HomeMy WebLinkAbout20170536 Ver 2_shoreline plans for permitting_20190212PROJECT SITE SHEETINDEX 1: TITLE 2: EXISTING CONDITIONS 3: PROPOSED PLAN 4-6: DETAILS n n Q w cn SHORELINE STABILIZATION o EFA PROPERTIES LLC �; LAKE TOXAWAY LAKE TOXAWAY PROPERTY OWNERS ASSOCIATION, INC. DB 211, PG 410 STONE WALL APPROX 12" WIDE S88°39'00"E 27.44' S88°39'00"E 43.32' (PF 16, SLIDE 430) (PF 16, SLIDE 430) • S62°10'38"E 10.98' (PF 16, SLIDE 430) HISTORICAL PLAT LINE S88°37'48"E 80.95' + BOAT HOUSE PEf�PB 2, PG 147 (PF 16, SLIDE 430) CURRENT LOT LINE S85°55'31" E � PER PF 16, SLIDE 430 48.14' N46°17'21"E 10.10'�- Y (PF SLIDE IDE 430) �►, (PF 16, SLIDE 430) } DRAINAGE - OUTLET • �� ; t � { CURRENT WATER SURFACE ELEV:3009.69' - • HISTORICAL PLAT t DOCKTPER LINE PB 2, PG 147 LOT 54A, REVISED EFA PROPERTIES LLC ui D.B. 734, PAGES 428 - IN 3 o t/ PF 16, SLIDE 430 }o> �• y o co —2015 WATER LINE 1 a TROUT BUFFER AREA OF EARTH FILL (CROSS HATCH) -Awl ' �I ' STONE WALL APPROX 24" WIDE • F a r' PROPERTY BOUNDARY INFORMATION FROM 6/5/18 SURVEY BY SPRINKLE SURVEYING, PA. - - � � `} - { 4 � s� �" ,� ��`'• =tom CURRENT LOT LINE PER (PF 1 -* HISTORICAL PLAT 16, SLIDE'430) LINE + l "ER PB 2, PG 147 _Z r. S85°53'32"W 180.88' Q(PF 16, SLIDE 430) OI� w "' S85°53'32"W 17.00' � f a (PF 16, SLIDE 430) w. 2.29, s 1 .i ' No o Z It ilk.. -- ti L. • r U LTJ TYPE 1 TURBIDITY CURTAIN - ,cnLli ANCHORED TO DOCK AND SHORELINE`- _ ;.,iiN!!N ■ a i+ � a __ - ! .� ♦t ��t .. iii ♦O EXISTING BOULDER WALL AND FILL TO BE REMOVED; IMPACT 02 PROTECT EXISTING TREES; AVOID_, ti ' _ <_wc') GRADING WITHIN DRIP LINES EXISTING DOCK TO BE PROTECTED Y O U) 0 O Lu � coo U 2015 WATER LINE USE EXISTING WALKWAY TO z N z ACCESS WORK AREA, AVOID < w z DISTURBING GROUND SURFACE p w o 2 Z w N m w rn Q U z PROPOSED OUTER LIMIT OF SHORELINE STABILIZATION; 7 TROUT BUFFER z IMPACT 01 .►� O U N J Z ., JwQ 00 � H Q cn Lu X . Z O 0 J w � Y R 1 O J = Lu DATE: FEB. 2019 SCALE: AS SHOWN NOTE: EXCAVATED FILL MATERIALS SHALL BE HAULED TO A PERMITTED DISPOSAL SITE OFF PROPOSED PLAN THE PROPERTY. NO ON-SITE STOCKPILING OF 0 30 60 90 EXCAVATED MATERIAL SHALL BE ALLOWED. SHEET 3 OF 6 2015 WATER LINE; SEE PLAN I I I I I FILL WIDTH VARIES, SEE PLAN EXISTING BOULDER SEAWALL iiiiii-111 1I III I-1III I-IMI-IMI-IMI-VIII=VIII=VIII-VIII=II11o APPROXIMATE POOL — — 1�=11111=11111=11111=11111=11111=11111=11111= III=11111 llL=J1 LL 1111 EXISTING CONDITIONS EXISTING LAKE BED 2015 WATER LINE; SEE PLAN SEE DISTURBED AREA STABILIZATION DETAILS CONFORM TO I EXISTING GROUND\ � I 12" TO 18" DEPTH SALVAGED CLEAN SOIL/TOPSOIL =III 1.5 MIN. 50-50 MIX OF CLASS A RIPRAP AND 57 STONE EXCAVATE TO STABLE SUBGRADE SOILS LEGEND EXISTING PROPOSED SALVAGED BOULDERS, TYP. 1 TON MIN. 0 EXISTING FILL TO BE REMOVED; IMPLEMENT SEDIMENT CONTROL MEASURES, SEE SHEET 6 WEDGE BRANCHES AND LIMBS <4" DIAM. BETWEEN BOULDERS FOR FISH HABITAT WHERE FEASIBLE APPROXIMATE NORMAL P REMOVE FILL TO ORIGINAL LAKE BED 3' MIN. \- CLASS 1 RIPRAP TYPE 2 NON -WOVEN FILTER FABRIC PROPOSED CONDITIONS 1. SALVAGE TOPSOILAND BOULDERS FOR RE -USE TO THE EXTENT FEASIBLE. 