. The 10 -year peak discharge rate for the existing Basin B4 -A drainage area was calculated to be 78 cfs. This calculation used the Rational Method as shown below: Q = CiA where: Q = peak runoff (cfs) C = weighted runoff coefficient i = rainfall intensity (in/hr) A = drainage area (acres) The weighted runoff coefficient (C) was found to be 0.49. This was based on 83% of the drainage area being grassed (0.4) and 17% being impervious (0.95). C values were based on City of Greensboro, Storm Drainage Design Manual, February 2008. The rainfall intensity (i) was found to be 2.76 in/hr, by using a time of concentration calculated at 45 minutes and the rainfall intensity (IDF) tables for the City of Greensboro shown in Appendix F of this report. The total drainage area (A) being served by Basin B4 -A is 57 acres. The above provided parameters are illustrated on Appendix B "Existing Basin B4 -A Drainage Area". JACOBS ChZM• Basin B4 -A Water Quality Report 3. Justification to Remove Stormwater Management Basin B4 -A Crossfield Taxiway Phase — 1 will impact the existing stormwater management Basin 134-A that was constructed at the time Runway 5L/23R was built. Preliminary grading and impacts associated with the Crossfield Taxiway site were previously shown on the approved 401 certification for the taxiway. There is a safety concern with this basin in place. Even extended dry detention basins attract wildlife which can present a serious threat to the safety of aircraft operations at airports. Basin B4 -A has been witnessed by airport staff to routinely attract Canada Geese, among other wildlife. It is PTAA's desire to remove all of Basin 134-A as part of the taxiway project. Section E-4 of the North Carolina Stormwater Design Manual prescribes specialized water quality controls for airports to reduce the wildlife hazard, recognizing that runways and taxiways are surrounded by a large amount of open space and that airfield runoff typically has very low concentrations of pollutants. This report will identify the Best Management Practices (BMP's) currently in place and the new BMP's for the taxiway that will continue to protect water quality after the removal of Basin 134-A. 3.1 Potential Airfield Pollutants Currently Basin 134-A controls runoff from a portion of Runway 5L -23R, on its northwest side, as shown in Appendix B "Existing Basin 134-A Drainage Area". Section E-4 of the NC Stormwater Design Manual states the following in respect to typical pollutants at airports, "the pollutants of concern include typical urban pollutants like nitrogen, phosphorus, sediment, hydrocarbons, and heavy metals as well as airport - specific pollutants such as de-icing fluid, urea, and aviation fuels. Based on samples collected at the Wilmington Airport, runoff from runways and taxiways can be significantly cleaner than runoff from typical urban areas, indicating that airports may not have quite as many urban pollutants as roads and highways". No pollutants other than the typical airport pollutants identified above are expected to be present in the existing Basin B4 -A drainage area or in any runoff that reaches Basin 134-A. Additionally, although aircraft are de-iced at PTI, no aircraft de-icing agents are present in the existing Basin B4 -A drainage area or in any runoff that reaches Basin 134-A because these activities are handled on the other side of the airport as indicated below in Figure 3-1. Basin B4 -A Water Quality Report ,JACOBS ChZM- Figure 3-1. Overall Airport Layout Aerial view of PTI highlighting aircraft deicing operations and Basin B4 -A. 4. Proposed Crossfield Taxiway Project 4.1 Phase 1 Phase 1 of the Proposed Crossfield Taxiway Project will provide grading for most of the taxiway corridor, including the portion within the Basin B4 -A drainage area, as shown in Appendix C "Proposed Basin B4 -A Drainage Area (Phase 1)". Considering there will be no taxiway paving in phase 1, there will be virtually no increase in peak stormwater discharge or pollutants. When Basin B4 -A is removed, stormwater that previously entered the basin from the two existing culverts will be redirected to a vegetated swale (Swale 1) via a proposed culvert shown in Appendix E "Basin B4 -A Removed (Enlarged)". Swale 1, will be installed in phase 1, however it is sized to carry a peak stormwater runoff of 79 cfs, which is based on the 10 -year storm event after Phase 2 is completed. See section 4.3 below for more detailed information concerning Swale 1. The only changes in the peak runoff between the existing conditions and after Phase 1 are with respect to the runoff coefficient and drainage area. These parameters are illustrated in Table 4-1 below: JACOBS' Ch2M- Table 4-1. Peak Discharge Values for a 10 Year Storm Basin B4 -A Water Quality Report Parameters Existing Area 0.49 Area After Phase 1 0.50 Runoff Coefficient (C) Rainfall Intensity (i) Drainage Area (A) 2.76 2.76 57 55.3 Peak Runoff (Q) 78 76 4.2 Phase 2 Phase 2 will consist of completing the grading and paving of Crossfield Taxiway as shown in Appendix D "Proposed Basin 134-A Drainage Area (Phase 2)". Stormwater conveyance for phase 2 will stay the same as it was for phase 1, however stormwater will run from the crown of the newly paved taxiway across 37.5 feet of taxiway pavement and an additional 30 feet of shoulder pavement. Once stormwater runs off the paved surfaces it will reach a vegetated receiving area for disconnected pavement known as the Taxiway Safety Area (TSA). The TSA in this case will be 39.5 feet wide, turfed and per FAA standards the slope will not exceed 3%. This TSA will run the entire length of the Taxiway, including the portion of the taxiway that is within the Basin 134-A drainage area. There will be a de minimis increase in peak runoff in the 10 -year storm event due to the additional airfield pavements. The new 10 -year peak runoff will be 79 cfs. The drainage area (A) and rainfall intensity (i) will be unchanged. All the peak discharge values can be seen below in Table 4-2. Table 4-2. Peak Discharge Values for a 10 Year Storm Runoff Coefficient (C) 0.49 0.50 0.52 Rainfall Intensity (i) 2.76 2.76 2.76 Drainage Area (A) 57 55.3 55.3 Peak Runoff (0) 78 76 79 4.3 Swale 1 As stated in section 4.1, Swale 1 was designed to accommodate the increased runoff from the Crossfield Taxiway project. The normal depth of water within the swale during the 10 -year storm will be 18 inches. The swale will be constructed with a minimum depth of 36 inches, providing for 18 inches of freeboard. The longitudinal slope of the swale will be 0.78% and the sides will be constructed at a 6:1 slope. The 10 -year velocity will be 5.86 feet per second. The swale will be planted with a Bermuda grass mix so that the velocity will fall below the allowable velocities for soils made up of clay mixes which is typical for this location. Appendix H includes the complete table for allowable velocities in grassed lined channels. During construction, erosion will be controlled through the use of erosion control matting and check dams. Erosion control matting will help stabilize and hold seed in place until grass can be grown. Using check dams will "reduce erosion in the drainage channel by reducing the velocity of flow" according to Chapter 6.83 of the North Carolina Erosion and Sediment Control Planning and Design Manual. Swale calculations are found in Appendix G of this report. After stormwater exits Swale 1, it is directed into a 40' x 40' rip rap bed to further dissipate the velocity. Stormwater then will follow the same overland path as it does now before entering the 10' x 12' box culvert shown in Appendix E "Basin 64-A Removed (Enlarged)". Currently the velocity is controlled in this box culvert by a low flow channel with equally spaced weirs and a series of dissipater curbs prior to the outfall of the box culvert. There have been no noted erosion issues at the outfall of the box culvert since Basin B4 -A Water Quality Report JACOBS Ch2M- its installation in the early 2000's. As shown in the Basin 64-A Report, dated December 6, 2018, the box culvert could easily handle the increased peak runoff from the construction of the Crossfield Taxiway and removal of Basin 134-A. The 10 -year peak runoff after removing Basin 134-A will only utilize 7.8% of the capacity of the box culvert. We expect the box culvert to provide the same level of control with respect to velocity after the removal of Basin B4 -A, therefore no additional downstream erosion is expected. 4.4 Additional BMP's At airports, runways, taxiways, and other areas that provide for overland stormwater flow that promote infiltration and treatment of stormwater into grassed buffers, shoulders, and grass swales shall be deemed permitted pursuant to the State post -construction stormwater requirements. It is our understanding that based on studies referenced in the Division of Water Quality's BMP manual runways and taxiways create very little TSS, nutrients or pollutants. The manual also recognizes that runways and taxiways are surrounded by large disconnected spaces and vegetated areas. For these reasons, the manual concludes that water quality will be adequately protected as long as airfield areas comply with the regulatory requirements for Disconnected Impervious Surfaces as outlined in Part E-4 and Part C-10 of the manual. Table 4-4.1 below compares the required parameters for disconnected pavement and the "safety" areas we are providing that will also perform as vegetated receiving areas. Table 4-4.1. Parameters for Vegetated Receiving Areas for Disconnected Pavement Parameters ITaxiway Proposed Crossfield Existing Runway Pavement (Draining to Receiving Area) Length Max of 100' 67.5' 1101' in Direction of Flow Vegetated Receiving Area Length in Min of 10' 39.5' 140' Direction of Flow Vegetated Receiving Max of 8% 3% 3% Area Transverse Slope `While the paved area for the runway slightly exceeds the 100' parameter, it is important to note that the adjacent vegetated receiving area is 14 times larger than the minimum requirement and the slope of the vegetated area (3%) is less than half of the 8% maximum. It is our belief that, by providing much larger and flatter vegetated receiving areas than required by the applicable design criteria, the vegetated receiving areas for the runway and taxiway will allow for longer contact time with stormwater runoff and will provide adequate water quality measures, in accordance with Chapter E-4 of the North Carolina Stormwater Design Manual, after the removal of Basin B4 -A. . JACOBS Ch2AI ,. Basin B4 -A Water Quality Report 5. Conclusion The stormwater management Basin B4 -A can be safely removed and sufficient stormwater control and water quality protection will still be achieved through the methods discussed in section 4.3 of this report. In addition, the report "Basin 134-A Report" dated December 06, 2018 and submitted previously shows that the existing drainage system will safely convey storm events up to the 100 -year storm even if Basin 134-A is removed. If you have any further questions or concerns, please do not hesitate to contact our office. s �- BASIN B4 -A _ DRAINAGE AREA r 57 ACRES r 17 TERMINAL f'S, 11 mal ,r +s>� L I I - LC i j _ RUN -- — — — — — - = — — — ®, x WAY 5R 23L r ------- "IQf r }1 \ i y IIL It _ - x '-\ tri\it �L�('� .............� -1 '\. J�r, _... i. NNr..._.I __ C '_�—`• I S� i �` t j — .., ''• -_:: �iJ � '.-�'= . `,�� I' I 11 ( J _ t if VI a h/ `� f"✓ � j a ` v "C �..�.. � t 1 S �i X3.5} • JANUARY -°° 400 APPENDIX A - BASIN 134-A LOCATION MAP 2019 —,cc T1 �' NORTH PIEDMONT TRIAD INTERNATIONAL AIRPORT k/1 O L H � . itI Ii II? • JANUARY -°° 400 APPENDIX A - BASIN 134-A LOCATION MAP 2019 —,cc T1 �' NORTH PIEDMONT TRIAD INTERNATIONAL AIRPORT O L H � . • JANUARY -°° 400 APPENDIX A - BASIN 134-A LOCATION MAP 2019 —,cc T1 �' NORTH PIEDMONT TRIAD INTERNATIONAL AIRPORT �W'Cc - Wl� VN/ 1N? il, 'rV qw� L yi �—M > zo Mad INN wy 1--N, f3 goo 1- gzo BASIN B4 -A DRAINAGE AREA 001 AREA = 57 ACRES EXISTING BASIN B4 -A Q- -0 TIME OF CONCENTRATION 45 MINS SHEET FLOW 42 MIN EXISTING RISER AND > SHALLOW CONCENTRATED OUTFALL STRUCTURE FLOW= 1 MIN CHANNEL FLOW = 2 MIN " RUNOFF COEFFICIENT = 0.49 J7- MEADOW -47.2 ACRES r IMPERVIOUS = 9.8 ACRES EXISTING 42 CULVERT �f 7, z:' EXISTING 10'x 12'-_ - EXISTING - - SERVICE ROAD EXISTING 54" BOX CULVERT 1/ 4. < CULVERT 77: Z-� — ----- -7: ....... .... RUNWAY 5L -23R ............... A r r VEGETATED RECEIVING AREA EXISTING RUNWAY PAVEMENT PAVEMENT AREA SHEET FLOW SHALLOW CONCENTRATED FLOW CHANNEL FLOWTc FOR DISCONNECTED FLOW BREAK JANUARY 200 0 200 400 APPENDIX B - EXISTING BASIN •2NORTH 2019 13 4-A DRAINAGE AREA PIEDMONT TRIAD INTERNATIONAL AIRPORT I 'N W1, I IK L - 5;;,a �.tf 1 / � 'l �.iN'11 `� � � rrt�<ri11�1�\� C� L� lei LIMITS OF PHASE I GRADING. ALL AREAS WILL BE TURFED. A\1 BASIN B4 -A DRAINAGE AREA AREA = 55.3 ACRES TIME OF CONCENTRATION = 45 MINS SHEET FLOW = 42 MIN SHALLOW CONCENTRATED JCI: _.J % � � -`' � ,�- Y- -------- FLOW = 1 MIN CHANNEL FLOW = 2 MIN FASIN B4 -A RUNOFF COEFFICIENT = 0.50 \E - MEADOW = 45.6 ACRES MOVED - IMPERVIOUS = 9.7 ACRES EXISTING 10'x 12' < BOX CULVERT b,/ RUNWAY 5L -23R EXISTING TAXIWAY BRIDGE 7 ,�,l - 100 "u- -s 0 RPM. --30. SHEET FLOW MmVEGETATED RECEIVING AREA EXISTING RUNWAY SHALLOW CONCENTRATED FLOW FOR DISCONNECTED PAVEMENT PAVEMENT AREA CHANNEL FLOW Tc FLOW BREAK JANUARY 200 0 200 400 APPENDIX C - PROPOSED BASIN 134-A Tsiiiiiia lfpTl • 2019 1-200' DRAINAGE AREA (PHASE 1) A& NORTH PIEDMONT TRIAD INTERNATIONAL AIRPORT 10010 RIEZ, NOR rol --30. SHEET FLOW MmVEGETATED RECEIVING AREA EXISTING RUNWAY SHALLOW CONCENTRATED FLOW FOR DISCONNECTED PAVEMENT PAVEMENT AREA CHANNEL FLOW Tc FLOW BREAK JANUARY 200 0 200 400 APPENDIX C - PROPOSED BASIN 134-A Tsiiiiiia lfpTl • 2019 1-200' DRAINAGE AREA (PHASE 1) A& NORTH PIEDMONT TRIAD INTERNATIONAL AIRPORT IA BASIN 134-A DRAINAGE AREA AREA = 55.3 ACRES TIME OF CONCENTRATION = 45 MINS SHEET FLOW = 42 MIN SHALLOW nlAl f'nKlr'C:KlTDA-rMM K/1 If CROSSFIELD TAXIWAY GRADING LIMIT, )AN' EXISTING TAXIWAY BRIDGE 4 f X\'AN6, < < < x� RELOCATED SERVI E ROAD FLOW= I MIN CHANNEL FLOW = 2 MIN BASIN B4 -A RUNOFF COEFFICIENT = 0.52 - MEADOW = 43.5 ACRES REMOVED - IMPERVIOUS= 11.8 ACRES EXISTING IN lu x lz BOX CULVERT < co ............ RUNWAY 5L -23R . . . . . . . . . . . . . . Yr 47� PROPOSED CROSSFIELD TAXIWAY SHEET FLOW VEGETATED RECEIVING AREA EXISTING RUNWAY SHALLOW CONCENTRATED FLOW FOR DISCONNECTED PAVEMENT PAVEMENT AREA CHANNEL FLOW Tc FLOW BREAK JANUARY 200 0 200 400 APPENDIX D - PROPOSED BASIN 134-A • 2019 V=200' DRAINAGE AREA (PHASE 11) T1 NORTH I I I PIEDMONT TRIAD INTERNATIONAL AIRPORT 1 �i �'"" /! co 03 �X oA 8an ` ' oononeGn An� VANPROPOSED --- -�7 )I V f�C7 jIE X11 EXK HEAD 836. EXISTING 10'X 12' CULVERT v� RELOCATED SERVICE ROAD j 1 JANUARY 50 0 50 100 APPENDIX E - BASIN B4 -A REMOVED ch zmlo. 2019 NORTH 70, (ENLARGED) PIEDM-Ad PpTl ONT TRIAD INTERNATIONAL AIRPORT 1 I I JANUARY 50 0 50 100 APPENDIX E - BASIN B4 -A REMOVED ch zmlo. 2019 NORTH 70, (ENLARGED) PIEDM-Ad PpTl ONT TRIAD INTERNATIONAL AIRPORT APPENDIX F GREENSBORO RAINFALL INTENSITY (IDF) TABLES CITY OF GREENSBORO STORM DRAINAGE DESIGN MANUAL 3) Drainage Area = A The acreage of the watershed in question can be computed from topographic maps by marking the ridgelines and planimetering the designated areas. The City of Greensboro uses a 1" = 200' scale map with a 2 -foot interval contour for designing and checking storm sewer. Copies of these maps are available both digitally and in hard copy and may be purchased from the Engineering Records Section of the City of Greensboro Engineering & Inspections Department or the GIS Division of the MIS Department. Once the values for C, I, and A are determined it is a simple procedure to calculate the peak discharge rate for the site using the equation, Q = CIA AVERAGE VALUES OF THE RUNOFF COEFFICIENT FOR GREENSBORO AND VICINITY Below are the runoff coefficients to be used in calculating storm water runoff. All drainage must be designed based on the built out conditions for the current land use zoning. Type of Development: Runoff Coefficient Residential, Single Family............................................................................... 0.65 Apartments, Condominiums, and Industrial Parks .......................................... 0.80 Paved Areas (Downtown Areas, Shopping Centers, etc.) ................................... 0.95 Playgrounds, Parks, Cemeteries, etc............................................................... 0.40 INTENSITY -DURATION -FREQUENCY TABLE FOR GREENSBORO, NC Precipitation Intensity Estimates (inches/hour) Rainfall Duration Annual Exceedance Probabili 1 in ears) 1 -yr 2 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 5 min 4.57 5.44 6.34 6.87 7.55 7.96 8.31 10 min 3.65 4.35 5.08 5.49 6.02 6.33 6.6 15 min 3.05 3.65 4.28 4.63 5.09 5.35 5.56 30 min 2.09 2.52 3.04 3.35 3.77 4.03 4.26 60 min 1.3 1.58 1.95 2.18 2.51 2.73 2.93 2 hr 0.77 0.93 1.16 1.31 1.53 1.68 1.83 3 hr 0.55 0.66 0.83 0.94 1.09 1.21 1.31 6 hr 0.33 0.4 0.5 0.57 0.67 0.75 0.83 12 hr 0.2 0.24 0.30 0.34 0.41 0.46 0.51 24 hr 0.12 0.14 0.18 0.20 0.24 0.27 0.3 Source: NOAA Atlas 12, Vol. 2, Version 3 (2004) for East Greensboro - 36.089 N 79.769 W Note: For the 1, 2, and 5 year recurrence intervals, precipitation values were obtained from a partial duration series. The 10, 25, 50, and 100 -year recurrence interval precipitation values were obtained from an annual maximum series August'07 Page 10 APPENDIX G SWALE 1 - HYDROLOGY CALCULATIONS 10 YEAR STORM EVENTS JACOBS' CI12AN4• Open Channel Flow Calculator - Trapezoidal (equal sides) Project: Crossfield Taxiway Phase 2 (10 Year Storm) Airport: Piedmont Triad International Airport Location: Greensboro, NC Date: 1/25/2019 Designer: Brock Burns Trapezoidal T d b e x -section area (A) = bd + Zd2 top width (T) = b + 2dz Z — d Note: Enter information into white cells and blanks. Blue cells are locked. Channel ID: Swale 1 Bottom Width, b ft Side Slopes �:1 Longitudinal Slope, S 0.0078 ft/ft Normal Depth, d 1.51 ft Manning's Roughness Coefficient, n Wetted Perimeter, pW 22.12 ft Area, A 19.7206 ft2 Hydraulic Radius, R 0.891528 ft Flow Rate, Q 80.13 ft3/s Velocity, V 5.86 ft/s APPENDIX H TABLE FOR ALLOWABLE VELOCITIES IN GRASS LINED CHANNELS 0 Table 8.05a Maximum Allowable Design Velocities' for Vegetated Channels Typical Soil Grass Lining Permissible Velocity' Channel Slope Characteristics2 for Established Grass Application Lining (ft/sec) 0-5% Easily Erodible Bermudagrass 5.0 Non -plastic Tall fescue 4.5 (Sands & Silts) Bahiagrass 4.5 Kentucky bluegrass 4.5 Grass -legume mixture 3.5 Erosion Resistant Bermudagrass 6.0 Plastic Tall fescue 5.5 (Clay mixes) Bahiagrass 5.5 Kentucky bluegrass 5.5 Grass -legume mixture 4.5 5-10% Easily Erodible Bermudagrass 4.5 Non -plastic Tall fescue 4.0 (Sands & Silts) Bahiagrass 4.0 Kentucky bluegrass 4.0 Grass -legume mixture 3.0 Erosion Resistant Bermudagrass 5.5 Plastic Tall fescue 5.0 (Clay mixes) Bahiagrass 5.0 Kentucky bluegrass 5.0 Grass -legume mixture 3.5 >10% Easily Erodible Bermudagrass 3.5 Non -plastic Tall fescue 2.5 (Sands & Silts) Bahiagrass 2.5 Kentucky bluegrass 2.5 Erosion Resistant Bermudagrass 4.5 Plastic Tall fescue 3.5 (Clay mixes) Bahiagrass 3.5 Kentucky bluegrass 3.5 ❑❑❑❑❑❑❑❑❑❑❑❑❑ NOTE: 'Permissible Velocity based on 10 -year storm peak runoff 2Soil erodibility based on resistance to soil movement from[] ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 'Before grass is established, permissible velocity is determined by the type of temporary liner used. Selecting Channel To calculate the required size of an open channel, assume the design flow is uniform and does not vary with time. Since actual flow conditions change Cross -Section throughout the length of a channel, subdivide the channel into design reaches, Geometry and design each reach to carry the appropriate capacity. The three most commonly used channel cross-sections are "V" -shaped, parabolic, and trapezoidal. Figure 8.05b gives mathematical formulas for the area, hydraulic radius and top width of each of these shapes. 8.05.4 EXHIBIT 3 lVater Resources ENVWOMMUNtA6 OUAL11 r March 11, 2016 Piedmont Triad Airport Authority Attn: Alex Rosser 1000-A Ted Johnson Parkway Greensboro NC 27409 PAT" MCCRORY DONALD R. VAN DER VAART "i " ,i,. "" S. JAY ZIMMERMAN r11� DWR # 15-1065 Guilford County Subject: Approval of individual 401 Water Quality Certification with Additional Conditions Approval of Jordan lake Riparian Buffer Impacts with Additional Conditions Cross -Field Taxiway USACE Action ID. No. SAW -2012-01547 Dear Mr. Rosser: Attached hereto is a copy of Certification No. WQC004053 issued to Mr. Alex Rosser and Piedmont Triad Airport Authority, dated March 8, 2016. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This Certification can be contested as provided in Articles 3 and 4 of General Statute 1508 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at httu://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. 450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone! 338.776.98001 FAX: 336.776.97971 Customer Service 1.877.623.6748 Internet: www.ncdenr.gov - www.ncwoter.org Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Sam Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act, 15A NCAC 02H .0500 and 15A NCAC 02B.0267. Contact Sue Homewood at 336-776-9693 or sue.homewod@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor ' 401 & Buffer Permitting Branch cc: Richard Darling, Michael Baker Engineering Inc (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 DWR WSRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 151065PTICrossFieldTaxiway(Guilford)_401_IC.docx NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION #WQC004053 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H.0500 and 15A NCAC 02B.0200, to Mr. Alex Rosser and Piedmont Triad Airport Authority, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on October 13, 2015 and subsequent information on December 15, 2015, December 21, 2015, February 4, 2016 and February 22, 2016, and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on November 19, 2015. