Loading...
HomeMy WebLinkAbout20181400 Ver 1_More Info Received_20181106Strickland, Bev From: Mark S. Davis <msdavis@VaughnMelton.com> Sent: Tuesday, November 06, 2018 10:41 AM To: Annino, Amy M Subject: RE: [External] RE: Lake James State Park - Cove Bridge Project Attachments: Lake James State Park - Bridge - EC Scour Hole and Vegetative Conveyance.pdf; Lake James State Park Flow Calculations.pdf Follow Up Flag: Flag Status: Amy, Follow up Flagged Attached is the revised EC plan sheet and flow calculations you requested. If you have any questions, please advise. Thanks, Mark From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Thursday, November 01, 2018 11:32 AM To: Mark S. Davis <msdavis@vaughnmelton.com> Subject: RE: [External] RE: Lake James State Park - Cove Bridge Project Thanks Mark. Can you also include the location / specs for the vegetative conveyance on the plan sheet? Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office amy.annino(cancdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 -�,'��Nothing Compares] Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Mark S. Davis <msdavis@VaughnMelton.com> Sent: Thursday, November 01, 2018 11:15 AM To: Annino, Amy M <amy.annino@ncdenr.gov> Subject: [External] RE: Lake James State Park - Cove Bridge Project External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Amy, It appears that the scour hole is encroaching upon Zone II. We will revise the plan sheets to keep the scour hole out of the buffer. We plan on using both the scour hole and vegetative conveyance. I will get the slope when we redo the plan sheet. I will get the revised drawings to you ASAP. Sorry for the confusion, I should have picked up the placement of the scour hole before I submitted the application. If you have any further questions, please advise. Thanks, Mark Mark S. Davis Environmental Specialist Vaughn & Melton Consulting Engineers 40 Colonial Square Sylva, NC 28779 msdavis@vaughnmelton.com 828-354-0117 (Office) 828-508-9670 (Cell) %M vaughn & mleldon From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Wednesday, October 31, 2018 4:04 PM To: Mark S. Davis <msdavis@vaughnmelton.com> Subject: Lake James State Park - Cove Bridge Project Mark, I am reviewing the Lake James bridge project and have a few questions. Where is the scour hole located in relation to the Catawba buffer? What grade slope is this proposed on? For diffuse flow, the PCN shows that a vegetated conveyance (lower SHWT) will be provided. Is this in relation to the scour hole? Thanks, Amy Annino Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office amy.annino(a)ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties mm Wnghn3Meldom Lake James State Park Stormwater Calculations V&M Project Number: 31720-05 Peak 10 Year Storm Flowrate: Q=CiA C=0.2 i=7.13 in/hr (5 minute t,, 10 year storm, NOAA ATLAS 14 POINT PRECIPITATION FREQUENCY ESTIMATE) A=0.32 acres Q=0.46 cfs Vegetative Conveyance Channel Analysis: Trapezoidal Ditch, 2:1 Side Slopes and 1' Channel Bottom Width at 2% slope Flow: 0.46 cfs Manning's n: 0.1718 Average Velocity: 0.531 fps Max Shear Stress: 0.567 lb/ft2 Channel Depth: 0.45 ft (Add 0.5' free board) Cl) 0 0 N M 0 0 0 N 0 CIO Y m J 0 0 N M �I c s 1 7 FLOODPLAIN MANAGEMENT DEVELOPMENT WHICH WILL TAKE PLACE WITHIN THE LIMITS OF THE 100 YEAR FLOODPLAIN AT ELEVATION 1205.7' IS DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF EXECUTIVE ORDER NO. 123 - UNIFORM FLOODPLAIN MANAGEMENT POLICY. LEGEND LIMITS OF DISTURBANCE SF SILT FENCE CONSTRUCTION ENTRANCE TEMPORARY DIVERSION DITCH TEMP. ROCK SILT CHECK TYPE A Q TEMP. ROCK SILT CHECK TYPE B WATTLE / SEDIMENT TUBE RIPRAP OUTLET PROTECTION SEE (REF.) NCDENR-EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL 4W � j z /2" /BUFFER ZONE N0. 2I % % �� � � IIII I■I I I PROPOSED / \ \ I I I ■ I — 18" PIPE _1215- m 111111 ■/IIII —1220CIA —1115— PROPOSED LIMITS OF DISTURBANCE (TYP.) 1 \ o \N , 1217' / _1230 _ — _ _ CONTOUR \ '' PROPOSED 1235� TEMPORARY ROCK SILT CHECK TYPE B (TYP.)1-240 LF 124 CONVEYANCE ATIVE 125 N / � 26 // '1-1160— � � � 111 I l� l l� l 11 �s \� _ \ / l / l / / / I I 1 I 1 I PROPOSED ♦� SC 250 N.A.G. MATTING ON ALL SLOPES OR APPROVED EQUAL (220 SY) �'� C'. � LL IV PROPOSED SC 250 N.A.G. MATTING ON ALL _ 29012 — 1185 -1180 1175 1z60 \ \ BUFFER ZONE NO. 1 oDnDncrn i tIIIII 40111111111 11I � 111111 I � IIII III IIIIIIIII VIII III111111 � VIII IIIIIIIII 111111 IIIIIIIII 111111 111111 I I I 111111 111111111 lir UN/w// I IIIIIIIII / � IIIIIIIIIII / i IIIIIIIII I I 11111111111 1� IIIIIIIII I IIIIIIIIIII 111 III II 111 I • I I I I I I I IIII 111 t I I l� 111111 \\\\\\ IIII\\ i I I IIII 111111\11 I IIII I I I I II IIIIIIIII I � ill I IIII I I I ___��/II IIIIIIIII -- J�1 II IIII �IIIIIII I PROPOSED SILT FENCE (TYP.) PROPOSED SILT FENCE OUTLET (TYP.) SLOPES OR APPROVED EQUAL (255 ST) 1 GRAPHIC SCALE ( IN FEET ) 1" = 30' PRELIMINARY; NOT FOR CONSTRUCTION FLOODPLAIN BOUNDARY Pipe or Ditch Outlet PLAN VIEW INSTALL LEVEL AND HUSH WITH NATURAL GROUND Square Prefor Scour Hole (P (Rip Rap in ba: not shown for INFLOW LINER: CLAS WITH GEOTEX SECTION A A .G1. IF) I F)F- / ,J 9 G � � n rl 'I O � � � PREFORMED SCOUR HOLE NOT TO SCALE D= 2' W- 4' a, o60 0 -0 M U c N '0 ^ v > U OM z �? X aJ t O = N N U ' 00 06 2 Co N 0- 00 0 3 Q o� .N =Q (v IS CL z 000 L. 00 � N �O c a V ti c 0 OOLLiA r LU LL W o s� N ora 0 v� C=LC%) 0 =Q vi z 000 L. 00 � N �O c a V ti Z Z N = OOLLiA r LU LL W o N ora 0 z O � OC Q W LU O�z� UW W v00 CN °6 Ex 0 � Z � � O o i m Q Q � U LL p� O Oac� a�� OW< F 4 Q Q LL, o z Q J Cn O to cn W WW U QG Q Q =�i� W N L.L LLJ Q O Q (3)0 N O z _I N U) Revisions No. I Date Project Number: 1634 Date: 10.12.2018 Drawn by: BAS CLEARING & GRUBBING PHASE FOR EROSION & SEDIMENTATION CONTROL Sheet Number: n2 Q G co W O U Cn Z W 2 Z) U O 0 Z O U Cn Z O U 0 O