Loading...
HomeMy WebLinkAboutSW6190102_Stormwater Report_20190206 Stormwater Report June 7, 2018 *** ***FOR OFFICIAL USE ONLY Wilmington District prepared for Contract #: W912HN-14-D-0017-DQ03 PN #: 76514 M&H Project #: 145.03 Fort Bragg, NC SOF Special Tactics Facility, Phase 3 SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - i - TABLE OF CONTENTS SECTION PAGE GENERAL ..................................................................................................................................... 1 METHODOLOGY ............................................................................................................................ 1 EXISTING CONDITIONS .................................................................................................................. 2 PROPOSED CONDITIONS ............................................................................................................... 2 STORMWATER MANAGEMENT ........................................................................................................ 3 OUTLET PROTECTION ................................................................................................................... 5 WATER QUALITY ........................................................................................................................... 5 SEDIMENTATION AND EROSION CONTROL ...................................................................................... 5 TABLES Table 1 RAINFALL DATA. ....................................................................................................... 3 FIGURES Figure 1 NCDEQ SUMMARY OF STORMWATER CALCULATIONS..………………..…………………………1 Figure 2 BIORETENTION BASIN. ……………………………………………………………………………….4 APPENDIX Appendix A USGS PROJECT LOCATION MAP ............................................................................ a.1 Appendix B PREDEVELOPMENT MAP......................................................................................... a.2 Appendix C POSTDEELOPMENT MAP......................................................................................... a.3 Appendix D EISA 438 CALCULATIONS ...................................................................................... a.4 Appendix E STORMWATER CALCULATIONS…………………………………………….... ................ a.5 Appendix F NRCS HOKE COUNTY SOIL SURVEY MAP ............................................................... a.6 Appendix G SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT ................. a.7 Appendix H BIORETENTION CELL SUPPLEMENT ......................................................................... a.8 Appendix I OUTLET PROTECTION CALCULATIONS ..................................................................... a.9 Appendix J LANDSCAPE PLANS .............................................................................................. a.10 Appendix K SKIMMER SEDIMENTATION BASIN CALCULATIONS .................................................. a.11 SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page 1 of 6 GENERAL INFORMATION The project is located within the Fort Bragg Army Installation at the Aberdeen Training Facility off of King Road. The site is Phase 3 of a multi-phase, multi-building project being developed within the existing training area. The site is currently undeveloped and covered with native vegetation. The site is bound on the north by undeveloped wooded area and to the south by an unnamed asphalt road. The eastern boundary of the site is developed infrastructure and buildings. The western boundary is primarily undeveloped and wooded. The project consists of three (5) new one story buildings totaling approximately 110,360 SF, privately owned vehicle (POV) parking, and access drives throughout the site. The total site area within the limits of construction is approximately 16.82 acres. The site prior to construction is undeveloped, consisting of a combination of open area and vegetation. Vegetation consists primarily of coniferous trees 8 to 12 inches in diameter