Loading...
HomeMy WebLinkAbout20190195 Ver 1_Environmental summary for USACE_20190212NCDOT Division 5 Environmental Summary for USACE GENERALINFO TIP or WBS Number: TIP: B-4516 Road: SR 1433 (Person Road) County: Franklin Stream Name: Sandy Creek River Basin: Tar Pamlico Location: 36.18877 deg. N, -78.20343 deg. W NCDENR-DWR Index Number: 28-78-1-(8) Stream Classification: B NSW+ DESCRIPTION OF WORK Project purpose: Replacement of structurally deficient bridge. Existing structure: Seven-span (1 @18.1', 1@16.8', 1@34.6', 1@17.2', 1@16.7', 1@17.3', 1@17.6') bridge Proposed structure: Two-span (1 @ 100', 1@50') box beam bridge with 4'-0" caps. IMPACT SUMMARY Stream Permanent: 40 feet permanent stream impact associated with rip rap bank stabilization. Is mitigation proposed for project? No, mitigation is not proposed for this project. PROTECTED SPECIES INFORMATION Northern lon� eared bat: BC of May Affect, Likely to Adversely Affect based on programmatic biological opinion with the FHWA, NCDOT and USACE that allows for incidental take for NLEB for projects with a federal nexus in Division 5. Dwarf wedgemussel: Use of the Programmatic Biological Opinion for Bridge and Culvert Replacements/Repairs/Rehabilitations in Eastern North Carolina, NCDOT Divisions 1-8 (June 13, 2018) and a mussel survey on March 20, 2017 provides a BC of May Affect, Not Likely to Adversely Affect for this species. Tar River spinvmussel: Use of the Programmatic Biological Opinion for Bridge and Culvert Replacements/Repairs/Rehabilitations in Eastern North Carolina, NCDOT Divisions 1-8 (June 13, 2018) and a mussel survey on March 20, 2017 provides a BC of May Affect, Not Likely to Adversely Affect for this species. Yellow lance: Use of the Programmatic Biological Opinion for Bridge and Culvert Replacements/Repairs/Rehabilitations in Eastern North Carolina, NCDOT Divisions 1-8 (June 13, 2018) and a mussel survey on March 20, 2017 provides a BC of May Affect, Not Likely to Adversely Affect for this species. Atlantic pi�toe (listed as Proposed Threatened): The Atlantic pigtoe was not collected during the Marcy 20, 2017 survey. However, it has been identified at the bridge site in the recent past (based on NHP data explorer information indicating EO Identification number 18739). The Department proposes at this time to follow prolect commitments outlined in the mussel PBO (see above information). The proiect currently has a let date of June 27, 2019. Accordin�ly, we hope that in-stream construction activities will be completed prior to the likely listin� of the Atlantic pi�toe as Threatened (not to occur prior to October 11, 2019). Michaux's sumac: Survey conducted in suitable habitat on July 17, 2017 did not result in any observations of this plant. A BC of No Effect is provided for Michaux's sumac. CULTURAL RESOURCES INFORMATION Historic Architecture: Historic Architecture Survey Required Form dated February 20, 2015 indicates presence of National Register listed property within APE. This is the Speed Farm (FK285). Survey was required. Historic Architecture and Landscapes Effects Form dated May 29/30, 2018 indicates No Adverse Effect from the project. Archaeology: No Archaeological Survey Required Form dated February 23, 2015 PERMIT REQUESTED: Nationwide Permit 13