HomeMy WebLinkAbout20181707 Ver 1_BufferImpact_Fig2_20190201Summary of Impacts
Temporary Impacts
Zone 1 - to become part of stream - 1153 sq. ft.
Zone 1 Access and Staging - 1725 sq. ft.
Zone 2 Access and Staging -
Surveyed Top
of Strearr�.Banks-7A
OIL
I
Limits of
Disturbance
— Vr.
Existing Stream
F
lk
N Buffer Impacts Figure 2
Stream Restoration Area
Feet
0 10 20 40 Date: Jan 2019 JEWELL
ENGINEERING CONSULTANTS, RC