HomeMy WebLinkAbout310077_Copy of CK_31_77_2018_IrrigationRecords_20190212FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # r Pivot 4 F8
Field Size (wetted acres) = (A) 77.37
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 11 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type Soybeans Recommended PAN 136
Loading (Ib/acre)
(1) (2) (3) (4) (5) (5) (7) (ti) (9) (10) (11)
Lagoon
ID
Date
(mm/dd/yr)
Start
Time
End
Time
Total
Minutes
(3)-(2)
Irrigation
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total Volum(
(gallons)
(6) x (5) x (4;
Volume
per Acre
(gal/acre)
(7) / (A)
✓aste Analys
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
(8)(9)
1000
Nitrogen
Balance**
(Ib/acre)
136
Weather
Code
Inspections
(Initials)
1
6/7/2018
8:00 AM
5:00 PM
540
1
875
472500
6107
1.96
11.97
124.03
c
SG
1
6/8/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.96
13.30
110.73
c
SG
1
6/9/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.96
13.30
97.43
c
SG
1
6/10/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.96
13.30
84.13
c
SG
1
7/12/2018
9:00 AM
6:00 PM
540
1
875
472500
6107
1.92
11.73
72.41
c
SG
1
7/13/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.92
13.03
59.38
c
SG
1
8/10/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.92
13.03
46.35
c
SG
1
9/3/2018
8:00 AM
7:00 PM
660
1
875
577500
7464
1.92
14.33
32.02
c
SG
t,rop tycie i otais = 1 4 14 ( ouu
1U,5.yj
Owner's Signature Operator's SignatL
Certified Operator (Print) Operator's Certification �
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # Pivot 1 F1
Field Size (wetted acres) = (A) 63.26
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 1 31 1 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan WC Deducted
Crop Type Soybeans Recommended PAN 106
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (101
NEW
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
PAN Applied Nitrogen
laste Analys (Ib/acre) Balance**
PAN* (8) x (9) (Ib/acre)
(Ib/1000 gal; 1000
106
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3)-(2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Fotal Volum(
(gallons)
6) x (5) x (4;
Volume
per Acre
(gal/acre)
(7) / (A)
2
4/18/2018
9:00 AM
6:00 PM
540
1
880
475200
7512
1.51 11.34 94.66
c
SG
2
5/2/2018
8:00 AM
5:00 PM
540
1
880
475200
7512
1.51 11.34 83.31
c
SG
2
5/4/2018
8:00 AM
5:00 PM
540
1
880
475200
7512
1.51 11.34 71.97
c
SG
2
5/14/2018
8:00 AM
7:00 PM
660
1
880
580800
9181
1.51 13.86 58.11
c
SG
2
6/21/2018
8:00 AM
7:00 PM
660
1
880
580800
9181
1.51 13.86 44.24
c
SG
2
9/3/2018
8:00 AM
7:00 PM
660
1
880
580800
9181
0.85 7.80 36.44
c
SG
2
9/20/2018
8:00 AM
6:00 PM
600
1
880
528000
8347
0.85 7.09 29.35
c
SG
crop c:ycie i otais = 1 jeyeuuu
Owner's Signature Operator's Signatt
Certified Operator (Print) Operator's Certification
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # I Pivot 1 F1
Field Size (wetted acres) = (A) 63.26
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 1 31 1 1 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type WC Recommended PAN 30
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
rfiff
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
PAN Applied Nitrogen
aste Analys (Ib/acre) Balance**
PAN* (8) x (9) (Ib/acre)
(Ib/1000 gal) 1000
30
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3) - (2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total VolumE
(gallons)