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 If conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Riparian Buffer Rules are met. No other impacts are approved, including incidental impacts. [35A NCAC 02H .0506(b) and/or (c)] and 15A NCAC 02B.0267(8)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream S1 395 (linear feet) 4S (linear feet) Open Waters E-1 3.43 (acres) E-2 0.54 (acres) E-3 0.91 (acres) E-4 1.08 (acres) Buffers —Zone 1 Allowable impacts S1 20,458 (square feet) 6,118 (square feet) E1 50,354 (square feet) E2 25,307 (square feet) E3 30,492 (square feet) E4 33,016 (square feet) Buffers — Zone 2 Allowable Impacts Amount Approved Amount Approved (units) (units) Permanent Temporary S1 11,276 (square feet) 6,228 (square feet) E1 36,792 (square feet) E2 20,085 (square feet) E3 23,654 (square feet) E4 25,143 (square feet) 2. Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the Restoration Systems, Causey Farm Mitigation Bank to meet this mitigation requirement. For accounting purposes, this Authorization Certificate authorizes reassignment of unused credit from PTAA Fedex Project (SAW -2000-21655) at the Causey Farm Mitigation Bank to meet the following compensatory mitigation requirement [15A NCAC 02H.0506 (b)(6)]: 3. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. if the property is sold, the new owner must be given a copy of this approval letter and General Certifications)/Permit/ Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 4. Pursuant to Session Law 2012-200, stormwater from the Crossfield Taxiway shall be permitted provided that the stormwater flows overland and promotes treatment through Infiltration. Should erosive channels develop from stormwater off the Crossfield Taxiway the PTAA shall immediately notify the Division and take all necessary measures to re- establish overland flow and infiltration or provide for alternative treatment of stormwater from the Crossfield Taxiway. A final, written stormwater management plan for each future development phase shall be submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh, NC 27699-1617). The stormwater management plan shall be designed to treat the runoff from the entire built upon area (with the exception of the Crossfield Taxiway) in the phase In accordance with the version of the 401 Stormwater Requirements and BMP Manual or Minimum Design Criteria on the place of the date of the submittal. The stormwater management plan shall be approved by the Division before any land disturbance associated with that phase may occur. Before any future permanent building, the corresponding stormwater management plan as approved by the Division shall constructed and operational. [15A NCAC 02H .0506(b)(5)] Compensatory Mitigation Required River and Sub -basin Number Stream 395 linear feet Cape Fear 03030002 3. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. if the property is sold, the new owner must be given a copy of this approval letter and General Certifications)/Permit/ Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 4. Pursuant to Session Law 2012-200, stormwater from the Crossfield Taxiway shall be permitted provided that the stormwater flows overland and promotes treatment through Infiltration. Should erosive channels develop from stormwater off the Crossfield Taxiway the PTAA shall immediately notify the Division and take all necessary measures to re- establish overland flow and infiltration or provide for alternative treatment of stormwater from the Crossfield Taxiway. A final, written stormwater management plan for each future development phase shall be submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh, NC 27699-1617). The stormwater management plan shall be designed to treat the runoff from the entire built upon area (with the exception of the Crossfield Taxiway) in the phase In accordance with the version of the 401 Stormwater Requirements and BMP Manual or Minimum Design Criteria on the place of the date of the submittal. The stormwater management plan shall be approved by the Division before any land disturbance associated with that phase may occur. Before any future permanent building, the corresponding stormwater management plan as approved by the Division shall constructed and operational. [15A NCAC 02H .0506(b)(5)] S. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this permit. [15A NCAC 02H .0501 and .05021 6. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. If applicable, the project must comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site and the following requirements [15A NCAC 02H .0506(b)(3) and (c)(3)]: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, Installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 6. Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions to this condition require application submittal to and written approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Energy, Mineral and Land Resources (DEMLR) or locally delegated program has released the specific area within the project. [15A NCAC 02H .0501 and .05021 7. An NPDES Construction Stormwater Permit is required for construction projects that disturb one (1) or more acres of land. This Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. if your project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. A copy of the general permit (NCG010000), inspection log sheets, and other information may be found at: http:/Iportal.ncdenr.orit/web/wg/ws/su/npdessw#tab-w. 15A NCAC Q2H .0506(b)(5) and (c)(5)] 8. All work in or adjacent to stream waters shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [15A NCAC 02H .0506(b)(3) and (c)(3)] 9. If concrete is used during the construction, then all necessary measures shall betaken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/fish kills. 115A NCAC 02B.0200] 10. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered and to allow for aquatic life movement during low flows. Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) must be maintained above and below locations of each culvert. [15A NCAC 02H .0506(b)(2) and (c)(2)] Placement of culverts and other structures in waters, streams must be below the elevation of the streambed by one (1) foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Additionally, when roadways, causeways, or other fill projects are constructed across FEMA -designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. 11. All temporary fill and culverts shall be removed and the impacted area returned to natural conditions, within 60 days of the determination that the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile, and the various sites shall be stabilized with natural woody vegetation (except approved maintenance areas) and restored to prevent erosion. [15A NCAC 02H .0506(b)(2) and (c)(2)) 12. All temporary pipes/culverts/riprap pads etc, shall be installed in all streams as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual so as not to restrict stream flow or cause dis-equilibrium. 115A NCAC 02H .0506(b)(2) and (c)(2)] 13. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result In de -stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)] 14. Any riprap used for stream stabilization shall be of a size and density to prevent movement by wave action, current action, or stream flows and consist of clean rock or masonry material free of debris or toxic pollutants. Riprap shall not be Installed in the streambed except in specific areas required for velocity control and to ensure integrity of bank stabilization measures. [15A NCAC 02H .0506(b)(2)] 15. A one-time application of fertilizer to re-establish vegetation is allowed in disturbed areas Including riparian buffers, but is restricted to no closer than 10 feet from top of bank of streams. Any fertilizer application must comply with all other Federal, State and Local regulations. [15A NCAC 02B.0267(6) and 15A NCAC 02B.0231] 16. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals. 17. Mr. Alex Rosser and Piedmont Triad Airport Authority shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. [15A NCAC 02B.0200] If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Mr. Alex Rosser and Piedmont Triad Airport Authority and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new or revised conditions shall be provided to Mr. Alex Rosser and Piedmont Triad Airport Authority in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 18. This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name. [15A NCAC 02H .0501 and .0502] 19. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Branch within ten days of project completion (available at: http://portal.ncdenr.org/web/wq/swp/ws/401/certsandpermits/apply/forms). [15A NCAC 02H .0502(f)] 20. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H.05061 Non-compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal and/or civil penalties. This the 11«' day of March 2016 Karen Higgins, Supervisor 401 & Buffer Permitting Branch KAH/sh D EXHIBIT 4 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS fig DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 284403-1343 April 11, 2016 Regulatory Division/1200A Action ID: SAW -2012-01547 Mr. J. Alex Rosser Piedmont Triad Airport Authority 1000-A Ted Johnson Parkway Greensboro, North Carolina 27409 Dear Mr. Rosser: In accordance with your written request of October 13, 2015, and additional information received November 16, 2015, December 11, 2015, December 21, 2015, February 2, 2016, and February 25, 2016, and the ensuing administrative record, enclosed is a Department of the Army permit authorization to construct access and infrastructure for Phase I of the Piedmont Triad International Airport (PTIA) Northwest Site development, including a cross -field taxiway, involving the permanent discharge of fill material into 394 linear feet of stream channel and 5.96 acre of open water impoundments, and the temporary discharge of fill material into 45 linear feet of stream channel. Any deviation in the authorized work will likely require modification of this permit. If a change in the authorized work is necessary, you should promptly submit revised plans to the Corps showing the proposed changes. You may not undertake the proposed changes until the Corps notified you that your permit has been modified. Carefully read your permit. The general and special conditions are important. Your failure to comply with these conditions could result in a violation of Federal law. Certain significant general conditions require that: a. You must complete construction before December 31, 2026. b. You must notify this office in advance as to when you intend to commence and complete work. c. You must allow representatives from this office to make periodic visits to your worksite as deemed necessary to assure compliance with permit plans and conditions. -2 - You should address all questions regarding this authorization to Mr. David E. Bailey, in the Raleigh Regulatory Field Office, telephone number (919) 554-4884, extension 30. Thank you in advance for completing our Customer Survey Form. This can be accomplished by visiting our web -site at http://cogpgp=u.usace.armv.mil/cm apeu/ft—z136:4:0 and completing the survey on-line. We value your comments and appreciate your taking the time to complete a survey each time you interact with our office. Sincerely, Kevin P. Landers Sr. Colonel, U.S. Army District Commander Enclosures Copy Furnished (with enclosures): Chief, Source Data Unit NOAA/National Ocean Service Attn: Sharon Tear N/CS261 1315 East-West Hwy., Rm 7316 Silver Spring, Maryland 20910-3282 Copies Furnished with special conditions and plans: Mr. Pete Benjamin U.S. Fish and Wildlife Service Raleigh Ecological Service Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Fritz Rohde Habitat Conservation Division — Atlantic Branch 101 Pivers Island Road Beaufort, North Carolina 28516 Pnrod onO R-YCW Papw -3 - Mr. Todd Bowers Oceans, Wetlands and Streams Protection Branch Wetlands and Streams Regulatory Section U.S. Environmental Protection Agency — Region 4 Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Atlanta, Georgia 30303-8931 Mr. Doug Huggett Division Coastal Management N.C. Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557 Dr. Pace Wilber Habitat Conservation Division — Atlantic Branch NOAA Fisheries Service 219 Fort Johnston Road Charleston, South Carolina 29412 Printed oneftqcw Papa Regulatory Division/1200A Action ID: SAW -2012-01547 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403.1343 Mr. J. Alex Rosser Piedmont Triad Airport Authority 1000-A Ted Johnson Parkway Greensboro, North Carolina 27409 Dear Mr. Rosser: March 15, 2016 In accordance with your written request of October 13, 2015, and additional information received November 16, 2015, December 11, 2015, December 21, 2015, February 2, 2016, and February 25, 2016, and the ensuing administrative record, enclosed are two copies of a permit to construct access and infrastructure for Phase i of the Piedmont Triad International. Airport (PTIA) Northwest Site development, including a cross -field taxiway, involving the permanent discharge of fill material into 394 linear feet of stream channel and 5.96 acre of open water impoundments, and the temporary discharge of fill material into 45 linear feet of stream channel. You should acknowledge that you accept the terms and conditions ofthe enclosed permit by signing and dating each copy in the spaces provided ("Permittee" on page 3). Your signature, as permittee, indicates that, as consideration for the issuance of this permit, you voluntarily accept and agree to comply with all of the terms and conditions of this permit. All pages of both copies of the signed permit with drawings should then be returned to this office for final authorization. A self-addressed envelope is enclosed for your convenience. Title 33, Part 325.1(f), of the Code of Federal Regulations reads, in part, that, "A $10 fee will be charged for permit applications when the work is noncommercial in nature and provides personal benefits that have no connection with a commercial enterprise...", and "A fee of $100 will be charged for permit applications when the planned or ultimate purpose of the project is commercial or industrial in nature and is in support of operations that charge for the production, distribution, or sale of goods or services." As your application fits the latter category, you are requested to remit your check for $100, made payable to the Finance and Accounting Officer, USAED, Wilmington. The check should accompany the signed and dated copies of your permit. This correspondence contains a proffered permit for the above described site. If you object to this decision, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for Prk"d. J9ReaydedPaper 4 appeal (RFA) form. If you request to appeal this decision you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn: David E. Bailey 69 Darlington Avenue Wilmington, North Carolina 28403 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by May 16, 2016. Il is not necessary to submit an RFA form to the Division Office if you do not object to the decision in contained in this correspondence. After the permit is authorized in this office, the original copy will be returned to you; the duplicate copy will be permanently retained in this office. If you have questions, please contact David E. Bailey at the Raleigh Regulatory Field Office, telephone 919-554-4884, extension 30. Thank you in advance for completing our Customer Survey Form. This can be accomplished by visiting our web site at http; tcnrpsmaPu.umce.rrrrrrtimiUrxrr aaeextf p—l36A-0 and completing the survey on-line. We value your comments and appreciate your taking the time to complete a survey each time you interact with our office. Sincerely, r r 1 Jean B. Gibby Chief, Raleigh Regulatory Field Office Enclosures Copy Furnished: Mr. Richard B. Darling Michael Baker Engineering, Inc. 8000 Regency Parkway, Suite 600 Cary, North Carolina 27518 DEPARTMENT OF THE ARMY PERMIT Permittee PIEDMONT TRIAD AIRPORT AUTHORITY ATTN: MR. J. ALEX ROSSER Permit No. SAW -2012-01547 issuing Office CESAW-RG-R NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over Ute permitted activity or the appropriate official of that office acting under the authority of the commanding officer. You are authorized to perform work in accordance with the terms and conditions specified below. Project Description: The project involves constructing access and infrastructure for Phase I of the Piedmont Triad International Airport (PTIA) Northwest Site development, including culvert and fill for a cross -field taxiway and fill pads for aviation industrial/commercial campus development. The project involves the -permanent discharge of fill material into 394 linear feet of stream channel and 5.96 acre of open water impoundments, and the temporarily discharge of fill material into 45 linear feet of stream channel. Project Location: The Phase I Northwest Site development is a portion of the total 553 -acre Northwest sector of PTIA located between the nordi side of PT1A/Bryan Boulevard and Pleasant Ridge Road, approximately 0.25 mile east of NC Highway 68, in Greensboro, in Guilford County, North Carolina (36.118619° N, -79.945644° W). Permit Conditions: General Conditions. 1. The time limit for completing the work authorized ends on December 31. 2026. if you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. ENG FORM 1721, Nov 86 EDITION OF SEP 82 IS OBSOLETE. (33 CFR 325 (Appendix A)) 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow representatives from this office to inspect the authorized activity at Any time deemed necessary to ensure that It is being or has been accomplished in accordance with the terms and conditions of your permit, Special Conditions: SEE ATTACHED SPECIAL CONDITIONS Further Information: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to: ( ) Section 1.0 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403). (X) Sectiam 404 of the Clean Water Act (33 U.S.C. 1344). ( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C.. 1413). 2. Limits of this authorization.. a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This pen -nit does not authoritu any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal project. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or lues thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted projector uses thereof as a result of current or fitture activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpennitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at anytime the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. ENG FORM 1721, Nov 86 EDITION OF SEP 82 IS OBSOLETE. (33 CFR 315 (Appendix A)) 2 b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (See 4 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. Extensions. General condition l establishes a time limit for the completion of the activity authorized by this permit, Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit. Your signature below, as permittee, indicates that you accept and agree to comply with the terms and conditions of this permit. C� A� QzL, 312.1 1Zo16 (PERMITTEE I DMONT TRIAD AIRPORT AUTHORITY (DATE) ATTN: MR. J. ALEX ROSSER This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below. tt QQG\1b r(�o, (DIS CT COMMANDER) KENIN P. LANDERS, SR., COLONEL (DATE) When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below. (TRANSFEREE) (D.4TE) 'U.S. GOVERNMENT PR4VTING OFFICE: 1986 - 717425 SPECIAL CONDITIONS ACTION 1D: SAW -2012-01547 PIEDMONT TRIAD AIRPORT AUTHORITY PHASE 1 OF THE PIEDMONT TRIAD INTERNATIONAL AIRPORT (PTIA) NORTHWEST SITE DEVELOPMENT Work Limits 1. All work authorized by this permit must be performed in strict compliance with the workplan, as depicted in the "Piedmont Triad. International Airport, Northwest Taxiway Connector and Preliminary Northwest Site Development" Plan Sheet Nos. G-1, PD -1, PD -2, PD -3, SW -1, GD -1, GD -2, DS -1, DS -2, ECI, EC2, EC3, EC4, BRI, and BR2, included with your e-mail dated December 22, 2016, subject line "PTIA NW Taxiway Connector", which are a part of this permit. 2. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 4. The permittee shall ensure that the construction design plans for this project do not deviate from the permit plans attached to this authorimion. Written verification shall be provided that the final construction drawings comply with the attached permit drawings prior to any active construction in waters of the United States, including wetlands. Any deviation in the construction design plans will be brought to the attention of the Corps of Engineers, Mr. David E. Bailey of the Raleigh Regulatory Field Office prior to any active construction in waters or wetlands. 5. The Permittee shall schedule an onsite preconstruction meeting between its representatives, the contractor's representatives and the appropriate Corps of Engineers Project Manager prior to undertaking any work within jurisdictional waters and wetlands to ensure that there is a mutual understanding of all terms and conditions contained within the Department of the Army permit. The Permittee shall notify the Corps of Engineers Project Manager a minimum of thirty (30) days in advance of the scheduled meeting in order to provide that individual with ample opportunity to schedule and participate in the required meeting. SPECIAL CONDITIONS ACTION ID: SAW -2012-01547 PIEDMONT TRIAD AIRPORT AUTHORITY PHASE 1 OF THE PIEDMONT TRIAD INTERNATIONAL AIRPORT (PTIA) NORTHWEST SITE DEVELOPMENT Related Laws 6. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Quality at (919) 733-3300 or (800) 858-0368 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 7. While accomplishing the authorized work, if the permittee discovers any previously unknown Federally endangered or threatened species, the District Engineer will be immediately notified so that required coordination can be initiated with the National Marine Fisheries Service (NMFS) and U.S. Fish and Wildlife Service (USFWS). If, at any time, a Federally protected species is incidentally injured or killed during work, all work operations must be immediately halted and the permittee must immediately contact the District Engineer to initiate the required Federal coordination. 