Loading...
HomeMy WebLinkAboutNCS000040_Letter to Permittee_20190205ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH interim Director Mr. David Waggoner Charlotte Pipe and Foundry Company P.O. Box 35430 Charlotte, NC 28235 Dear Mr. Waggoner: NORTH CAROLINA Environmental Quality February 5, 2019 Subject: Final NPDES Stormwater Permit Permit No. NCS000040 Charlotte Pipe and Foundry Company Mecklenburg County In response to your renewal application for continued coverage under NPDES stormwater permit No. NCS000040, the Division of Energy, Mineral and Land Resources is forwarding herewith the subject state - NPDES permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This final permit includes no major changes from the draft permit sent to you on September 19, 2018. The monitoring strategy remains the same (semi-annual) as the previous term of the permit. Please note that analytical and qualitative monitoring is required in this permit. Failure to complete the monitoring as required is a violation of the permit and any permit noncompliance constitutes a violation of the Clean Water Act. Reference Part III, Section A, Item 2 "Duty to Comply", Item 9 "Penalties for Tampering" and Item 10 "Penalties for Falsification of Reports" of your permit for further information. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina 27611- 7447. Unless such demand is made, this decision shall be final and binding. Please take notice this permit is not transferable. Part III, B.2. addresses the requirements to be followed in case of change in ownership or control of this discharge. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources t r- ��fi. E Q 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 W TH CAROLIM1LG r.a 919.707.9200 Mr. David Waggoner Charlotte Pipe and Foundry Company Subject: Final NPDES Stormwater Permit No. NCS000040 February 5, 2019 Page 2 of 2 Mineral, and Land Resources, or permits required by the Division of Water Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. If you have any questions or comments concerning this permit, contact Tom S. Poe at (919) 707- 3646, or at email, tom.poe@ncdenr.gov. Sincerely, q for S. Daniel Smith, Interim Director Division of Energy, Mineral and Land Resources cc: (sent via email) Chad Broadway, Charlotte -Mecklenburg Stormwater Services Zahid Khan, DEMLR Land Quality, Mooresville Regional Office Sam Sampath, Ph.D., EPA Region IV, 61 Forsyth Street, Atlanta, GA 30303 R4NPDESPerrnits@epa.gov Stormwater Program Files Attachments: NPDES Stormwater Permit No. NCS000040 NPDES Stormwater DMR Forms