Loading...
HomeMy WebLinkAbout20181680 Ver 1_Revised PCN application_20190204ENVIRONMENTAL PROFESSIONALS, INC. Planning for a Better Environment P.O. Box 3368 DATE Kill Devil Hills, NC 27948 Telephone: 252-441-0239 Fax: 252-441-0721 Email: obxwood@yahoo.com TO: North Carolina Division of Water Resources 401 Wetlands Unit Attn: Ms. Karen Higgins 1650 Mail Service Center Raleigh, NC 27699-1650 ATTACHED LETTER OF TRANSMITTAL DATE: January 21, 2019 JOB NO.: 017 -004 -PT RE: Ricardo Antonio Sequra Quilica Lot 11 -California Pines Roanoke Island, Dare County COPIES DATE DESCRIPTION OF DOCUMENTS 1 1-21-19 Signed/Dated Pre -Construction Notification Form 1 2-8-17 Signed/Dated Authorization to Act As Representative Form 1 6-8-17 U.S. Fish & Wildlife Service— National Wetlands Inventory 1 8-17-18 Notification of Jurisdictional Determination 1 1-21-19 Letter to The Great Dismal Swamp Restoration Bank for Confirmation of Acceptance of Mitigation Credits 1 1-21-19 Acceptance Letter from The Great Dismal Swamp Restoration Bank 16-8-17 Parcel Data Sheet 1 Revised 1-19-19 Plat it x 17 THESE ARE SUBMITTED AS CHECKED BELOW: ❑ For your approval ❑ 11 For your use ❑ ❑ As requested REMARKS: COPY TO: Project File Review & Comment Signature/Notarization SIGNED: ��� �J ��� rge H. Wood, CEP, PWS Environmental Professionals, Inc. 020F. YJA r49 1LJ_uait =, O�Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: © Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18 & 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes Q No 1d. Type(s) of approval sought from the DWQ (check all that apply): Q 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes 0 No For the record only for Corps Permit: ❑ Yes 0 No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 0 Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. © Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑Yes Q No 2. Project Information 2a. Name of project: Ricardo Quilica 2b. County: Dare 2c. Nearest municipality / town: Manteo 2d. Subdivision name: California Pines 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 2126/0139 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 4055 Mill Landing Road 3e. City, state, zip: Wanchese, INC 27981 3f. Telephone no.: 252-216-4031 3g. Fax no.: 3h. Email address: ricardosequramail@gmail.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: (N/A) 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. AgentfConsultant Information (if applicable) 5a. Name: George.H. Wood 5b. Business name (if applicable): Environmental Professionals, Inc. 5c. Street address: 1404 S. Virginia Dare Trail (P.O. Box 3368) 5d. City, state, zip: Kill Devil Hills, NC 27948 5e. Telephone no.: Office: 252-441-0239 Cell: 252-423-1234 5f. Fax no.: 5g. Email address: obxwood@yahoo.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 11 978905 29 3953 1 b. Site coordinates (in decimal degrees): Latitude: 35.902895 Longitude: -75.682375 1c. Property size: .28 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Croatan Sound 2b. Water Quality Classification of nearest receiving water: Sc 2c. River basin: Pasquotank 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Unimproved - land use in area residential 3b. List the total estimated acreage of all existing wetlands on the property: A6 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Fill Explain the purpose of the proposed project: to provide setbacks for wastewater and residential construction 3e. Describe the overall project in detail, including the type of equipment to be used: The property will be cleared, silt fence Installed, area filled for residential construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project(including all priorphases) in thepast? 0 Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑X [I Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Environmental Professionals, Inc.. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. August 17, 2016 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑Yes ❑X No 6b. if yes, explain. N/A Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams—tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Non -Tidal Freshwater Marsh Yes Corps 0.12 W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one S2 - Choose one - S3 - Choose one - S4 - Choose one - - S5 - Choose one - S6 - Choose one 3h. Total stream and tributary impacts o 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivil ually Ilst all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 0 4g. Comments: S. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded I Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 0 0 61. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Only the areas necessary for wastewater setbacks and residential construction including house, driveways, and parking filled. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2:1 slopes on fill - 3 -bedroom house 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑X Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑X DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Cam fete if Using a Mitigation Bank 3a. Name of Mitigation Bank: The Great Dismal Swamp Restoration Bank 3b. Credits Purchased (attach receipt and letter) Type: Non -riparian wetland Type: Choose one Type: Choose one Quantity: .30 acres Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes QX No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 61h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 27 2b. Does this project require a Stormwater Management Plan? ❑ Yes ©No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Below Threshold 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: N/A 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Dare ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑X Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review MX Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply❑ORW (check all that apply): ❑Session Law 2006-246 ❑Other. 41b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review Sa. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 11b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered 'yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H.0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. On-site ground absorption system Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act 0 Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? On Line 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? F ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? No open water 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes 0 No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? On Line 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? QX Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Elevated Structure 8c. What source(s) did you use to make the floodplain determination? surveyor George H. Wood, CEP, PWS January 21, 2019 ApplicanttAgent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only If an authorization letter from the applicant is provided. Page 10 of 10 AUTHORIZATION TO ACT AS REPRESENTATIVE NORM Landowner of record authorizes Environmental Professionals. Inc, to: 1 • enter the property to gather environmental and site information, including delineation of environmental regulatory jurisdictions; 2• enter the site with the regulatory agencies (i.e. U.S. Army Corps of Engineers, North Carolina Division of Coastal Management, North Carolina Division of Water Quality, etc.) as needed to review regulatory alignment(s) and/or to identify additional regulatory jurisdictions; 3, submit plats and other information to acquire regulatory agency confirmations, approvals, and/or determinations (U.S. Army Corps of Engineers, North Carolina Division of Coastal Management, North Carolina Division of Water Quality, etc.); and 4• aetas agent for the purposes determinations. of obtaining environmental permits, authorizations, and/or Lnndowncr —' ---7402/08/2017 --__. Date Client 02/08/2017 Date R ) / u m / \/ z U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2018-00670 County: Dare County U.S.G.S. Quad: Manteo NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner/Applicant: Mr. Ricardo Ouilca Address: 4055 Mill Landing Road Wanchese, NC 27981 Telephone Number: 252-216-4031 Size (acres) 0.28 Nearest Waterway Atlantic Ocean USGS HUC 03010205 Nearest Town Manteo River Basin Albemarle -Chowan Coordinates Latitude: 35.9028947772036 Longitude: -75.6823752118643 Location description: The property is located at 1335 Burnside Road in Manteo Dare County NC The undeveloped property totals 0.28 acres and