8. While accomplishing the authorized work, if the permittee discovers any previously unknown cultural resources, the District Engineer will be immediately notified so that required coordination can be initiated with the North Carolina Division of Cultural Resources. Project Maintenance 9. The permittee shall advise the Corps in writing prior to beginning the work authorized by this permit and again upon completion of the work authorized by this permit. 10. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. Soils used for fill shall not be contaminated with any toxic substance in concentrations governed by Section 307 of the Clean Water Act. 2 SPECIAL CONDITIONS ACTION 1D: SAW -2012-01547 PIEDMONT TRIAD AIRPORT AUTHORITY PHASE I OF THE PIEDMONT TRIAD INTERNATIONAL AIRPORT (PTIA) NORTHWEST SITE DEVELOPMENT 11. The permittee shall take measures to prevent live or fresh concrete, including bags of uncured concrete, from coming into contact with any water in or entering into waters of the United States. Water inside coffer dams or casings that has been in contact with concrete shall only be returned to waters of the United States when it no longer poses a threat to aquatic organisms (i.e, concrete is set and cured). 12. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 13. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). Fescue will not be planted within wetland areas. 14. The permittee shall remove all sediment and erosion control measures placed in wetlands or waters, and shall restore; natural grades in those areas, prior to project completion. Enforcement 15. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. SPECIAL CONDITIONS ACTION 1D: SAW -2012-01547 PIEDMONT TRIAD AIRPORT AUTHORITY PHASE 1 OF THF. PTF.DMONT TRIAD iNTF,RNATIONAL AIRPORT (PTIA) NORTHWEST SITE DEVELOPMENT 16. All reports, documentation and correspondence required by the conditions of this permit shall be submitted to the following address: U.S. Army Corps of Engineers, Regulatory Division, Raleigh Regulatory Field Office, c/o Mr. David E. Bailey, 3331 Heritage Trade Drive, Suite 105, Wake Forest, North Carolina 27587, and by telephone at: 919-554-4884, extension 30. The Permittee shall reference the following permit number, SAW -2012- 01547, on all submittals. 17. Violations of these conditions or violations of Section 404 of the Clean Water Act must be reported in writing to the U.S. Army Corps of Engineers, Wilmington District within 24 hours of the permittee's discovery of the violation. 18. A representative of the Corps of Engineers will periodically and randomly inspect the work for compliance with these conditions. Deviations from these procedures may result in an administrative financial penalty and/or directive to cease work until the problem is resolved to the satisfaction of the Corps. Mitigation 19. The permittee shall provide compensatory mitigation for unavoidable impacts to 244 linear feet of perennial stream channel at a 2:1 ratio (488 Stream Mitigation Units[SMUs]) by the restoration of 780 linear feet of stream channel as described in the mitigation plan entitled "Wetland and Stream Mitigation Plan" and dated October 6, 2006. The mitigation plan was previously approved on February 14, 2008 under Corps Action ID: SAW -2006-41354 and provides for the restoration of 1,123 linear feet of off-site stream channel "CFa" (1.6:1 "restoration" ratio) at the Causey Farm mitigation site in southeastern Guilford County, North Carolina. The construction and planting phases of this plan, as well as annual reporting requirements outlined in the referenced mitigation plan are complete and were determined successful by Raleigh Regulatory Field Office Staff per letter dated January 13, 2010 (Corps Action ID: SAW -2000-21655). Within 14 days of receipt of this permit, the permittee must supply a signed letter stating that they understand and concur that 488 SMUs of the previously available 702 SMUs from Causey Farm have been applied to the project authorized under Action ID: SAW -2012-01547, and that these 488 SMUs arc no longer available to apply to any future project. 4 "fit) l tl'lf",.tl'tti"ti ()l' 011 IONS ANI) PRO( 1:SS ANI) R11_,QVl'ST FOR A11111`AL. Applicant: Piedmont Triad Airport Authority File Number: SAW -2012-015 17 Date: March 15, 2016 Attn: Mr. J. Alex Rosser Attached is: See Section below ® INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A. PROFFERED PERMIT (Standard Permit or Letter ofpermission) B PERMIT DENIAL _ C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION F I -The fit-JIVS and nptiow, regardingan adwinistintive appeal of the above tk-cisinn" Additional infortnution may be fooled atiiel!li!r�ct3±rrt;�ct�tcrcw frggor _ ii��ttlhti+ 4 X33 shit l'.irt 13L A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Pennission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section 11 of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below_ B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authoriwition. If you received a letter of Pennission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the Permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the forn to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURiSDICTIONAI. DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: f you disagree with the approved JD, you may appeal the approved JD tinder the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the district engineer. This form trust be received by the division engineer within 60 days of the date of this notice. E: PRF,LIMiNARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. if you wish, you may request an approved JD (which may be appealed). by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. -12 W -1,Z441 �1':Ftl�,:rirr�7'A�i'",i�/N�Ci,A." REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps merr:orandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. I't7IN � AG' .fi{UR U TlMt 1NCt RMA 10N.- KlN:If Ifyou have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr_ Jason Steele, Administrative Appeal Review Officer Attn: David E. Bailey CESAD-PDO Raleigh Regulatory Field Office U.S. Army Corps of Engineers, South Atlantic Division 3331 Heritage Trade Drive, Suite 105 60 Forsyth Street, Room l OM 15 Wake Forest, North Carolina 27587 Atlanta, Georgia 30303-8801 Phone: 404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportuni!y opportunityto participate in all site investigations. Date: 'telephone number: Signature of appellant 6r agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: David Bailey, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303- 8801 Phone: (404) 562-5137 February 17, 2016 Mr. David Bailey Regulatory Project Manager US Army Corps of Engineers 3331 Heritage Trade Drive Suite 105 Wake Forest, NC 27587 RE: PTIA Northwest Taxiway Connector Project (Action ID SAW -2012-01547) & I IAECO Facility Improvements Project (Action ID SAW -2015-00920) Dear Mr. Bailey - Restoration Systems (RS) is designating the 1,123 linear feet (1f) of North Prong Stinking Quarter Creek of the Causey Farm Mitigation Site currently available as 702 Stream Mitigation Units (SMUs) based on the 1:1.6 "off-site" penalty ratio established for the PTAA FedEx Project (SAW -2000-21655) as follows: PTIA Northwest Taxiway Connector Project (SAW -2012-01547) 488 SMUs IIAECO Facility Improvements Project (SAW -2015-00920) 214 SMUs This letter documents the use of all available SMUs at the Causey Farm Site and we will update our records accordingly. Sincerely, �d John Preyer President Restoration Systems cc: Sue Homewood / Division of Water Resources Richard Darling / Michael Baker International Alex Rosser / Piedmont Triad Airport Authority 1101 Haynes St., Suite 211 - Raleigh. NC 27604 - wwAxesturalinnsystems.com - Ph 919.755.9490 - Fx 919.755.9492 Water Resources L~Uhs-11.144 UUAt4V March 11, 2016 Piedmont Triad Airport Authority Attn: Alex Rosser 1000-A Ted Johnson Parkway Greensboro NC 27409 PAT MCCRORY DONAUD R. VAN DFR VAAK*r r."Ylr S. )AY ZIMMERMAN hd'. b. DWR II 15-1065 Guilford County Subject: Approval of Individual 401 Water quality Certlficatlon with Additional Conditions Approval of Jordan take Riparian Buffer Imipacts with Additional Conditions Cross -Field Taxiway USACE Action ID. No. SAW -2012-01547 Dear Mr. Rosser: Attached hereto Is a copy of Certification No. WgC004053 issued to Mr. Alex Rosser and Piedmont Triad Airport Authority, dated March 8, 2016. Please note that you should get any other federal, state or local permits before proceeding with the subject project, Including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This Certification can be contested as provided in Articles 3 and 4 of General Statute 1508 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sbty (60) calendar days. A petition form maybe obtained from the OAH at htta:/Iwww.ncoah.com/ or by callingthe OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8,00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. 450 K Panes M9 ted, Sint 3W. WrOmi-suss, ROO Caoin 27106 Phm- 336-n&MO � FAX- 3+6-776-9r91 k Ca$WM suvW 14774MAI tntetnet. www.ncdcar.gov - www.rtcwater.ou Mailing address for the OAH: If sending via US Postol Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Sam Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act, 15A NCAC 021-1.0500 and 15A NCAC 02B.0267. Contact Sue Homewood at 336-776-9693 or sue.homewod@ncdenr.gov if you have any questions or concerns. Sincerely, �' 0 Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: Richard Darling, Michael Baker Engineering Inc (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 DWR WSRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 151065PTICrossFieldTaxiway(Guiiford)_401_IC.docx NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION #WQC004053 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500 and 15A NCAC 02B.0200, to Mr. Alex Rosser and Piedmont Triad Airport Authority, who have authorization for the Impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on October 13, 2015 and subsequent information on December 15, 2015, December 21, 2015, February 4, 2016 and February 22, 2016, and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on November 19, 2015. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Riparian Buffer Rules are met. No other impacts are approved, including incidental Impacts. 115A NCAC 02H .0506(b) and/or (c)j and 15A NCAC 026.0267(8)) Type of impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream S1 395 linear feet) 45 linear feet Open Waters E-1 3.43 (acres) E-2 0.54 (acres) E-3 0.91 (acres) E-4 1.08 (acres) Buffers — Zone 1 Allowable Impacts S1 20,458 (sqare feet) 6,118 (square feet) E1 50,354 (square feet) E2 25,307 (square feet E3 30,492 (square feet E4 33,016 (square feet) Buffers — Zone 2 Allowable Impacts Amount Approved (units) Permanent Amount Approved (units) Temporary S1 11,276 (square feet) 6,228 (square feet) E1 36,792 (square feet) E2 20,085 square feet) E3 23,654 (square feet E4 25,143 (square feet) 2. Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the Restoration Systems, Causey Farm Mitigation Bank to meet this mitigation requirement, For accounting purposes, this Authorization Certificate authorizes reassignment of unused credit from PTAA Fedex Project (SAW -2000-21655) at the Causey Farm Mitigation Bank to meet the following compensatory mitigation requirement 115A NCAC 02H .0506 (b)(6)]: 3. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. if you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee, If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/ Authorization and is responsible for complying with all conditions. 115A NCAC 02H .0507(4)(2)] 4. Pursuant to Session Law 2012-200, stormwater from the Crossfield Taxiway shall be permitted provided that the stormwater flows overland and promotes treatment through infiltration. Should erosive channels develop from stormwater off the Crossfield Taxiway the PTAA shall immediately notify the Division and take all necessary measures to re- establish overland flow and infiltration or provide for alternative treatment of stormwater from the Crossfield Taxiway. A final, written stormwater management plan for each future development phase shall be submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh, NC 27699-1617). The stormwater management plan shall be designed to treat the runoff from the entire built upon area (with the exception of the Crossfield Tax") M the phase in accordance with the version of the 401 Stormwater Requirements and UMP Manual or Minimum Design Criteria on the place of the date of the submittal. The stormwater management plan shall be approved by the Division before any land disturbance associated with that phase may occur. Before any future permanent bulldln& the corresponding stormwater management plan as approved by the Division shall constructed and operational. [15A NCAC 02H .OS06(b)(5)] Compensatory Mitigation Required River and Sub -basin Number Stream 395 linear feet Cape Fear 03030002 3. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. if you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee, If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/ Authorization and is responsible for complying with all conditions. 115A NCAC 02H .0507(4)(2)] 4. Pursuant to Session Law 2012-200, stormwater from the Crossfield Taxiway shall be permitted provided that the stormwater flows overland and promotes treatment through infiltration. Should erosive channels develop from stormwater off the Crossfield Taxiway the PTAA shall immediately notify the Division and take all necessary measures to re- establish overland flow and infiltration or provide for alternative treatment of stormwater from the Crossfield Taxiway. A final, written stormwater management plan for each future development phase shall be submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh, NC 27699-1617). The stormwater management plan shall be designed to treat the runoff from the entire built upon area (with the exception of the Crossfield Tax") M the phase in accordance with the version of the 401 Stormwater Requirements and UMP Manual or Minimum Design Criteria on the place of the date of the submittal. The stormwater management plan shall be approved by the Division before any land disturbance associated with that phase may occur. Before any future permanent bulldln& the corresponding stormwater management plan as approved by the Division shall constructed and operational. [15A NCAC 02H .OS06(b)(5)] 5. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this permit. [15A NCAC 02H .0501 and .0502) 6. Erosion and sediment control practices must be In full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. if applicable, the project must comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site and the following requirements 115A NCAC 02H .0506(b)(3) and (c)(3)1: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified In the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, Including contractor -owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, Installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation In accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 6. Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions to this condition require application submittal to and written approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted In a manner that may result In dis-equilibrium of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Energy, Mineral and land Resources (DEMUR) or locally delegated program has released the specific area within the project 115A NCAC 02H .0501 and .05021 7. An NPDES Construction Stormwater Permit is required for construction projects that disturb one (1) or more acres of land. This Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If your project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. A copy of the general permit (NCG010000), inspection log sheets, and other information may be found at: htto://Portal.ncdenr.or#Jweb/wo/ws/sulnodessw#tab-w. 15A NCAC 02H .0506(b)(5) and (c)(5)) S. All work in or adjacent to stream waters shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [15A NCAC 02H .0506(b)(3) and (c)(3)) 9. if concrete Is used during the construction, then all necessary measures shall betaken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/fish kills. [15A NCAC 028.0200] 10. Culverts required for this project shall be Installed in such a manner that the original dream profiles are not altered and to allow for aquatic life movement during low flows. Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) must be maintained above and below locations of each culvert. (15A NCAC 02H .0506(b)(2) and (c)(2)) Placement of culverts and other structures in waters, streams must be below the elevation of the streambed by one (1) foot for all culverts with a diameter greater than 48 Inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 Inches, to allow low flow passage of water and aquatic life. Installation of culverts In wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Additionally, when roadways, causeways, or other fill projects are constructed across FEMA -designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the fioodway that may result in destabilization of streams or wetlands. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable Instead of rip rap or other bank hardening methods. 11. All temporary fill and culverts shall be removed and the impacted area returned to natural conditions, within 60 days of the determination that the temporary Impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile, and the various sites shall be stabilized with natural woody vegetation (except approved maintenance areas) and restored to prevent erosion. 115A NCAC 02H .0506(b)(2) and (c)(2)) 12. All temporary pipes/culverts/riprap pads etc, shall be installed in all streams as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual so as not to restrict stream flow or cause dis-equilibrium. [15A NCAC 02H .0506(b)(2) and (c)(2)) 13. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed In" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)) 14. Any riprap used for stream stabilization shall be of a size and density to prevent movement by wave action, current action, or stream flows and consist of clean rock or masonry material free of debris or toxic pollutants. Riprap shall not be installed In the streambed except In specific areas required for velocity control and to ensure integrity of bank stabilization measures. (15A NCAC 02H .0506(b)(2)) 15. A one-time application of fertilizer to re-establish vegetation Is allowed in disturbed areas including riparian buffers, but is restricted to no closer than 10 feet from top of bank of streams. Any fertilizer application must comply with all other Federal, State and local regulations. [15A NCAC 02B.0267(6) and 15A NCAC 028.0231) 16. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals. 17. Mr. Alex Rosser and Piedmont Triad Airport Authority shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. 115A NCAC 026.02001 if the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Mr. Alex Rosser and Piedmont Triad Airport Authority and the U.S. Army Corps of Engineers, provide public notice In accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing In accordance with 15A NCAC 02H.0504. Any new or revised conditions shall be provided to Mr. Alex Rosser and Piedmont Triad Airport Authority in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 18. This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property Is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued In their name. [15A NCAC 02H .0501 and .0502] 19. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Branch within ten days of project completion (available at: http://oortal.ncdenr.org/web/wq/swp/ws/401/certsandpermits/apply/forms). 115A NCAC 02H .0502(f)] 20. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain In effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H.0506] Non-compliance with or violation of the conditions herein set forth may result In revocation of this Certification and may also result In criminal and/or civil penalties. This the 111h day of March 2016 Karen Higgins, Supery s`0 401 & Buffer Permitting Branch KAH/sh r I I i I 1 I I I I I I 1 ( � w I I i ------------ PIEDMONT TRIAD INTERNATIONAL AIRPORT PROJECT LOCATION MAP NORTHWEST TAXIWAY CONNECTOR AND PRELIMINARY NORTHWEST SITE DEVELOPMENT PLEASANT RIDGE SITE GRADING, DRAINAGE A -ND EROSION CONTROL INDEX OF DRAWINGS DESCRIPTION DRAWING NO. TITLE .4I ET GI MLA'Ulz1-D UL MUK&N 1 IMPAC: I S PLAN PGI -PD-3 STORMWATER MANAGEMENT OVERVIEW PLAN SW -1 GRADING, DAAMAGE AND ER0SION CONTROL PLANS GD-13OD-2 DRAINAGE STRUCTURE TABLES 10-1 i DS -2 EROSION CONTROL DETAILS ECI -E04 BUFFER RESTORATION PLAN BR -1 8 tiR�2 JURISDICTIONAL WATERS IMPACTS ----------------------------- !'Prl PIEDMONTTMD AMPORTAUTHORRY 1000ATaf;::7PSA q GrmanEmro, NC 2740D OFQ (A16) tab 6E00 FAXI 66Sd6W 1Y1MIMA00matcom -AS diagneNa In -S4re9m QWW ASMomt Vl WMIWW 01M Vc WRr 10. ZU1Z ° Mommod b Me air kdb daemd" Joldan St41or-Zorra 2 VICINITY MAP i 0 CL� 9= Z J2 z 0-i H j F - w W z5 W z� 0Z W R: ,,N.1l u.1114.,„r� I P811LIHINART - I i PLAITS s' z NOT un 3 COVSTpOCrKl7f i I 1 ocr ocT 1 ESIGNFA ININARATIONAL W1rw.mheRelnfeom MCHAEL BAKER ENGINEERM. OC Gu*eporl Odra liA 350 Grumahom, NC 27409 OFC:(999)991-1500 FAX: (336)931-1501 DATE DECEMBER 2015 SCALE: AS SHOWN I I SHEET I G-1 I 1 OF C-1 --..--.--- ------ J *MADon PONDS STREAMS JORDAN BUFFER DESCRIPTION E%b*oFe+keISI (CobbYards) Parerr�al z�no1 z.2REMARKS (- (fie F-0 F-0 ( fad) St" PD -1 Pond E-1(3.43 Aa-) Perms 17050 3.4 - 50.854 ToW Ren M 0 Sheet PGI Pond E2 (0.54 Aa-) PetosneM 19.900 old - - 25AT aes Told Removal Temporary 0 0 0 Sheat 1,01 Pond E-3 PSI Acres) Pw=fwd 41.100 "1 - - 30.492 29.654 Told Rengwi Tanp—y 0 0 0 St" PG1 Pond E-4 (1.05 aaea) Pernmt 53.700 1.08 - - 33,016 M143 ToW Removal T 0 0 0 Sheet PGI PaW EIS A02 A—) Pemrerwm 0 0 - 0 0 NotOkkolmod T 0 0 0 0 SheWPt)3 'Sftnm$AC PeO°acmd 14.400 150 244 20.458 11 Qdrettpufa0ad T 3S 10 9.119 SUmn TOW Pemoormu 904.750 5.90 150 244 159.827 11 Tenporory 0 3s 10 6,118 k229 -AS diagneNa In -S4re9m QWW ASMomt Vl WMIWW 01M Vc WRr 10. ZU1Z ° Mommod b Me air kdb daemd" Joldan St41or-Zorra 2 VICINITY MAP i 0 CL� 9= Z J2 z 0-i H j F - w W z5 W z� 0Z W R: ,,N.1l u.1114.,„r� I P811LIHINART - I i PLAITS s' z NOT un 3 COVSTpOCrKl7f i I 1 ocr ocT 1 ESIGNFA ININARATIONAL W1rw.mheRelnfeom MCHAEL BAKER ENGINEERM. OC Gu*eporl Odra liA 350 Grumahom, NC 27409 OFC:(999)991-1500 FAX: (336)931-1501 DATE DECEMBER 2015 SCALE: AS SHOWN I I SHEET I G-1 I 1 OF C-1 --..