HomeMy WebLinkAbout20190175 Ver 1_B-4427 Beaufort 6 WetPrm Dwgs_20190207I 11�hW�y North Carolina Department of Transportation `'�
; StOrm�,v�`t� :�;
_ _ - , k. , Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: B-4427 TIP No.: 176P.2.R.89 Count ies : Beaufort Pa e 1 of 1
General Project Information
WBS Element: B-4427 TIP Number: 17BP.2.R.89 Pro'ect T pe: Brid e Re lacement Date: 4/9/2018
NCDOT Contact: Ja B. Johnson Contractor / Desi ner: MI En ineerin / Andrew Nottin ham, PE
Address: 1037 W.H. Smith Blvd Address: 1011 Schaub Drive
PO BOX 1587 Suite 100
Greenville, NC 27835 Ralei h, NC 27606
Phone: 252-439-2821 Phone: 919-851-6606
Email: 'b'ohnson ncdot. ov Email: anottin ham mi-en ineers.com
Cit /Town: Old Ford Count ies : Beaufort
River Basin s: Tar-Pamlico CAMA Count ? Yes
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.184 miles Surroundin Land Use: Rural
Proposed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.54 ac. 0.49 ac.
Typical Cross Section Description: 2 lane undivided highway with 11' lanes at normal crown and tapered paved shoulders 2 lane undivided highway with 11' lanes at normal crown
up to 4.5' wide at bridge
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 2800 Year: 2038 Existin : 1500 Year: 2018
General Project Narrative: Existing 6-span (1 @15'-10", 1@14'-10", 1@15'-4", 1@14'-10", 1@15', 1@15'-10") rc floor on timber joists bridge on SR 1422 (Market St. Ext. North) spans Big Swamp. Existing
(Description of Minimization of Water bridge will be replaced while the road is closed (no detour bridge). The replacement bridge is a 2-span (1@55', 1@45') 21" CSU with 4' end bent caps. The proposed bridge has
Quality Impacts) no deck drains to minimize direct discharge into the stream. The stream is classified as swamp water, nutrient sensitive water, and class C. Drainage is collected at lower end of
bidge(southeast quadrant) and lower side of roadway (upstream side) and discharged into a rip rap pad at outlet outside of the buffer at non erosive velocities. The approach
drainage ditches on the south end of the project discharge into the floodplain +/- 400 feet from the stream outside of the project limits. There are no ditches on the North end of
the project and all of the water sheet flows across the grass shoulder and slopes into the floodplain.
Surface Water Bod 1: Bi Swam NCDWR Stream Index No.: 28-103-14-1-1
NCDWR Surface Water Classification for Water Body Prima Classification: Class C
Supplemental Classification: Swam Waters Sw NSW None
Other Stream Classification: None
Impairments: None
A uatic T&E S ecies? No Comments:
NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico
Pro'ect Includes Brid e Spannin Water Bod ? Yes Deck Drains Dischar e Over Buffer? No Dissipator Pads Provided in Buffer? N/A
Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
�
�
�
�
�
�
�
�
�
z
�o
��
��
��
��
w �,
��
��
��
r�
��
��
��
��
��
��
��
��
N
�
�
�
�
..
�
V
W
O
�
�
��
�
�
�
• �
�
V
�
�
O
V
See Sheet 9A For Index of Sheets
See Sheet 98 For Conventlonal Symbols
Tp WASH�N�'TON
��
CLEARING ON THIS PROJECT SHALL BE PERFORMED
TO THE LIMITS ESTABLISHED BY MODIFIED METHOD II.
GRAPHIC SCALES DESIGN DATA
ADT 2018 = 1500 VPD_
50 25 0 50 loo qDT 2038 = 2800 VPD
PLANS K = NA %
D = NA %
50 25 0 50 100 T= 7 %*
V = 60 MPH
PROFILE (HORIZONTAL) * TTST =_ _ DUAL __
l0 5_ o l0 20_ FUNC CLASS =
COLLECTOR
PROFILE (VERTICAL) SUB-REGIONAL TIER
����� �� ����� ��������
���%����1� �IF �I�������
BEA UFOR.T CO U1�TY
LOCATIOIV: REPLACE BRIDGE 6 OVER BIG SWAMP
01V SR 1422_(MARKET STREET EXTE11tS10111)____
TYPE OF WORK: GRADI11lG, DRAl1VAGE, PAVI11lG A11tD_STRUCTURE
BEGIN PROJECT B-442
—L— POC STA. 19 + 50.(
C�
�
.....�...........t�.,...
