HomeMy WebLinkAbout20190177 Ver 1_B-4828 FW_ Division 5 Projects (UNCLASSIFIED) from Deannia_20190209From: Riffey. Deanna
To: Murray. Christopher A
Subject: B-4828 FW: Division 5 Projects (UNCLASSIFIED)
Date: Friday, February 8, 2019 9:49:14 AM
Attachments: image002.ona
FYI
Deanna Riffey
Environmental Program Consultant
Environmental Analysis Unit
North Carolina Department of Transportation
919 707 6151 office
driffey_(a)ncdot.gov
Mail
1598 Mail Service Center Raleigh, NC 27699-1598
Physical Address
1020 Birch Ridge Drive Raleigh, NC 27610
'r'-ySAfF.� �.�..
��,+'�
"�'. f � ,;.��;.
-��.`.�r- .�-
� �4�: �:. ���;'
, - �{�
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Alsmeyer, Eric C SAW <Eric.C.Alsmeyer@usace.army.mil>
Sent: Friday, August 09, 2013 9:02 AM
To: Riffey, Deanna <driffey@ncdot.gov>
Subject: RE: Division 5 Projects (UNCLASSIFIED)
Classification: LTNCLASSIFIED
Caveats: NONE
Thanks, I will continue without it.
���
From: Riffey, Deanna [mailto:driffeyCa�ncdot.gov]
Sent: Thursday, August 08, 2013 11:52 AM
To: Alsmeyer, Eric C SAW
Subject: RE: Division 5 Projects (UNCLASSIFIED)
Eric,
I got in touch with Hal Bain from RK & K and they do not have an upland form for B-4828.
Deanna
From: Alsmeyer, Eric C SAW [mailto:Eric.C.Alsmeyer(a�usace.army.mil]
Sent: Tuesday, August 06, 2013 11:11 AM
To: Riffey, Deanna
Cc: Price, Gregory W; Beauregard, Rachelle
Subject: RE: Division 5 Projects (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Deanna: 1) I have the Prel JD forms — I'm just looking for the Wetland data forms. I don't have them
for either B-5323 or B-5328, both of which have onsite wetlands, as well as for B-4828.
2) I would at least like you to check with RK&K and see if they did an "upland" data form for B-4828.
If they didn't do one, I can deal with it. Most consultants should know that that is the minimum
requirement for sites without wetlands, to show that the "most-likely wet" part of a site is not wet.
We have probably been lax in the past and not always required it, but it has been part of the
normally required documentation for a site without wetlands, for as long as I have been here in the
Wilmington District.
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public. To help
us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our
website at htt��://oer2.nwp.usace.army.mil/survey.html to complete the survey online (Paper copies
available upon request).
Thank you,
���
Eric Alsmeyer
Project Manager
Raleigh Regulatory Field Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Tel: (919) 554-4884, x23
Fax: (919) 562-0421
Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.as�
(If you need information that is not yet available on our new website, please let me know)
From: Riffey, Deanna [mailto:driffey(a�ncdot.gov]
Sent: Tuesday, August 06, 2013 10:47 AM
To: Alsmeyer, Eric C SAW
Subject: Division 5 Projects
Eric,
We have a couple of questions to know exactly what to send.
1) The question came up if you just need the wetland delineation forms for the projects or if
you need the forms plus preliminary JD Forms?
2) Do you absolutely have to have an upland delineation form for B-4828 that has only a
perennial stream? In scoping this out to our consultant we did not include upland forms for
non-wetland areas. This has not been part of our protocol and will have to go to back to
consultants at additional cost to get this done.
Thanks for your help,
Deanna