Loading...
HomeMy WebLinkAbout20190177 Ver 1_PCN Form Submission_20190209D1�VR �irlslan af Water Resources Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190177 Is a payment required for this project?* f No paymentrequired � Fee received f Fee needed - send electronic notification Select Project Reviewer" Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: Replacement of Bridge 56 over Sandy Creek on SR 1526 (Weldons Mill Road) 1a. Who is the PrimaryContact?* Chris Murray 1b. PrimaryContact Email:* cmurray@ncdot.gov Date Submitted 2/9/2019 Nearest Body of Water Sandy Creek Basin Tar-Pamlico Water Classification C-NSW+; 28-78-1-(1) Site Coordinates Latitude: Longitude: 3628995 -78.32064 A. Processing Information County (or Counties) where the project is located: Vance Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: B-4828 WBS # (�) 38598.1.2 1a. Type(s) of approval sought from the Corps: Ve rsion# * 1 Reviewing Office * Central Office - (919) 707-9000 1c. PrimaryContact Phone:* (919)220-4633 :: rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? C' Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? f Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: Various 2c. Responsible party: 2d. Address Street Address 2612 N. Duke Street Address Line 2 �Y Durham Fbstal / Zip Code 27704 2e. Telephone Number: (919)220-4633 2g. Email Address:* r 401 Water Quality Certification - E�ress rJ Riparian Buffer Authorization State / Aovince I F�gion NC Country USA 2f. Fax Number: x C' Yes R No C' Yes G No cmurray@ncdot.gov C. Project Information and Prior Project History " 1. Project Information 1b. Subdivision name: (rf appropriate) 1c. Nearest municipality/town: Henderson 2. Project Identification 2a. Propertyldentification Number: 0543 01008,0543 01007 2c. Project Address Street Address near 2368 Weldons Mill Road Address Line 2 �Y Henderson Fbstal I Zip Code 27537 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Sandy Creek 3b. Water Resources Classification of nearest receiving water:* C-NSW+; 28-78-1-(1) 3c. What river basin(s) is your project located in?* Tar-Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201010701 4. Project Description and History 2b. Property size: 6 ac State / Rovince I f�gion NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Exsting conditions at site include maintained state road, maintained shoulder, wooded land and grassed land. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes r No C' Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) B-4828 USGS topo map.pdf 125MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) B-4828 soil survey.pdf 304.06KB 4f. List the total estimated acreage of all existing wetlands on the property: <0.01 4g. List the total estimated linear feet of all existing streams on the property: 280 4h. Explain the purpose of the proposed project:* Replacement of ewsting bridge with a new similar bridge on new location to the east of SR 1526. Epsting structure: 2@ 40.3 ft timer floor on steel girders with timber caps and piles. Note that in-stream interior pile is located on a concrete sill. A temporary causeway will be installed to provide access to remove the sill. Proposed shucture: 1@ 80 ft, 1@ 45 ft 33 inch box beam with 4 ft caps on new alignment to the east of SR 1526 (Weldons Mill Road). A temporary causeway will be installed to provide access to install the in-stream interior drilled shaft piles. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Grading, drainage, pavement and structure at the project site. Equipment may include backhoe, crane, bull dozer, excavator, mini excavator, etc. Typical roadway and bridge construction equipment. 4j. Please upload project drawings for the proposed project. 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes r No Comments: PJD request sent via email to USACE on 2/S/19. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary r Approved C' Not Verified � Unknown C' WA Corps AID Number: Sc. If Sa is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Heather Smith VHB early delineation by RK&K personnel Hal Bain in 2013 C' Unknown Sd1. Jurisdictional determination upload B-482S FW_ Division 5 Projects (UNCLASSIFIED) from Deannia.pdf 277.98KB 6. Future Project Plans 6a. Is this a phased project?" � Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�I? No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): fJ Wetlands IJ Streams-tributaries � Open Waters � Pond Construction 2. Wetland Impacts �J Buffers 2a. Site #* (�) 2a7 Reason (?) 2b. Impact type *(�) 2a Type of W. * 2d. W. name * 2e. Forested * Zf. Type of 2g. Impact Jurisdicition*(') area* 12 I Mech. Clearing P Bottomland Hardwood Forest Wetland Z Yes Both 0.010 I(acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.010 2h. Comments: Small amount of minor mechanized dearing in wetland impacts. 