Loading...
HomeMy WebLinkAbout310077_Copy of CK_31_77_2018_IrrigationRecords_20190212FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # r Pivot 4 F8 Field Size (wetted acres) = (A) 77.37 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 11 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type Soybeans Recommended PAN 136 Loading (Ib/acre) (1) (2) (3) (4) (5) (5) (7) (ti) (9) (10) (11) Lagoon ID Date (mm/dd/yr) Start Time End Time Total Minutes (3)-(2) Irrigation # of Sprinklers Operating Flow Rate (gal/min) Total Volum( (gallons) (6) x (5) x (4; Volume per Acre (gal/acre) (7) / (A) ✓aste Analys PAN* (Ib/1000 gal) PAN Applied (Ib/acre) (8)(9) 1000 Nitrogen Balance** (Ib/acre) 136 Weather Code Inspections (Initials) 1 6/7/2018 8:00 AM 5:00 PM 540 1 875 472500 6107 1.96 11.97 124.03 c SG 1 6/8/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.96 13.30 110.73 c SG 1 6/9/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.96 13.30 97.43 c SG 1 6/10/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.96 13.30 84.13 c SG 1 7/12/2018 9:00 AM 6:00 PM 540 1 875 472500 6107 1.92 11.73 72.41 c SG 1 7/13/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.92 13.03 59.38 c SG 1 8/10/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.92 13.03 46.35 c SG 1 9/3/2018 8:00 AM 7:00 PM 660 1 875 577500 7464 1.92 14.33 32.02 c SG t,rop tycie i otais = 1 4 14 ( ouu 1U,5.yj Owner's Signature Operator's SignatL Certified Operator (Print) Operator's Certification � * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # Pivot 1 F1 Field Size (wetted acres) = (A) 63.26 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 1 31 1 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan WC Deducted Crop Type Soybeans Recommended PAN 106 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (101 NEW Lagoon ID Date (mm/dd/yr) Irrigation PAN Applied Nitrogen laste Analys (Ib/acre) Balance** PAN* (8) x (9) (Ib/acre) (Ib/1000 gal; 1000 106 Weather Code Inspections (Initials) Start Time End Time Total Minutes (3)-(2) # of Sprinklers Operating Flow Rate (gal/min) Fotal Volum( (gallons) 6) x (5) x (4; Volume per Acre (gal/acre) (7) / (A) 2 4/18/2018 9:00 AM 6:00 PM 540 1 880 475200 7512 1.51 11.34 94.66 c SG 2 5/2/2018 8:00 AM 5:00 PM 540 1 880 475200 7512 1.51 11.34 83.31 c SG 2 5/4/2018 8:00 AM 5:00 PM 540 1 880 475200 7512 1.51 11.34 71.97 c SG 2 5/14/2018 8:00 AM 7:00 PM 660 1 880 580800 9181 1.51 13.86 58.11 c SG 2 6/21/2018 8:00 AM 7:00 PM 660 1 880 580800 9181 1.51 13.86 44.24 c SG 2 9/3/2018 8:00 AM 7:00 PM 660 1 880 580800 9181 0.85 7.80 36.44 c SG 2 9/20/2018 8:00 AM 6:00 PM 600 1 880 528000 8347 0.85 7.09 29.35 c SG crop c:ycie i otais = 1 jeyeuuu Owner's Signature Operator's Signatt Certified Operator (Print) Operator's Certification * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # I Pivot 1 F1 Field Size (wetted acres) = (A) 63.26 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 1 31 1 1 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type WC Recommended PAN 30 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) rfiff Lagoon ID Date (mm/dd/yr) Irrigation PAN Applied Nitrogen aste Analys (Ib/acre) Balance** PAN* (8) x (9) (Ib/acre) (Ib/1000 gal) 1000 30 Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total VolumE (gallons) 6) x (5) x (4; Volume per Acre (gal/acre) (7) / (A) 2 9/27/2018 8:00 AM 4:00 PM 480 1 880 422400 6677 0.85 5.68 24.32 c SG 2 9/28/2018 8:00 AM 5:00 PM 540 1 880 475200 7512 0.85 6.39 17.94 c SG 2 1/8/2019 8:00 AM 4:00 PM 480 1 880 422400 6677 1.81 12.09 5.85 c SG END crop uycie i otais = I -i jzuuuu 1 1 24.