6) x (5) x (4;
Volume
per Acre
(gal/acre)
(7) / (A)
2
9/27/2018
8:00 AM
4:00 PM
480
1
880
422400
6677
0.85 5.68 24.32
c
SG
2
9/28/2018
8:00 AM
5:00 PM
540
1
880
475200
7512
0.85 6.39 17.94
c
SG
2
1/8/2019
8:00 AM
4:00 PM
480
1
880
422400
6677
1.81 12.09 5.85
c
SG
END
crop uycie i otais = I -i jzuuuu 1
1 24.-10 1
Owner's Signature Operator's SignatL
Certified Operator (Print) Operator's Certification �
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) ########
FORM IRR -2 Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # Pivot 1 F1 Facility Number 31 - 77
Field Size (wetted acres) = (A) 63.26
Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick
Owner's Address Irrigation Operator's
Address
Owner's Phone # Operator's Phone #
From Waste Utilization Plan
Crop Type WC Recommended PAN 30
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (101 (111
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
Waste Analysis
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
(8) x (9)
1000
Nitrogen
Balance**
(Ib/acre)
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3)-(2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total Volume
(gallons)
(6) x (5) x (4)
Volume
per Acre
(gal/acre)
(7) / (A)
30
2
2/18/2018
10:00 AM
6:00 PM
480
1
880
422400
6677
1.51
10.08
19.92
c
SG
crop uycie i otais = I 4zz4uu I I -i u.ub
Owner's Signature Operator's Signature
Certified Operator (Print) Operator's Certification No.
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # r Pivot 1 F2
Field Size (wetted acres) = (A) 91.49
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 1 31 1 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type WC Recommended PAN 30
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
PAN Applied Nitrogen
Waste Analysis (Ib/acre) Balance**
PAN* 8 x 9 (Ib/acre)
(Ib/1000 gal) 1000
30
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3) - (2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total VolumE
(gallons)
(6) x (5) x (4
Volume
per Acre
(gal/acre)
(7) / (A)
2
10/19/2018
8:00 AM
4:00 PM
480
1
880
422400
4617
0.65 3.00 27.00
c
SG
2
10/20/2018
8:00 AM
6:00 PM
600
1
880
528000
5771
0.65 3.75 23.25
c
SG
Crop Cycle Totals= 1 950400
6.75
Owner's Signature Operator's SignatL
Certified Operator (Print) Operator's Certification N
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) ########
FORM IRR -2 Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone #F -Pivot 1 F2 Facility Number 31 77
Field Size (wetted acres) = (A) 91.49
Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick
Owner's Address Irrigation Operator's
Address
Owner's Phone # Operator's Phone #
From Waste Utilization Plan WC Deducted
Crop Type Corn Recommended PAN 105
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
Waste Analysis
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
8 x 9
1000
Nitrogen
Balance**
(Ib/acre)
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3) - (2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total Volume
(gallons)
(6) x (5) x (4)
Volume
per Acre
(gal/acre)
(7) / (A)
105
2
6/7/2018
10:00 AM
5:00 PM
420
1
880
369600
4040
1.51
6.10
98.90
c
SG
2
6/8/2018
8:00 AM
6:00 PM
600
1
880
528000
5771
1.51
8.71
90.19
c
SG
Crop Cycle Totals = 1 897600
14.81
Owner's Signature Operator's Signature
Certified Operator (Print) Operator's Certification No.
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.)
