Loading...
HomeMy WebLinkAbout20181400 Ver 1_Buffer Impacts - Dimensions_20181205Strickland, Bev From: Mark S. Davis <msdavis@VaughnMelton.com> Sent: Wednesday, December 05, 2018 3:21 PM To: Annino, Amy M Cc: Michael Calhoun Subject: [External] Lake James Pedestrian Bridge - Buffer Impacts - Dimensions Attachments: Lake James Pedestrian Bridge - Buffer Impacts - Dimensions.pdf External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Amy, Attached are the buffer zone impact drawings for Site 1 and Site 2, which I have marked with approximate areas for each buffer zone (Zone 1 and Zone 2). These area dimensions are close in square footage; however, I have included the impact table which has the exact areas, which were calculated by using survey data entered into CADD and Microstation design software. The 20 and 30 areas with cross hatches in the original permit drawings only represent Buffer Zone 1 (30 feet) and Buffer Zone 2 (20 feet). Hope this clears up the dimensions of the Buffer Zone impacts. I will get the tree counts to you as soon as possible. Thanks for your patience. Mark Mark S. Davis Environmental Specialist Vaughn & Melton Consulting Engineers 40 Colonial Square Sylva, NC 28779 msdavis@vaughnmelton.com 828-354-0117 (Office) 828-508-9670 (Cell) ION vauahn & mieldon plve I � i I W � I Z v� 8 � 1 � I Ze` ,� �b 2 0 0 N M M N W N c c K