contains 0.16 acres of wetlands Indicate Which of the Following Aunly: A. Preliminary Determination There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in anyway by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary Jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHAjurisdiction overall of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. Page 1 of 2 SAW -2018-00678 _ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWAjurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on Aueust 17, 2018, Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (LAMA). You should contact the Division of Coastal Management in Elizabeth City, NC, at (252) 264-3901 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Billy Standridae at (910) 251-4595 or Bi11v,W.Standrid eOusace army mil. C. Basis For Determination: The wetlands within the Property were delineated usine the Corps of Fneineers 1987 Wetland Delineation Mamint n..d fh. Ae.......,.._,,.•...1.,._.... .- . . _ _ D. Remarks: None E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B. above) If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) tact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn; Jason Steele, Review Officer 60 Forsyth Street SW, Room IOM15 Atlanta, Georgia 30303-8801 In order for an RNA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by October 17, 2018. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. STANDRIDGEBILLY. S'TANM e1" WCA UCG. S.G Wvr N tw.DoD. DN:[�Ue, o•US. G,ve�nmen4 W+DOD,w.pNl. Corps Regulatory Official: WAYNE.1240687956 srAnD...uuv.WAVNe.iarx,,,, Date: August 17, 2018 Expiration Date: August 17.2023 IM IRON 11fM% 11RIIFE:SSIONUS PI,INNFVI; IIIR I.I ill N f N 1'IN, 'M li .V I January 21, 2019 The Great Dismal Swamp Restoration Bank, LLC Attn: Ms. Beverly White P.O. Box 6186 Chesapeake, VA 23323 Dear Ms. White, This letter is to request continuation of acceptance for mitigation credits for the Ricardo Antonio Sequra Quilica application for proposed impacts to wetlands. Corps' Project Number: Waterway: Permittee's Name: Location of Impact: Permit Action: Impacts (Acres/Linear Feet): Impact NWI Classification: Impact Hydrologic Unit Code: Anticipated Mitigation: SAW -2018-00670 Non -Riparian Ricardo Antonio Sequra Quilica Manteo, Dare County, North Carolina Nationwide #14 & #18 0.12 Acres None Pasquotank 03010205 0.24 Acres Thank you for providing a letter of acceptance for these proposed impacts. Sincerely, Environmental Professionals, Inc. 1�4�_J �� Gcorgc H. Wood, CEP, PWS P.O. BOX 3368 • KILL DEVIL HILLS, NORTH CAROLINA 27948 TELEPHONE: 25244141239 • ENIAIL: obxw,mJlo p,h�w.com 'Phe Great DismaCSwamp RestorationBank, LLC 11. O. Box 6186 'PhOltr (757) 487'-.'")'441 Ch'ai1/ Pc7kC, i'' -;l _'.{i',{ ,Jcfx (757) 4S;7-868() January 21, 2019 Mr. George Wood Environmental Professionals, Inc. P.O. Box 3368 Kill Devil Hills, NC 27948 RE: Ricardo Antonio Sequra Quilica Manteo, Dare County, NC Dear Mr. Wood: The following price quote is given in reply to your request for the purchase of 0.24 Non -Riparian wetland mitigation credits (HUC Code 03010205) from The Great Dismal Swamp RestorationBank Timberlake Farm. These credits are currently available from our Timberlake mitigation bank. The cost will be Five Thousand, Seven Hundred, Sixty Dollars ($ 5,760.00). This quote will expire on April 30, 2019. You will need to submit to the USCOE the necessary application for said mitigation, and receive USCOE permission to furnish said required credits from our Timberlake bank. To complete this transaction, we will require payment in full. Once payment is received, the credit sale will be reported to the US Army Corps of Engineers. Please provide and/or confirm the following information: Corps Project #: SAW -2018-00670 Waterway: Non -Riparian Permittee Name: Ricardo Antonio Sequra Quilica Locality of Impact: Manteo, Dare County, NC Permit action (i.e., IP, NWP-39, enforcement, etc.)NWP #14 & 18 Impacts (acres/linear feet): 0.12 Impacts NWI classification: None Impacts Hydrologic Unit Code: 03010205 Pasquotank Anticipated Mitigation: 0.24 Mitigation Bank, Permittee, and Consultant agree not to discuss with any other party the details and/or pricing of this agreement, unless necessary for regulatory matters. Information contained herein shall be