12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # Pivot 2 F3
Field Size (wetted acres) = (A) 48.88
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 1 3 1 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type WC Recommended PAN 30
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (81 (91 (101
lu
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
aste Analys
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
(8) x (9)
1000
Nitrogen
Balance**
(Ib/acre)
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3) - (2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total VolumE
(gallons)
16) x (5) x (4
Volume
per Acre
(gal/acre)
(7) / (A)
30
3
2/2/2019
12:00 PM
11:00 PM
660
1
356
234960
4807
1.90
9.13
20.87
c
SG
crop cycie i otais = I 2J49bU
9.1j
Owner's Signature Operator's SignatL
Certified Operator (Print) Operator's Certification
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Facility Number 1 31 - 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type Wheat Recommended PAN 132
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
Lagoon
ID
Zone # Pivot 2 F4
Field Size (wetted acres) = (A)
49.9
Farm Owner
John Kilpatrick
Owner's Address
Total Volume
(gallons)
(6) x (5) x (4)
Owner's Phone #
Waste Analysis
PAN*
(Ib/1000 gal)
Facility Number 1 31 - 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type Wheat Recommended PAN 132
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
Lagoon
ID
Date
(mm/dd/yr)
Start
Time
End
Time
Total
Minutes
(3) - (2)
Irrigation
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total Volume
(gallons)
(6) x (5) x (4)
Volume
per Acre
(gal/acre)
(7) / (A)
Waste Analysis
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
8 x 9
1000
Nitrogen
Balance**
(Ib/acre)
132
Weather
Code
Inspections
(Initials)
3
9/19/2018
8:00 AM
6:00 PM
600
1
356
213600
4281
1.94
8.30
123.70
c
SG
3
9/20/2018
8:00 AM
6:00 PM
600
1
356
213600
4281
1.94
8.30
115.39
c
SG
3
9/21/2018
9:00 AM
7:00 PM
600
1
356
213600
4281
1.94
8.30
107.09
c
SG
3
9/24/2018
8:00 AM
5:00 PM
540
1
356
192240
3853
1.94
7.47
99.61
c
SG
3
9/27/2018
8:00 AM
4:00 PM
480
1
356
170880
3424
1.94
6.64
92.97
c
SG
3
10/22/2018
8:00 AM
4:00 PM
480
1
356
170880
3424
1.94
6.64
86.33
c
SG
3
12/27/2018
8:00 AM
6:00 PM
600
1
356
213600
4281
1.90
8.13
78.19
c
SG
3
1/8/2019
8:00 AM
4:00 PM
480
1
356
170880
3424
1.90
6.51
71.69
c
SG
3
1/9/2019
8:00 AM
5:00 PM
540
1
356
192240
3853
1.90
7.32
64.37
c
SG
3
1/10/2019
8:00 AM
5:00 PM
540
1
356
192240
3853
1.90
7.32
57.05
c
SG
Crop Cycle Totals= 1 1943760
74.95
Owner's Signature Operator's Signature
Certified Operator (Print) Operator's Certification No.
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.)
12/20/2006
FORM IRR -2 Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # Pivot 2 F3 Facility Number 31 - 77
Field Size (wetted acres) = (A) 48.88
Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick
Owner's Address Irrigation Operator's
Address
Owner's Phone # Operator's Phone #
From Waste Utilization Plan
Crop Type Soybeans Recommended PAN 136
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (1 11
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
Waste Analysis
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
8 x 9
1000
Nitrogen
Balance"
(Ib/acre)
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3)-(2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total Volume
(gallons)
(6) x (5) x (4)
Volume
per Acre
(gal/acre)
(7) / (A)
136
3
9/3/2018
8:00 AM
7:00 PM
660
1
356
234960
4807
1.94
9.33
126.67
c
SG
3
9/4/2018
8:00 AM
6:00 PM
600
1
356
213600
4370
1.94
8.48
118.20
c
SG
3
9/5/2018
8:00 AM
6:00 PM
600
1
356
213600
4370
1.94
8.48
109.72
c
SG
crop uycie i oiais = 1 0021 OU I I 20.2b
Owner's Signature Operator's Signature
Certified Operator (Print) Operator's Certification No.
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.)