2. LEAVE EXISTING BOULDER WALL IN PLACE WHILE FILL SOILS ARE REMOVED. 3. EXCESS SOIL SHALL BE HAULED TOA PERMITTED DISPOSAL SITE. 4. SEED AND MULCH DISTURBED SOIL. SEE SEEDING SPECS SHEET 5. 5. INSTALL LIVE STAKES ALONG SHORELINE AS SPACE PERMITS. SEE SHEET 5. TYPICAL SECTIONS 4 SHORELINE STABILIZATION (q U n' d W 6 I— z_ Lu W Q W W U 2 w 0 0q IS �0000U � N z z U_ O J U) W cn m rn Q U z z O Q U N_ z J W Q H 0--Q U)wX z�0 J a W Lu � Q O = W U) DATE: FEB. 2019 SCALE: AS SHOWN TYPICAL SECTIONS SHEET 4 OF 6 n m cwt) =U1 N -� _ n Q Q rn N w N Q 0 o z 0 W o cn o W v m w � o (q U n' d W 6 I— z_ Lu W Q W W U 2 w 0 0q IS �0000U � N z z U_ O J U) W cn m rn Q U z z O Q U N_ z J W Q H 0--Q U)wX z�0 J a W Lu � Q O = W U) DATE: FEB. 2019 SCALE: AS SHOWN TYPICAL SECTIONS SHEET 4 OF 6 cwt) =U1 N -� _ (q U n' d W 6 I— z_ Lu W Q W W U 2 w 0 0q IS �0000U � N z z U_ O J U) W cn m rn Q U z z O Q U N_ z J W Q H 0--Q U)wX z�0 J a W Lu � Q O = W U) DATE: FEB. 2019 SCALE: AS SHOWN TYPICAL SECTIONS SHEET 4 OF 6 PERMANENT SEED MIX Seeding Rate = 20 Ib/acre Mulching: wheat or oat straw mulch applied at 2 tons/acre Common Name Scientific Name Percentage Deer Tongue Panicum clandestinum 20 Fox Sedge Carex vulpiniodea 25 Soft Rush Juncus effusus 25 Woolgrass Scirpus cypennus 20 River Oats Chasmanthium latifolium 10 TEMPORARY SEED MIX Application Dates Common Name Scientific Name Rate (Ib/acre) Applied Rate (Ib/acre)Applied TOP CUT AT 15° W Separately w/ Permanent Mix August 15 to May 1 Rye Grain Secale cereale 120 60 May 1 to August 15 Browntop Millet Panicum ramosum 40 20 ri_'� SEED MIXES 5 DISTURBED AREAS n Q SEED AND MULCH DISTURBED AREA a 0 0 Co TOP CUT AT 15° W 00 Of N U \ AFTER Q z U z INSTALLATION w c z MIN. 2 NODES 4' O.C. Z o ABOVE GRADE Q (� '>u) a) —BUDS POINTED W = w Y _j Q U w UPWARD z LIVE STAKE SECTION NOTES: 1. PROTECT EXISTING TREES ALONG SHORELINE TO THE EXTENT PRACTICAL. 2. APPLY TEMPORARY AND PERMANENT SEED MIXES AND MULCH TO DISTURBED SOIL. 3. WHERE SPACE ALLOWS, LIVE STAKE DISTURBED AREAS. 4. FORM PILOT HOLE THROUGH HARD SOIL OR STONE TO PREVENT DAMAGE TO STAKE. 5. LIVE STAKE MIX TO INCLUDE AT LEAST TWO OF THE FOLLOWING SPECIES: SILKY DOGWOOD, SILKY WILLOW, ELDERBERRY, NINEBARK, BUTTONBUSH. 18" MIN. 1/2" TO 2" BASE CUT AT 45 DEG. LIVE STAKE DETAIL 2 DISTURBED AREA STABILIZATION 5 NTS z O Q J U Z N_ J W Q H W Q cn w X ZOO LLI D_ L J L. Ow U) DATE: FEB. 2019 SCALE: AS SHOWN DETAILS SHEET 5 OF 6 18 OZ/SQ. YD. PVC LAMINATED POLYESTER FABRIC LAKE BED ---_____ EXISTING BOULDER WALL TO BE LEFT IN PLACE DURING FILL REMOVAL PLASTIC SHEETING iO4ratirx14 1. ANCHOR CURTAIN TO SHORELINE AND/OR DOCK WITH 1/4" STEEL CHAIN. 2. APPROX. LENGTH OF CURTAIN IS 200 LF. r—J) TYPE 1 TURBIDITY CURTAIN '\__j6 NTS NOTES ON CONSTRUCTION SEQUENCE: 1. DEPLOY TURBIDITY CURTAIN AND ANCHOR TO SHORELINE AND/OR DOCK AS APPROPRIATE. 