spread roughly 30 to 50 feet apart. The topography slopes generally towards the wetlands to the south, with an elevation range of approximately 55 feet. The soils consists primarily silty sands or clayey sands. Prior to construction, the government will harvest the area, with the remainder of the vegetation to be removed by the contractor. All drainage areas for the project are in the watershed of Rockfish Creek, Stream Index 18-31-1, Classification C: Aquatic Life, Secondary Recreation, Freshwater, in the Cape Fear River Basin. METHODOLOGY Per the North Carolina Department of Environmental Quality (NCDEQ), the approved methods used in stormwater calculations are as shown in Figure 1. Figure 1 - Ref: NCDEQ Stormwater BMP Manual All methodology used to determine both peak flow and storm event volumes follows the guidelines set by the Corp of Engineers Wilmington District and NCDEQ. As the project is a federal project which exceeds 5,000 square feet of footprint, Section 438 of the Energy Independence and Security Act or 2007 (EISA 438) mandates the use of site planning, design, construction, and maintenance strategies for the property to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property. SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page 2 of 6 EXISTING CONDITIONS The existing site where the training facility and associated supporting infrastructure is to be constructed is approximately 16.82 acres. The site, prior to construction, undeveloped, consisting of a combination of open area and vegetation. Vegetation consists primarily of coniferous trees 8 to 12 inches in diameter spread roughly 10 to 20 feet apart. The topography slopes generally towards the wetlands to the south, with an elevation range of approximately 35 feet. The soils consists primarily silty sands or clayey sands. Prior to construction, the government will harvest the area, with the remainder of the vegetation to be removed by the contractor. For purposed of drainage calculations, the open site area is considered in fair to good condition, and the forested area moderately dense. One existing drainage structures exist on the site to convey drainage onto the site. This pipe will be removed and the drainage routed around the site. Due to the sandy nature of the existing soils, most first flush drainage permeates into the ground. For the purpose of the stormwater calculations, the site has been divided into 5 separate areas. See the predevelopment hydrology sheets for more information. Predevelopment area 1, 2 and 3 will be routed around the new construction. Drainage within areas 4 and 5 will be captured and infiltrated onsite. A Subsurface Exploration Report will be performed by Soils Section, Geotechnical & HTRW Branch, US. Army Engineer District, Savannah. To calculate storm data, 24hr rainfall data to use for design was provided for by Fort Bragg. The rainfall data used are given in Table 1. For stormwater design, the 10yr event will be used. For temporary erosion control measures during construction, the 2yr event will be used. TABLE 1 RAINFALL DATA STORM EVENT 24HR RAINFALL DATA (IN) 1YR 3.03 2YR 3.67 5YR 4.71 10YR 5.4 25YR 6.5 50YR 7.3 100YR 8.2 WinTR55 Small Watershed Hydrology software, developed for the USDA, was utilized to calculate the peak runoff for both predevelopment and post development runoff. This software has been used in the past for other projects located at Fort Bragg and for NCDEQ, and is an approved method for stormwater calculations. The composite runoff curve number calculations for each area were entered into WinTR55 and the results are shown in the appendix and on the plan drawings. PROPOSED CONDITIONS To better control runoff at the source, and to better calculate strormwater runoff for drainage structures, the developed site was separated into 11 separate subbasins. These basins do not necessarily align with the original drainage areas, however the outflow of the post development basins is at the same location as the predevelopment