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.010 ❑ 3a. Reason for impact (�') 3b.lmpact type * 3c. Type of impact" 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width" 3h. Impact (7) Jurisdiction* length* Bank stabilization Permanent Bank Stabiliration Sand Creek Perennial Both 30 137 S1 Y Average (feet) pinear feet) gy Temporary dewatering and Temporary Workpad/Causev✓ay Sandy Creek Perennial Both 30 143 temp. CaUseway Average(feet) Qinearfeet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 137 3i. Total stream and ditch impacts: 280 3i. Total temporary stream impacts: 143 3j. Comments: Permanent stream impacts from bank stabili�ation and temporary stream impacts from dewatering and temporary causeway. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. � Neuse r Catawba r Goose Creek r Other CJ Tar-Pamlico r Randleman r Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Sites 1-4 Bridge Allowable P Sandy Creek No 6,935 4,601 6h. Total buffer impacts: Total Temporary impacts: Total Permanent impacts: Total combined buffer impacts: 6i. Comments: Supporting Documentation B4828_Permit_Drawi ngs_20190131. pdf B4828_Permit_Drawings_Buffer_20190131.pdf Zone 1 0.00 Zone 1 6,935.00 Zone 1 6,935.00 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Temporary construction easement near Station 17+gq Rt was reduced to minimize wetland impacts. A temporary detention basin will constructed in this area. Only the most minimal amount of rip rap on sUeambanks was designed for the project to provide long-term sUeambank stabilization. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction will be reviewed by Division 5 environmental personnel and contract inspectors to identify areas to further minimize impacts during construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Project will use Nationwide Permit No. 3. Impacts at site are minimal and do not meet mitigation required thresholds. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? G Yes �' No What type of SCM are you providing? r Level Spreader fJ Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen r Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation Zone 2 0.00 Zone 2 4,601.00 Zone 2 4,601.00 2.63MB 1.41 MB � B-4828 SWMP.pdf 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* F Yes r No Comments: Project is in compliance. 105.73KB I G. Supplementary Information ^ I 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * f• Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environme ntal Policy Act (NEPAISEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* C' Yes r No Comments: * Document does not require review by SCH. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* � Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water qualit�* C' Yes r No 3b. If you answered "no," provide a short narrative description. Project involves replacement of an e�tisting deficient bridge structure with a new strucure to Ihe east of SR 1526. The design provides improvement to roadway design and a new bridge meeting current standards. The project does not provide for additional future development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes r No C' fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * � Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?" � Yes r No Sc. If yes, indicate the USFWS Field Office you have contacted. Raleigh Sd. Is another Federal agency involved?" � Yes r No Se. Is this a DOT project located within Division's 1-8? G Yes �' No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Use of the Programmatic Biological Opinion for Bridge and Culvert Replacements/Repairs/Rehabilitations in Eastern North Carolina, NCDOT Divisions 1-8 (June 13, 2018) and a mussel survey on July 31, 2017. Informal consultation request for Atlantic pigtoe sent to USFWS on February 9, 2019. However, not that species is only listed as Proposed at this time and is not afforded protection under Section 7 of the ESA. Consultation Documentation Upload B-4828 FIf�lAL USFWS concurrence request.pdf 101.89K6 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Mapping 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* � Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Consultation with State Historic Preservation Office and NCDOT HEU personnel. Recent alignment change at project that results in the alignment shift of the roadway avoids impacts to the adjacent Weldons Mill and results in a No Effect for Historic Structures on 12/11/18. See attached files. 7c. Historic or Prehistoric Information Upload B4828 13-08-0047RevisedSig ned EffectsForm. pdf B-4828 hist str NeedSurvey.pdf B-4828 Vance Archaeological Survey Required Form.pdf B-4828 Vance No NRHP Archaeological Sites Present Form.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* G Yes �' No Sb. If yes, explain how project meets FEMA requirements: Approved BSR design. 8c. What source(s) did you use to make the floodplain determination?* Available mapping and SWMP. Miscellaneous Comments See attached Environmental summary for USACE for Franklin 56. Miscellaneous attachments not previouslyrequested. Environmental summary for USACE for Franklin 56.pdf Signature * fJ By checking the box and signing below, I certify that: 7.63MB 1.82 MB 1.24M6 3.34MB 131.86KB . I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Chris Murray Signature Grf�+s ytuj2�,4Y �I Date 2/9/2019