--.--- ------ J -------------------------------------------- • , (J ( I ❑ a l i ( sr a ,mac ro 1w , ' R V LEGEND p `U _.._.._.._.._... EXlSTING PTIA PROPERTY LWE NCDOTRIGHT-OF-WAY LME _..J• �' 1 t 'r-" —��. - �— _ — j-- NCDOTCONTROLLED ACCESS ROW MATCH LINE TNV STA 130+00 - SEE SHEET PD -2 200 100 0 200 SCALE M FEET PROPOSED SITE GRADING LIMITS \fie J '�= ` o L- n OUSTING WETLANDS �` �\ .,. -__,i� ^�,._- • - — _ _ _ — PERENNIAL STREAM BVTERMJTT£NTSTRI:AAA r ��, '..-,... .J'��- _� •i ©� a' I ----------- SOFT JORDAN BUFFER 43W ZONE t) • - ,� - �•., % �� / --- — SOFT JORDAN BUFFER (2D• ZONE 2) -A �X — 633— EKISTMO CONTOUR X. —835— PROPOSED CONTOUR PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE PAVEMENT fcommumm PROPOSED BUILDING LOCATION �� • z PROPOSED POND REMOVAL r -\, N'� Q PROPOSED DRAINAGE yT§ASIN,/} i IN I " m \ / V � TA7c1YVVlV / ` THE TEMPORARY BASIN - - SHALL BE REMOVED AND REGRADED FOR POSITIVE DRAINAGE UPON COMPLETION . OF THE PROJECT. BARREL 1 �IMGIL DJNdoo PR Eb TA)111y Y` •i `• I 1 I�� �.-;%,y ,� •a� a -- •-.GRAD cr.; �, .- '"'• �'''..!3 - bTyP.E aERp$ ..` ••l �l'•�-; , +\I . , 11� t�` �7 j - -'�- ;;i • . `..� . '9 CpNradLnaq aid - iJd� 79 1 t m one241 •t `i 1 \' - . I `I !•C a , . ` if `� a, 5p'. BuOUT p t ' ' • • 'i: ( 850 \` x(30'7taln`i)t•. '� so 50 2 ,• 1N FEET \ • TEMPORARY BASIN OUTFALL PLAN PIEDMONT TRIAD AIRPORT AUTHORITY 7o00A Tai tnt.m.an Parkway G ombmo, NC 27409 OFC: (336) 665,400 FAX (336) 665.5894 www_vtompoxam N� LL (L a Q F - < O a 0-1 � aw z w- W W W - C!? 0.. O Qcn � W WQ f-- H w 00 �-0/'� z 4L w d E DCT OCT DESIGNED DRAWN $B CHECKED S.O. INTERNATIONAL www.mbakerinicom MICHAEL BAKER ENGINEERING, INC 200 CwOrepor( Ddvo Suite 350 Gtoonboro, NC 27409 OFC: (336)931-1500 FAX: (338)931-1501 DATE: DECEMBER 2015 SCALE. AS SHOWN SHEET PD -1 OF PO -3 POND IMPACTS TABLE IO F,&*V Pond Amor W4(0.1.) Jordan LLJIer 30' Zane 1 JoMon BuHvr 20' Zarw 2 RomiwM (oi.) 3.43 50.35! 76,792 TOTAL REMOVAL 0.54 25.707 moss - 0.91 30.422 23.854 1.0673.016 062 n-2- 18.070 mgr DMTUROED I " m \ / V � TA7c1YVVlV / ` THE TEMPORARY BASIN - - SHALL BE REMOVED AND REGRADED FOR POSITIVE DRAINAGE UPON COMPLETION . OF THE PROJECT. BARREL 1 �IMGIL DJNdoo PR Eb TA)111y Y` •i `• I 1 I�� �.-;%,y ,� •a� a -- •-.GRAD cr.; �, .- '"'• �'''..!3 - bTyP.E aERp$ ..` ••l �l'•�-; , +\I . , 11� t�` �7 j - -'�- ;;i • . `..� . '9 CpNradLnaq aid - iJd� 79 1 t m one241 •t `i 1 \' - . I `I !•C a , . ` if `� a, 5p'. BuOUT p t ' ' • • 'i: ( 850 \` x(30'7taln`i)t•. '� so 50 2 ,• 1N FEET \ • TEMPORARY BASIN OUTFALL PLAN PIEDMONT TRIAD AIRPORT AUTHORITY 7o00A Tai tnt.m.an Parkway G ombmo, NC 27409 OFC: (336) 665,400 FAX (336) 665.5894 www_vtompoxam N� LL (L a Q F - < O a 0-1 � aw z w- W W W - C!? 0.. O Qcn � W WQ f-- H w 00 �-0/'� z 4L w d E DCT OCT DESIGNED DRAWN $B CHECKED S.O. INTERNATIONAL www.mbakerinicom MICHAEL BAKER ENGINEERING, INC 200 CwOrepor( Ddvo Suite 350 Gtoonboro, NC 27409 OFC: (336)931-1500 FAX: (338)931-1501 DATE: DECEMBER 2015 SCALE. AS SHOWN SHEET PD -1 OF PO -3 -- --------------- - ----------------------------------------------------------- I I ! I MATCH LINE T/W STA 130+00 - SEE SHEET PD -1 I J�1 _ LEGEND ...._.„,.._..-... EXISTING P7)A PROPERTY LINE ----�-- NCDOT RIGHT-0FWAY LINE —•-}-- NCDOTCONTROLLEDACCESSROW ----------- PROPOSED GRADING LIMITS ® FXLSTN(i WFT14N.'M ----- PERENNIALSTRIE M —... --.. INTER&MENTSTREAM _,-.._...._._ SOFT JORDAN BLIFFER(3V ZONE 1) -- SOFT JORDAN BUFFER (20' ZONE 2) --ass— EXISTING CONTOUR —835— PROPOSED CONTOUR PROPOSED ASPHALT PAVE MFM PROPOSED DRAINAGE P¢DNMnaReM PIEDMONT tRIAO AIRPORTAUTHORITY SOODA Ted JDhrreorr Parkway Greensboro. NC 27409 OFC: (336) 665.5800 FAX (336) 8855890 wwew.0yhomp8.mm LL O Q TZ IZ OV O Q EL W ZZ N� IL O W WW Z Cq d O Q Lu ZW Q Z a W 0 IL a `BRBLIliL11ARY PIANS ; I t nOWOTtraPon I a' OwlsTnacrwll I - .tri .-- - �,.rnun,,,••"' I NW TAXIWAY CONNECTOR TO BRIDGE ACROSS 1-73 I I 200 100 0 :00 SCALE IN FEET I I I I i I « I R I I I DATE BY DES I -------------'---------------'---------------`----------------.----------------------`—_----_ ------------_--`--- „f � r: rT1_E_CK11 r s= SO. 1 INTRANATIONAL I I I —� !� wrm.mbakeriNl.cam I MICHAEL BAKER ,� _ice '• 200 Centroporl Drive , r r Supe 350 - _ LEGEND ...._.„,.._..-... EXISTING P7)A PROPERTY LINE ----�-- NCDOT RIGHT-0FWAY LINE —•-}-- NCDOTCONTROLLEDACCESSROW ----------- PROPOSED GRADING LIMITS ® FXLSTN(i WFT14N.'M ----- PERENNIALSTRIE M —... --.. INTER&MENTSTREAM _,-.._...._._ SOFT JORDAN BLIFFER(3V ZONE 1) -- SOFT JORDAN BUFFER (20' ZONE 2) --ass— EXISTING CONTOUR —835— PROPOSED CONTOUR PROPOSED ASPHALT PAVE MFM PROPOSED DRAINAGE P¢DNMnaReM PIEDMONT tRIAO AIRPORTAUTHORITY SOODA Ted JDhrreorr Parkway Greensboro. NC 27409 OFC: (336) 665.5800 FAX (336) 8855890 wwew.0yhomp8.mm LL O Q TZ IZ OV O Q EL W ZZ N� IL O W WW Z Cq d O Q Lu ZW Q Z a W 0 IL a `BRBLIliL11ARY PIANS ; I t nOWOTtraPon I a' OwlsTnacrwll I - .tri .-- - �,.rnun,,,••"' I NW TAXIWAY CONNECTOR TO BRIDGE ACROSS 1-73 I I 200 100 0 :00 SCALE IN FEET I I I I i I « I R I I I DATE BY DES I -------------'---------------'---------------`----------------.----------------------`—_----_ ------------_--`--- „f � r: rT1_E_CK11 SO. 1 INTRANATIONAL I I I —� !� wrm.mbakeriNl.cam I MICHAEL BAKER ENGINEERING, INC 200 Centroporl Drive I Supe 350 Greensboro, NC 27409 OFC: (336)931-1500 FAX: (336p31-1501 DATE: DECEMBER 2015 I I SCALE: AS SHOWN ) SHEET PD -2 i I ' I OF PD -3 I I I i -------------------------_—_- � I i CL 9 VERT PISTAI A AT10N NOTES: 1. INSTALL EROSION CONTROL PERIMETER MEASURES AND SILT FENCE PER PUW, 1 2. AREA PREPARATION . y r' j i ` ♦d ) 1 A f� J r e) ORY WORKAREA USMKi SANOBAr.OIKES WITH PLASTK: BARRIER UNERSATLMTREA?M i •� / ( '�,•� AND DOWNSTREAM LIMITS OF STREAM IMPACT9 b) PUMP WATER AROUND WORK AREA UNTIL AREA IS DRY ENOUGH FOR CONSTRUCTION. I a) WATER FROM DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE EROSION CONTROL DEVICE (MLT BAGS. SEDIMENT TRAP. ETC.) ( 3. INSTALL DRAINAGE STTtUGTURE AT LOCATION AND ELEVATIONS SHOWN. I 4.OWALLEMBANKMENT ACROSS STREAM. �'-� i tet•'•• �`J- r f �'"`' •s'` !•`• - 1 S. SEED AND MAX EMMBANKIAENT,STABAZEAREA. / f" -fit•- / 1 CENTEOW&IlEENDWALI� 1 5. REMOVE TEMPORARY DIVERSION ONCE AREA IS ST!(BM.12ED. E 1Mn0.23T8 _••�••�••�••� EXISTING PMPROPERMLINE I —Q— NCDOTWW-OF•WACIJW ;� �'�� •_ i • �t �'/• / " ' I yds+ f --1, — NCDOTCONTibOLLEOACCESS ROW i j p `r f� - - r _- - r� _ J %L -t-- -/-- PROPO�SITE GRADIIGLITS 1 ff� EXISTING WETLANDS ;% r�/ / •, — t-�"'�� r .�- _ '~ ! / �`� r� / t10TE&. '�_.% !� ,• /' /, ,�•l r f � f i f � r 1 ---- PER NWALSTREAM r;�j`�,, `= .- ( /,.•! __ ... %-- �f I / J TEMwRAR1f - r ` - � ,• __ ,,. .^ •� � �!'� l f � � /f _ r _ �,r wTfRlMRTFJ4T STREAM �1 EXCAVA ' .; —i _ �►� /' �' f I (45x/77[2.5) / %�•. /• ! I�. r. i r T T/- �. ---- 56FTJORDAN BUFFER I—fm— EXL4TINO CONTOUR �f /I !'1,1, �/ •� �.� iso f i fit -� 1. `� _ ii t / f �I` i� �d16 .� �� ,q ''J~ _— %% OF WORKAREA j —835— PROPOSED CONTOUR � elmmemmmc PROPOSEp DRAINAGE � 'f � x/11 • - ! /i•.', t`j/�:a< � . � 1/� /�"..� C,�/'1''�--'-'` :I �,.�.---�"�! STREAM BUFFER DELINEATION � •. r.. �r -e', /' ! • E1 - jFENCE (ORANGE SAFETY ETifJCE) BAG 1 ►—�—r pxMr9 z. sb.em4 Epi ) SED6JENT t EC � /' r% R ; �yA,rw► — , � Ij/ //ter _ _ _ 1111 I TEMPORARY DIVERSIONW CMMEt. (4.>hM E�2) PROPOSED CULVERT INSTALLATION PLAN I 50 25 0 so I I SCALE W FEET END x x x Jor&A Bwbr(3v zww l) Ix X x Pamwwd 1mmd ToW s 2DA55112 JoMnn BIlIw (20'tJale 2) ® M PrgmaneMNWoctTaW=11.27652 ,�I, � Jordon eupor (07 ions i) v TaraperarykepaeLTolal=6,11552 ®� Jaden buffs, (27 ) Tokd =9.226 52 q �d LY -1 III [2 STREAM AND BUFFER IMPACTS W 25 0 so SCALE IN FEET SLOPE 2:1 ITYP) CLASS 1 R6' KTm T *2(' MIN. H * 4.5 MAIC t. COMPACT ANY FILL USED IN CONSTRUCTION OF RIP RAP LINED CHANNEL PER P-182 SPECIFICATION. 7. RIP RAP L0 LNG SHALL BE LEVEL WITH (OR St"TLY BELOW) EXISTIKI STREAM SED AWDIOR PIPE INVERTS. J. STREAM BANKS SHALL BE STABILIZED WTTHW 4 HOURS OF COMPLETION AND PRIOR TO REMOVING THE TEMPORARY DIVERSION. Ckmlw C Rbe DLanow) STREAMBED DETAIL Hol ToSCIW dfp r�iiawori �itNlm I PvEOMOwTRMD AWSKMAUTHOI M 1000A TW Joknaa7 Pa*wn ftmnsboft NC 2740 Ompmeamm Fm (906) 6953694 www-flo—pa- 9- O QW U a z0 O W W Zp WWO ZIr co) W ©(j W Q W 0 F— _ �z O w (L a d�.no.lggyq s � a - P11111 QIOUT rLARs z wlRrr lMftMl °= t�7lsnLocllNr r ITITSRNAT100AL wowir"It"ko"m MICHAEL BAKER ENGIIEERIIG. INC 20D Owdrepod W kv SL" 960 Gn um"o, NO 27405 OM- (315)!914500 FAX: (315)911-1501 DATE: DECEMSER 2015 SCALE AS SHOWN SHEET PD -3 OF POS I susEat tOAILEAfTEt t'INE4 I tF fuOpEt,4AM"c5 I G I I $ I I S I K I I z I o z I C I m �"� 1 •`• ( I I j � � � j I I O m v 9 Cal r I u n m ±; ro a z cs a o a ci �. m m �*' gNg � Iz z 1 �S Fi m z -a -n0� rom y ml m u,i "' PIEDMONT TRIAD INTERNATIONAL AIRPORT ° y ' Q� o� oI <' _ NORTHWEST SITE DEVELOPMENT 1 r${ x rn STORMWATER MANAGEMENT OVERVIEW��� FOR PROPOSED CAMPUS SITES N_ sy Rl fPTI t•IiOaeMl vow AWW t A1nI F" PIEDMONT TRIAD AIRPORT AUTHORITY IOWA Ted.toit o Partway Grownbao, NC 21409 OFC: (338) 885-5800 FAX (335) 855.8894 www tlykomptLcom EL O 0 QW Z J2 5O LEGEND �- U OW 11718 1 -'; Z _ - _- - U ZOF-� . -._.-.-.-. - .. EXISTINGPPROPERTYLINE M 0W z U) Q O W NCOOTRIGHT-OF-WAY LINE t� r = 0 Z ` - 00 -"- Z> Z — NCOGT CONTROLLED ACCESS ROW W Z a o C ----r--- PROPOSED SITE GRADING LIMITS - _ ___ �1 .•._... !�' `9 V ® EMSTINGWETUINOS •STk 14+00_00 IT" .THIS SHEETN .tiN:O- Std� 10♦q:0 ttf 86613y.9S0b : j i f — " - — —•»--••.— PERENNIAL STREAM INTERMITTENT STREAM j:, SOFT JORDAN BUFFER ;si 040 —8133— EXISTINGCONTOUR . TW(tov ris) PROPOSED CONTOUR PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE PAVEMENT Iwstwat PROPOSED BUILDING LOCATION aec=== PROPOSED DRAINAGE fist 3e GRAVEL CONSTR. ENTRANCE (0"3. Sheet EC -1) - STREAM BUFFER DELINEATION FENCE (ORANGE SAFETY FENCE) SEDpRENTfENCE (DateE 2. Sheat EC -1) } TEMPORARY N CHANNEL ' loo,. _ —.nar EC (1)"aY 4, sheetl -2) Ecz) r ssI 6 TEMPORARY SEDIMENT BASIN rnar(t.nAN (OeW12.SheetEC-2) sit 13 BLOCK AND GRAVEL INLET PROTECTION Sheet ECJ) SEENOTEI,THISWET�_ _Jam. (D"5-, • (4�`" -�_- �� ., n ROCK DOUGHNUT MET PROTECTION (Detail 3.Shoot EC -4) a' a a r.- • tea/ ROCK PIPE INLET PROTECTION (0" 1, Sheet 15 -CA) � • ".---•�,TM,-:.- 4 m..- C ROCK 04ECI DAM (001604, SheetEC-3) ,1 .f . lr-; ' a ! C • a : m {,` TSU � TEMPORARY SLOPE GRAIN (Oeta02, Sheet EC -4) n T(Decd EROSE! CONTROL MAT TWO 1. Sheet EC -1) m 21 RIP RAP CHANNEL LINING fPTI t•IiOaeMl vow AWW t A1nI F" PIEDMONT TRIAD AIRPORT AUTHORITY IOWA Ted.toit o Partway Grownbao, NC 21409 OFC: (338) 885-5800 FAX (335) 855.8894 www tlykomptLcom ,..........,.,, rlleuNlnnxr �=: c PIANS _ i ho N(TT USG Felt 4"aXsmMIUN 1-11, ............... , DCT DCT DESIGNED DRAWN i i INTERNATIONAL www. bakwln.Lcom MICHAEL BAKER 1 ENGINEERING, INC 200 Contreport Drive I SUNG, 350 I Greensboro, NC 21409 OFC: (336;j31.1500 1 FAX: (330)931-1501 DATE: DECEMBER 2015 I SCALE: AS SHOWN SHEET GD -1 NOTE: 1. SEE SHEET OS -1 FOR SOUTH CAMPUS DRAINAGE STRUCTURE TABLES, 2-SEE SHEET FC -2 FOR TEMPORARY SMP DESIGN DATA. OF 00 -2 EL O 0 QW Z J2 5O z p �- U OW Q0 F- > U ZOF-� w� 0W z U) Q O W vJ 00 Q t� r = 0 Z 00 Q Z> Z W Z a o `9 V ,..........,.,, rlleuNlnnxr �=: c PIANS _ i ho N(TT USG Felt 4"aXsmMIUN 1-11, ............... , DCT DCT DESIGNED DRAWN i i INTERNATIONAL www. bakwln.Lcom MICHAEL BAKER 1 ENGINEERING, INC 200 Contreport Drive I SUNG, 350 I Greensboro, NC 21409 OFC: (336;j31.1500 1 FAX: (330)931-1501 DATE: DECEMBER 2015 I SCALE: AS SHOWN SHEET GD -1 NOTE: 1. SEE SHEET OS -1 FOR SOUTH CAMPUS DRAINAGE STRUCTURE TABLES, 2-SEE SHEET FC -2 FOR TEMPORARY SMP DESIGN DATA. OF 00 -2 �J r -..r._j " mill"-� �t ...Ayr ICD•MI M"Ililima ,WINOMIII PIEDMONT TRL1D AIRPORT AUTHORITY 1004A Tad Jillil Pall.way Gleeeebow. NC 27409 OFC --(336)665-56W FAX (336) 0655694 www.rtyfrornpf.com z In 1 F y. •_- f �,,. • l LIJ §ECNOTE �rTF1rS S Et? w 1 ! IOYA 6+ro.Jt ds J NEUV SEOBd 321.] CF w i PESGN 3ED4NT STORAGE- 16.191.161 AEOD SURFACE AAEA•12.16e,IT 3F OE3lG1! SURFACE AAo 1.13 BF Z L lbV 1RAWFARLENST rox3.lBa'lcBa WcD.BD 0 lM ELEV TI BOTTOM ELEYA110N•era.a Ll 0 z0 T- 7! Oj ------------------- I I I I 1 i I I F------------------------------------------------------------------------------------------------- I t 1 1 1 I a I I 1 I 1 I 1 I I I 1 I I I I I I I 1 I I I I i I i I I 1 I I I 1 ------------------------------------------------------- I I 1 I 1 ' I' i I I I I I I l - - - -- - -------------------- ._...-.-------------------- I I EROSION CONTROL CONSTRUCTION SEQUENCE AND MAINTENANCE NOTES: 1 ALL TEMPORARY DIVERSION BERMS, SILT FENCE. & ERICSON At SEDIMENT CONTROL MEASURES REQUIRED FOR LAND DISTURBANCE HIMIN A WORK AREA SHALL EE INSTALLED PRIOR TO BEGINNING WORK WITHIN 1 THAT 110RK AREA. 2- THE CONTRACTOR SHALL SUBMIT TO ME ENGINEER AND DINNER A DETAILED CTINSTRUCTION PROGRESS SCHEDULE. THESE PLANS AND SPECIFICATIONS PROTIDE GENERAL CONSTRUCTION SEOUFMCE AND SAFETY PARAMETERS WHICH MUST BE INCORPORATED INTO TIRE APPROVED SCHEDULE. THE CONTRACIOR'S EROSION CONTROL PLAN SHALL RE INCORPORATED IN THE CONSTRUCTION SEQUENCE PLAN, 3. THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES IN ALL MATTERS OF CONTROLLING I EROSION, AND CCILLECT.ON OF SIEDUENT WITHIN THE PROJECT SITE. ( 4. ANY FINES, PENALTIES, OR OTHER COSTS ASSESSED BY STATE, LOCAL OR THE GOVERNMENTAL AC£NCIES FDA NON-PERFORMANCE OF THE EROSION CONTROL REOUIREMENTS OF THIS PROJECT AGAINST THE I n'RPO)-t AUTNOOR,TY SHALL BErOME THE RESPONSIBILITY OF THE CONTRACTOR. AND ANY SVCM ASSESSMENTS, IF HOT PAID BY THE CONTRACTOR, WILL BE DMU EPO FROM MONIES DUE AT THE COMPLETION OF THIS PROJECT. I 5 THE ENONEER MAY DIRECT THAT ACCITKrIAL ERM404 GONTROL MEA -AURES BE INSTALLED AT ANY TIME AND IN ANY LOCATION AS DEEMED NECESSARY. 6. ALL EROSION AIM SEDIMENT CONTROL PRACTICES PALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERT RUNOFT - PRCOUCING RAINFALL, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MACE IMMEOIAIELY TO MAMTAM ALL PRACTICES AS DESIGNED. 7. SEDIMENT WALL DE REMOVED FROM BEHIND THE SILr FENCE MEN IT REACHES 0.5 FEET DEEP. THE 1 EROSION CONTROL BARRIER WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARR" 0. THE DE-WANPING OF EROSON CONTROL UCA4UFES WITH SEDIMENT -LADEN WATER DIRECTLY 10 � STREAMS Ns PRCNHBITEO. I 9, TEMPORARY SEDIMENT TRAPS REQUIRED FOR tFcE EXCAVATION OF AN UPSTREAM O,TCH SHALL BE ( INSTALLED AT THE ELEVA•104 REOUIRED FOR HT TO BE OPERATIONAL AFTER THE EXCAVATION OF THE or TCH. I 10, ALL TEMPORARY SEDIMENT TRAPS SMALL PREVENT SEDIMENT FROM ENIERINC ANY WETLANDS OUTING ( CLEARNC & CMJ99HG OPERATIONS / EXCAVATION OPERAT,ONS. 1 It. ALL TEMPORARY DIVERSIONS SHALL HAVE POSITIVE DRAINAGE TO RESPECTIVE EAMON AND SEDMENT I CONTROL MEASURE 1 12. ALL TEMPORARY SEDIMENT TRAPS SMALL PREVENT SEDIMENT FROM LEMING THE CONSTRUCTION SITE AVSD ENTERING; ; JURWCTIO,NAL WATERS OURM CLEARING AND OWNING OPERATIONS AND DURING I EXCAVATIONS OPERATIONS. CONTRACTOR SMALL MNNTA04 ALL EXISTING AND PROPOSED MOTOR CONTRTHE REMOVALAIRPORT �ID L OF EROSION CONTROLMEASURES is APPROVED Y THE CPROJECT OF A.ROLINADEPARTMENTT AOF ENVRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND DUALITY SECTION. TME CONST RUCTION OF TIIE PPOMECr MUST1E COMPLMO IN SEQUENTIAL OROERA.S L15TEL) II - . 1. CONTACT LAND DUALITY PA*R TO START DF CONSTRUCTION. 2. L45TALL CONSTRUCTION ENTRANCE PADS. 3, INSTALL SLT FENCE AROUND PERtMEIER OF THE SITE AS SHOWN ON THE PLANS. 4, INSTALL SEDIMENT BASINS, SEDIMENT (RAPS, AMD DIVERSION DITCHES BEFORE BEGINNING, AS SHORN ON PLANS. 3. BEGIN CLEARING AM (:RUBBING OPERATIONS ON THE PROJECT SITE 6, AS CMSTRUC71M OPERATIONS ALLOW. STRIP TOPSOIL AND STOCKMLE. 7. INSTALL DIVERSION DITCHES. AS NECESSARY, TO CONVEY RUNOFF 10 EROSION CONTROL MEASURES. a RFGIN CRAMNK7 OPFRATIMN% tNSTAII FRIISRMI r(WTR(% MFASNaFR, AC RknAH nN IMF PIAN-, AR CONSTRUCTION PROCEEDS. 9_ SLOPE DRAINS WITH BERMS SHALL BE INSTALLED CONCURRENTLY WITH GRADING OPERATICUS vLT FE'NLE SHALL BE INSTALLED AROUND SLOPE AREAS PRIOR TO START OF GRADING OPERATIONS, 10. PLACE TOPSOIL FROM OIMTE STOCKPILE ON COMPLETED AREAS OF CRAOINC AS i'MSTRUCIMI N PROCEEDS. 11, COVER ALL SLOPES 3:1 OR LESS WITH TYPE I TEMPORARY EROSION CONTROL MATTING (EXCELSIOR CURLER CL 1, OR APPROVED EOUAV. COVER ALL SLOPES GREATER THAN It WITH/ TYPE 2 TEMPORARY EROSION CONTROL MATTING (REYCLE% TRM-V, 1 OR APPROVED EQUAL). 12. GROINOCOVER SMALL 13E ESTABLISHED ON ALL EXPOSED SLOPES WITHIN 7 CALENCAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. I& PERMANENT CR"DCOVER SHALL BE ESTABLISHED LW ALL &SHIRRED AREAS WITHIN 14 CA.ENOAR DAYS FOLLOiVNC COMPLETION OF CONSTRUCTION. iC INCE PERMANENT VEGETATION HAS BEEN ESTA81LISHED AND ACCEPTED SY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES (MCDENR) THE CONTRACTOR SHALL REMOVE THE TEMPORARY EROSION CONTROL DEVICES, RE-CRAOE. AND RESEED AS NECESSARY. ALL STAGING AREAS AND HAUL ROUTES SHALL BE RESEEDED. 1S, CONTRACTOR SHALL RESTORE ALL TEMPORARY IMPACT MEAS WITHIN THE BUFFER AREAS AND STREAM TO PRE-WNSTRUCTION CONDITIONS PRIOR t0 THE COMPLETION OF THE PROJECT. SEEDING, MULCHING, AND TOPSOIL NOTES: 1. ALL SOIL STABILIZATION MEASURES SHALL DEET ME REQUIREMENTS OF ITEMS T-901, 7-906, ANO 1-903 OF THE SPECIFICATIONS, GRGUNDCOVER SHALL BE ESTABLISHED ON ALL EXPOSED SLOPES WORN 1 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING PERMANENT GRC'JNOCOVER SHALL BE ESTABLISHED LW ALL DSTURDEO AREAS WITIAN 14 WORKING DAYS FOUCAMNG COMPLETION OF CONSTRUE TION. 2. PRIOR TO SOL 5IAWLIZATION, AREAS SMALL BE CLEARED OF STONES OR DEBRIS LARGER THAN 2 INDIES IN DIAMEIER. 3. AREA TO BE SEEDED SHALL BE THOROUGHLY LOOSENED TO A DEPTH OF 5 INCHES. THE TOP 3 INCHES SHALL RE WCR TIED INTO A SATISFACTORY SECOeED BY DISCSNC, (:R BY USE OF L`ATIPACXERS, ROLLERS, DRAGS. OR OTHER APPRCeRNA7E MEAN& 4. THE i4ms OF SEED AND THE RATES Or APPLICATION OF SEED SHALL BE AS STATED BE, CW. ALL RATES ARE IN POUNDS PER ACRE. ALL AREAS EXCEPT STORMWATER MANAGEMENT PONDS: 7a'tC7D +T:�A ar1 A 1000 TALL FESCUE 100 KOBE LESPEDEZA 250 aAHIA CRASS 400 RYE GRAIN (JANUARY TO FEWLIARY APPLICATION) TEMPORARY SEEDING FOR THE PROJECT STALL M_EI ALL REDUMENCNIS PUBLISHED WITHIN THE CURRENT EDITION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRO MENTAL AND NATURAL RESOURCES. DIVISION OF LAND RESOURCES. LA40 QUALITY SEGROWS EROSION AND SEDWENT CONTROL PLANNING AND DESIGN MANUAL, TABLE 6.10A, TABLE 6.108 AND TAnLC 6.I0C FOUND DN PAGE 6.10.4, PAGE 8.10.5 AND PACE 6.10.6. NOTE: MERE NOTED ON PLATtS. SERICEA LESPECFZA SEEDD, SHALL BE ADDED TO THE SPECIFIED SEEO MIXTURE AT A RATE OF THIRTY (30) POUNDS PER ACRE. NO ADDITIONAL PAYMENT SHALL NE MADE FOR THE ADDITION Or SERICEA LESPEOEZA SEED. SDOR ILWARR MANAGEMENT PCNN$_E'ERMAN�YT SF -UNC• (MAY 10 SEPT --.AIDER APr^IUCAi,CW:) (OCIOSER TO APRIL APPLiCATIryt.) 750 TALL FESCUE 1200 TALL FESCUE 250 BERMUDA GRASS 150 BERMUDA GRASS 250 BAHIA GRASS 100 aIUE GRASS 100 HARD FESCUE RE KINDS OF GRASS. LEGUME, AND COVER -CROP SEED FURNISHED SHALL BE THOSE STIPULATED ABOVE. SEED SHALL CONFORM TO THE REOUIREMENTS OF FEDERAL SPECIFICATION UJ -5-161. SEED SHALL BE. FUMIS14EO SEPARATELY OR IN MIXTURES IN STANDARD CONTAINERS MATH THE SEED NAME, LOT NUMBER. NET %SCHT, PERCENTAGES OF PURIIY AND OF CERMINATION AND HARD SEED, AND PERCENTAGE OF MAXIMUM WEED SEED CONTENT ClEARLY MARKED FOR EACH KIND OF SEED. THE CONTRACTOR SHALL FURNISH TME ENGWEER DUPLICATE SIGNED COPIES OF A STAIEME14T BY THE VENDOR CERTIFYING TESTING WITHIN SUI (6) MONTHS OF DATE OF DELIVERY. THIS STATEMENT SHALL INCIUOE: NAME AND ADDRESS OF LABORATORY, DATE OF TEST, LOT NUMBER FON EACH KIND OF SEED, AND THE RESULTS OF TEST AS 10 NAME. PERCENTAGES OF PURITY AND OF GERMINATION. AND PERCENTAGE OF WEED CONTENT FOR EACH MND OF SEED. S. GROUND LIMESTONE SHALL BE APPLIED PRION 10 APPLICATION OF FERDLIZER OR 5LED AND SHALL OF WORKED Into TOP 3 INCHES OF SOIL. S. FERTrLI.'EN SMALL BE SPREAD IUMFORMIY OVER ALL AREAS TO BE SIDED AFTER UM24C IS COAAPLr E. 7 CRASS SEED SHALL BE APPLIED AT THE RATE INDICATED ABOVE MPD IN THE SPECIFICATIONS. PROPERLY COVERED, AND COMPACTED WIN AN APPROVED LANK ROLLER. B. MULL'It SIIALL BE APPLIED IMMEDIATELY AFTER SEEDINO, MULCH MUST MEET THE PEOUIREMENTS OF ITEM T- 903. 9. STRAW MULCI SHALL BE SPREAD TO A UtIRLVW THICKNESS AT THE RATE OF 2 - 3 TONS PER ACRE TO PROVIDE A LOOSE DEPTH OF NOT LESS THAN 1-4/2 INCHES NCC MORE THAN 3 INCHES. TO. MULCH SMALL HE HELD IN PLACE BY EIGHT DiSCING, PINS, STAKES. IARC MESH, OR ASPHALT 6INDEP. 11, E ASPHALT SPRAY ME IHCID IS USED, MULCHED SURFACES SHALL BE SPRAYED UNIFORMLY AT A RATE OF APPROXIMATELY 8.0 GALLONS PER 1,003 SQUARE FEET. 12. G ASPHALT MIX METHOD 15 USED, THE MUCH SHALL BE APPLIED BY OLOWINN: AND THE ASPHALT 02CER MATERIAL SHALL 13E SPRAYED INTO THE MUCH AS IT LEAVES THE SLOWER, DIRER SHALL BE UNIFORMLY APPLIED TO THE MULCH AT THE RATE OF APPROXIMATELY 8.0 GALLONS PER 1,000 SQUARE FEET, 13. CONTRACTOR SHALL PROTECT SEEDED AND MULLED AREAS AGAINST TRAFFIC SURFACES CULUEO 04 DAMAGED SHALL BE REPAIRED. RESEEDED,AND REMULCHHED. CONTRACTOR SIALL MOW. WATER . AND OTHERWISE MAINTAIN SEEDED AREAS IN A SATISFACTORY CONDITION UNTIL FINAL INSPECTION AND ACCEPTANCE OF THE WORK. STABILIZATION TIMEFRAMESiREQUIREMENTS Site Area Description Stabilization Timeframe Exceptions Pedrrmiter dikes, swales, ditches and slopes T days Norte High Quality Water (HaM Zones 7 days None Slopes steeper than 3:1 7 dM If slopes are 10' Dr lass in length and are not steeper than 2:1. 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than VY In Length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and H( Zones. 