basins. For all areas offsite and outside of the construction limits, and for areas that are outside the developed area and grassed, the stormwater is routed around the site to its natural outfall location. The post-developed composite weighted CN calculations for each subbasin used in WinTR-55 as well as post-developed peak flows are shown in the appendix and on the plan drawings. SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page 3 of 6 For design of all stormwater structures, AutoDesk Storm and Sanitary Analysis 2014 was utilized. As the total length of each structure is relatively small and each contributing drainage area has a time of concentration (Tc) overall less than 5 minutes to the inlet, it was assumed that each inlet on the system would receive the peak flow input at the same time. This results in a “worst case” scenario for the stormwater system, and ensures an adequate design for the 10yr storm event. Pipe sizes were calculated using the software, with minimum pipe sizes directed by UFC 3-201-01 Civil Engineering. The results of the stormwater structure designs are included in the appendices including HGL calculations. STORMWATER MANAGEMENT As the project is a Federal facility over 5,000 square feet, the stormwater requirements of EISA Section 438 (Title 42, US Code, Section 17094) must be met. In accordance with the Department of Defense memo dated January 19, 2010 entitled DoD Implementation of Storm Water Requirements under Section 438 of the Energy Independence and Security Act (EISA) the designer of record shall implement the procedures for complying with EISA 438 as outlined in the EPA Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act. The EPA Guidance manual prescribes two options to comply with the EISA 438 mandate. Option 1 is to retain and infiltrate the 95th percentile storm event onsite. Option 2 allows site-specific hydrologic analysis to determine the types of stormwater practices necessary to preserve predevelopment runoff conditions. Option 2 is provided for situations where pre-development conditions can be maintained by retaining less than the 95th percentile storm event, or where site-specific parameters dictate a prescriptive methodology be used or Option 1 is not protective enough, for example at the headwater of an impaired stream. For this project, Option 1 was selected. To be in compliance with EISA 438, based upon Option 1 of the EPA Technical Guidance document, the total volume of runoff from the 95th percentile storm event must be captured and infiltrated on-site. The method to determine this volume is based upon guidance from the EPA document. The 95th percentile storm event for the project area is equivalent to 1.8” of rainfall, as provided by the Fort Bragg Installation Design Guide. Criteria used for determination of total stormwater runoff to capture and infiltrate, the following criteria was used: Hydrologic Soil Group A, average Maximum Infiltration Rate of 15 inches per hour or as determined by the percolation testing, Minimum Infiltration Rate of 0.1 inches per hour, a Decay Factor or 2 per hour and Pervious Depression Storage of 0.2 inches. To provide for this storage, a total of 11 infiltration areas have been designed to help infiltrate the runoff closest to the source. Each of these areas are bioretention area consisting of a volume of ponding storage, a section of engineered fill to promote infiltration and sediment removal, and a layer of open graded aggregate to provide for the storage (see Figure 2). All drainage for the construction portion of the site is routed to an infiltration area. The design of the bioretention areas is based upon design criteria from Sustainable Landscape Systems for Managing Storm Water 2nd Edition, developed by Ohio State University Extension. The bioretention areas are designed to infiltrate the 95th percentile storm event as close as practical to the origin of the drainage. All drainage enters the bioretention areas via surface flow, or via stormwater