2. INSTALL PLASTIC SHEETING AFTER FILL SOIL IMMEDIATELY BEHIND WALL IS REMOVED. 3. USE PUMP TO DE -WATER WORK AREA ONCE PLASTIC SHEETING IS INSTALLED. 4. WORK FROM THE SHORELINE AS MUCH AS IS PRACTICAL AND AVOID EQUIPMENT ACCESS TO LAKE BED DURING FILL REMOVAL. 5. FILL SOIL SHALL BE HAULED TO A PERMITTED OFF-SITE DISPOSAL AREA. 6. REMOVE PLASTIC SHEETING AND CEASE PUMPING ONCE ALL FILL SOIL IS REMOVED. 7. REMOVE AND SALVAGE BOULDERS, TAKING CARE TO MINIMIZE DISTURBANCE TO LAKE BED SOILS BY LIFTING BOULDERS VERTICALL RATHER THAN DRAGGING. SOME EQUIIPMENT ACCESS TO THE LAKE BED WILL BE REQUIRED WHERE THE DISTANCE FROM SHORELINE TO EXISTING WALL EXCEEDS THE REACH OF THE EXCAVATOR. DISCHARGE HOSE Uico =U) A LAKE DEWATERING PUMP; =;�'" O Q'_ PLACE ON DOCK OR ■ �..... �. BOULDER WALL ' . SUCTION HOSE A o 0 WORKa AREA W � � U ----- � z o z Lu � U w o J z Q �— � � \ F3 Q J W Z =w PROPOSED = w cn Q U SHORELINE — z PLAN z EXISTING 0 () 10 MIL PLASTIC BOULDER WALL N J Z SHEETING J U) LLI SAND BAGS AS NEEDED -` m TO ANCHOR SHEETING = F- Q WORK AREA LAKE U) W X W O n z SECTION A -A' Q Oma Q = W rn 2 SEDIMENT CONTROL DETAIL 6 NTS DATE: FEB. 2019 Lij NON -WOVEN GEOTEXTILE SILT C14o z BAG ON WOODEN PALLET OR O CLASS A STONE BASE. p (n PROTECT EXISTING DOCK. > � W � m U 6" EPS FOAM FLOATATION w EXISTING DOCK � o 18 OZ/SQ. YD. PVC LAMINATED POLYESTER FABRIC LAKE BED ---_____ EXISTING BOULDER WALL TO BE LEFT IN PLACE DURING FILL REMOVAL PLASTIC SHEETING iO4ratirx14 1. ANCHOR CURTAIN TO SHORELINE AND/OR DOCK WITH 1/4" STEEL CHAIN. 2. APPROX. LENGTH OF CURTAIN IS 200 LF. r—J) TYPE 1 TURBIDITY CURTAIN '\__j6 NTS NOTES ON CONSTRUCTION SEQUENCE: 1. DEPLOY TURBIDITY CURTAIN AND ANCHOR TO SHORELINE AND/OR DOCK AS APPROPRIATE. 2. INSTALL PLASTIC SHEETING AFTER FILL SOIL IMMEDIATELY BEHIND WALL IS REMOVED. 3. USE PUMP TO DE -WATER WORK AREA ONCE PLASTIC SHEETING IS INSTALLED. 4. WORK FROM THE SHORELINE AS MUCH AS IS PRACTICAL AND AVOID EQUIPMENT ACCESS TO LAKE BED DURING FILL REMOVAL. 5. FILL SOIL SHALL BE HAULED TO A PERMITTED OFF-SITE DISPOSAL AREA. 6. REMOVE PLASTIC SHEETING AND CEASE PUMPING ONCE ALL FILL SOIL IS REMOVED. 7. REMOVE AND SALVAGE BOULDERS, TAKING CARE TO MINIMIZE DISTURBANCE TO LAKE BED SOILS BY LIFTING BOULDERS VERTICALL RATHER THAN DRAGGING. SOME EQUIIPMENT ACCESS TO THE LAKE BED WILL BE REQUIRED WHERE THE DISTANCE FROM SHORELINE TO EXISTING WALL EXCEEDS THE REACH OF THE EXCAVATOR. DISCHARGE HOSE Uico =U) A LAKE DEWATERING PUMP; =;�'" O Q'_ PLACE ON DOCK OR ■ �..... �. BOULDER WALL ' . SUCTION HOSE A o 0 WORKa AREA W � � U ----- � z o z Lu � U w o J z Q �— � � \ F3 Q J W Z =w PROPOSED = w cn Q U SHORELINE — z PLAN SCALE: AS SHOWN DETAILS SHEET 6 OF 6 z EXISTING 0 () 10 MIL PLASTIC BOULDER WALL N J Z SHEETING J U) LLI SAND BAGS AS NEEDED -` Q Q TO ANCHOR SHEETING = F- Q WORK AREA LAKE U) W X W O z SECTION A -A' w 0- Y Oma = W 2 SEDIMENT CONTROL DETAIL 6 NTS DATE: FEB. 2019 SCALE: AS SHOWN DETAILS SHEET 6 OF 6