Loading...
HomeMy WebLinkAbout20190177 Ver 1_B-4828 FW_ Division 5 Projects (UNCLASSIFIED) from Deannia_20190209From: Riffey. Deanna To: Murray. Christopher A Subject: B-4828 FW: Division 5 Projects (UNCLASSIFIED) Date: Friday, February 8, 2019 9:49:14 AM Attachments: image002.ona FYI Deanna Riffey Environmental Program Consultant Environmental Analysis Unit North Carolina Department of Transportation 919 707 6151 office driffey_(a)ncdot.gov Mail 1598 Mail Service Center Raleigh, NC 27699-1598 Physical Address 1020 Birch Ridge Drive Raleigh, NC 27610 'r'-ySAfF.� �.�.. ��,+'� "�'. f � ,;.��;. -��.`.�r- .�- � �4�: �:. ���;' , - �{� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Alsmeyer, Eric C SAW <Eric.C.Alsmeyer@usace.army.mil> Sent: Friday, August 09, 2013 9:02 AM To: Riffey, Deanna <driffey@ncdot.gov> Subject: RE: Division 5 Projects (UNCLASSIFIED) Classification: LTNCLASSIFIED Caveats: NONE Thanks, I will continue without it. ��� From: Riffey, Deanna [mailto:driffeyCa�ncdot.gov] Sent: Thursday, August 08, 2013 11:52 AM To: Alsmeyer, Eric C SAW Subject: RE: Division 5 Projects (UNCLASSIFIED) Eric, I got in touch with Hal Bain from RK & K and they do not have an upland form for B-4828. Deanna From: Alsmeyer, Eric C SAW [mailto:Eric.C.Alsmeyer(a�usace.army.mil] Sent: Tuesday, August 06, 2013 11:11 AM To: Riffey, Deanna Cc: Price, Gregory W; Beauregard, Rachelle Subject: RE: Division 5 Projects (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Deanna: 1) I have the Prel JD forms — I'm just looking for the Wetland data forms. I don't have them for either B-5323 or B-5328, both of which have onsite wetlands, as well as for B-4828. 2) I would at least like you to check with RK&K and see if they did an "upland" data form for B-4828. If they didn't do one, I can deal with it. Most consultants should know that that is the minimum requirement for sites without wetlands, to show that the "most-likely wet" part of a site is not wet. We have probably been lax in the past and not always required it, but it has been part of the normally required documentation for a site without wetlands, for as long as I have been here in the Wilmington District. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at htt��://oer2.nwp.usace.army.mil/survey.html to complete the survey online (Paper copies available upon request). Thank you, ��� Eric Alsmeyer Project Manager Raleigh Regulatory Field Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Tel: (919) 554-4884, x23 Fax: (919) 562-0421 Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.as� (If you need information that is not yet available on our new website, please let me know) From: Riffey, Deanna [mailto:driffey(a�ncdot.gov] Sent: Tuesday, August 06, 2013 10:47 AM To: Alsmeyer, Eric C SAW Subject: Division 5 Projects Eric, We have a couple of questions to know exactly what to send. 1) The question came up if you just need the wetland delineation forms for the projects or if you need the forms plus preliminary JD Forms? 2) Do you absolutely have to have an upland delineation form for B-4828 that has only a perennial stream? In scoping this out to our consultant we did not include upland forms for non-wetland areas. This has not been part of our protocol and will have to go to back to consultants at additional cost to get this done. Thanks for your help, Deanna Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE Classification: LTNCLASSIFIED Caveats: NONE