-------°---
,. . . � . �__�-------�----------- �u.
.------�-----------�-------------�------- -
-L- STA. 24 + 45.19
�, ,
� ��PE„t
�`
" *"1'.
\ �'
�
E
,
STATE PROJECT REPERENCE N . �NO.� '
���� B-442 7 �
STATE PROJ.NO. P.APROl.NO. D25CRIP'CION
PERMIT DRAWING
SHEET 2 OF 8
�
NA�
NA 2011
u
.....r.,.........�.... ..,,.t.t
....t� ...............�.........,
------�--------- -------�------
f-Y-*-=-YS��i�-{Ah4f�IEE�*�.Ti3EfzF�YFEP�S10A4�,-. 4 } . �. . —z
SITE 1
T � NC 171
INC�Nd1�L1E°Il°]E Il�]LANS
DO NOT USE FOR R/ W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLE55 ALL SIGNATURES COMPLETED
PROJECT LENGTH
LEIVGTH ROADWAY TIP PROJECT B11427 = 0.165 MILES
LEIVGTH BRIDGE TIP PROJECT B11427 = 0.019 MILES
rrcyuicri ui inc v� uoz w:
CDM_ CDM Smith Inc
5400 Glenwood Avenue
m� h Suitea00
Ralei9h, NC 27612-3228
NC COA N0. F-1255
FOR THE NORTH CAROLINA DEPT.OF TRANSP(
2018 STANDARD SPECIFIC9T70NS
DAVID Z. KEISER. P. E.
TOTAL LENGTH TIP PROJECT B-4427 = 0.184 MII,ES RIGHT OF WAY DATE: pRo�Ecr ENc,x�Ee
MARCH 19, 2018 KIT A. PERSIANI, P. E.
PROJECT DESIGN ENGINEER
LETTIIVG DATE:
_OCTOBER 3� 2018_ HEATHER C,_LANE,_P,_E.______
NCDOT CONTACT
HYDRAULICS ElYGI1VEER
P.E.
SIGNATUR6:
ROADWAY DESIGIY
E1VGIIVEER
S7GNATURE:
P.E.
`D O 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N � B-4427 X-4
� 5 5 5 1 1 1 1 5
HEE _5 OF _8
0.0 5 0. 25
3;1 �- - - ---- - :I
� �
� �
� ' �
- - - -- - - ---- �- - - -
25 + 0.00
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�o
���
���
���
���
w�w
���
��Q
��z
}��
��w
��� — —
���
���
��� , , , ,
���
���
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 @55', 1 @45'
1 21+48/29+12 -L- 21" CSU BRIDGE 0.13
TOTALS*: 0.13 0 0 0
*Rounded totals are sum of actual impacts
NOTES:
Site 1 Sta.21+48/23+49 -L- RT, Permanent fill in wetlands =0.03 ac.
Site 1 Sta.22+38/23+49 -L- LT, Permanent fill in wetlands =0.01 ac.
Site 1 Sta.24+40/26+72 -L- RT, Permanent fill in wetlands =0.04 ac.
Site 1 Sta.24+40/29+12 -L- LT, Permanent fill in wetlands =0.05 ac.
zo,s os os
N
N
c
r1
.�
a
N
M
4
115
c
n
e
a
N
M
C 4
`
�
N
M
2
c
c
l�
[t
c
n
Z
�
N
M
PERMIT DRAWING
SHEET 8 OF 8
I� `� I, , -
��
NOT TO SCALE
M\[�Ill�(�)"II
I)IVI�ION �F HIGHWAYS
BEAUF�RT C�UNTY
�R�JECT:liBP.2.I�.89 (B-��2�)
Ia�PL.�CE �IaIII�GE �006
�N SR 1�22 �VER
�IG SWt�MII�
3 % 26 % 18