Loading...
HomeMy WebLinkAbout310077_CK_31_77_2018_IrrigationRecords_DWR_WiRO 10_20190212FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # I Pivot 4 F7 Field Size (wetted acres) = (A) 72.97 Farm Owner John Kilpatrick Owner's Address Owner's Phone # Facility Number 31 77 Irrigation Operator David Kilpatrick Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan WC Deducted Crop Type Corn Recommended PAN 105 Loading (lb/acre) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) HE Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN' (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) 1000 Nitrogen Balance" (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volumf (gallons) 6) x (5) x (4 Volume per Acre (gal/acre) (7) / (A) 105 1 3/4/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.22 7.90 97.10 c SG 1 3/5/2018 7:00 AM 12:00 PM 300 1 875 262500 3597 1.22 4.39 92.71 c SG 1 3/29/2018 7:00 AM 4:00 PM 540 1 875 472500 6475 3.24 20.98 71.73 c SG 1 3/30/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 3.24 20.98 50.75 c SG 1 4/3/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.96 12.69 38.06 c SG 1 4/18/2018 8:00 AM 4:00 PM 480 1 875 420000 5756 1.96 11.28 26.78 c SG 1 5/2/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.96 12.69 14.09 c SG 1 5/4/2018 8:00 AM 5:00 PM 540 1 875 472500 6475 1.96 12.69 1.40 c SG END Crop Cycle Totals = 1 3517500 1 103.60 1 Owner's Signature Operator's Signatu Certified Operator (Print) Operator's Certification N * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) 12/20/2006