12/20/2006
FORM IRR -2 Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # r Pivot 2 F4 Facility Number 31 - 77
Field Size (wetted acres) = (A) 49.9
Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick
Owner's Address Irrigation Operator's
Address
Owner's Phone # Operator's Phone #
From Waste Utilization Plan
Crop Type Corn Recommended PAN 135
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
Waste Analysis
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
8 x 9
1000
Nitrogen
Balance**
(Ib/acre)
Weather
Code
Inspections
(Initials)
Start End
Time Time
Total
Minutes
(3) - (2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Volume
Total Volume per Acre
(gallons) (gal/acre)
(6) x (5) x (4) (7) / (A)
135
3
3/29/2018
7:00 AM 5:00 PM
600
1
356
213600 4281
2.66
11.39
123.61
c
SG
3
3/30/2018
7:00 AM 5:00 PM
600
1
356
213600 4281
2.66
11.39
112.23
c
SG
3
5/4/2018
8:00 AM 5:00 PM
540
1
356
192240 3853
2.26
8.71
103.52
c
SG
3
6/7/2018
10:00 AM 5:00 PM
420
1
356
149520 2996
2.26
6.77
96.75
c
SG
3
6/8/2018
8:00 AM 6:00 PM
600
1
356
213600 4281
2.26
9.67
87.07
c
SG
3
6/13/2018
8:00 AM 6:00 PM
600
1
356
213600 4281
2.26
9.67
77.40
c
SG
3
6/18/2018
8:00 AM 6:00 PM
600
1
356
213600 4281
2.26
9.67
67.73
c
SG
crop uycie i otais = I -i 4uy r lou I 1 e 1.Z r
Owner's Signature Operator's Signature
Certified Operator (Print) Operator's Certification No.
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.)
12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # I Pivot 4 F7
Field Size (wetted acres) = (A) 72.97
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 1 31 1 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan WC Deducted
Crop Type Corn Recommended PAN 105
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
Waste Analysis
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
(8) x (9)
1000
Nitrogen
Balance**
(Ib/acre)
Weather
Code
Inspections
(Initials)
Volume
Start End Total # of Flow Total VolumE per Acre
Time Time Minutes Sprinklers Rate (gallons) (gal/acre)
(3)-(2) Operating (gal/min) 6) x (5) x (4; (7) / (A)
105
1
3/4/2018
8:00 AM
5:00 PM
540
1
875
472500
6475
1.22
7.90
97.10
c
SG
1
3/5/2018
7:00 AM
12:00 PM
300
1
875
262500
3597
1.22
4.39
92.71
c
SG
1
3/29/2018
7:00 AM
4:00 PM
540
1
875
472500
6475
3.24
20.98
71.73
c
SG
1
3/30/2018
8:00 AM
5:00 PM
540
1
875
472500
6475
3.24
20.98
50.75
c
SG
1
4/3/2018
8:00 AM
5:00 PM
540
1
875
472500
6475
1.96
12.69
38.06
c
SG
1
4/18/2018
8:00 AM
4:00 PM
480
1
875
420000
5756
1.96
11.28
26.78
c
SG
1
5/2/2018
8:00 AM
5:00 PM
540
1
875
472500
6475
1.96
12.69
14.09
c
SG
1
5/4/2018
8:00 AM
5:00 PM
540
1
875
472500
6475
1.96
12.69
1.40
c
SG
END
prop toycie i otais = I ow to
Owner's Signature Operator's Signatu
Certified Operator (Print) Operator's Certification N
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # Pivot 4 F7
Field Size (wetted acres) = (A) 72.97
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 1 3 1 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type Wheat Recommended PAN 132
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (101
MEN
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
PAN Applied Nitrogen
Waste Analysis (Ib/acre) Balance**
PAN* (8) x (9) (Ib/acre)
(Ib/1000 gal) 1000
132
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3)-(2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Fotal Volum(
