Loading...
HomeMy WebLinkAbout20190170 Ver 1_PCN Form Submission_20190205D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190170 Is a payment required for this project?* f No paymentrequired � Fee received F Fee needed - send electronic notification Reviewing Office * Cenhal Office - (919) 707-9000 Information for Initial Review 1a. Name of project: Stoney Creek Greenway 1a. Who is the PrimaryContact?* Bobby Croom 1b. PrimaryContact Email:* bcroom@goldsboronc.gov Date Submitted 2/5/2019 Nearest Body of Water Stoney Creek Basin Neuse Water Classification C; NSW Site Coordinates Latitude: 35.387318 A. Processing Information County (or Counties) where the project is located: Wayne Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: EB-5707 WBS # (�) 50403.3.1 1a. Type(s) of approval sought from the Corps: Ve rsion# * 1 What amout is owed?* r• $zao.00 C' $570.00 Select Project Reviewer" Rob Ridings:eads\rgridings 1c. PrimaryContact Phone:* (919)580-4278 Longitude: -77.953757 :: rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? C' Yes r No Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: r 401 Water Quality Certification - E�ress rJ Riparian Buffer Authorization 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? F Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment Stony Creek Greenway - Buffer SOA 1-10-18 (2).pdf 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? � Yes r No 2. Owner Information 2a. Name(s) on recorded deed: City of Goldsboro 2b. Deed book and page no.: 1063-665;715-268 2c. Responsible party: 2d. Address Street Address PO Drawer A Address Line 2 �Y Goldsboro Fbstal / Zip Code 27533 2e. Telephone Number: (919)580-4362 S[ate / FYovince I Region NC Cauntry USA 2f. Fax Number: 150.75KB x C•' Yes C' No G Yes C' No �, 2g. Email Address:* bcroom@goldsboronc.gov C. Project Information and Prior Project History " 1. Project Information 1b. Subdivision name: (rf appropriate) 1c. Nearest municipality/town: Goldsboro 2. Project Identification 2a. Propertyldentification Number: 3519175611;3519187531 2c. Project Address Street Address Royall Avenue Address Line 2 �Y Goldsboro Postal I Zip Code 2b. Property size: 31.49 State / Rovince I f�gion NC Country USA 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Stoney Creek 3b. Water Resources Classification of nearest receiving water:* C; NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202020102 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The greenway path traverses two parcels that are both owned by the City of Goldsboro. One portion will follow an exsting sanitary sewer easement on an othenvise undisturbed parcel. The other parcel contains a small community park and parking lot that will be connected to the greenway. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* � Yes r No � Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) US Topo Map.pdf 352.57KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 20181130_07350507979_33_Soil_Map.pdf 508.1 KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.11 4g. List the total estimated linear feet of all existing streams on the property: 2000 4h. Explain the purpose of the proposed project:* To connect a greenway trail segment to an existing city park. 4i. Describe the overell project in detail, including indirect impacts and the type of equipment to be used:* The project will attempt to minimize ground disturbance by utilizing ebsting stone functioning as a sanitary sewer easement path. Further, any construction and paving equipment will stay within the limited project confines. Due to the nature of the path and the limits of construction, equipment will be able to progress through the project linearly and make tuming maneuvers outside of its boundaries. 4j. Please upload project drewings for the proposed project. Stoney Creek Greenway.pdf 5. Jurisdictional Determinations 28 55MB Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* � Yes r No r Unknown Comments: Sb. If the Corps made a jurisdictional determination, what type of determination was made?" � Preliminary r Approved � Not Verified � Unknown r WA Corps AID Number: Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Kimley Fbrn Other: Sd1. Jurisdictional determination upload Fig5_JD FeaturesAerial.pdf 11.25MB 6. Future Project Plans 6a. Is this a phased project?* C' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries fJ Buffers r Open Waters I� Pond Construction 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. ,r! Neuse r Tar-Pamlico � Catawba � Randleman � Goose Creek � Jordan Lake r Other Impact Type Il6c. Per or Temp Il6d. Stream name Il6e. Buffer mitigation required? Il6f. Zone 1 impact Il6g. Zone 2 impact eway P Stoney Creek Yes 0 2,648 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 0.00 2,645.00 Zone 1 Zone 2 Total combined buffer impacts: 0.00 2,645.00 6i. Comments: Preliminary project plans are attached under #4j. Supporting Documentation I E. Impact Justification and Mitigation � 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project path has been selected to avoid delineated wetlands and to minimize overall impacts. While there is some zone 2 impact, the alternatives would make greater impacts to stream and e�tisting wooded areas. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: The limits of disturbance are minimized laterally such that only enough space to construct the path is available. Equipment needing to 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? � Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Waters will not be substantially impacted. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? � Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (low�r SHWT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen fJ Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C' Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? � Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?* � Yes r No � 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environme ntal Policy Act (NEPAISEPA)? * C' Yes r No Comments: * Christopher A. Militscher of the NEPA Program Office commented through email that "the EPA has no environmental concerns regarding (this project)." 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500�, Isolated Wetland Rules (15ANCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* C' Yes r No 3b. If you answered "no," provide a short narrative description. The only development in the distant future could be a short eutension of the greenway path if a connection crossing a state road and railroad track is permitted. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r No � WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat?* C' Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No Sc. If yes, indicate the USFWS Field Office you have contacted. Raleigh Sd. Is another Federal agency involved?* C' Yes r No Se. Is this a DOT project located within Division's 1-8? F Yes r No C' Unknown Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S. Fish and Wildlife Service website and email contact. Consultation Documentation Upload USFWS Response.pdf Wildlife Resources Commission Response.pdf EB-5707-scoping - NC Div Water Resources.pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?" � Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* EFH Mapper Tool on the NOAA website. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 35.75KB 70.43KB 128.61 KB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* C' Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* State Historic Preservation Office. 7c. Historic or Prehistoric Information Upload HPO Response.pdf 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?" � Yes r No Sb. If yes, explain how project meets FEMA requirements: Greenway path is an allowable activity. Sc. What source(s) did you use to make the floodplain determination?" FEMA website and local floodplain maps. Miscellaneous Comments Miscellaneous attachments not previouslyrequested. Signature * rJ By checking the box and signing below, I certify that: 287.35KB � �I • I have given true., accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Bobby Croom Signature �oF�tE�1 ��tn�rfi- Date 2/5/2019