HomeMy WebLinkAbout20190170 Ver 1_PCN Form Submission_20190205D1�VR
�irlslan af Water Resources
Initial Review
Pre-Construction Notification (PCN) Form
September 29, 2018 Ver 3
Has this project met the requirements for acceptance in to the review process?*
F Yes
C' No
Is this project a public transportation project?"
� Yes r No
Change only rf needed.
BIMS # Assigned *
20190170
Is a payment required for this project?*
f No paymentrequired
� Fee received
F Fee needed - send electronic notification
Reviewing Office *
Cenhal Office - (919) 707-9000
Information for Initial Review
1a. Name of project:
Stoney Creek Greenway
1a. Who is the PrimaryContact?*
Bobby Croom
1b. PrimaryContact Email:*
bcroom@goldsboronc.gov
Date Submitted
2/5/2019
Nearest Body of Water
Stoney Creek
Basin
Neuse
Water Classification
C; NSW
Site Coordinates
Latitude:
35.387318
A. Processing Information
County (or Counties) where the project is located:
Wayne
Is this project a public transportation project?*
r Yes r No
Is this a NCDOT Project?*
G Yes r No
(NCDOT only) T.I.P. or state project number:
EB-5707
WBS # (�)
50403.3.1
1a. Type(s) of approval sought from the Corps:
Ve rsion# *
1
What amout is owed?*
r• $zao.00
C' $570.00
Select Project Reviewer"
Rob Ridings:eads\rgridings
1c. PrimaryContact Phone:*
(919)580-4278
Longitude:
-77.953757
::
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified bythe Corps?
C' Yes r No
Nationwide Permit (NWP) Number:
14 - Linear transportation
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - Regular
r' Non-404 Jurisdictional General Permit
r Individual Permit
1e. Is this notification solelyfor the record because written approval is not required?
Forthe record onlyfor DWR401 Certification:
For the record onlyfor Corps Permit:
r 401 Water Quality Certification - E�ress
rJ Riparian Buffer Authorization
1f. Is this an after-the-fact permit application?*
� Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
F Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
� Yes r No
Acceptance LetterAttachment
Stony Creek Greenway - Buffer SOA 1-10-18 (2).pdf
1h. Is the project located in any of NC's twenty coastal counties?
C' Yes r No
1j. Is the project located in a designated trout watershed?
� Yes r No
B. Applicant Information
1d. Who is applying for the permit?
rJ Owner r Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
� Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
City of Goldsboro
2b. Deed book and page no.:
1063-665;715-268
2c. Responsible party:
2d. Address
Street Address
PO Drawer A
Address Line 2
�Y
Goldsboro
Fbstal / Zip Code
27533
2e. Telephone Number:
(919)580-4362
S[ate / FYovince I Region
NC
Cauntry
USA
2f. Fax Number:
150.75KB
x
C•' Yes C' No
G Yes C' No
�,
2g. Email Address:*
bcroom@goldsboronc.gov
C. Project Information and Prior Project History "
1. Project Information
1b. Subdivision name:
(rf appropriate)
1c. Nearest municipality/town:
Goldsboro
2. Project Identification
2a. Propertyldentification Number:
3519175611;3519187531
2c. Project Address
Street Address
Royall Avenue
Address Line 2
�Y
Goldsboro
Postal I Zip Code
2b. Property size:
31.49
State / Rovince I f�gion
NC
Country
USA
3. SurFace Waters
3a. Name of the nearest body of water to proposed project:*
Stoney Creek
3b. Water Resources Classification of nearest receiving water:*
C; NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202020102
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The greenway path traverses two parcels that are both owned by the City of Goldsboro. One portion will follow an exsting sanitary sewer easement on an othenvise undisturbed parcel.
The other parcel contains a small community park and parking lot that will be connected to the greenway.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
� Yes r No � Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
US Topo Map.pdf
352.57KB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
20181130_07350507979_33_Soil_Map.pdf 508.1 KB
4f. List the total estimated acreage of all existing wetlands on the property:
0.11
4g. List the total estimated linear feet of all existing streams on the property:
2000
4h. Explain the purpose of the proposed project:*
To connect a greenway trail segment to an existing city park.
