Loading...
HomeMy WebLinkAboutWQ0007169_Site Plans/Maps_20190208 (2)GENERAL NOTES LL LOCATIONS AND ELEVATIONS OF STRUCTURES AND EQUIPMENT SHALL BE FIELD VERIFIED 'LEASE REFER TO THE PROJECT SPECIFICATIONS FOR DETAILS OF CONSTRUCTION HE READY -MIX RECLAMATION SYSTEM COMPONENTS ARE MANUFACTURED BY NVIRO-PORT, INC. USE MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION. SAND AND GRAVEL BINS (12 FT X 12 FT EACH) SCREW C)� `%/EYCIR INTAKEI HOPPER RAMP 2 INCH HOSE TO MIXER SCREEN DECK SLURRY TANK AGITATION TANK PUMP AND HOSE - TRANSFER TO MIXING A 1 z�, ( SETTLING BASIN11 ' A (20 FT X 40 FT X 4 FT) OVERFLOW DRAIN LINE 10 DIA PLAN VIEW TRUCk NOTE: EQUIPMENT SHOWN SCHEMATICALLY SEE MANUFACTURER'S LITERATURE FOR DETAILS INTAKE HOPPER SLURRY TANK SEAL 1453 SETTLING BASIN SECTION A -A P.O. Qov 666 Gv jfe Fa/!s NC 0 e6va 4GITATI❑N TANK CONCRETE RECYCLE FACILITY EQUIPMENT ARRANGEMENT CALDWELL READY MIX, INC. SAWMILLS, N,C. DRAWN DY.APPROVED 8Y. R.I.H./L.E.H./W,R.H. V,RJi, SCALES DRAWING Y 1/8' 1' DATE. 10/01/00 J -266-L