collection pipes with the outlet at the top of the pond area, allowing for sediment to be removed via infiltration. The storage required for each area and the amount of storage provided for infiltration is shown on the plans. Storage is provided in the above ground ponding (maximum 12”), media and the open graded aggregate (minimum 2 feet). To determine the storage volume to meet EISA 438, the Army LID Planning and Cost Tool was compared against what was calculated via the Direct Determination method. The database determines the volume required to be stored and infiltrated onside in order to meet EISA 438. The Army LID Planning and Cost Tool was developed to MILCON standards for projects within the jurisdiction of the Army. As such, the volumes determined using the Army LID Planning and Cost Tool are used for the design of the bioretention basins. Although the database was used to determine volume required, it was not used to design the bioretention areas. See below for the design of the bioretention area. SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page 4 of 6 The Army LID Planning and Cost Tool looks as the pre-developed and post-developed areas to calculate the storage volume requirements. WinTR-55 was utilized to calculate pre and post developed composite runoff curve numbers and peak flows for the areas draining to each bioretention area. The pre-developed composite weighted CN and peak flows for each bioretention area can be found in the appendix. A map of the post development drainage areas can be found in Appendix C. In addition, the volume required for the first flush, or 1” rainfall event, as required by NCDEQ was calculated. This would equate to the minimum required volume to store to meet NCDEQ requirements. This volume is smaller than the required volume to be stored to meet EISA 438, hence the requirements for NCDEQ in terms of storage volume are met. The volume provided in the ponding area meets NCDEQ requirements. The Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) was used to calculate required volumes. The volumes provided in each area within the respective bioretention area are shown in Appendix H. For all storm events greater than the 95th percentile event, and for other events where the infiltration areas cannot sufficiently handle the storm event, excess runoff is bypassed directly to the outfall area. As the open aggregate fills with water, when the level reaches the bottom of the perforated pipe, drainage enters the pipe and is carried to either the next infiltration area, or to the outfall. In addition, if there is excess ponding due to either the saturation of the engineered fill or a large storm event, water is collected through the grate in the riser structure. This prevents flooding in areas surrounding the bioretention basins as the top of the grate is set at an elevation below the surrounding grade. The width of the bioretention areas within the parking lot are dictated by the Fort Bragg Installation Design Guide. Although the design of the bioretention areas are not completely compatible with the Bioretention Cell Supplement form provided by NCDEQ, this form has been completed for the drainage areas and included in the appendix. SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page 5 of 6 Figure 2 - Bioretention Basin Seasonal high water table (SHWT) depths was determined in conjunction with the geotechnical report. SHWT depths were found to be a minimum of 13’ below grade to more than 25’ below grade. As the 95th percentile storm event is being captured and infiltrated on-site and all excess storm drainage is routed to outlet structures with appropriate energy dissipation, this meets LEED 6.1 Stormwater Design Quantity Control requirements. The existing site has less than 50% impervious surface, and the bioretention/infiltration of the 95th percentile storm even meets the quantity control requirements. Manholes are provided in addition to the 36” riser pipes in the bioretention areas to facilitate