(gallons)
16) x (5) x (4;
Volume
per Acre
(gal/acre)
(7) / (A)
1
9/20/2018
8:00 AM
6:00 PM
600
1
875
525000
7195
1.92 13.81 118.19
c
SG
1
9/21/2018
8:00 AM
6:00 PM
600
1
875
525000
7195
1.92 13.81 104.37
c
SG
1
10/22/2018
8.00 AM
4:00 PM
480
1
875
420000
5756
1.92 11.05 93.32
c
SG
1
12/22/2018
8:00 AM
7:00 PM
660
1
875
577500
7914
0.66 5.22 88.10
c
SG
1
1/9/2019
8.00 AM
5:00 PM
540
1
875
472500
6475
0.66 4.27 83.82
c
SG
1
2/2/2019
12:00 PM
11:00 PM
660
1
875
577500
7914
0.66 5.22 78.60
c
SG
crop uycie i otais = 1 juyrouu
OJ.4u
Owner's Signature Operator's Signatt
Certified Operator (Print) Operator's Certification
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # Pivot 4 F7
Field Size (wetted acres) = (A) 72.97
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 1 31 -1 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type Winter Cover Recommended PAN 30
Loading (Ib/acre)
(1) (2) (3) (4) (5) (6) (7) (81 (91 (101
Iu
Lagoon
ID
Date
(mm/dd/yr)
Irrigation
PAN Applied Nitrogen
Jaste Analys (Ib/acre) Balance**
PAN* (8) x (9) (Ib/acre)
(Ib/1000 gal) 1000
30
Weather
Code
Inspections
(Initials)
Start
Time
End
Time
Total
Minutes
(3) - (2)
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total VolumE
(gallons)
6) x (5) x (4;
Volume
per Acre
(gal/acre)
(7) / (A)
1
2/1/2018
7:00 AM
4:30 PM
570
1
875
498750
6835
1.22 8.34 21.66
c
SG
1
2/6/2018
8:00 AM
5:00 PM
540
1
875
472500
6475
1.22 7.90 13.76
c
SG
crop uycie i otais = I y t -i zou
Owner's Signature Operator's Signatu
Certified Operator (Print) Operator's Certification N
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006
FORM IRR -2
Lagoon Liquid Irrigation Fields Record
One Form for Each Field per Crop Cycle
Zone # r Pivot 4 F8
Field Size (wetted acres) = (A) 77.37
Farm Owner John Kilpatrick
Owner's Address
Owner's Phone #
Facility Number 11 77
Irrigation Operator David Kilpatrick
Irrigation Operator's
Address
Operator's Phone #
From Waste Utilization Plan
Crop Type Soybeans Recommended PAN 136
Loading (Ib/acre)
(1) (2) (3) (4) (5) (5) (7) (ti) (9) (10) (11)
Lagoon
ID
Date
(mm/dd/yr)
Start
Time
End
Time
Total
Minutes
(3)-(2)
Irrigation
# of
Sprinklers
Operating
Flow
Rate
(gal/min)
Total Volum(
(gallons)
(6) x (5) x (4;
Volume
per Acre
(gal/acre)
(7) / (A)
✓aste Analys
PAN*
(Ib/1000 gal)
PAN Applied
(Ib/acre)
(8)(9)
1000
Nitrogen
Balance**
(Ib/acre)
136
Weather
Code
Inspections
(Initials)
1
6/7/2018
8:00 AM
5:00 PM
540
1
875
472500
6107
1.96
11.97
124.03
c
SG
1
6/8/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.96
13.30
110.73
c
SG
1
6/9/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.96
13.30
97.43
c
SG
1
6/10/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.96
13.30
84.13
c
SG
1
7/12/2018
9:00 AM
6:00 PM
540
1
875
472500
6107
1.92
11.73
72.41
c
SG
1
7/13/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.92
13.03
59.38
c
SG
1
8/10/2018
8:00 AM
6:00 PM
600
1
875
525000
6786
1.92
13.03
46.35
c
SG
1
9/3/2018
8:00 AM
7:00 PM
660
1
875
577500
7464
1.92
14.33
32.02
c
SG
t,rop tycie i otais = 1 4 14 ( ouu
1U,5.yj
Owner's Signature Operator's SignatL
Certified Operator (Print) Operator's Certification �
* NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events.
** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event.
***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006