Loading...
HomeMy WebLinkAboutNC0043532_Compliance Inspection_20190129ROY COOPER G&v-�rrlor K41 HAEL S. RECAN Secretary LINDA CULPEPPER arwtpr Certified Mail # 7016 1370 0000 2591 1308 Return Receipt Requested Mr. Duane Wingo Stanly County 1000 North 1st Street, Suite 12 Albemarle, NC 28001 NORTH CAROLINA Environmental Qual" February 11, 2019 SUBJECT: NOTICE OF VIOLATION Tracking Number: NOV-2019-PC-0069 Permit No. NCO043532 West Stanly WWTP Stanly County Dear Mr. Wingo: The North Carolina Division of Water Resources conducted an inspection of the West Stanly WWTP on January 29, 2019. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0043532. A summary of the findings and comments noted during the inspection are provided in the enclosed copy of the inspection report. The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Mooresville Regional Office. The following violation(s) were noted during the inspection: Inspection Area Description of Violation Chemical Feed A tote located in pump station is being used to mix Potassium Permanganate (KMn04) and water to apply to influent waste stream to reduce odors. Appropriate safety equipment, including eye protection, should be used when mixing chemicals. An adequate eye wash station should be available. Potassium Permanganate (KMn04) can cause severe skin burns and eye damage. NortNCaro I,naDepartmer.tofErv:rar.irerta Quairty I DimsionofWater Resources Woo reav:15ERegom:Off.-oe 1 610 East Denier Avenue, Suite 3011 Mooresv �e,North 03raiina2S115 Inspection Area Description of Violation Disinfection -Gas At the time of inspection, a dye test was conducted on chlorine contact basin. Flow was recorded at 416 gallons per minute. Time recorded for dye to travel half way through chlorine contact basin was 18 minutes. Total detention time of 36 minutes was recorded. Travel pattern of dye was observed in chlorine contact basin and appeared to be well mixed. During dye test, it was noted chlorine contact basin had grease build up at effluent water line. Debris was floating on surface at head of basin. Small balls of grease were noted going over discharge weir. Secondary Clarifier At time of inspection, only one of three secondary clarifiers was in operation. At time of inspection, influent flow was at 416 gallons per minute (0.599 gallons per day), solids were starting to pick up and wash out of secondary clarifier. Bar Screens Mechanical bar screen located at influent pump station was not operational and flow was being bypassed to manual screen. Flow had not been isolated from mechanical screen. It was noted that bar screen has been down since hurricane Florence in September 2018. Pump Station - Influent Grease build up was noted on sides of influent channel leading into pump station. There was also a strong odor of hydrogen sulfide gas (H2S) around influent channel and pump station. Hydrogen sulfide is very poisonous to the respiratory system, explosive, flammable and colorless. Basement of pump station should have properly operating vent fans with switches placed at top of stairs. Personnel should allow adequate time for stairwell and basement to vent before entry. Operations & Maintenance Grease was noted in chlorine contact basin and suspended in effluent being discharged. Trash cans full of debris and grease should be disposed of properly to prevent being a vector attraction. Floating solids on chlorine contact basin should be regularly removed to prevent vector attraction. Solids should be pumped from chlorine contact basin on regular schedule to prevent build-up. In addition, the issues below must also be addressed: Compliance Issue(s): - Mechanical bar screen should be repaired and placed back in service - Potassium Permanganate (KMnO4) should be added upstream of pump station to reduce odor at McCoy Creek pump station and abate complaints from neighbors. - An evaluation should be conducted to determine if the two non -operational secondary clarifiers can be repaired and placed back in operation to reduce hydraulic overload on last operating clarifier and, if practical, operated until facility upgrades require demolition. A copy of the evaluation report is requested to be sent to DWQ Mooresville Regional Office. - Grease and solids should be removed from chlorine contact basin on regular schedule. Debris collected from chlorine contact basin should be removed promptly and disposed of properly to prevent vector attraction. - Appropriate safety protection equipment should be available at chemical mixing stations. - Appropriate signage should be displayed on all sides of fence around pump stations and wastewater treatment plant. NortY Cara- na Departmer.tof Erv:rorrr.erts'Qua: ly I Mrsoftof Water Resourozs Mooresv eF fl•:lra Off Del 610 Ea2l,enterAvenue, Suae3011 Moore—.v e, North Dsro-:na28115 Please be advised that in accordance with your NPDES Permit NC0043532, Part II, Section C, Proper Operation and Maintenance; the Permittee shall at all times provide the operation and maintenance resources necessary to operate the existing facilities at optimum efficiency. The Permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions of this permit. NOTE: Properly and officially designated operators are fully responsible for all proper operation and maintenance of the facility, and all documentation required thereof, whether acting as a contract operator [subcontractor] or a member of the Permittee's staff. Remedial actions should have already been taken to correct this problem and prevent further occurrences in the future. The Division of Water Resources may pursue enforcement action for this and any additional violations of State law. To prevent further action, please respond in writing to this office within 30 days upon your receipt of this Notice of Violation regarding your plans or measures to be taken to address the indicated violations and other identified issues, if applicable. If you should have any questions, please do not hesitate to contact Roberto Scheller with the Water Quality Regional Operations Section in the Mooresville Regional Office at 704-663-1699. Sincerely, DocuSigned by: A14CC681 AF27425... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ ATTACH M E NTS Cc: Laserfich NPDES Compliance/Enforcement Unit - Enforcement File North Carolina Depart mentof Env:ronrnents!Quality I Div -so a of Water Resoumes Woo resv-17eReg*m-Offce1610Ea2l CeDler Ave rkae,Saae3011WcoresvihE,North Qtrohrha2S115 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NCO043532 111 12 I 19/01/29 I17 18 I S J 19 LG] 201 I 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self-Monitoring Evaluation Rating 131 QA ----------------------Reserved------------------- 67 70 I I2 71 I tyI 72 I r l 73 � I 74 751 I I I 1 1 1 I80 uI Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 10:24AM 19/01/29 18/12/01 West Stanly WWTP 24939-B Barbees Grove Rd Exit Time/Date Permit Expiration Date Oakboro NC 28129 12:55PM 19/01/29 23/01/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Tommy Gibbons/ORC/910-605-1284/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Andy Lucas,1000 N 1st St Ste 12 Albemarle NC 28001//704-986-3601/7049863711 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self-Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Roberto Scheller C� MRO WQ//252-946-6481/ 2/8/2019 Cj91C2A007838943E— Signatureof Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: eyj � 2/11/2019 AlaccsalAFvazs... Page# NPDES yr/mo/day Inspection Type NCO043532 111 121 19/01/29 1 17 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NCO043532 Owner - Facility: West Stanly WWTP Inspection Date: 01/29/2019 Inspection Type: Compliance Evaluation Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? 0 ❑ ❑ ❑ Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: Current permit was issued 10/19/2019 and expires 01/31/2023. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CM Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ Comment: Reports reviewed include process control, DMRs, Lab analysis, COC's, and field equipment calibration logs. Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Page# 3 Permit: NCO043532 Owner - Facility: West Stanly WWTP Inspection Date: 01/29/2019 Inspection Type: Compliance Evaluation Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ Laboratory Yes No NA NE Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? 0 ❑ ❑ ❑ Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ ❑ 0 Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ ❑ 0 Comment: Facilitv uses contract lab Environmental 1 (Certification #10) and Meritech (Certification #27 for toxicity testing. In accordance with 15A NCAC 02H .0805 Certification and Renewal of Certification, (7) (0), "All thermometers must meet National Institute of Standards and Technology (NIST) specifications for accuracy or be checked, at a minimum annually, against a NIST traceable thermometer and proper corrections made." Maintenance of NIST thermometers should be done per NIST Special Publication 1088, Maintenance, Validation, and Recalibration of Liquid -in -Glass Thermometers. Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Is the wet well free of excessive grease? ❑ 0 ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Is SCADA telemetry available and operational? 0 ❑ ❑ ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment: Grease build uD was noted on sides of influent channel leadina into pump station. There was also a strong odor of hydrogen sulfide pas (H2S) around influent channel and pump station. Hydrogen sulfide is very poisonous to the respiratory system, explosive, flammable and colorless. Basement of pump station should have properly operating vent fans with switches placed at top of stairs. Personnel should allow adequate time for stairwell and basement to vent before entry. Appropriate signage should be displayed on all sides of fence around pump station. Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b.Mechanical 0 Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Page# 4 Permit: NCO043532 Inspection Date: 01/29/2019 Owner - Facility: West Stanly WWTP Inspection Type: Compliance Evaluation Bar Screens Yes No NA NE Is the unit in good condition? ❑ 0 ❑ ❑ Comment: Mechanical bar screen located at influent pump station was not operational and flow was being by passed to manual screen. Flow had not been isolated from mechanical screen. It was noted that mechanical bar screen has been down since hurricane Florence in September 2018. Influent Sampling Yes No NA NE # Is composite sampling flow proportional? ❑ 0 ❑ ❑ Is sample collected above side streams? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? 0 ❑ # Is disposal of grit in compliance? ❑ Is sampling performed according to the permit? 