cleanout. It is the user’s desire to utilize landscape rock in lieu of mulch to reduce the risk of floating debris (mulch) from entering into and clogging the system. No water supply wells are within 100’ of the project site. No surface waters are within 30’ of the project site. No Class SA waters are within 50’ of the project site. OUTLET PROTECTION All excess stormwater from the infiltration areas, as well as outlet structures for stormwater routed around the project site and will be provided outlet protection at the headwalls. Outlet protection will be provided in accordance with guidance from Chapter 8.06 Design of Riprap Outlet Protection of the North Carolina Division of Environmental Quality Erosion and Sediment Control Planning and Design Manual. Calculations for the outlet protection are shown in the appendix. WATER QUALITY To ensure the removal of Total Suspended Solids (TSS), all runoff is directed to the infiltration areas via either sheet flow or via storm collection pipes with their outlets at the top of the bioretention basins (protected with energy dissipaters). This includes runoff from all parking areas and roof drainage structures. This makes certain that the storm events up to the 95Th percentile event (and first flush for larger events) will have the runoff filtered through a minimum the landscape rock and a minimum of 24” of SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page 6 of 6 engineered soil. Additionally, in bioretention areas that do not have landscape rock, a 3’ rock strip is included to meet NCDEQ requirements for TSS removal at bioretention basins. In addition, a non-woven geotextile fabric is placed above both the gravel section of the bioretention basin and the perforated collection pipe to keep sediment and other fines from infiltrating the storage area. It is generally accepted that bioretention basins of this type will remove between 80-90% of TSS along with the removal of heavy metals. This design has previously been used on projects at Fort Bragg and has been approved by NCDEQ for TSS removal requirements. This method will also meet LEED 6.2 Stormwater Quality Control requirements. EROSION AND SEDIMENTATION CONTROL Separate erosion and sedimentation control during construction plans have been developed for submittal to NCDEQ for permit requirements. Calculations used for sizing skimmer sedimentation basins is included with this report. SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.1 - APPENDIX A USGS PROJECT LOCATION MAP 6RXWKHUQ 3LQHV 5DHIRUG 0F&DLQ 1LDJDUD 1LF KROVRQ &UHHN /REHOLD 6LOYHU +LOO :DJUDP 3LQHEOXII $'-2,1,1* 48$'5$1*/(6  ŰO                                                                     9LNLQJ$LUSRUW `_ `_ `_ 5$7/( 3/$1.5' )850 $ * ( .2 3 3 (5 65 '0&&$,1 6 71+25$&(:$/7(565'1&'($7215' (//,1 *7 2 1'5 5 2 6 $'51&:,17(5/1 &$//2:$<5' $6 +(0 2 1 75 ' 5$,/52$'/1 (&+$0 %(5 65' '2 8%/(& '5 .,1*5')8/)25'0&0,//$15'$50<5'$17/(5'5)$:17 5 / & 2; 5 ' 1 & 6+$:5'$%(5'(( 1 5 '.,1*5'& $ / /2:$ < 5 ' +81 7(56581 ,9(<672/'3,1(+85675'32 2 /(5'2/'%$515'5(,//<676$1 '(5 65 '67527+(55'9(1785$/15 (6 (5 9 $7 ,2 15 '%2 :(5 65 '0217526(5'%8) ) $ / 2&5 ( ( . 5 '7$75 2 1 ,'5 7+(/21*5'1&1 &%(67676+((76'50225(&25 '1&7 + 2 5 1 % ( 5 *'5&$1'/(:22'$'0 ,5 $/'5 */$'+,//$&5(&('$5+$//)$505'$1'5(:$9(1&'2%<'5%227+321'5'52*(56/167$7(57(/( 5 2 0 ( / 1 %$0$/1/(/$ 6/1 758'($8$9(&22/635,1*'5* )257%5$**)257%5$**)257%5$*** )257 %5$** *XP%U *XP%U /LW W O H&U&D E L Q%U &DELQ%U )LHOG%U )L H OG%U 5 R F N ILV K & U 5RFNILV K&U5RFNILVK&U5R F NILVK&U 5 R F NILV K & U -X Q LSHU&U-XQLSHU&U3LQH\%RWWRP&U%X IIDOR&U0RXQWDLQ&U0LOO&U&DOI%U&DO I%U 0 LOO&U :ROI3LW&U 7UHQW%U30F.LHWKDQ 3RQG %URZQ & $VKOH\ +HLJKWV )LYH3RLQWV $VKPRQW 0RQWURVH 7LPEHUODQG 0F&DLQ 6DQGVWRQH +LOO 3RROHV 6LGLQJ  ˆ  ˆ   ˆ  ˆ        ˆ       ˆ      ˆ     ˆ     &%%4 &%%4 &%%4 &%%4 0&&$,11&  ([SUHVVZD\/RFDO&RQQHFWRU 52$'&/$66,),&$7,21 5DPS :' 6HFRQGDU\+Z\ /RFDO5RDG ,QWHUVWDWH 5RXWH 6WDWH5RXWH865RXWH89+ 0&&$,148$'5$1*/( 1257+&$52/,1$ 0,187(6(5,(6 86'(3$570(172)7+(,17(5,25 86*(2/2*,&$/6859(<  1257+ &$52/,1$ 48$'5$1*/(/2&$7,21 ,PDJHU\1$,30D\ 5RDGV‹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˜ ™01 *1 870*5,'$1'0$*1(7,&1257+ '(&/ ,1$7,21$7&(17(52)6+((7 ƒ 0,/6 ƒ0,/6 PROJECT LOCATION You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.2 - APPENDIX B PREDEVELOPMENT MAP BSDCG702.