-10 1 Owner's Signature Operator's SignatL Certified Operator (Print) Operator's Certification � * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. 'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) ######## FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # Pivot 1 F1 Facility Number 31 - 77 Field Size (wetted acres) = (A) 63.26 Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick Owner's Address Irrigation Operator's Address Owner's Phone # Operator's Phone # From Waste Utilization Plan Crop Type WC Recommended PAN 30 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (101 (111 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (Ib/1000 gal) PAN Applied (Ib/acre) (8) x (9) 1000 Nitrogen Balance** (Ib/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3)-(2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 30 2 2/18/2018 10:00 AM 6:00 PM 480 1 880 422400 6677 1.51 10.08 19.92 c SG crop uycie i otais = I 4zz4uu I I -i u.ub Owner's Signature Operator's Signature Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. 'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # r Pivot 1 F2 Field Size (wetted acres) = (A) 91.49 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 1 31 1 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type WC Recommended PAN 30 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) Lagoon ID Date (mm/dd/yr) Irrigation PAN Applied Nitrogen Waste Analysis (Ib/acre) Balance** PAN* 8 x 9 (Ib/acre) (Ib/1000 gal) 1000 30 Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total VolumE (gallons) (6) x (5) x (4 Volume per Acre (gal/acre) (7) / (A) 2 10/19/2018 8:00 AM 4:00 PM 480 1 880 422400 4617 0.65 3.00 27.00 c SG 2 10/20/2018 8:00 AM 6:00 PM 600 1 880 528000 5771 0.65 3.75 23.25 c SG Crop Cycle Totals= 1 950400 6.75 Owner's Signature Operator's SignatL Certified Operator (Print) Operator's Certification N * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) ######## FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone #F -Pivot 1 F2 Facility Number 31 77 Field Size (wetted acres) = (A) 91.49 Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick Owner's Address Irrigation Operator's Address Owner's Phone # Operator's Phone # From Waste Utilization Plan WC Deducted Crop Type Corn Recommended PAN 105 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (Ib/1000 gal) PAN Applied (Ib/acre) 8 x 9 1000 Nitrogen Balance** (Ib/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 105 2 6/7/2018 10:00 AM 5:00 PM 420 1 880 369600 4040 1.51 6.10 98.90 c SG 2 6/8/2018 8:00 AM 6:00 PM 600 1 880 528000 5771 1.51 8.71 90.19 c SG Crop Cycle Totals = 1 897600 14.81 Owner's Signature Operator's Signature Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # Pivot 2 F3 Field Size (wetted acres) = (A) 48.88 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 1 3 1 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type WC Recommended PAN 30 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (81 (91 (101 lu Lagoon ID Date (mm/dd/yr) Irrigation aste Analys PAN* (Ib/1000 gal) PAN Applied (Ib/acre) (8) x (9) 1000 Nitrogen Balance** (Ib/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total VolumE (gallons) 16) x (5) x (4 Volume per Acre (gal/acre) (7) / (A) 30 3 2/2/2019 12:00 PM 11:00 PM 660 1 356 234960 4807 1.90 9.13 20.87 c SG crop cycie i otais = I 2J49bU 9.1j Owner's Signature Operator's SignatL Certified Operator (Print) Operator's Certification * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Facility Number 1 31 - 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type Wheat Recommended PAN 132 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) Lagoon ID Zone # Pivot 2 F4 Field Size (wetted acres) = (A) 49.9 Farm Owner John Kilpatrick Owner's Address Total Volume (gallons) (6) x (5) x (4) Owner's Phone # Waste Analysis PAN* (Ib/1000 gal) Facility Number 1 31 - 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type Wheat Recommended PAN 132 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) Lagoon ID Date (mm/dd/yr) Start Time End Time Total Minutes (3) - (2) Irrigation # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) Waste Analysis PAN* (Ib/1000 gal) PAN Applied (Ib/acre) 8 x 9 1000 Nitrogen Balance** (Ib/acre) 132 Weather Code Inspections (Initials) 3 9/19/2018 8:00 AM 6:00 PM 600 1 356 213600 4281 1.94 8.30 123.70 c SG 3 9/20/2018 8:00 