50' MIN. _ BUT SUTFICENT 10 KEEP SEDIMENT ON SITE I I 1 I I 1 T 1 (TTP.) a SINUS 2' TYP. L TO BE 915TALlED IN ACCCROANCE MANUFACTURERS SPEOmAricm NOTES: 1, TYPE 1 MATTING SHALL BE AMERICAN CZMSION (CURLER CL 1 OR APPROVED EWM.). ALLOWABLE SHEAR STRESS 1.35 La/FTT 2- FOR TYPE 2 MA(TIICL SHEAR STRESS > 4.0 l8/FT 7 S TYPE 2 MATTING SHALL BE AMERICAN EXCELSIOR. RECVCIL% IRM -V. OR NPROVED EQUAL. MATTING FOR EROSION CONTROL W --O" MAX POST SPACING ""E WIRE FENCE q- I I lJ EXIST. GROUND LINE J 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE THE CCNSIRUCRON ENTRANCE 15 USED. SYN THEM FILTER FABRIC - T> (SURGE STONE OR RM AD PROPOSED SIREET, "ON. Ys NY III. BALLAST) WHICHEVER 15 MICHAFI. BAKER ENGINEERING. INC ELEVATION VIEW SHELL POST WIRE FENCE -7'- J//WOVEN Fl,/ i-'.Rw.TIC FILTER FABRIC GROUND in A• COMPACIED SQL OR CRAWL SECTION VIEW NOTES: t. ACOIFN PCSIS SHALL NOT BE USED FOR SILT FENCE INSTALLAIM, POSTS SHALL BE 1,33 LOAN. FT. STEEL "III A WIIMUM LENGTH W 5 FEET. 2- INSTALL. SLT FKhGE NHENL SHOWN ON RIC PL4-45 AND MAINTAIN UNTIL DISTURBED AREA IS CUMPILTELY STAERUZED. TEMPORARY SILT FENCE2 n 75 1--i-PTI t'�COMGnT,pop Awe.11 AUI..C. H PNEONK)NT TRIAD AtRIPQRT A IITHORITY iDOQA Ted Jc"a P.xk-y Gwmbmo, NC 214.79 OFC: (338) 665-5101) FAY: (33H>) 6655694 IYWw.DyOomP%,mm 0 a�- Q�z <[ w 1 m z0 O '-'11 W Q W 'W Nz LA.. ❑ W W PL:z u) ❑ !!F-� Q vl N W l.6 F z C00 G z ❑ ('V T._L I,JtIltltlt/Ill/frf :' rlvutlarnar PIANS = n RO xUT CRE FOR --, CO�S7'DUCr70X1 NOTES: INTERNATIONAL YYYTW,IrITaFerinll.com i 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE THE CCNSIRUCRON ENTRANCE 15 USED. I T> (SURGE STONE OR RM AD PROPOSED SIREET, "ON. Ys NY III. BALLAST) WHICHEVER 15 MICHAFI. BAKER ENGINEERING. INC L-CMECKE 2. IF CCNSTRUCIM ON THE SIE ARE SUCH THAT TIE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING 00 Cen(repgt Drive OVER THE STONE, THEN THE TIRES OF THE VEHICLES Must 9E WASHED BEFORE ENTERING THE PUBLIC ROAD, Suft 350 1 I 3.i A PROJECT CONTINUES TO PULL MUO AHD DEBRIS ON TO THE PUBLIC ROAD, THE CONTRACTOR SMALL GNlensboro, NC 27409 CLEAN THE AREA, OFC: (338)931-1500 r- 35, ON Ii- INTERNATIONAL YYYTW,IrITaFerinll.com i Z`-3" STONE TO BE USED 25. OR WIDTH OF I T> (SURGE STONE OR RM AD PROPOSED SIREET, "ON. Ys NY III. BALLAST) WHICHEVER 15 MICHAFI. BAKER ENGINEERING. INC i o GREA FELL u 00 Cen(repgt Drive Cr EXISTING FABRIC UNDER STONE Suft 350 1 I ROADWAY GNlensboro, NC 27409 PLAN CROSS SECTION OFC: (338)931-1500 I FAX: (336)931-1501 TEMPORARY CONSTRUCTION ENTRANCE PAD DATE: DECEMBER 2015 3 I I L__--__-__--______-__---------_--------------------___ __--------__--_--_-.__--_--_ ----_-._-_ H. T.3. ECI SCALE: AS SHOWN SHEET i I:FVISIOPIS E C 1 ( w2IAM NO. DA E BY DBSCRIPTlON I I I L__--__-__--______-__---------_--------------------___ __--------__--_--_-.__--_--_ ----_-._-_ I . I I I I a C040" ANN-9EEP rCW4MM Ahn-SEEP COlN1 Cg1M Ur TM. b eAN1REL 1e' MN. BANAEL Ir ANTI -SEEP COLLAR INSTALLATION NMS: PORwi. AFTER FILL HAS BEEN PLANED A WA. Ib" O4ER BARREL. CONTRACTOR TO EXCAVATE ANR-SEEP COLLAR TO MW. DIMENSIONS SHORN AND BACIWU MM P-610 CONCRETE, NOTE: EXACT ELEVA110NS TO BE FlELO VERIFIED AND ADAASTED PRIOR W ACTUAL CONSIRUCIM OF SEQMENT BASIN. SEDIMENTIDRY DETENTION BASIN .@ N.T.S. I.D. HENT4 • CLT TRENCH TO STABLE SOIL MATERIAL, BUT X4 RE -01) OOPFAC 'AREA LENGTH WIDTH 1 TSI No CASE MANE IT LESS THAN 2• uEP 1a.705 See Ran See Ree PLAN TU HLOW 9.162 NOM 9NSTALL BAWM IN SAW MAIW T53 9.000 6.400 AS SLT FDtCE. R�a� SILT FENCE TS4 ILD32 4.123 FER09GN1 0.AIW TSS 12081 9.443 BAFFLES w&, BASIN BARREL BARREL TOP OF EMERGENCY RISER SEDIMENT 14.879 EXTEND THE ENTIRE sus of BAFFLES 3 T E LD. BOTTOM INVAN BARREL BARREL ORIFICE RISER INY.OUT DAM SPILLWAYDLk RIM CLEANOUT 14• EC ELEV. ELEV. ELEV. Dtk LENGTH DIA. ELEV. ELEV. ELEV. ELEV. 159 a Ts -2 sl swoo I &Do 1 884.89 46' w 16' 696.50 094.00 3a- 1 anmu 511.00 4.786 16.806 Hi INIZOO 077.00 670.76 48- 15V 3.8' 686:00 684.04 30' suou e93:o0 22 10' 1512_ 4.318 NOTE: EXACT ELEVA110NS TO BE FlELO VERIFIED AND ADAASTED PRIOR W ACTUAL CONSIRUCIM OF SEQMENT BASIN. SEDIMENTIDRY DETENTION BASIN .@ N.T.S. I.D. RE fD STIORAGE RE -01) OOPFAC 'AREA LENGTH WIDTH VAR DEPTH LENGTH TSI 14.445 1a.705 See Ran See Ree See Rae Lo• TU HLOW 9.162 12• T53 9.000 6.400 10' TS4 ILD32 4.123 !!• TSS 12081 9.443 ILY TSB 19.551 14.879 T4' X57 19.837 14.995 14• TSB 2700 7.041 td 159 54D 4.463 e TSIO 4.786 16.806 D' 7511 7.330 22 10' 1512_ 4.318 -0. 5.443 8' TS13 12.749 19.139 W NOTES: 1. MAINTAIN EXISTING TEMPORARY SEDIMENT TRAPS. 2, STOMOE CAPACITY SHALL BE J.600 ETT/ ACRE W DbTLMEO AREA. 3, STWE.SIZE SHAM. ITE MSS T MIN A ONE FOOT (T FT.) LAVER OF NCODT / 57 C PLACE FLIER FAMC BELOW NO RAP. S REMOVE sWIAENT TRIOS AS CIRECTED SY THE ENCINE . 6, REMOVE SEMMEMT 61EN VOLUME IS CNE-NtALF OF REQUIRED STORAGE VOLUME 7. REQUIRED STORAGE CAPACITY AND SLWACE AREA ARE MEASURED FROM THE WEIR ELEVATION. 1 I COMPACTED F B' NOTES: 4. 1EMPORARr SLT DIVERSION OOGI TALL HOT BE MEASURED•. COST VILL BE e10"TAL W OMEN I7EM3. 2. TEMPORARY GROUND COYER WM BE ESTA$ISHEO IN ALL DIVERSION OI1O4ES. TEMPORARY SILT DIVERSION DITCH 4 N.T.S.EC-2 SIDE NEW SKIMMER SEDIMENT BASIN 2 ELLS C-2 WC EMO CAP YC aww END CAP PVC9 of iril E �![ E OUTLET .A.P. PIEOIAm TRMID AIRPCRTAUTHORM IOGM Ted Johmw Pa&M Gmwmbw% N027401 OF= (MM 0 5000 FAX -PANS -NN W W W.ByBQItIDI.00111 L— ei. O Z Qa Z O I-- W 0 Z "' o CC w IW" ~ r Z Z Vi c � U 3:0)i OO W G Z W a =- PBBLEYINANL �' - li1.AiTu = ' 80 RDi PeR 6OR c '% OOXlL711t,7NR 3 •.............. DCT EICF DESIGNED DRAWN CHE(2CED S:D. INTERNATIONAL WWWJ*BkwhE.wm MICHAEL BAKER ENGOFefuwl MC 200 Ce **W VdW SuRe 350 GNeloablRD NC 27408 DRC 030)8314500 FAX- VW)g I-IS01 DATE: DECEMmm 2015 scat- AS SHOWN SIWT EC2 I I OF EE:a ------------ I CKWATERING r CONCRETE BLOCK 0 111 t2;' sa`E wAshED sroNE n.rt1T TEIVPORARwRc SEa"NT POOL SCREEII PROVIDE ONE BEWA1ERg413 BOCK PER SIDE Y M4X. 1S' DROP INLET W/ CRAZE COST DT INLET PROTECTION SHALL BE INCLUDED IN THE COST OF STRUCTLIRL BLOCK AND GRAVEL PROTECTION 1 PLAN SLOPE t-1/7:1 OR FLATTER D H T FILTER FABRIC SECTION A -A H. RIP RAP TO TOP OF PIPE (MAX. H - D + T) 1-20' CLASS I R,P RAP, UNLESS OTNEJTYASE S40v44 ON PLANS f= 12" CLASS 'R' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS OUTLET WITH DITCH D CLASS I RIP RAP S.Y. IONS t 1 9 4 T 24 •5 7 1s 21 t 91 42 34 39 49 PIPE OUTLET PROTECTION w/ DITCH z N.T.S. EC - i 1 ( x7,rxwlW.IDAT1E I 1 4 k� SECTION A -A MIN 12" Na. 57 r-20" CLASS 1 IIP RAP, UNLESS OTHERWISE SHOWN ON PLANS Ta 12" CLASS 'e' TIP RAP, UNLESS OTHERNASE SHOWN ON PIANS NOTES: OUTLET WITHOUT DITc 1. SEE GRAOMl PLANS FOR RIP RAP APRON O CLASS 1 RIP RAP DWENSBHS. S.Y. IONS —,. MIER FABRIC t a 2. COMPACT ANY FILL USED I4 CONSUM14ON 7 12 OF APRON. 4 1 7 J 3. RIP RAP APRON SHALL BE LEVEL WITH RECEMW1 10 3 •2" STREAM OR SUCx7LY BELOW. _P2 28 T7 38 3a Is7 PIPE OUTLET PROTECTION WITHOUT DITCH a N.T.S. 1.5' CLASS 'B' EROSION MIN 12" Na. 57 CONTROL STONE WASr•EO S?tXaE� (TIP) 24" WAX. AT CENTER SECTION A -A MIER FABRIC MEN II[lW ON 171140 �UfeRi N• tIN»11Y PIEDMONT TRIAD NRPORT AUTHORITY 1000A Ted Johm kok"y Gfeereamo. NC 27400 OFC: (336) 665-660 FAX:(336)665.5694 www.flyfrwmpkoom 0 a� �z �U)� Lu J 00 I- W W ZW 0 z 0 w cr- W W z O Z_ cn U z aW 0 a= o I— I-- w Z W W 00 � z 0 W a �• PttCIdtONAttY �% r>r4.xs z Ixt NOT rsE AUp =; raasrlluLnnN IN TB RN AT10"AL wwvr.mbakwfftLvm MICW\EL BAKER ENGINTEERING. INC 2DO Centmpoit Dive SL41e 350 Gmanslxxo, NC 27409 OFC: (M)931 -t SOD FAX: (336)931-1501 DATE: DECEMBER 2015 SCALE: AS SHOWN t I SHEET I I EC3I I OF EC4 I I I 1 I J B F:P RAP 12" No, 57 WASHED STONE PLAN wd 4•�If1iFFN-. . � ��•. 10 `rf`�ij�. Vii: ��ii��� �i�i�i��i�\y�\i�l`�ii��r r •�\1����1�r`r`lr`rr`�r y r\rr\rr VOP =-G17APACIEU FILL ISLAAD) ICP or DrvDx&av r r -- NOTES: NATURAL GROUND L USE DIVERSION BITCHES TO CONVEY SEOtMENT-LADEN RUNOFF TO NILEU n SEE DE TA - 3. THIS SHEET. 7. ENTRANCE TO BE CONSTRUCTED Or A STANDARD A.ARL0-ENO SECTION DIVERSION CHHAWCL 1 WITH A MIN, 6' METAL TOE PLATE ALL FITTINGS MUST BE WATERTIGHT. 1 1 A STANDARD T -SECTION FITTING MAY ALSO BE USED AT THE INLET. A SM TO BE HAND -COMPACTED AROUND AND UNDER THE PIPE IN 6- LITTs M AaIIEVE nRI CONTACT BETWEEN nHE PIPE AND THE SOUL. SECTION VIEW OF INLET 4. REMOVE SLOPE DRAINS ANO DIVERSION DITCHES UPON DHE COMPLETION OF DIE PRO.ECT, AS DIRECTED BY THE ENGIWER. TEMPORARY SLOPE DRAIN z H.. T.S. EC -4 SECTION A -A ROCK PIPE INLET PROTECTION r',1 H.TS. - - - - EC-{ CLASS B No. 57 STONE (12" 1.5 EmittROOS ON CONTROL --D� SEE_ TABLE Rid :''7 I' I t NATES t. A MINMIVAI 1-f WT vADE LEVEL AREA SET 4 INCHES BELOW THE DROP INLET CREST WILL ADD PROIECiION AGAINST n+E ENTRANCE OF MATERIAL- INLET 2. YAM MESH YAM 2-1401 CPEMRDS MAY W PLACED OVER THE DRAIN GRATING OUT MUST BE INSPECTED FREOVENTLY TO AVOID BLOLIIACE BY TRASH #57 OR #5 STONE CLASS D EROSION CONTROL STONE 0 /57 OR j5 STONE S. It IS WORTANI THAT ALL SORMWATER FLOW OVER ME STRUCTURE INTO ME STORM DRAW. AND NOT PAST ME SODJCIURE. ROCK DOUGHNUT INLET PROTECTION �1 N.T.S. EC -4 -ApTl FIE-ONT rn ,.m n w�nunm PIEDMONT TRIAD AIRPORT AUTHORITY I OWA Tod Jabnsan Parhway GHeerrcburc, NC 27400 OFC: (336) G65-sm FAX (3:ID) GG5•f.694 wwwAyirompti.oaln 0 a- F -- Ex Q LLQ (o 2i J _I Z O F- 0 w o J LU 5 0Y LY W W I— Z Z !A U U Q W Z O '^ O Z F- 2 O W 0 '` PltC1.lIfIdYAl1Y -': PIANS = DD AM usE TOR Lnwcrlurnow . a" OCT DGT DESIGNED DRAWN SB CHECKED S.U. cumm la -mm INTERNATIONAL www.mbakeviDD.com MICHAEL BAKER ENGINEERING, INC 200 Ccntrcpod Drive Suite 350 Greensboro, NC 27409 OFC:1336)£131-ISOD FAX (336)931-1501 DATE: DECEMBER 2015 SCALE AS SHOWN SHEET EC4 OF EC4 AAAL --�� "e eeeeAAA - -'AAOAeo-e A q A!I'Q' zaAAAeAA A A'a-q e -Q A A AAA�AIAAAA AAAAAAA ,r A A A A4 -A- A Ae6A. Ae -1�e AfaA. cf _ i'�=;rte { , o-�•A oo ; - - ,, r ..t ` // f; �" r- f ' C°'ACIS Q NFemtrnTlnu NnrFc- 1. REMOVE EXISTING SEDIMENT CONTROL MEASURES AS DIRECTED. LEGEND BACKFILL AREA TO MATCH PRE -CONSTRUCTION GRADES. STRFAMBANK STASIUMATION 2. APPLY TEMPORARY SEEDING IN RIPARIAN BUFFER IN ACCORDANCE SEE PLAN TING SCHEDULE (THIS SHEET) WITH TEAIPORARY SEEDING TABLE, T1413 SHEET. 3. SCARIFY, APPLY TEMPORARY SEEDING AND PLACE TURF REINFORCEMENT A -AAAA RIPARIAN BUFFER RESTORATK)N MATTING ON THE STREAM BANKS PER DETAIL 2, SHEET BR2- SEE PLANTING SCHEDULE (THIS SHEET) 4, INSTALL LIVE STAKES ALONG STREAM BANKS PER SPECIFICATIONS ON THIS SIIEET AND OETAa_ i, SHEET BR2. REMOVE EOUIPMENT, APPURTENANCES, CONSTRUCTION DEBRIS AND TRASH FROM THE PROJECT AREA. BUFFER RESTORATION PLAN 5 APPLY PERMANENT SEEDING ANWOR PLANTINGS AS DIRECTED IN THE IN REMAINING DISTURBED AREAS WITHIN THE PROJECT AREA IN ACCORDANCE 30 15 0 30 PERMANENT SEEDING TABLE ON THIS SHEET AND ALL 0711ER APPLICABLE DETAILSISPECIFICATIONS. SCALE IN FEET SEEDING TABLE Temporary $eeding: The easdbed shad be property prepared and amended with Agricultural Ilene (2000-30001Noae) and 10.10.10 teNlt er Q00 t OD0 Ib acre) prkx to sari leg, to accordance vAh 910 Nath CaroMs Erosion and Sediment Control, F`WL g and Design Manua iemporaary seeding short ber required for denuded areas that vAl not be brought to Rnat grade or worked weadn 30 days or In areas wham surface staMlfraborn Is needed due to conshuceon a0N.'Uas. Faodplsn wM:arda shell not twelve tomporary seeding. WIMerSe(dlm RAIs S o-egDates Winter Rye 130 Itt%Oue August 16 - Dor_mber i Summe(Seedna Rate 04") Socfta Oaks BrowntopMltid 45 Apnl15- August ly Getman MIIIat 45 April 15 - Augud 11 Afton seeding, epptyy 20011Tk�cre olpapa rrich or equK-Mint suUaWe mulch. Andxrby kic4ig W!th nstUrhp or by rrtmong "Ith a muk h anchor tool. A dlek with the blade get nesrty vertical can be used as s mushing IDOL Permanent aeeding: The eeedberd anal be pmpady :Caron and amended vi Apeieultura! Ito (4000 ttaraero} and 10-10-10 Tortiilcar (1200:0 none) prior to seeding. In ce with"Nath CorGMa Eruatat and Sedtmorl Control, Piarrytg and Daalgn Manual. Per isrant aecdn0 shail be completed withta 30 days o(Brtat coda'sudlon ectNioos. WN,Isrhd buffers and lloodyioln waNmda shag not receive permanent Doodling. SearinN ILats tibl"111) Sesotho Dabs Beovn,cp WIM 45 April l -July 15 Gon'01 Mutat 45 April 1 -July 15 AnorsOedkag apply 3001b1acreofpaper mulch orequ;whleatsulloblernukh. Amdhsrbytaddnpwith net-Jngorby atrpYng with a mute h anchor W. A dkk with the blade not nearly vartirat can be used as o mwching tool. TdaltlbNMnce: Damaged, bare on denuded gra» *1 tie receaded and fantliaed as mooted. U grawdh Is lass ahm adequalq tho soadod gree will be top draased with an appropriate amount or fortulzer do"ndent on sol chemistry h arxordancti VAth standard Inductry practices. ( r.•ywirw.t unrel ora ueOd,nv,.any n I Planthig Palette for ZoNs l: Streratbank StnbIHzsUael Boxelfv PLANTTNQ %VVI' AND C STRATA CONZION NAME D1ENS)T V INDICATOR • FORMS SITRUBS C ,pheVadhtaeeerdertahr Butted.busb 43.560dcme/ace: ODL LiveStake news drromtnri Silky dogxvood l sleWAII2ref0ot FACW4 Live Sake Ilcnigm 1114ckwillow OBL Live Stake Approximately equal numbers of at lead hro sMicat selected from the stove gat drould be plowed in thef4re rioted (Live Stake) to reach the required density of 43r C0 riemshas or 1 demlcqure foot roav&jfWmw cc planting retail number 3 for live stake plaNingmtibods FRC ' - 'Well and indcalor Ratusaccording toIISFTYS 1928). sprrnTAort a rguad. Boxelfv 4Vsrmdt:rs FACW C nil a nit birch FACtV C us FACW+ FAC C rate&Iws Rairu;1 FACU C roav&jfWmw Peaiwmn FRC C sprrnTAort a L7menash FACW C irI>s8w Ahcklula FAC C 'IS"c,ednrabs Symrnon FACW- C r3 Pilsen Witbwoald FACW C daatelyequil neribets orat kuot;ourspasesse!,t:W Cimn tle sbmv U:shnlHIbe petted is It& ikd(Cod,tdwr)to ter. htfe rqurd dereilyoC4=0 shrmhne. -hdmdhur atiirneuits Burosbhwh 215skwrn(m OBL C rusmnox::m SdtydViclo3 FACW+ C ,Vginica Virginia willow FACW+ C x nigra Bhekwalow O&L C "rame.a StlLy ailfwv OBL r. tburos emaa-te n.ia FSitl6ernf FACW- C tphortaarposOA—da^Js COW beery FAG- C unarmd"Wwrt Aouw.aood FAC C =dvrelelyegdahi numbed ofd ease Liver aledurlrled Som the rbove listsbovklW pheiedistha s:akd((Srawircr) b machfhe teq�irddettis or215 sttraslactc. SELECTED AND INSTALLED 10. NO SEEDING$ SHOULD BE PLANTED WITHIN THE SEWER UNE RIGHT -Oft -WAY, See. Fimti4 detail U-61 ride krccbi ireriad ir"4L,-eh rliriirg r..et!rk. Wetlani i1.Dsebr soler «told r( In USFWS (1988). C = Cnnla:ner PLANTING SCHEDULE GENERAL NOTES: GENERAL. NOTES: 1. INSERT PAR AS SHOWN, AND PUSH HANDLE FORWARD. f. SWIG HOEDAO FROM OVERHEAD DOWNWARD, SINKING THE BLADE ITS FUU 2. REMOVE THE BAR, AND PLACE SEEOUNGATCORRECTDEPDL LENGTHVERTICMLYINTO SOL (MINIMUM OEM OrSLOT 130INCHES), 3. INSERT BAR 3 TO 4 INCHES FROM SEEDLING (TOWARDYOL4. AND PULL I MOLE TO 2. PULL THE SLADE UPWARD SLIGHTLY BY LIFTING THE END OF HANDLE. CLOSE BOTTOM OF HOLE 3. PUSH THE HANDLE DOWNWARD WHILE PULING BACK TO OPEN HOLE. 4. PUSH !({WOLF FORWARD TO CLOSE TOP OF HOLE. k WITH THE BLADE W CAVITY TO HOLD BACK LOOSE SOIL, CAREFULLY PLACE B. REMOVE BAR, AND CAREFULLY CLOSE THE OPENING WITH YOUR HEEL TO AVOID SEEDLING W HOLE, MAKING SURE ROOTS ABE FULLY EXTENDING. THEN REMOVE T115 INJURING THE SEEDLING. SLADE. S. THIS TECHNIQUE WILL NOT BE USED FOR CONTAINERIZED TREES. S. CLOSE THE HOLE BY INSERTING HOEOAO BESIDE THE SEEDLING, THEIN LUTING UP AND PUSHING DOWN ON THE HANDLE TO TIGLITENSOIL THEN PUS14 EOILTOWARO 7, DEPTH OF HOLE MUST ae DEEP ENOUGH TO ACCOMMODATE ENTIRE TAP ROOT. SEEDLING. HE SURE PLANTING SLOT IS CLOSED COMPI.ETLY. e. AVOID ROOT.E'RLININO. e. A MINIMIN OF FOUR (4) SPECIES OF BARE ROOT TRUE SEEDLINGS SMALL BE T AVOIOJ.ROOTWG(SEE a ABOVE). SELECTED AND INSTALLED 10. NO SEEDING$ SHOULD BE PLANTED WITHIN THE SEWER UNE RIGHT -Oft -WAY, T. SEE'APPROVED BARE ROOT SPECIES' USI' (BELOW) FOR ALTERNATIVES S. THIS TECHNIQUE WILL NOT BE USED FORCONTAINERIZFD TREES. BARE ROOT SEEDLING PLANTING DETAIL (APPROVED METHODS, KT. S. nrxm«r+iuwrwro'" cur �unnr PIEDMONT T'BAD AIRF(MT AUTHDMTY IOWA Tod Johann Ps Away c reonsbot%(NC 27408 OFC: W1.%Ca FAY7 3 05546mi twYW,gyTrgl"xom LAI Ili. LZ L Z J2 Z O/ zo LM+.. Q. Z Q f- F Z in COLLJL Q s+t W W LL O M O D � 0 Z W W 0- ,111. ....,1 '11 INA MdNS n uo Ktrr Uea req COx aal7fON e OCT DCT DESIGNED DAWN - SB CHECKED S.O. 1 14 T E It N AT 10 N A L vnvw.mboherinlLcom MICHAEL BAKER ENGINEERING, INC 200 Centreport Drive S00 350 Graonshora, NC 27409 OFC: (336)931-1500 FAX: 1336)931-1501 DATE: DECEMBER 2015 SCALE AS SHOWN SHEET BR1 of Blain wnrJ iutebe 9r'IaN m ,p (TFiM) WiM 1;,wmi GENERAL NOTES: I. AFTER INSTMUITION OF 1URP RMWOACEMENT MATTING, LIVE STAKES SHALL DE MBrALLM ON THE STREAMA NKS. Z EACH LIVE STAVE SHALL BE 24'40' TALL MTN A DETER OF /12-1' MAIOMUM AND AT LEAST 4 NODES (OLDS). AT LEAST 2 NODES (6) OF THE LAt STAKE SHALL OE ABOVE GROUND EL07ACE AND AT LEAST NODES (1r.) SHALL BE BURIED BENEATH THE OMOUND SURFACE INTALL LIVE STAN TO BELOW-OnOLIND DEPTH OF Ir -13'. THEN PRUNE A5WE43ROUN3 PORTION OF LIVE STAKE ABOVE SECOND NODE 3. UNE STAKES SHALL IIE INSTALLED AT A SPACING OF T ON CENTER (O.CL FROM TOE Cr- STRLNABM:K TOA FEAPEWCULAA DISTANCE OF B FROM TOE OFF EACII STREAMIANIC 4. UNE STAKES SHALL BE INSTALLED IN 100% COCONUT FIBER LOOS AND T14ROWH TURF FJENFDACEMENT MATTING (IRAN). S. INE STARE CUTTINGS SHALL BE COLLECTED WITHIN 30 MILES OF PROJECT STE- LIVE STAKING DETAIL BR2 NOt TOSCALE I-JYzdr-urtdp{uud.Useb tfcI6!0rwmwIm ar4c125fi,x Nc6lnAmcAcan L'+rean rx et3ivnlenL 2. Boy. al the lop al Y,o ch mie) by amhod, C,e blond In a W do•-�P }�116- ts'id Bch a1d1 BpFr Ima:Of I2' oI b�B�'telInelaf Id be>vnd he vprttcos .IXRM d Inl,� trel'.b4 hCG the CL9nte1 N'IN h tbN 0/ 6IB�Teirs;Z �pp�1pa.Imalc 1 spar/ Iho bo:iom oI yro benCt 9a�a u and u ,padjl'o ranrJT nRer req. A{+{.Jy aced M dod s:0 av! hNd tem. 12 pMlon of Ni bask over coed A; Parted soA. Setppre bI c. ave? avtolssR,eubZh& tabalmet. P1 +� spacad oNwrovlmalc y l 2- opus b?nkets11xmt be ar+chaad Ad, B myr stupk-&-lakes opp.o.lmalc 1r,•+art n a 6' dccP x 6'„ a'rcrah. Bac; and comCacl I'.o bench agar a r�tt a• Adlaocvd blan'',ets mu.t bo OYella eJ -Q us nlatolJ 6" oral al 0, To ens/r� proper all nt plawpClre cape It, oveAap met Nb4tnIrPI OeYN Inst gLy M tOpl lttl+wlri the red let m sl.vch Ir mvq rw3 c5) Oe 1,4. onto n0 ove oeosd, S The I"Im"l etuLlmpkpasd7dSe+Ldekt canAlc41 b:r4 oor17,e abyla1n1""^a1pmd4 J b4 f=c;r ew tLM. sv'Avi4t0ne rIareNnne�, , OBc'k+B uM.t pRr,2, z TURF REINFORCEMENT DETAIL 8R2 ROI I O SCAIF Wald R. FIN.Iv d Croda GENERAL NOTES 1. CONTAINERIZED TREES AND SHRUBS SHALL BE + GALLON OR S GALLON S,ZE. 2. CONTAINFRCEDTREES AND SHRUBS SHALL BE PURCHASED FROM A NURSERY WtI N STOCK THAT ORIGINATED WITHIN 100 $0ILE3 OF PROJECT SITE. 3. CONTAINERIZED TREES AND SHRM SHALL BE INSTALLED VERTICALLY. 4. AMINIMUM OF FOUR (4) SPECIES OF CONTAINERIZED TREES AND THREE (I SPECIES OF CONTAINCI M0 SHRUGS SHALL BE SELECTED AND INSTALLED. SEE 'APPROVED CONFAINE-WED SPECIES- LIST FOR ALTERNATIVES. 0. OVEREKCAVATE PLANTING HOLES BY 1N3 TOTAL DEPTH AND BACKFILL. CONTAINERIZED TREE OR 3 SHRUB PLANTING DETAIL eR'- 110I in,;,rPVE "tm w +.a k� --44,PTJ r�'.Gut'1i MI.e Malel{t1WTNMm PIEDMONT TRLAO AIF.PORT AUTHORITY ,(WATod .IohMw Fvkway G,a...Eoao, NL: 27409 OFC: (3-q 665.56uo FAX: (335) 005•E694 ,vww.Oylrompli.xm /LLQ. V ON !_L-. z W Q w I z o I-(-' OJ o W O zNW of W LU F— z (n — 1 Q (n U) WN/ Q LJ tip F— w LL z � LL 00 �z m a_ c` PIIGWlIISAILT --} PIANN = DO hurt use Fon r =, cox.-amwnov ...0 ,Iv' DCT DWN EDCI,� S.G. alav INTERNATIONAL wwrv.mhaker1n4,cDm MICHAEL BAKER ENGINEERING, INC 200 CoMrspon Drtm Sulle 350 Gra aeboro, NC 27408 OFC: (335)931-7500 FAX: (336)931-1501 DATE: DECEMDERMIS SCALE AS SHOWN SHEET B R2 OF BR2 Mr. Miclde Elmore Director of Development Piedmont Triad Airport Authority P.O. Box 35445 Greensboro, NC, 27425 EXHIBIT 5 Md" F Easky Governor wills m G. Rase Jr.. Sewetery North Caeoliut Department of HavLaemeet and Natural Resources November 10, 2003 Re: Proposed Runway 5LJ23R, Proposed New Overnight Express Air Cargo Sorting and Distribution Facility, and Associated Developments at Piedmont Triad International Airport, Guilford County DWQ #00-0846; USAGE Action 1D. No. 200021655 Dear Mr. Elmore: ALM w. 911maL P.E., Direclor Division of water Quality Coleen H. Sullins. Deputy Director Division of Water Quality Attached hereto is a copy of Certification No. 3428 issued to the Piedmont Triad Airport Authority, dated November 10, 2003. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid waste, Sediment and Erosion Control, Stormwater, Dam safety, Non -discharge and Water Supply Watershed regulations. This Certification replaces the one issued to you September 2, 2003. N we can be of further assistance, do not hesitate to contact us. Sincerely, 44"" K&;r-tt Alan W. Klimek. P.E. AWK1cbk Attachments cc: John Thomas; U.S. Army Corps of Engineers, Raleigh Regulatory Field Office DWQ, Winston-Salem Regional Office File Copy Central Files Steve zoufaly Interested Citizens Sylvia Norman; City of Greensboro Attorney's Office Dacha Brown; Contract Administrator, Guilford County Attorney's Office Kathy Matthews; US Environmental Protection Agency — Region IV N. C. Division of water Quality. 401 Wetlands Certification Unit. 1650 Mdl Service Curler, Ralaish. NC 27699-1650 (Manias Address) 2321 Cra6lme Blvd.. RaW06 NC 27604-2260 (Location) (919) 733-1786 Lebow). 919-733-93 (fax), Customer Service t 1-877-623-6748 Mr. Mic13e Mmare November 10. 2003 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWI) Regulations in 15 NCAC 2H, Section .0500 to. the Piedmont Triad Airport Authority (PTAA) for the discharge of fill into the jurisdictional waters of Brush Creek and its unnamed tributaries, including approximately 23.44 acres of wetlands and 12,846 linear feet of streams associated with the Proposed Runway 51MR, Proposed New Overnight Express Air Cargo Sorting and Distribution Facility, and Associated Developments at Piednwnt.Triad International Airport, Guilford County, North Carolina, pursuant to an application filed on 5th day of February of 2002. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Sediment and erosion control measures shall adhere to the design standards for sensitive watersheds [15A NCAC 4B .00241; see NCDOT publication, Best Management Practices for the Protection of Surface Waters (March 1997); 2. The, turbidity standard shall not be exceeded as described in 15 A NCAC' 2B .0200. Appropriate sediment and erosion control practices must be used to meet this standard; 3. All sediment and erosion control measures placed in wetlands and waters shall be removed and the original grade restored within two months after the Division of Land Resources has released the Project: 4. Appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" whichever is more appropriate (available from the Division of Land Resources (DLR) in the DENR Regional or Central Offices) shall be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to assure compliance with the appropriate turbidity water quality standard; Culverts: 5. Culverts required for this project shall be installed in such a manner that original stream profiles are not altered. Existing stream dimensions (including the cross section dimension, pattern, and longitudinal profile) are to be maintained above and below the locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream 2 Mr. Mickie Bkoo e November 10, 20M grade shall be ie -established. If the pipes are installed in a perched manner, .the pipes shall be removed and re -installed correctly. The culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up -or down -stream of the culvert(s). Existing stream dimensions (including the cross section dimension, pattern and longitudinal profile) are to be maintained above and below locations of each culvert. Native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip -rap or other bank hardening methods. If rip -rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions; 6. Mitigation must be provided for the proposed impacts as specified in the tables below and as described in the Wetland and Stream Mitigation Plan prepared by LawOibb (iroup?MACTEC (December 28, 2001) and the Conceptual Mitigation Report prepared by EcoScience (February 2002). The Conceptual Mitigation Report notes that up to 6,840 linear feet of stream restoration wr'fl be achieved onsite.' For the purposes of this CertWrAdon, 6,539 linear feet of restoration at Causey Farms will be required to satisfy the requirements of 15A NCAC .0506(hx6). The remaining 301 linear feet of restoration credits will be available. for use by the PTAA for stream mitigation should design constraints necessitate minor increases in stream fill. A final stream and wetland mitigation plan must be approved in writing by the Division of Water Quality before any permanent facilities associated with this project are occupied. Additionally, the compensatory mitigation plan must be completely constructed and implemented according to the plans approved by the Division before any permanent facilities associated with the project are occupied. The mitigation sites must be maintained according to the approved plan and permanently protected by the use of conservation easements or similar protections. If the Division determines that any of the mitigation projects are not constructed or performing according to the approved plans, the Division shall notify you in writing and corrective action shall be completed within 6 months according to the approved plans. Any repairs or adjustments to the mitigation sites must be made according to the approved plan or must receive prior written approval from the Division. Two copies of an as - built report as well as annual reports shall be sent to the Division by April 1" of each year for the entire length of the five year monitoring period; WETLANDS Preservation Creation Restoration Total HoMM Creek 12.6 acres 2.0 acres 14.6 acres Brush Creek 69.9 acres 5.3 acres 7.4 aures 82.6 acres Ca Farms 14,510 linear feet 12,946 Hnear feet 4.0 acres 4.0 acres Subtotal: 69.9 acres 17.9 acres 13.4 acres 101.2 acres STREAMS Preservation Restoration Total Creek 6,107 linear feet 6,107 linear feet Brush Creek 14,510 linear feet 200 linear feet 14,710 linear feet Cause Farms 6,539 linear feet 5,910 linear feet Subtotal: 14,510 linear feet 12,946 Hnear feet 26,727 linear feet Water S NWI Watershed Variance: 7. All conditions of the Major Variance to the water supply watershed protection stream buffer requirements approved by the Water Quality Committee of the Environmental Management Commission on October 9, 2002 are hereby incorporated as conditions of this 401 Certification; 3 Mr. MkWe Elmore November 10. 2003 8. The final, written stormwater management plan for each of the four phases of this project (including a signed and notarized Operation and Maintenance Agreement) shall be approved in writing by the Division of Water Quality before the impacts associated with the corresponding phase of the project occur. The stormwater management plan must include plans and specifications for stormwater management facilities that are appropriate for surface waters classified as WS -III, appropriate for use in proximity to runways and designed to remove 85% Total Suspended Solids on an annual average basis according to the NC Department of Environment and Natural Resources Stormwater Best Management Practices Manual (April, 1999). These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any of the new facilities are used at the Piedmont Triad International Airport, the facilities (as approved by the Division) shall be constructed and operational, and the stormwater management plan (as approved by the Division) shall be implemented. The structural stormwater practices as approved by the Division as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division. The four phases include: 8a. Fedex Site, 8b. Bryan Boulevard Relocation, 8c. Runway 5LMR, and 8d. Crossfield taxiway. 8e. Within ane year of your receipt of this Certification, the retro -fit stormwater control plan as necessary to meet Water Quality Standards for the entire Piedmont Triad International Airport and areas associated with the Horsepen Creek mitigation area shall be submitted to the Division for written approval. Before any facilities associated with any of the four phases of this project are occupied, written approval for the retro -fit stormwater plan must be obtained from the Division; 9. The combined performance of the stormwater control measures must be modeled for lr 2, 5, and 10 year pre -and post -construction discharge events to ensure that downstream peak flows and the resultant streambank stability (downstream to Lake Ifiggins for Brush Creek and downstream to Latae Brandt for Horsepen Creek) are not amplified by the simultaneous, combined releases from the stormwater control measures from the entire PTAA property. The release rates for stormwater management facilities must be designed based on the modeling to prevent amplification of peak flows. The above designs must be approved in writing by this The Division before any of the facilities which are tributary to each of the stormwater control devices is occupied or opened for use. In addition, the stormwater management facilities, as approved by the Division, must be constructed and operational, prior to the occupation or use of the facilities authorized herein; 10. An additional stormwater management plan (including a spill containment and treatment failure plan) must be provided to ensure that Surface Water Quality Standards are not violated as the result of runoff contammatim by deicing and/or similar agents that are applied to aircraft or paved surfaces. The plan must include means to collect the runoff that occurs during or following the application of the above agents and must include a means to treat the pollutants in runoff to levels that comply with Surface Water Quality Standards. The plan must include the procedures, design plans and specifications necessary to achieve compliance with Water Quality Standards. The plan must be approved by the Division of Water Quality within one year of the date of issuance of the 404 Permit. Additionally, before the impacts associated with the first phase of the project to be constructed will occur, procedures and infrastructure must be in place and operational. The plan must be implemented as approved by the Division of Water Quality; 4 Mr. Midde Elm= November 10, 2003 11. Additionally, any increase in duration of discharges in excess of the pre -construction channel forming discharge must be evaluated to determine the effects on downstream stream bed and bank stability (downstream to Lake Higgins for Brush Creek and downstream to Labe Brandt for Horsepen Creek) from the entire PTAA property. In order to make this determination, the duration of the 1, 2, 5 and 10 year pre -construction discharges that are in excess of the peak pre- construction 1 year discharge must be compared to the duration of the 1, 2, 5 and 10 year post - construction discharges that are in excess of the peak pre -construction 1 year discharge. The release rates from the stormwater management facilities must be designed based on the above evaluation to prevent additional stream bed or bank erosion. The above designs must be approved in writing by the Division before any of the facilities tributary to each of the stormweer control devices is occupied or opened for use, and the facilities (as approved by the Division), must be constructed and operational; 12. The Piedmont Triad Airport Authority shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 250507(d). Before modifying the Certification, the Division shall notify PTAA and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 250503 and provide opportunity for public hearing in accordance with 15A NCAC 250504. Any new or revised conditions shall be provided to PTAA m writing, shall be provided to the United States Array Carps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; 13. Measures shall be taken to prevent live or fresh concrete from coming into contact with waters of the state until the concrete has hardened; 14. Waste or borrow sites shall not be located in streams or wetlands; 15. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contarnination of stream waters from fuels, lubricants, hydraulic fluids and other toxic materials; 16. All work in stream channels shall be performed during low flow conditions; 17. The outside edge of the buffer, wetland or water boundary, along the entire construction corridor within the boundaries approved under this Certification shall be clearly marked by orange fabric fencing for areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; 18. All temporary fill and culverts shall be removed and the impacted area returned to the original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile after construction is complete or within six (6) months of the establishment of the crossing, whichever is sooner, and the various sites shall be mbilized with natural woody vegetation (except for the maintenance areas of permanent utility crossings) and restored to prevent erosion. If the crossings are not completely removed and restored as described above within the specified time above, additional written approval from the Division must be obtained to modify this condition; E Mr. Mede Fksm November 10, 2003 19. In the event that PTAA undertakes to transfer property ownership of any land containing retained jurisdictional wetlands, waters and protective buffers, deed notifications or similar mechanisms shall be placed on all said jurisdictional areas on the property in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to said property transfer. A sample deed notification can be downloaded from the 401/Wedands Unit web site at h2o.enr.state.nc.us/ncwet1ands; 20. The anticipated cumulative impacts from this project shall be addressed via written agreements between the NC Division of Water Quality, Greensboro and Guilford County in accordance with the appropriate signed agreements; 21. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties; 22. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" foam to notify the Division when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wedands Unit of the NC Division of Water Quality upon completion of the project. Photographs upstream and downstream of each culvert site must be included to document correct installation along with the Cernfreate of Completion form; 23. This Certification shall expire, upon expiration of the 404 Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request mast be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 10th day of November 2003 DIVISION OF WATER QUALITY "- Alan W. Klimek, P.E. WQC # 3428 AWK1cbk IM T ERM AT I ON AI EXHIBIT 6 Discharge Monitoring Locations NPDES Permit NCS000508 Piedmont Triad International Airport Monitoring Locations • SDO (Stormwater Discharge Outfall) • In -Stream • Representative SDO � sI NPDES DM.xlsx/Locations 1:13 PM https://projects.mbakercorp.com/PTIA/Site Plans/ Page 1 of 2 2/5/2019 III T EI "' E R® Discharge Monitoring Results 2018 In -Stream #05 NPDES Permit NCS000508 Piedmont Triad International Airport In -Stream #06 Date pH Turb.2 D.O.3 Tox 4 pH Turb. D.O. Tox. 1/12/2018 7.42 7.68 9.32 >100% 7.14 12.32 8.76 >100% 1/17/2018 6.63 11.16 11.31 >100% 7.06 12.14 9.82 >100% 11/13/2018 7.60 48.91 14.23 >100% 7.49 49.32 14.68 >100% 11/24/2018 7.80 16.34 14.17 >100% 7.27 12.97 13.82 >100% 12/2/2018 7.03 21.82 9.51 >100% 7.11 28.79 10.79 >100% 12/14/2018 7.62 27.82 11.38 >100% 7.39 29.41 10.94 >100% 1 Benchmark exceedance <6, >9 2 Turbidity (NTU), benchmark exceedance >50 3 Dissolved Oxygen (mg/L), benchmark exceedance <5 4 Acute Toxicity (EPA/600/4-90/027F), benchmark exceedance <100% NPDES DM.xlsx/Results 1:13 PM https://projects.mbokercorp.com/PTIA/DMR2 Page 2 of 2 2/5/2019 EXHIBIT 7 NCS000508 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE'STORMWATER UNDER THE RATIONAL POLLUTANT DISCHARGE ELBMATION SYSTEM Incompliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, PIEDMONT TRIAD AIRPORT AUTHORITY is hereby authorized to discharge stormwater from a facility located at Piedmont Triad International Airport 6415 Bryan Blvd. Greensboro, NC Guilford County to receiving waters designated as Brush Creek, Horsepen Creek, and East Fork Deep River, class WS -III; NSW and WS -IV streams in the Cape Fear River Basin, in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V and VI hereof. This permit shall become effective July 1, 2010. This permit and the authorization to discharge shall expire at midnight on June 30, 2015. Signed this daythe 40' of June, 2010. for Coleen H. Sullins Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No. NCS000508 TABLE OF CONTENTS PART I INTRODUCTION Section A: Individual Permit Coverage Section B: Permitted Activities Section C: Location Map PART I1 MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B: Routine Analytical Monitoring Requirements Section C: Qualitative Monitoring Requirements Section D: De -Icing Event Analytical Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS Section A: Compliance and Liability I : Compliance Schedule . 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability 5. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability 8. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports Section B: General Conditions 1. Individual Permit Expiration 2. Transfers 1 Permit No. NCS000508 3. Signatory Requirements. :1. 4. Individual Permit Modification, Revocation and Reissuance, or Termination 5. Permit Actions Section C: Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce Not a Defense 3. Bypassing of Stormwater Control Facilities Section D: Monitoring and Records 1. Representative Sampling 2. Recording Results 3. Flow Measurements 4. Test Procedures 5. Representative Outfall 6. Records Retention 7. Inspection and Entry Section E: Reporting Requirements 1. Discharge Monitoring Reports 2. Submitting Reports . 3. Availability of Reports 4. Non-Stonmwater Discharges 5. Planned Changes 6. Anticipated Noncompliance 7. Spills 8. Bypass 9. Twenty-four Hour Reporting 10. Other Noncompliance `. 11. Other Information PART IV LIMITATIONS REOPENER PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VI DEFINITIONS and SPECIAL CONDITIONS ii Permit No. NCS000508 PART I (INTRODUCTION SECTION A: INDIVIDUAL PERMIT COVERAGE During the period beginning on the effective date of the permit and lasting until expiration, the permittee and co -permittees listed on the following page are authorized to discharge stormwater associated with industrial activity... Such discharges shall be controlled, limited and monitored as specified in this permit. Discharges covered in this permit are the stormwater discharges from the current airport operations (001 through 066) as well as additional stormwater discharge points that may be created by further n1brdification or expansion of airport operations. Current discharges 001 through 012 and 03.8 through 040 discharge to Horsepen Creek. Current discharges 013 through 019 discharge to East Fork Deep River. Current discharges 020 through 037 and 041 through 066 discharge to Brush Creek. SECTION B: PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee and co-permitees are authorized to discharge stormwater to the surface .waters of North Carolina or separate storm sewer system that has been adequately treated and managed in accordance with the terms and conditions of this individual permit. All stormwater discharges shall be in accordance with the conditions of this permit. Any other point source discharge to surface waters of the state. is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval, Stormwater discharges allowed by this individual permit shall not cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. Part I Page I of 2 Permit No. NCS000508 Co -Permittees Alamo/National Car Rental Jetstream Ground Services, Inc. Allegiant Air Koury Aviation American Eagle Landmark Aviation Atlantic Aero Lincoln Financial Aviation Repair Technologies Marriot Hotel Avis Rent A Car i Northwest Airlines Budget Rent a Car Piedmont Triad Airport Authority Carolina Aircraft Piedmont Triad ARFF Station/Command Ctr. Cessna Citation Service Center Premier Transportation Champion Cartage Prime Flight Services Chatauqua Airlines Quantem Aviation Services, Inc. COMAIR Hangar QuickIlight Services Continental Airlines Smartecarte Delta Airlines TIMCO Delta Global Services Tradewinds DHL Triad Transportation Dollar/Thrifty Rental Car United Express Enterprise Rental Car United Parcel Service FAA US Airways FedEx US Postal Service GTCC Aviation Center USA Parking Valet i Hertz Rent A Car i VF Corporation Honda Aircraft Company Worldwide Flight Services Jetstream Air, LLC Dynamic Airways JBT AeroTech Part I Page 2 of 2 SECTION C: LOCATION MAP Permit No. NCS000508 4 7 40-1 Piedmont Triad International Airport NCS000508 ra li Abp Stale 1:30,000 Piedmont Triad Airport Authority Piedmont Triad Int4rnational Airport Lab bxle:36006'24"N Longitude: 790 56'31" W County: Guilford - ReceKirxj Streams: Horsepen Cr, Brush Cr, E Fork Deep R� Stream (lass: WS -111; 116W, WS -111; NSW, WS -1V Sub -basin: 03-06-02 (Cape Fear River Sarin) Facility Location Permit No. NCS000508 PART H MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The Permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as the Plan. This Plan shall be considered public information in accordance with Part III, Standard Conditions, Section E, Paragraph 3 of this individual permit. The Plan shall include, at a minimum, the following items: 1. Site Plan. The site plan shall provide a description of the physical facility and the potential pollutant sources. which may be expected to contribute to contamination of stormwater discharges. The site plan shall contain the following: (a) A general location map (USGS quadrangle map or appropriately drafted equivalent map); showing the facility's location in relation to transportation routes and surface -waters, the name of the receiving water(s) to which the stormwater outfall(s) discharges, or if the dischas-ge is to a municipal separate storm sewer system, the name of the municipality"and the ultimate receiving waters, and accurate latitude and longitude of the point(s) of discharge. The general location map (or alternatively the site map) shall identify whether each receiving water is impaired (on the state's 303(d) list of impaired waters) or is located in a watershed for which a TMDL has been established, and what the parameter(s) of concern are. . (b) A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. A narrative description of the potential pollutants which could be expected to be present in the stormwater discharge from each outfall. (c) A site map drawn to scale (including a distance legend) showing: the site property boundary, the stormwater discharge outfalls, all on-site and adjacent surface waters and wetlands, industrial activity areas (including storage of materials, disposal areas, process areas, loading and unloading areas, and haul roads), site topography, all drainage features and structures, drainage areas for each outfall, direction of flow in each drainage area, industrial activities occurring in each drainage area, buildings, existing BUTs, and impervious surfaces. The site map must indicate the percentage of each drainage area that is impervious. (d) A list of significant spills or leaks of pollutants that have occurred at the. facility during the three (3) previous years and any corrective actions taken to mitigate spill impacts. (e) Certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in Part H Page 1 of 13 Permit No. NCS000508 accordance with the requirements found. in Part III, Standard Conditions, Section B, Paragraph 3. The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. 2. Stormwater Management Plan. The stormwater management plan shall contain a narrative description of the materials management practices employed which control or minimize the exposure of significant materials to stormwater, including structural and nonstructural measures. The stormwater management plan, at a minimum, shall incorporate the following; _ (a) Feasibility Study. A review of the technical and economic feasibility cif changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. Wherever practical, the permittee shall prevent exposure of all storage areas, material handling operations, and manufacturing or fueling operations. In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. (b) Secondary Containment Requirements and Records. Secondary containment is required for, bulk storage of liquid materials; storage in any amount of Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) water priority chemicals; and storage in any amount of hazardous substances, in order to prevent leaks and spills from contaminating stormwater runoff. A table or summary of all such tanks, and stored materials and their associated secondary containment areas shall be maintained. If the secondary containment devices are connected to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices.(which shall be secured closed with a locking mechanism), and any stormwater that accumulates in the. containment area shall be at a minimum visually observed for color, foam, outfall staining, visible sheens and dry weather flow, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated by any material. Records documenting the individual making the observation, the description of the accumulated stormwater, and the date and time of the release shall be kept for a period of five years. (c) BMP Summary. A listing of site structural and non-structural Best Management Practices (BMP) shall be provided. The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs. The BMP Summary shall be reviewed and updated annually. 3. Spill Prevention and Response Plan. -.The Spill Prevention and Response Plan,(SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel (or the team) responsible for implementing Part II Page 2 of 13 Permit No. NCS000508 the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible person shall be on-site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPkP. 4. Preventative Maintenance and Good Housekeeping Program. A preventative maintenance and good housekeeping program shall be developed. The program shall list all siormwater control systems, stormwater discharge outfalls, all on-site and adjacent surface waters and wetlands, industrial activity areas (including material storage areas, material handling areas, disposal areas, process areas, loading and unloading areas, and haul roads), all drainage features and structures, and existing structural BMPs. The program shall establish schedules of inspections, maintenance, and housekeeping activities of stormwater control systems, as well as facility equipment, facility areas, and facility systems that present a potential for stormwater exposure or stormwater pollution. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. Timely compliance with the established schedules for inspections, maintenance, and -housekeeping shall be recorded in writing and maintained in the SPPP. 5. Employee Training. Training programs shall be developed and training provided at a minimum on an annual basis for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. Facility personnel (or team) responsible for implementing the training shall be identified, and their annual training shall be documented by the signature of each employee. trained. 6. Responsible Party. The Stormwater Pollution Prevention Plan shall identify a specific position(s) responsible for the overall coordination, development, implementation, and revision to the Plan. Responsibilities for all components of the Plan shall be documented and position assignments provided. 7. Plan Amendment. The permittee shall amend the Plan whenever there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to surface waters. All aspects of the Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years, or the notation that no spills have occurred. The annual update shall include written re -certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. Each annual update shall include a documented re-evaluation of the effectiveness of the BMPs listed in the BMP Summery of the Stormwater Management Plan. Part II Page 3 of 13 Permit No. NCS000508 The Director may notify the permittee when the Plan does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule -to the Director for modifying the Plan to meet minimum requirements. The permittee shall provide certification in writing (in accordance with Part III, Standard Conditions, Section B, Paragraph 3) to the Director that the changes have been made. 8.. Facility Inspections. Inspections of the facility and all koirmwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi-annual schedule, once during the first half of the year (January to June), and once t - during the second half (July to December), with at least 60 days separating inspection dates (unless performed more. frequently than semi-annually). These facility inspections are different from, and in addition to, the stormwater discharge characteristic monitoring required in Part II B and C of this permit. 9. Implementation. The permittee shall implement the Plan. Implementation of the Plan shall include documentation of all monitoring, measurements, inspections, maintenance activities, and training provided to employees, including the log of the sampling data and of actions taken to implement BMP9 associated with the industrial activities, ;ncluding. vehicle maintenance activities. Such documentation shall be kept on-site fbii period of five years and made available to the Director or the Director's authorized representative immediately upon request. Part 11 .Page 4 of 13 Permit No. NCS000508 SECTIOf4-B: ROUNTINE ANALYTICAL MONITORING REQUIREMENTS Routine analytical monitoring of stop iwater discharges shall be performed at each selected representative stormwater discharge outfall (SDO), as noted in Table 1, and as specified in Table 2. All routine analytical monitoring shall be performed during a representative storm event. Table 1. Representative Outfall Identification Re resents _.. entativallst' 004 003, 004 005 008 013 017 018, 019, 020, 038, 039'- 006 006, 007, 016 016A 009 010, 011, 012 014, 015 016A, 021 022 023 024 and 026 001, 002, 024, 025, 026 027 027,028 030 029, 030, 031, 062, 063, 064, 065, 066 033 032, 033, 034, 035, 036 037 A representative storm event is a storm event that measures greater than 0.1 inches of rainfall. The time between this storm event and the previous storm event measuring greater than 0.1 inches must be at least 72 hours. A single storm event may have a period of no precipitation of up to 10 hours. For example, if it rains but stops before producing any collectable discharge, a sample may be collected if the next rain producing a discharge begins within 10 hours. Part H Page 5 of 13 Permit No. NCS000508 Table 2. Routine Analytical Monitoring Requirements at Representative Outfalls Dischar .:::'.:.; .` a gencyi Characteristics Measurement Frequ : Sample Type .L:> Sample r: Location Total Suspended Solids m Quarterly . Grab SDO Biochemical Oxygen Demand mg/L' Quarterly Grab SDO Chemical Oxygen Demand m L Quarterly Grab SDO :TPH / Non -polar Oil & Grease EPA Method 1664 SGT -HEM mg/L Quarterly Q Grab SDO Detergents (MBAS) m L Quarterly Grab SDO Turbidity NTU Quarterly Grab SDO NH3—Nitrogen m L Quarterly. Grab SDO NO3+NO2 Nitro en m Quarterly Grab SDO Phosphorus, Total m Quarterly Grab SDO H standard Quarterly Grab SDO Total Rainfall' inches Quarterly ain Gauge - Footnotes* 1 Measurement Frequency: Four times per year (once per quarter) during a representative storm event. 2 Grab sample collection shall begin within the first 30 minutes of discharge or as soon thereafter as reasonably possible and shall be completed as expeditiously as practicable. 3 .Sample Location: Samples shall be collected at each representative stormwater discharge outfall (SDO) as specified, in - Table 1. 4 .-For each sampled representative storm event the total precipitation must be recorded. An on -ate rain gau&;f of Aocal rain gauge reading must be recorded. The permittee shall complete the minimum twenty (20) analytical samplings in accordance with the schedule specified below in Table 3. A minimum of 30 days must separate sample dates unless monthly monitoring has been instituted under a Tier Two response. Part II Page 6 of 13 Permit No. NCS000508 Table 3. MonitorI Schedule Monitorbi � 'eriod'' »SampYe Number .:. Start .: : ;=1 , ... -:: '> E Year 1 - Period 1 1 July 1, 2010 September 30, 2010 Year 1 - Period 2 2 October 1, 2010 December 31, 2010 Year 1- Period 3 3 January 1, 2011 March 31, 2011 Year 1- Period 4 . 4 April 1, 2011 June 30, 2011 Year 2 - Period 1 5 July 1, 2011 September 30, 2011 . Year 2 - Period 2 6 October 1, 2011 - December 31, 2011 `fear 2 - Period 3 7 January 1, 2012 March 31, 2012 Year 2 - Period 4 8 April 1, 2012 June 30, 2012 Year 3 -Period 1 9 July 1, 2012 September 30, 2012 Year 3 - Period 2 10 October 1, 2012 December 31, 2012 Year 3 - Period 3 11 January 1, 2013 March 31, 2013 Year 3 - Period 4 12 April 1, 2013 June 30, 2013 Year 4 - Period 1 13 July 1, 2013 September 30, 2013 Year 4 - Period 2 14. October 1, 2013 December 31, 2013 Year 4 - Period 3 15 January 1, 2014 March 31, 2014 Year 4 - Period 4 16 April 1, 2014 June 30, 2014 Year 5 - Period 1 17 July 1, 2014 September 30, 2014 Year 5 -Period 2 18 October 1, 2014 December 31, 2014 .Year 5 - Period 3 .19 January 1, 2015 March 31, 2015 Year 5 - Period 4 20 April 1, 2015 June 30, 2015 Foot : 1 Maintain quarterly monitoring during permit renewal process. If at the expiration of the Individual Permit, the permittee has submitted an application for renewal of coverage before the submittal deadline, the permittee will be considered for renewed coverage. The applicant must continue quarterly monitoring until the renewed permit is issued 2 If no representative storm event occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow" within 30 days of the end of the sampling period. Part 11 Page 7 of 13 Permit No. NCS000508 The permittee shall report the analytical results from the first sample with valid results within the monitoring period. The permittee shall compare monitoring results to the benchtnark values ir. . Table 4. The benchmark values in Table 4 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of bencitimark values must be addressed as provided in and in accordance with the tiered response chart on page 9 of Part II. Table 4. Benchmark Values for Routine Analytical Monitoring at Representative Outfalls i Footnotes: 1 Turbidity: The turbidity benchmark value will become effective beginning in Year 2 of this permit following the completion of airport runway construction activities. Part II Page 8 of 13 Total Suspended Solids mg/L 100 Biochemical Oxygen Demand mglL 30 Chemical Oxygen Demand mg/L 120. TPH / Non -polar Oil & Grease mg/L 15 Detergents (MBAS) mg/L 0.5 Turbidity` NTU ' 50 N113—Nitrogen mg/L 7.2 NO3+NO2 Nitrogen mg/L 10 Phosphorus, Total r mg/L 2 pH standard 6-9 Footnotes: 1 Turbidity: The turbidity benchmark value will become effective beginning in Year 2 of this permit following the completion of airport runway construction activities. Part II Page 8 of 13 Permit No. NCS000508 ... .. r :.:':`:> Tier One If: The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any parameter at any outfall or in -stream location; Then: The permittee shall: 1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results. . 2. Identify and evaluate possible causes of the benchmark value exceedance. 3. Identify potential source controls, operational controls, or physical improvements, if any, that could reduce the difference between the sampling results and the benchmark value and select any such corrective measure or combination of corrective measures that the permittee determines to be appropriate and warranted, after due consideration of the cause and nature of the exceedance and the feasibility, cost and effectiveness of -such measures. 4. Implement the selected actions, if any, within two months of the inspection, or as soon thereafter as reasonably possible. 5. Recoid each instance of a Tier One response in the Stormwater Pollution Prevention Plan. Include the date and value of the benchmark exceedance, the inspection date, the personnel conducting the inspection, the selected actions, if any, and the date the selected actions were implemented, or, if no action was implemented, the basis for that decision. Tier Two If: During the term of this permit, the first valid sampling results from two consecutive monitoring periods are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific outfall or in -stream location; Then: The permittee shall: 1. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for each parameter at each outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark values or within the benchmark range. 3. If no discharge occurs during the sampling period, the permittee is required to submit a monthly monitoring report indicating "No Flow" to comply with reporting requirements. 4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan. During the term of this permit, if the valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any specific outfall or in -stream location on four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. The permittee -will then consult with DWQ about feasible, practical, and cost-effective measures that the permittee could undertake to reduce the difference between the sampling results and the benchmark value and to avoid causing or contributing to any violation of water quality standards. After consultation with the permittee, DWQ may require that the permittee revise, increase, or decrease the monitoring frequency for the remainder of the permit and may impose such other requirements, if any, as may be necessary to prevent the Part II Page 9 of 13 Permit No. NCS000508 permittee's discharge from causing or contributing to any violation of water quality standards, including but not limited to: • require the permittee to install structural controls; or • require the permittee to implement other stormwater control measures. If the inspection and evaluation of a particular sampling result under Tier One or Tier Two show that the result is not caused by the permittee's operations or facilities, it will not be treated as a benchmark exceedance for purposes of determining whether four consecutive exceedances have -occurred. This site discharges to a segment of the East Fork Deep River with an approved Total Maximum Daily Load (TMDL) for turbidity and fecal coliform. The Division will consider monitoring results in determining whether additional BMPs are needed to control the pollutant(s) of concern to the maximum extent practicable. If additional BMPs are needed to achieve the required level of control as mandated by the TMDL, if any, the permittee will. be required to (1) develop a strategy for implementing appropriate BMPs, and (2) submit' a timetable for incorporation of those BMPs into the permitted Stormwater Pollution Prevention Plan. SECTION C: QUALITATIVE MONITORING REQUIREMENTS Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status and shall be performed as specified in Table 5, during the analytical monitoring event. Qualitative monitoring is for the purpose of evaluating the effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of stOrinwater pollution. In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall document the suspected cause of the condition and any actions taken in response to the discovery. This documentation will be maintained with the SPPP. Table 5. Qualitative Monitoring Requirements at All Outfalls Discharge Characteristics'- ' : ';" Frequency) ::: .: Monitoiiting Location Color Quarterly SDO Odor Quarterly SDO Clarity Quarterly SDO Floating Solids Quarterly SDO Suspended Solids Quarterly SDO Foam Quarterly SDO Oil Sheen Quarterly SDO Erosion or deposition at the outfall Quarterly SDO Other obvious indicators of stormwater pollution ,early SDO Part II Page 10 of 13 Permit No. NCS000508 Footnotes: I Measurement Frequency. Four times per year (once per quarter) during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded If at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered for a renewal application. The applicant must continue quarterly monitoring until the renewed permit is issued See Table 3 for schedule of monitoring periods through the end of this permitting cycle. 2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status. SECTION D:.DE-ICING EVENT ANALYTICAL MONITORING REQUIREMENTS De-icing event analytical monitoring of stormwater discharges shall be performed at selected representative SDOs as specified in Table 6. De-icing event analytical monitoring shall be performed four (4) times per year during qualifying de-icing events resulting in the use of at least 100 gallons of glycol in any concentration. Each monitoring event shall be conducted during a discharge event at the time of de-icing activities, or during the next separate discharge event, up to 72 hours following de-icing activities. Table 6. De-icing Event Analytical Monitoring Requirements for Representative Outfalls Discharge�Characteristics :Units- Measurement . Simole :;;:,.Sample Locado' n3 ::. Ethylene Glycol m 4-yJyr Grab SDO Propylene Glycol Mg/L 4X/yr Grab SDO Biochemical Oxygen.Dernand m 4X/Yr Grab SDO Chemical Oxygen Demand m L 4X/yr Grab SDO NW—Nitrogen m 4X/yr Grab SDO H standard I 4X/yr Grab SDO Acute Toxici a % 4X/yr Grab SDO Total Glycol Applied all 4X/yr Estimate - Total Rainfall inches 4X/yr Rain gauge - Footnotes: I Measurement Frequency: Four times per year during qualifying de-icing events as described above. 2 If the stormwater runoff is controlled by a stormwater detention pond a grab sample of the discharge from the pond shall be collected within the fust 30 minutes of discharge from the pond or as soon thereafter as reasonably possible. 3 Sample Location: Samples shall be collected at each representative stormwater discharge outfall (SDO) as specified in Table I. 4 Acute Toxicity shall be performed in accordance with the Special Conditions page at the end of this permit. Monitoring results shall be compared to the benchmark values in Table 8. The benchmark values in Table 8 are not permit limits but should be used as guidelines for the permittee's Part H Page 11 of 13 Permit No. NCS000508 Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values must be addressed as provided in and in accordance with the tiered response chart on page 9 of Part II except that item 2 of Tier Two is deleted and replaced with the following requirement: 2. Immediately institute monitoring during one qualifying de-icing event per month for each parameter at each outfall where a sampling result exceeded the benchmark value for two consecutive samples. Such monitoring (one per month) shall continue for the remainder of the de-icing season so long as a qualified de-icing event occurs during each subsequent month. In -stream analytical monitoring shall be performed concurrently with each of the four (4) monitored de-icing events per" dear. Each monitoring event shall be conducted during a discharge event at the time of de-icing activities, or during the next separate discharge event, up to 72 hours following de-icing activities. In -stream analytical monitoring shall be performed at selected stream sites as specified in Table 7. Table 7. De-IcingEvent Analytical Monitoring, Req uirements for In -stream Sampling Parameter : Units: Measure*ent •: Sample Fre uenc . Type L0cati6ri2 IS#1 through, IS#2, Dissolved Oxygen mg/L 4 M/yr Grab IS#5 through IS#8, IS#10 through IS#11 IS#1 through IS#2, Turbidity NTU 4X/yr Grab IS#5 through IS#8, IS#10 ugh IS#11 IS#1 through IS#2, pH standard 4X/yr Grab IS#5 through IS#8, IS#10 throut IS#11 IS#1 through IS#2, . Acute Toxicity' % 4X/yr Grab IS#5 through IS#8, IS#10 through IS#11 Footnotes: I Measurement Frequency: Four times per year during qualifying de-icing events as described above. 2 Sample Location: Samples shall be collected at each identified in -stream location named above. 3 Acute Toxicity shall be performed in accordance with the Special Conditions page at the end of this permit. Part II Page 12 of 13 Permit No. NCS000508 Monitoring results shall be compared to the benchmark values in Table 8. The benchmark values in Table 8 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). ). Exceedances of benchmark values must be addressed as provided in and in accordance with the tiered response chart on page 9 of Part H except that item 2 of Tier Two is deleted and replaced with the following requirement: 2. Immediately institute monitoring during one qualifying de-icing event per month for each parameter at each in -stream location where a sampling result exceeded the benchmark value for two consecutive samples. Such monitoring (one per month) shall continue for the remainder of the de-icing season so long as a qualified de-icing event occurs during each subsequent month. Table 8. Benchmark Values for De-icing Event Analytical Monitoring for Representative Outfalls and In -Stream Sampling Dis�liarge.Chiiracteristics Ethylene Glycol. mg/L 14,000 Propylene Glycol mg/L N/A Biochemical Oxygen Demand mg/L 30 Chemical Oxygen Demand mg/L 120 N113—Nitrogen mom- 7.2 pH Standard units 6-9 Acute Toxicityt % o >100% Dissolved Oxygen mg/L S Turbidity' NTU 50 Footnotes: 1 Acute Toxicity: For monitoring purposes, any result with a value of less than >100% would constitute a benchmark exceedance. 2 Dissolved Oxygen: For monitoring purposes, any result with a value of less than 5 mg/L would constitute a : benchmark exeeedance. 3 Turbidity: The turbidity benchmark value will become effective beginning in Year 2 of this permit following the completion of airport runway construction activities. Part H Page 13 of 13 Permit No. NCS000508 PART III . STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS SECTION A: COMPLIANCE AND LIABILITY Compliance Schedule The permittee shall comply with Limitations.and Controls specified for stormwater discharges in accordance with the following schedule: Existing Facilities already operating but applying for permit coverage for the first time: The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the initial permit and updated thereafter on an annual basis. Secondary containatetit; as specified in Part 11, Section A, Paragraph 2(b) of this permit, shall be accomplished within 12 ,months of the effective date of the initial permit issuance. New Facilities applying for coverage for the first time and existing facilities previously permitted and applying for renewal under this permit: The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis. Secondary containment, as specified -in Part II, Section A, Paragraph 2(b) of this permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. 2. Duty to Comely The permittee must comply with all conditions of this individual permit. Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of a permit upon renewal application. a. The permittee shall comply with standards or prohibitions established under section 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified to incorporate the requirement. b. The Clean Water Act provides that any person who violates a permit condition is subject to a civil penalty not to exceed $25,000 per day for each violation. Any person who negligently violates any permit condition is subject to criminal penalties of $2,500 to 25,000 per day of violation, or imprisonment for not more than 1 year, or both. Any person who knowingly violates permit conditions is subject to criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both Also, any person who violates a permit condition may be assessed an administrative penalty not to exceed $10,000 per violation with the maximum amount not to exceed $125,000. [Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).] Under state law, a daily civil penalty of not more than ten thousand dollars ($10,000) per violation may be assessed against any person who violates or fails to act in accordance with the terns, conditions, or requirements of a permit. [Ref NC General Statutes 143-215.6A]. d. Any person may be assessed an.administrative penalty by the Director for violating section 301, 302, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act. Administrative penalties for Class I violations are not to exceed $10,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $25,000. Penalties for Class II violations are not to exceed Part III Page 1 of 8 Permit No. NCS000508 $10;000 per day for each day during which the violation continues, with the maximum amount of any Class II penalty not to exceed $125,000. 3. Duty to Mitieate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this individual permit which has a reasonable likelihood of adversely affecting human health or the environment. Civil and Criminal Liability Except as provided in Part III, Section C of this permit regarding bypassing of stonmwater-control facilities, nothing in this individual permit shall be construed to relieve the permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3,143-215.6A, 143-215.6B, 143- 215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended 5. Oil and Hazardous Substance Liability Nothing in this individual permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321. 6. Property Rig >t9 The issuance of this individual permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations. ' 7, Severability The provisions of this individual permit are severable, and if any provision of this individual permit, or the application of any provision of this individual permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this individual permit, shall not be affected thereby. 8. Duty to Provide Information The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit issued pursuant to this individual permit or to determine compliance with this individual permit. The permittee shall also furnish to the Director upon request, copies of records required to be kept by this individual permit. 9. Penalties for Tampering The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this individual permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or both. Part III Page 2 of 8 Permit No. NCS000508 10. Penalties for Falsification of Revorts. The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this individual permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. SECTION B: GEARAL CONDITIONS Individual Permit Exviration The perri ittee is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall'submit forms and fees as are required by the agency authorized to issue permits no later than 1.80 days prior to the expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subjected to enforcement procedures as provided in NCGS § 143-215.36 and 33 USC 1251 et. seq. 2. Transfers This permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary under the Clean Water Act. The Permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. Signatory Requirements All applications, reports, or information submitted to the Director shall be signed and certified. a. All applications to be covered under this individual permit shall be signed as follows: (1) In the case of a corpbration: by a principal executive officer of at least the level of vice- president, or his duly authorized representative, if such representative is responsible for the overall operation of the facility from which the discharge described in the permit application form originates; (2) In the case of a partnership or limited partnership: by a general partner; (3) In the case of a sole proprietorship: by the proprietor; (4) In the case of a municipal; state, or other public entity: -by a principal executive officer, ranking elected official, or other duly authorized employee. b. All reports required by the individual permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if " (1). The authorization is made in writing by a person, described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position ofplam manager, operator of a well or well field, superintendent, a position of equivalent Part III Page 3 of 8 Permit No. NCS000508 responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Director. Any person signing a document under paragraphs a. or b. of this section shall make the following certification: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my laowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 4. Individual Permit Modification. -Revocation and Reissuance. or Termination Theaissuance of this individual permit does not prohibit the Director fibro reopening and modifying the individual permit, revoking and reissuing the individual permit, or terminating the individual permit as allowed by the laws, rules; and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina Administrative Code, Subchapter 2H .0 100; and North Carolina General Statute 143-215.1 et al. 5. Permit Actions The permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any individual permit condition. SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS 1. Proper Overation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this individual permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of da individual permit. 2. Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this individual permit. 3. Bussing of Stormwater Control Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: Bypass was unavoidable to prevent loss of life, personal igjury or severe property damage; and Part III Page 4 of 8 Permit No. NCS000508 b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and C. The permittee submitted notices as required under, Part III, Section E of this permit. If the Director determines that it will meet the three conditions listed above, the Director may approve an anticipated bypass after Considering its adverse effL• ts. SECTION D: MONITORING ANDRECORDS 1. Representative Sampling Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of the permitted discharge. Analytical sampling shall be performed during a representative storm event. Samples shall be taken on a day and time that is characteristic of the discharge. All outfall samples shall be taken before the discbarge joins or is.diluted by any other waste stream, body of water, or substance. Monitoring points as specified in this permit shall not be changed without notification to and approval of the Director. 2. Recording Results For each measurement, sample, inspection or maintenance activity performed or collected pursuant to the requirements of this individual permit, the permittee shall record the following information: a. The date, exact place, and time of sampling,•nmasurements, inspection or maintenance activity, b. The individual(s) who performed the sampling, measurements, inspection or maintenance activity, C. The date(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 3. Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. 4. ' Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(8); 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136. Part III Page 5 of 8 Permit No. NCS000508 To meet the intent of the monitoring required by this individual permit, all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status. If it is esta&Whed that the stormwater discharges are substantially identical and the permittee is granted reprearntative outfall status, then sampling requiremetats may be perfbnned at a reduced number of outfalls. Records Retention Visual monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained on-site. The permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, and copies of all reports required by this individual permit for a period of at least 5 years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time. 7. Inspection and EnW The permittee shall allow the Director, or an authorized representative (including an authorized contractor acting as a representative of the Director), or in the case of a facility which discharges through a municipal separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to; a. J3rter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this individual permit; b. Have access to and copy, at reasonable times, any records'that must be kept under the conditions of this individual permit; C. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this individual permit; and d. Sample or monitor at reasonable times, for the purposes of assuring individual permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location. SECTION E: REPORTING REQUIREMENTS Discharge Monitoring Repents Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on Discharge Monitoring Report forms provided by the Director. Submittals shall be delivered to the Division no few than 30 days from the date the facility receives the sampling results from the laboratory. The permittee shall submit an Annual Summary Data Monitoring Report to the appropriate DWQ Regional Office in February of each year. The submittal shall be on forms supplied by, the Division. Part III Page 6 of 8 Permit No. NCS000508 If no discharge has occurred from the facility during a monitoring period, the permittee is required to submit a discharge monitoring report, within 30 days of the end of the monitoring period, giving all required information and indicating"NO FLOW' as per NCAC T1 5A 02B .0506. The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division, and shall retain the completed forms on site. Visual monitoring results should not be submitted to the Division, except upon DWQ's specific requirement to do so. 2. Submitting Reports Two signed copies of Discharge Monitoring Reports (DMRs) shall be submitted to: Central Files Division of Water Quality 1617 Mail Service Center Raleigh; North Carolina 27699-1617 In addition, a separate signed Annual Summary DMR copy shall be submitted to the local DWQ Regional Office (RO) by Match 1 of each year. Addresses for each RO and the counties covered by each RO can be found here: http://www.enr.state.nc.us/html/reeionalofriices.html. The permittee shall retain the completed originals onsite. Visual monitoring results should not be submitted to the Regional Offices or G..!mtral Files specifically requested by DWQ. 3. Availability of Reports Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal• Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division of Water Quality. As required by the Act, analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.613 or in Section 309 of the Federal Act. 4. Non-Stormwater Dischar¢es If the storm event monitored in accordance with this Individual Permit coincides with a non-stormwater discharge, the -permittee shall separately monitor all parameters as required under the non-stormwater discharge permit and provide this information with the stormwater discharge monitoring report. 5. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged. This notification requirement includes pollutants which are not specifically listed in the Individual Permit or subject to notification requirements under 40 CFR Part 122.42 (a). 6. Anticipated Noncomgliancc The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which may result in noncompliance with the Individual Permit requirements. Part III Page 7 of 8 Permit No. NCSOOQ508 7. Spills ' The permittee shall report to the local DWQ Regional Office, within 24 hours, all significant spills as defined in Part VI of this permit. Additionally, the permittee shall report spills including: any oil spill of 25 gallons or more, any spill regardless of amount that causes a sheen on surface waters, any oil spill regardless of amount occurring within 100 feet of surface.waters, and any oil spill less than 25 gallons that cannot be cleaned up within 24 hours. a. Anticipated bypass. If the permittee knows in advance of the.need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. b. Unanticipated bypass. The permittee shall submit notice within 24 hours ofbecoming aware of an unanticipated bypass. 9. Twenty-four Hour Reporting The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the nonoompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has. not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Director may waive the written report on a:case-b-y-case basis if the oral report has been received. . within 24 hours. 10. Other Noncomvliance The permittee shall report all instances of noncompliance not reported under'24 hour reporting at the time monitoring reports are submitted 11. Other Information Where the permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent to be covered under this Individual Permit or in any report to the Director, it shall promptly submit such facts or information. Part III Page 8 of 8 NCS000508 PART IV . LIMITATIONS REOPENER This individual permit shall be modified or alternatively, revoked and reissued, to comply with any applicable effluent guideline or water quality standard issued or approved under provisions of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved: a. Contains different conditions or is otherwise more stringent than any effluent limitation in the individual permit; or b. Controls any pollutant not limited in the individual permit. The individual permit as modified or reissued under this pargraph shall also contain any other requirements in the Act then applicable. PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS. The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the Individual Permit. PART VI DEFINITIONS 1. Act See Clean Water Act. 2. Allowable Non-Stormwater Discharges This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwater conveyance system are: (a) All other discharges .that are authorized by a non-stormwater NPDES permit. (b) . Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, flows from riparian habitats and wetlands. (c) Discharges resulting from fire -fighting or fire -fighting training. 3. Best Management Practices (BMPs) Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the form of a process, activity, or physical structure. More information on BMPs can be found at: http://cfpub.epa.gov/npdes/stormwaterlmenuofbmps/index.cfn 4. Bypass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility. 5. Bulk Storage of Liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. Parts IV, V and VI Page I of 4 Permit No. NCS000508 6. Certificate of Coverage The Certificate of Coverage (COC) is the cover sheet which accompanies the Individual Permit upon issuance and lists the facility name, location, receiving stream, river basin, effective date of coverage under the permit and is signed by the Director. 7. Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et. seq. 8. Division or DWO The Division of Water Quality, Department of Environment and Natural Resources. 9. Director The Director of the Division of Water Quality, the permit issuing authority. 10. EMC The North Carolina Environmental Management Commission. 11. Grab Samole An individual sample collected instantaneously. Grab samples that will be analyzed (quantitatively or qualitatively) must be taken within the first 30 minutes of discharge. 12. Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. 13. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility; a surface impoundment, an injection well, a hazardous waste long-term storage facility or - a surface storage facility. - 14. Municipal Separate Storm Sewer System A stormwater collection system within an incorporated area of local self-government such as a city or town. 15. No ExQosure A condition of no exposure means that all industrial materials- and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. D WQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a facility complies with the terms and conditions described in 40 CFR § 122.26(g) 16, Notice of Intent The state application form which, when submitted to the Division, officially indicates the facility's notice of intent to seek coverage under an Individual Permit. 17. Permittee The owner or operator issued a certificate of coverage pursuant to this Individual Permit. 18. Dint Source Discharge of Stotmwater Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters of the state. Part VI Page 2 of 5 Pages Permit No. NCS000508 19. Representative Storm Event A storm event that measures greater than 0.1 inches of rainfall. The time between this storm event and the previous stone event measuring greater than 0.1 inches must be at least 72 hours. A single storm event may have a period of no precipitation of up to 10 hours. 'For example, if it rains but stops before producing any collectable discharge, a sample may be collected if the next rain producing a discharge begins within 10 hours.. 20. Representative Outfall.Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls. 21. Secondary Containment T Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25 -year, 24-hour storm event. 22.. Section 313 Water Priority Chemical A chemical or chemical category which: a. Is listed in 40 CFR 372.65.pursuant to Section 313 of Title III of the Superfund Amendments and . Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right - to -Know Act of 1986; b. Is present at or above threshold levels at •a facility subject to SARA title III, Section 313 reporting requirements; and C. Meets at least one of the following criteria: (1) Is listed in appendix D of 40 CFR part 122 on Table II (organic priority pollutants), Table III (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances); (2) Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40 CFR 116.4; or (3) Is a pollutant for.which EPA has published acute or chronic water quality criteria. 23. Severe Property Damaee Means substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 24. Significant Materials Inchtdes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to report pursuant to section. 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. 25. Significant Shills Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under section 311 of the Clean Water Pict (Ref: 40 CFR 110.10 and CFR 117.21) or section 102 of CERCLA (Ref 40 CFR 302.4). 26.. Stormwater.Discharge Outfall (SDO) The point of departure of stormwater from a discernible, confined, or discrete conveyance, including but not limited to, storm sewer pipes, drainage ditches, channels, spillways, or channelized collection areas, from which stonnwater flows directly or indirectly into waters of the State ofNorth Carolina. Part VI Page 3 of 5 Pages Permit No. NCS000508 27. Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. 28. Stormwater Associated with Industrial Activi The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 29. Stormwater Pollution Prevention Plan A comprehensive site-specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution Potential of the site. 30. Total Maximum Daily Load (TUDL) TMDLs are written plans for attaining and maintaining water quality standards; in all seasons, for a specific water body and pollutant, (A list of approved TMDLs for the state of North Carolina can be found at http',//h2o.enr.state.nc:us/tmdl/) 31. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act. 32. Vehicle Maintenance Activity Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or airport de-icing operations. 33. Visible Sedimentation Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site. of origin whickcan be seen with the unaided eye. 34. 25 -year. 24 hour storm event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. Part VI Page.4 of 5 Pages Permit No. NCS000508 SUPPLEMENT TO MONITORING, CONTROLS AND LIMITATIONS FOR PERMITTED DISCHARGES SPECIAL CONDITIONS ACUTE TOXICITY MONITORING De-icing Events (Outfalls 004, 006, 016A, 024, 026, 027, 030, 033) The permittee shall conduct acute toxicity tests on discharges occurring from four (4) qualifying de-icing events using protocols defined as definitive in E.P.A. Document EPA/600/4-90/027F entitled "Methods for Measuring the Acute Toxicity of Effluents to Freshwater and Marine Organisms." The monitoring shall be performed as a Ceriodaphnia dubia 24-hour static test. The parameter code for this test is TAE3B. All toxicity testing results required as part of this permit condition will be entered on the Discharge Monitoring Report form for the month in which it was performed,. using the appropriate parameter code. Test results shall'be sent to DWQ in accordance with Part III Section E #2, Submitting Reports. Test data shall be complete -and accurate and include all supporting chemical/physical measurements performed in association with the toxicity tests, as well. as all dose/response data. Total residual chlorine of the effluent toxicity sample must be measured and reported if chlorine is employed for disinfection of the waste stream. Should any test data from either these monitoring requirements or tests performed by the North Carolina Division of Water Quality indicate potential impacts to the receiving stream, this permit may be re -opened and modified to include. alternate monitoring requirements or limits. NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control organism survival and appropriate environmental controls, shall constitute an invalid test and will require immediate follow-up testing to be completed during the next qualified de-icing event following the permittee's receipt of laboratory results. Part VI Page 5 of 5 Pages