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\05_Civil\BSDCG702.dgn2/13/20176:09:10 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE WM FORMER TRANS- JUNCTION BOX 493 492 491 489 488 487 486 484 483 482 481 479 478 477 476 474 473 472 471 469 468 467 466 464 463 462 461 459 458 457 456 454 453 452 451 449 448 447 446 444 443 443 444 444 443 442 441 439 439 441 442 443 444 449 448447446 459 458 457 456 454 453 452 451 469 468 467 466 464 463 462 461 479 478 477 476 474 473 472 471 474 474 471 471 471 471 472 473 474 466 466 486 484 483 482 481 464 463 451 469 10pi 6CD 8CD 6CD 8 8 8 10 10 10 10 10 10 10 12 12 12 12 12 12 10 10 10 12 12 12 6 12 8 8 8 8 8 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 12 12 8 12 12 DA2 PRE DA4 PRE DA5 PRE DA3 PRE DA1 PRE 4 3 9 440 4 4 0 441441442442443443444444445 445 44544544544 5445 446 446446446 447 4474474 47447 448 448448448448 12 449449449449 449 490 485 480 475 470 465 460 455 450 445 440 440 445 450 460 455 470 465 480 475 475 475 470 470 485 465460 470 450 450 450450 450450 4 5 0450 451451 451 452 452 452 10 453 453 453 453 10 454 454 454 4 54 12 10 455 4 55 455 455 455455455455455 455455 10 8 456 456 456 4 5 6 457 457 457 4 5 7 18"CMP 458 458 458 458 GATE INV.-457.32 HW 459459 459 459460 460 460 460 4604604604 6 0 460460460460 4 6 0 12 18"CMP 4BO 4BO 4BO 4BO 4BO 461 461 461461 461 461 46115"CM P462 462462 462 462 462 462 462 TOP-463.20 INV.-460.00 YI INV.-461.34 TOP-463.24 YI 10 12 4634 6 3 463 463 463 463 463 463 463 EJB 464464 464 464464 464 464 464 464 464 465 465 465 4 65 465 4654 6 5465 465 4654 65 4 6 5 465465465465465 465 465 465 4 6 5 465 8' CHAIN LINK FENCE8466466466466466 466 46 6466466 466466 466466 466 466 4 6 4 466 12' CHAIN LINK FENCE 467467467 467 467467 467467 467 467 463 467 467468468 468468468 468 468 468468 468 468 462 468 468C469 469469 469 469 461 4 69 469469 469 469 EM TRANSFORMER 470 470 470 470470470470470470 4 7 0 4 70 470 470470470 47047012 12 471 471 471 471471 471 8472 8 10 10 12 6 12 104736 8 10 8 WELLHEAD & PUMP 12 10 10 8 10 10 8 8 10 10 6BO 8 12474 6 12 10' CHAIN LINK FENCE 8475475475 475475475 10 8 10 6BO 6BO476 8 8 8 6 8 8 8 10 6BO 847710 8 8 8 8 6 8 8 6 10 10478 6BO 10 8 8 8 8 8 1047912 10480480480480480 10 8 10 104818 8 8 8 10 8482 648384841248548548548548584868487488 84894904904904904914924938' CHAIN LINK FENCE 494495495496497498499 FFE-470.05 0-9012 BUILDING METAL 1 STORY GATE TRANSFORMER LTP LTP LTP STOP SIGN ROAD (ASPHALT GOOD COND.) ROAD (ASPHALT GOOD COND.) CG702S.HAGGARDM.MAYERC. LOWEPRE DEVELOPED HYDROLOGY EXHIBITGEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. 50'25'0 50'100'150' GRAPHIC SCALE: 1"=50'-0"N SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.3 - APPENDIX C POSTDEVELOPMENT MAP BSDCG703b.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\05_Civil\BSDCG703b.dgn1/18/201911:22:53 AMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE GI-17B WM FORMER TRANS-RD6" 6" 6"RDRD6"10"10"RD RD RD 6"RDRDRD CO CO CO 2:1 2:1 2 :1 2 :1 2:12:1 2:13:13:13:13:13:13:1 3:13:13:13:12:1 2:12:1 JUNCTION BOX 492 491 489 488 487 486 484 483 482 481 479 478 477 476 474 473 472 471 469 468 467 466 464 463 462 461 459 458 457 456 454 453 452 451 449 448 447 446 444 443 443 444 444 443 442 441 439 439 441 442 443 444 449 448447446 459 458 457 456 454 453 452 451 469 468 467 466 464 463 462 461 479 478 477 476 474 473 472 471 474 474 471 471 471 471 472 473 474 466 466 481 464 463 451 469 10pi 6CD 8CD 6CD 8 8 8 10 10 10 10 10 10 10 12 12 12 12 12 12 10 10 10 12 12 12 6 12 8 8 8 8 8 10 10 10 10 10 10 10 10 10 10 10 10 10 10 12 12 8 GI-17 GI-17ASD15"SS CO SSMH 4 3 9 440 4 4 0 442442441441444 444444 444443443445 445445 445 44544544544 5445447447 446 446447447446447 446 447 448448448 448 448 448 448448448448 CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD RD CO 450 450 450450450450450450 450450449490 485 480 475 470 465 460 455 450 445 440 440 445 450 460 455 470 465 480 475 475 475 470 470 465460 470 12 450 450 450450 450450 4 5 0450 449449449449 4494504 5 1 451451451 45145245245345210 453452 452 453 452 453 45345445445445445445512 10 10 454 454 454 45 4 455 455455 455 455455 455455 8 10 455 4 5 5 455 455 455455455455455 455455 456 456 456 4 5 6 457 18"CMP 457458 457 458 457 458 4 5 7 4 5 8 459 45 9GATE INV.