Loading...
HomeMy WebLinkAbout310077_IrrigationRecords_20190212FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # Pivot 1 F1 Facility Number 31 -77 Field Size (wetted acres) = (A) Farm Owner Irrigation Operator Owner's Address Irrigation Operator's Address Owner's Phone # Operator's Phone # From Waste Utilization Plan WC Deducted Crop Type Recommended PAN Loading (lb/acre) (1)(2)(3)(4)(5)(6)(7)(8)(9)(10)(11) Irrigation Volume PAN Applied Nitrogen Weather Inspections Lagoon Date Start End Total # of Flow Total Volume per Acre Waste Analysis (lb/acre)Balance**Code (Initials) ID (mm/dd/yr)Time Time Minutes Sprinklers Rate (gallons)(gal/acre)PAN*(8) x (9)(lb/acre) (3) - (2)Operating (gal/min)(6) x (5) x (4)(7) / (A)(lb/1000 gal)1000 106 2 4/18/2018 9:00 AM 6:00 PM 540 1 880 475200 7512 1.51 11.34 94.66 c SG 2 5/2/2018 8:00 AM 5:00 PM 540 1 880 475200 7512 1.51 11.34 83.31 c SG 2 5/4/2018 8:00 AM 5:00 PM 540 1 880 475200 7512 1.51 11.34 71.97 c SG 2 5/14/2018 8:00 AM 7:00 PM 660 1 880 580800 9181 1.51 13.86 58.11 c SG 2 6/21/2018 8:00 AM 7:00 PM 660 1 880 580800 9181 1.51 13.86 44.24 c SG 2 9/3/2018 8:00 AM 7:00 PM 660 1 880 580800 9181 0.85 7.80 36.44 c SG 2 9/20/2018 8:00 AM 6:00 PM 600 1 880 528000 8347 0.85 7.09 29.35 c SG 3696000 76.65 Owner's Signature Operator's Signature Certified Operator (Print)Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.)12/20/2006 63.26 John Kilpatrick David Kilpatrick Soybeans 106 Crop Cycle Totals =