4i. Describe the overell project in detail, including indirect impacts and the type of equipment to be used:*
The project will attempt to minimize ground disturbance by utilizing ebsting stone functioning as a sanitary sewer easement path. Further, any construction and paving equipment will
stay within the limited project confines. Due to the nature of the path and the limits of construction, equipment will be able to progress through the project linearly and make tuming
maneuvers outside of its boundaries.
4j. Please upload project drewings for the proposed project.
Stoney Creek Greenway.pdf
5. Jurisdictional Determinations
28 55MB
Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?*
� Yes r No r Unknown
Comments:
Sb. If the Corps made a jurisdictional determination, what type of determination was made?"
� Preliminary r Approved � Not Verified � Unknown r WA
Corps AID Number:
Sc. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company: Kimley Fbrn
Other:
Sd1. Jurisdictional determination upload
Fig5_JD FeaturesAerial.pdf 11.25MB
6. Future Project Plans
6a. Is this a phased project?*
C' Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands r Streams-tributaries fJ Buffers
r Open Waters I� Pond Construction
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
,r! Neuse r Tar-Pamlico
� Catawba � Randleman
� Goose Creek � Jordan Lake
r Other
Impact Type Il6c. Per or Temp Il6d. Stream name Il6e. Buffer mitigation required? Il6f. Zone 1 impact Il6g. Zone 2 impact
eway P Stoney Creek Yes 0 2,648
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 0.00 0.00
Zone 1 Zone 2
Total Permanent impacts: 0.00 2,645.00
Zone 1 Zone 2
Total combined buffer impacts: 0.00 2,645.00
6i. Comments:
Preliminary project plans are attached under #4j.
Supporting Documentation
I E. Impact Justification and Mitigation �
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The project path has been selected to avoid delineated wetlands and to minimize overall impacts. While there is some zone 2 impact, the alternatives
would make greater impacts to stream and e�tisting wooded areas.
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:
The limits of disturbance are minimized laterally such that only enough space to construct the path is available. Equipment needing to
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
� Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Waters will not be substantially impacted.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
� Yes r No
What type of SCM are you providing?
r Level Spreader
r Vegetated Conveyance (low�r SHWT)
r Wetland Swale (higher SMNT)
r Other SCM that removes minimum 30 % nitrogen
fJ Proposed project will not create concentrated stormwater flow through the buffer
Diffuse Flow Documentation
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
C' Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
� Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?*
� Yes r No
�
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environme ntal Policy Act (NEPAISEPA)? *
C' Yes r No
Comments:
*
Christopher A. Militscher of the NEPA Program Office commented through email that "the EPA has no environmental concerns regarding (this
project)."
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500�, Isolated Wetland Rules (15ANCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
f Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
C' Yes r No
3b. If you answered "no," provide a short narrative description.
The only development in the distant future could be a short eutension of the greenway path if a connection crossing a state road and railroad track is
permitted.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
f Yes r No � WA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
Sa. Will this project occur in or near an area with federally protected species or habitat?*
C' Yes r No
Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
Sc. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
Sd. Is another Federal agency involved?*
C' Yes r No
Se. Is this a DOT project located within Division's 1-8?
F Yes r No
C' Unknown
Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
U.S. Fish and Wildlife Service website and email contact.
Consultation Documentation Upload
USFWS Response.pdf
Wildlife Resources Commission Response.pdf
EB-5707-scoping - NC Div Water Resources.pdf
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?"
� Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
EFH Mapper Tool on the NOAA website.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
35.75KB
70.43KB
128.61 KB
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
C' Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
State Historic Preservation Office.
7c. Historic or Prehistoric Information Upload
HPO Response.pdf
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain?"
� Yes r No
Sb. If yes, explain how project meets FEMA requirements:
Greenway path is an allowable activity.
Sc. What source(s) did you use to make the floodplain determination?"
FEMA website and local floodplain maps.
Miscellaneous
Comments
Miscellaneous attachments not previouslyrequested.
Signature
*
rJ By checking the box and signing below, I certify that:
287.35KB
�
�I
• I have given true., accurate, and complete information on this form;
• I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
. I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Bobby Croom
Signature
�oF�tE�1 ��tn�rfi-
Date
2/5/2019