AM 6:00 PM 600 1 356 213600 4281 1.94 8.30 115.39 c SG 3 9/21/2018 9:00 AM 7:00 PM 600 1 356 213600 4281 1.94 8.30 107.09 c SG 3 9/24/2018 8:00 AM 5:00 PM 540 1 356 192240 3853 1.94 7.47 99.61 c SG 3 9/27/2018 8:00 AM 4:00 PM 480 1 356 170880 3424 1.94 6.64 92.97 c SG 3 10/22/2018 8:00 AM 4:00 PM 480 1 356 170880 3424 1.94 6.64 86.33 c SG 3 12/27/2018 8:00 AM 6:00 PM 600 1 356 213600 4281 1.90 8.13 78.19 c SG 3 1/8/2019 8:00 AM 4:00 PM 480 1 356 170880 3424 1.90 6.51 71.69 c SG 3 1/9/2019 8:00 AM 5:00 PM 540 1 356 192240 3853 1.90 7.32 64.37 c SG 3 1/10/2019 8:00 AM 5:00 PM 540 1 356 192240 3853 1.90 7.32 57.05 c SG Crop Cycle Totals= 1 1943760 74.95 Owner's Signature Operator's Signature Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. 'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # Pivot 2 F3 Facility Number 31 - 77 Field Size (wetted acres) = (A) 48.88 Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick Owner's Address Irrigation Operator's Address Owner's Phone # Operator's Phone # From Waste Utilization Plan Crop Type Soybeans Recommended PAN 136 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (1 11 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (Ib/1000 gal) PAN Applied (Ib/acre) 8 x 9 1000 Nitrogen Balance" (Ib/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3)-(2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 136 3 9/3/2018 8:00 AM 7:00 PM 660 1 356 234960 4807 1.94 9.33 126.67 c SG 3 9/4/2018 8:00 AM 6:00 PM 600 1 356 213600 4370 1.94 8.48 118.20 c SG 3 9/5/2018 8:00 AM 6:00 PM 600 1 356 213600 4370 1.94 8.48 109.72 c SG crop uycie i oiais = 1 0021 OU I I 20.2b Owner's Signature Operator's Signature Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. 'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # r Pivot 2 F4 Facility Number 31 - 77 Field Size (wetted acres) = (A) 49.9 Farm Owner John Kilpatrick Irrigation Operator David Kilpatrick Owner's Address Irrigation Operator's Address Owner's Phone # Operator's Phone # From Waste Utilization Plan Crop Type Corn Recommended PAN 135 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (Ib/1000 gal) PAN Applied (Ib/acre) 8 x 9 1000 Nitrogen Balance** (Ib/acre) Weather Code Inspections (Initials) Start End Time Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Volume Total Volume per Acre (gallons) (gal/acre) (6) x (5) x (4) (7) / (A) 135 3 3/29/2018 7:00 AM 5:00 PM 600 1 356 213600 4281 2.66 11.39 123.61 c SG 3 3/30/2018 7:00 AM 5:00 PM 600 1 356 213600 4281 2.66 11.39 112.23 c SG 3 5/4/2018 8:00 AM 5:00 PM 540 1 356 192240 3853 2.26 8.71 103.52 c SG 3 6/7/2018 10:00 AM 5:00 PM 420 1 356 149520 2996 2.26 6.77 96.75 c SG 3 6/8/2018 8:00 AM 6:00 PM 600 1 356 213600 4281 2.26 9.67 87.07 c SG 3 6/13/2018 8:00 AM 6:00 PM 600 1 356 213600 4281 2.26 9.67 77.40 c SG 3 6/18/2018 8:00 AM 6:00 PM 600 1 356 213600 4281 2.26 9.67 67.73 c SG crop uycie i otais = I -i 4uy r lou I 1 e 1.Z r Owner's Signature Operator's Signature Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # I Pivot 4 F7 Field Size (wetted acres) = (A) 72.97 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 1 31 1 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan WC Deducted Crop Type Corn Recommended PAN 105 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (Ib/1000 gal) PAN Applied (Ib/acre) (8) x (9) 1000 Nitrogen Balance** (Ib/acre) Weather Code Inspections (Initials) Volume Start End Total # of Flow Total VolumE per Acre Time Time Minutes Sprinklers Rate (gallons) (gal/acre) (3)-(2) Operating (gal/min) 6) x (5) x (4; (7) / (A) 105 1 3/4/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.22 7.90 97.10 c SG 1 3/5/2018 7:00 AM 12:00 PM 300 1 875 262500 3597 1.22 4.39 92.71 c SG 1 3/29/2018 7:00 AM 4:00 PM 540 1 875 472500 6475 3.24 20.98 71.73 c SG 1 3/30/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 3.24 20.98 50.75 c SG 1 4/3/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.96 12.69 38.06 c SG 1 4/18/2018 8:00 AM 4:00 PM 480 1 875 420000 5756 1.96 