held in the strictest confidence. Thank you for allowing us to quote this project. We look forward to working with you. Sincerely, , IRA I I�� Beverly M. hi eYY Manager— cc unting / Sales GDSRB CC: File Parcel Data Shoot County of Dare, North Carolina 'Owner and Parcel information is based on current data on file and was last updated on June 02 2017 Primary (100%) Owner Information: QUILCA, RICARDO ANTONIO SEQURA 4055 MILL LANDING RD WANCHESE NC 27981 Parcel Information: Parcel: 025481000 PIN: 978905293953 District: 11- MANTEO OUT Subdivision: CALIFORNIA PINES SUBDIV LotBtkSect: LOT: 11 BLK: SEC: Multiple Lots: - PlatCabSlide: PL: A SL: 120 Units: 0 Deed Date: 10/17/2016 BkPg: zjm 0;1;;9 Parcel Status: ACTIVE Property Use: VACANT LAND (PRIVATE) BUILDING USE Et FEATURES Tax Year Bldg Value $0 Building Use: Exterior Walls: Full Baths: Half Baths: Bedrooms: Heat -Fuel: Heat -Type: Air Conditioning: MISCELLANEOUS USE Tax Year Misc Value $0 018117, 1:43 PM 025481.000 11 -978905 -RT -013A LAND USE Tax Year Land Value: $26,7Q0 Land Description : 11 -Village TOTAL LAND AREA: 12000 square feet ht ins dltaa,darecount Ww.Oovlparcelcar<I.php?parcol .025401000 1335 BURNSIDE RD Next Year Bidg Value $Q Actual Year Built: Finished sqft for building 1: Total Finished SgFt for all bldgs: 0 Next Year Misc Value $0 Next Year LandValue• L6,700 Page 1 of 2 N/F ATHOLENE L. COLE (WB 07E, PG. 354) LOT 10 20' AG u 0 S 60'00'00" W 70.02' N/F MONIKA ZAJAC—LORKE LINDSEY W. SAUNDERS (PC. H, SL 398) _av Ac 17.91' a\_ 52.71 1.0, AG 0.48' N. PL 10' SETBACK _ F T --Til 2� MBII I OI W---+— I, Lilo � I I II� QI�U I I QI ' LINE TABLE UNE LENGTH BEARING L1 TIE 36.79 S20 7'19"E 1-2 14.26 78'0 '1 "E L3 46.51 N '48"W L4 26.53 NO '56'34"W L5 31.41 N 9'36'47"E L6 52.37 N 7'14'48"W L7 17.37 N00'51'46"W L8 16.04 N07 7"W 9 R 9.27 78'0 'i " L10 TI 3.34 S07 3'27"E 20' AG u 0 S 60'00'00" W 70.02' N/F MONIKA ZAJAC—LORKE LINDSEY W. SAUNDERS (PC. H, SL 398) _av Ac 17.91' a\_ 52.71 1.0, AG 0.48' N. PL 10' SETBACK _ F T --Til 2� MBII I OI W---+— I, Lilo � I I II� QI�U I I QI ' J 10. m m I .o PROPOSED HOUSE LO 3 BEDROOM I� IXIXIXZ; x-128 90 (T1E)------- CL DRIVEWAY 1341 BURNSIDE ROAD APPROX. T - F11 t l- 10'x 2jS('Y KIP SPACP) ' MBL I. 20' I CONC I N 61'31'00" E 70.00' 4' WIDE DITCH i e BURNSIDE ROAD — SR_ 1123 60' R/W PROPOSED HOUSE WETLAND FILL SECTION A—A 1"- 10' WETLAND FILL AREA FOR HOUSE= 3,993 S.F. WETLAND FILL FOR DRIVEWAY= 1,275 S.F. TOTAL WETLAND FILL AREA= 5,268 S.F. 0 10 20 40 GRAPHIC SCALE: 1" = 20' PROPOSED FILL AREA 1� N N n I0 coN N G w N60 .00'00"E 70.02' (TIE) 1 ar Ac 7.72�- 22.3( 477772- 9 LOT 12 CALIFORNIA PINES (P.C. A, SL 344) ±a 9.6' Im 58.63'(TIE) ° SILT FENCE GRADE 2 BLL < REVISED: 1-19-19 SECTION 404 & 401 WETLAND PERMIT APPLICATION FOR RICARDO ANTONIO SEQURA QUILICA LOT 11, CALIFORNIA PINES, ROANOKE ISLAND 1335 BURNSIDE ROAD NAGS HEAD TOWNSHIP, DARE COUNTY, N. C. SCM£ DAIS: MAW NR CT ft C-20' 10/17/18 K.O. 17004 1 of i ENVIRONMENTAL PROFESS/ONALS, INC" Planning for a Better Environment 1404 S. Virginia Dare Trail P.O. BOX 3368 — KILL DEVIL HILLS, NC 27M PhiOW (251) 441-023P FAX (252) 44FO721 oI®o I I< X3.0 m l I Of I wlw >Iz I I a t0 I UIJ I 1 af aI"' I Ia_wI I Imo? NI UPLANDS I (5,103 S.F.) I I. �olLOT \ 11 / .S (1 2,203 S.F.) J 10. m m I .o PROPOSED HOUSE LO 3 BEDROOM I� IXIXIXZ; x-128 90 (T1E)------- CL DRIVEWAY 1341 BURNSIDE ROAD APPROX. T - F11 t l- 10'x 2jS('Y KIP SPACP) ' MBL I. 20' I CONC I N 61'31'00" E 70.00' 4' WIDE DITCH i e BURNSIDE ROAD — SR_ 1123 60' R/W PROPOSED HOUSE WETLAND FILL SECTION A—A 1"- 10' WETLAND FILL AREA FOR HOUSE= 3,993 S.F. WETLAND FILL FOR DRIVEWAY= 1,275 S.F. TOTAL WETLAND FILL AREA= 5,268 S.F. 0 10 20 40 GRAPHIC SCALE: 1" = 20' PROPOSED FILL AREA 1� N N n I0 coN N G w N60 .00'00"E 70.02' (TIE) 1 ar Ac 7.72�- 22.3( 477772- 9 LOT 12 CALIFORNIA PINES (P.C. A, SL 344) ±a 9.6' Im 58.63'(TIE) ° SILT FENCE GRADE 2 BLL < REVISED: 1-19-19 SECTION 404 & 401 WETLAND PERMIT APPLICATION FOR RICARDO ANTONIO SEQURA QUILICA LOT 11, CALIFORNIA PINES, ROANOKE ISLAND 1335 BURNSIDE ROAD NAGS HEAD TOWNSHIP, DARE COUNTY, N. C. SCM£ DAIS: MAW NR CT ft C-20' 10/17/18 K.O. 17004 1 of i ENVIRONMENTAL PROFESS/ONALS, INC" Planning for a Better Environment 1404 S. Virginia Dare Trail P.O. BOX 3368 — KILL DEVIL HILLS, NC 27M PhiOW (251) 441-023P FAX (252) 44FO721