0 ❑ ❑ ❑ Comment: At time of inspection influent sampler was recorded at 3.4 degrees Celsius. Grit Removal Yes No NA NE Type of grit removal ❑ Is storage adequate? ❑ 0 a.Manual ❑ Are backup pumps available? ❑ ❑ b.Mechanical 0 Is the site free of excessive leaking? ❑ ❑ Is the grit free of excessive organic matter? ❑ ❑ 0 ❑ Is the grit free of excessive odor? ❑ ❑ 0 ❑ # Is disposal of grit in compliance? ❑ ❑ 0 ❑ Comment: Grit removal was not operating at time of inspection. Chemical Feed Yes No NA NE Is containment adequate? ❑ 0 ❑ ❑ Is storage adequate? ❑ 0 ❑ ❑ Are backup pumps available? ❑ ❑ ❑ 0 Is the site free of excessive leaking? ❑ ❑ ❑ 0 Comment: A tote located in DumD station is beina used to mix Potassium Permanaanate (KMn04) and water to apply to influent waste stream to reduce odors. Appropriate safety equipment, including eve protection, should be used when mixing chemicals. An adequate eve wash station should be avalible. Potassium Permanganate (KMn04) causes sever skin burns and eve damage. Page# 5 Permit: NCO043532 Owner - Facility: West Stanly WWTP Inspection Date: 01/29/2019 Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Surface Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? 0 ❑ ❑ ❑ Are the diffusers operational? ❑ ❑ 0 ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? ❑ 0 ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ 0 Is the DO level acceptable?(1.0 to 3.0 mg/1) ❑ ❑ ❑ 0 Comment: Surface aerators were operational at time of inspection. A frothy foam covered more that 25% of surface of aeration basin. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? ❑ 0 ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? ❑ ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) ❑ ❑ ❑ 0 Comment: At time of inspection only one of three secondary clarifiers were in operation. Influnt flow was at 416 gallons per minute (0.599 gallons per day), soilds were starting to pick up and wash out of secondary. It is recommended an evaluation be conducted on feasibility to place two non -operational clarifiers back into service. Disinfection -Gas Yes No NA NE Are cylinders secured adequately? 0 ❑ ❑ ❑ Are cylinders protected from direct sunlight? 0 ❑ ❑ ❑ Is there adequate reserve supply of disinfectant? 0 ❑ ❑ ❑ Is the level of chlorine residual acceptable? ❑ ❑ ❑ 0 Is the contact chamber free of growth, or sludge buildup? ❑ 0 ❑ ❑ Page# 6 Permit: NCO043532 Owner - Facility: West Stanly WWTP Yes No NA NE Is the capacity adequate? 0 ❑ Inspection Date: 01/29/2019 Inspection Type: Compliance Evaluation ❑ Is the mixing adequate? 0 ❑ Disinfection -Gas Yes No NA NE Is there chlorine residual prior to de -chlorination? ❑ ❑ ❑ 0 Does the Stationary Source have more than 2500 lbs of Chlorine (CAS No. 7782-50-5)? ❑ 0 ❑ ❑ If yes, then is there a Risk Management Plan on site? ❑ ❑ 0 ❑ If yes, then what is the EPA twelve digit ID Number? (1000 - If yes, then when was the RMP last updated? Comment: At time of inspection a dve test was conducted on chlorine contact basin. Flow was recorded at 416 gallons per minute. Time recorded for dye to travel half way through chlorine contact basin was 18 minutes. Total detention time of 36 minutes was recorded. Travel pattern of dye was observed in chlorine contact basin and appeared to be well mixed. During dye test it was noted chlorine contact basin had grease build up at effluent water line. Debris was floating on surface at head of basin. Small ball of grease were noted going over discharge weir. Aerobic Digester Yes No NA NE Is the capacity adequate? 0 ❑ ❑ ❑ Is the mixing adequate? 0 ❑ ❑ ❑ Is the site free of excessive foaming in the tank? 0 ❑ ❑ ❑ # Is the odor acceptable? 0 ❑ ❑ ❑ # Is tankage available for properly waste sludge? 0 ❑ ❑ ❑ Comment: Aerobic digester was operational at time of inspection. Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Is SCADA telemetry available and operational? ❑ ❑ 0 ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment: Effluent pumps were operating at time of inspection. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ Page# 7 Permit: NCO043532 Owner - Facility: West Stanly WWTP Inspection Date: 01/29/2019 Inspection Type: Compliance Evaluation Effluent Sampling Yes No NA NE # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: At time of inspection effluent sampler was recorded at 3 degrees Celsius. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? 0 ❑ ❑ ❑ Comment: Last calibration of effluent flow meter was recorded on 8/29/2018. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ❑ 0 ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Grease was noted in chlorine contact basin and susDended in effluent beina discharaed Trash cans full of debris and grease should be disposed of properly to prevent being a vector attraction. Floating solids on chlorine contact basin should be regularly removed to prevent vector attraction. Solids should be pumped from chlorine contact basin on regular schedule to prevent build-up. Trees were noted growing up on fence line. Appropriate signage should be displayed on all sides of fence around WWTP. Standby Power Yes No NA NE Is automatically activated standby power available? 0 ❑ ❑ ❑ Is the generator tested by interrupting primary power source? 0 ❑ ❑ ❑ Is the generator tested under load? ❑ ❑ ❑ 0 Was generator tested & operational during the inspection? ❑ ❑ ❑ 0 Do the generator(s) have adequate capacity to operate the entire wastewater site? 0 ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? 0 ❑ ❑ ❑ Is the generator fuel level monitored? 0 ❑ ❑ ❑ Comment: Page# 8