11.28 26.78 c SG 1 5/2/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.96 12.69 14.09 c SG 1 5/4/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.96 12.69 1.40 c SG END prop toycie i otais = I ow to Owner's Signature Operator's Signatu Certified Operator (Print) Operator's Certification N * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. 'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # Pivot 4 F7 Field Size (wetted acres) = (A) 72.97 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 1 3 1 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type Wheat Recommended PAN 132 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (101 MEN Lagoon ID Date (mm/dd/yr) Irrigation PAN Applied Nitrogen Waste Analysis (Ib/acre) Balance** PAN* (8) x (9) (Ib/acre) (Ib/1000 gal) 1000 132 Weather Code Inspections (Initials) Start Time End Time Total Minutes (3)-(2) # of Sprinklers Operating Flow Rate (gal/min) Fotal Volum( (gallons) 16) x (5) x (4; Volume per Acre (gal/acre) (7) / (A) 1 9/20/2018 8:00 AM 6:00 PM 600 1 875 525000 7195 1.92 13.81 118.19 c SG 1 9/21/2018 8:00 AM 6:00 PM 600 1 875 525000 7195 1.92 13.81 104.37 c SG 1 10/22/2018 8.00 AM 4:00 PM 480 1 875 420000 5756 1.92 11.05 93.32 c SG 1 12/22/2018 8:00 AM 7:00 PM 660 1 875 577500 7914 0.66 5.22 88.10 c SG 1 1/9/2019 8.00 AM 5:00 PM 540 1 875 472500 6475 0.66 4.27 83.82 c SG 1 2/2/2019 12:00 PM 11:00 PM 660 1 875 577500 7914 0.66 5.22 78.60 c SG crop uycie i otais = 1 juyrouu OJ.4u Owner's Signature Operator's Signatt Certified Operator (Print) Operator's Certification * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # Pivot 4 F7 Field Size (wetted acres) = (A) 72.97 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 1 31 -1 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type Winter Cover Recommended PAN 30 Loading (Ib/acre) (1) (2) (3) (4) (5) (6) (7) (81 (91 (101 Iu Lagoon ID Date (mm/dd/yr) Irrigation PAN Applied Nitrogen Jaste Analys (Ib/acre) Balance** PAN* (8) x (9) (Ib/acre) (Ib/1000 gal) 1000 30 Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total VolumE (gallons) 6) x (5) x (4; Volume per Acre (gal/acre) (7) / (A) 1 2/1/2018 7:00 AM 4:30 PM 570 1 875 498750 6835 1.22 8.34 21.66 c SG 1 2/6/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.22 7.90 13.76 c SG crop uycie i otais = I y t -i zou Owner's Signature Operator's Signatu Certified Operator (Print) Operator's Certification N * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. 'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006 FORM IRR -2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # r Pivot 4 F8 Field Size (wetted acres) = (A) 77.37 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 11 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Crop Type Soybeans Recommended PAN 136 Loading (Ib/acre) (1) (2) (3) (4) (5) (5) (7) (ti) (9) (10) (11) Lagoon ID Date (mm/dd/yr) Start Time End Time Total Minutes (3)-(2) Irrigation # of Sprinklers Operating Flow Rate (gal/min) Total Volum( (gallons) (6) x (5) x (4; Volume per Acre (gal/acre) (7) / (A) ✓aste Analys PAN* (Ib/1000 gal) PAN Applied (Ib/acre) (8)(9) 1000 Nitrogen Balance** (Ib/acre) 136 Weather Code Inspections (Initials) 1 6/7/2018 8:00 AM 5:00 PM 540 1 875 472500 6107 1.96 11.97 124.03 c SG 1 6/8/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.96 13.30 110.73 c SG 1 6/9/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.96 13.30 97.43 c SG 1 6/10/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.96 13.30 84.13 c SG 1 7/12/2018 9:00 AM 6:00 PM 540 1 875 472500 6107 1.92 11.73 72.41 c SG 1 7/13/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.92 13.03 59.38 c SG 1 8/10/2018 8:00 AM 6:00 PM 600 1 875 525000 6786 1.92 13.03 46.35 c SG 1 9/3/2018 8:00 AM 7:00 PM 660 1 875 577500 7464 1.92 14.33 32.02 c SG t,rop tycie i otais = 1 4 14 ( ouu 1U,5.yj Owner's Signature Operator's SignatL Certified Operator (Print) Operator's Certification � * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006