-457.32 HW 459459 459 4 5 9 460 460 460 460461461461461461461461 461 461 461461461 460 460 461 461 461 461461461461 461461 461 460 460 460 460 460 461461 461 461 461 461462461461 460460460460460460460460 4BO 12 460 460 460 460 4604604604 6 0 460460460461 461 461461 461 460 460461 461 18"CMP462 462462 462462 462 462 462 462462 462 462 462 462462 462 462 462 462 462 462462 462 462462 462 462 462462462462462462462 462 462 462 462462 462 462 462 462 46215"C M PTOP-463.20 INV.-460.00 YI INV.-461.34 TOP-463.24 YI 24"464 463 463463463 464463 4 6 3 4 6 3 463 463 463 4 63 46 4 4 64 464 463 463 464 464 463 463 463463463 463 463 463 464464464 4 6 3 464464464 464 463 464464463 464463463463 463 463 463 464464464 464 463464 463463464 463 464464464 464464464 463 463463 463 464 463 464 12 10 4634 6 3 464464 463 464 464464 463 464 463 464 463 464 463 463 464 464463 EJB 465465465465465465 465 465 465465465465 465 46 5 465 465 4 6 5 465465465 46546 5 465 465465465465 465465465 465 465465465 4 65 4654654 6 5 465 465465 465 4658' CHAIN LINK FENCE8 465 465 465 4 65 465 4654 65465 465 46546 5 4 6 5 465465465465465 4 65 465 465 4 6 5 465 466 467467 467 467 466 466 467466 467 466 467 467466 467466 467 467 467466 466466 467467466 466 4 6 6466466 467467 467 467 466 4 66 466466 466466 466 467467466467 466 467 467466 4 64 463 467 467466 12' CHAIN LINK FENCE 468 468 468 468 C469468 468 468468468 468 469 468 468468469 468 469 469468 462 461 468 4 69469468469 469 469470470470470470470 470 EM TRANSFORMER 12 12 470 470 470 470470470470470470 4 7 0 4 7 0 470 47047 0 470 4704708 471 471 471 471471472 471RD WELLHEAD & PUMP 8 8 10 1010 10 12 12 6 8 8 8 12 10 10 10 10 6 8473475475475475475 4 7 4475 10' CHAIN LINK FENCE 6BO 10 12 10 12 8 8 8 10 6475475475475475474475 476 4 7 64766BO 6BO 10 8 8 10 8 8 8 8 6476CO RD CO RD478478477477477477478478 6BO 6BO 8 10 8 8 8 8 10 10 8 8 8 10 6 6477478479479479479 10 10 124794804 8 0 480 480480 480480 481 481480 10 8 10 104804804804804804814824828 8 8 8 8 10 648248384848" PERF48548548548512 8 8485485485486487 8488489490490490490490490491494FFE = 466.00' BUILDING 7 FFE = 466.00'FFE = 466.00' BUILDING 7 FFE = 463.25' FFE = 462.00' BUILDING 4 BUILDING 5 FFE = 463.00'FFE = 463.00' BUILDING 5 GEN STAGING AREA CONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7 SAR BARN BID ITEM 5) (OPTIONAL FFE = 466.00' BID ITEM 3) (OPTIONALSTEPSD SD SDSDSDSDSDSD SD SDSD SD SD SD SD SDSDCB-7 CB-6 CB-5 CB-3 CB-2 CB-1 GI-8 GI-1GI-2GI-3 GI-4 SD CB-16 CB-17 CB-18 CB-19 CB-13 CB-12 CB-21 CB-22 SD SD GI-7 GI-6 GI-5 GI-9GI-10GI-11GI-12 GI-13 GI-14GI-15 CB-8 CB-20 CB-25 SD SD SS CO SS COSDSD GI-19 GI-18 MH SS MH SS MH SS MH SS HW-1 HW-2 MH SS MH SS MH SS MH SS HW-5 HW-6 HW-7 CI-1 CI-2 CI-3 SDSDSDSDSDCB-24 GI-16 SDCB-4 SDSDGI-20SD SDSD SD SD SD SDS D SDSDSDSDSDSDSDSDSD2 4"24" 24" 24"24"15"SD15" 15"15"18" 15"SD1 5"SD18"18"SD18"SD18"18"SD 18"15"24"24"SD 24"15"15"15"15"15"18"18"18"24"15"24"24"24"18"18"CB-9 CB-10 CB-11 CB-14 CB-15 CI-4 CI-5 CI-6 CI-7 HW-8 HW-9 8" PERF.8" PERF. 8" PERF. 8" PERF. 8" PERF. 8" PERF. 8" PERF.15"SDSDSDSS CO SD 15" S D24" MH-1 SD MH-3 SD MH-2 SD MH-4 SD18"SD SD SD SD SD 8" PERF. SD SD SDSD15"15"15"15"15"SD SD18"15" CB-26 CB-27 RDRDRDRD10"S DSD RD RDRD RDRD RD RD RD RDRDRDRDRD6"6"10"6"6"6"6"6"6"6"10" 10"6"6"6" 10"6"6"6"6"10"10" 6" 6"6"6"6"6"6"10"10"6"6"6"6"6"10"6"6"10"RDRDRDRD6"6"10"6"10"SD SDSD6"10"RDMH-9 SD MH-8 SD MH-5 SD MH-7 SD MH-6 SD 15"15"15"SDCB-2818"24"8" PERF.8" PERF.SDSDGI-18A GI-18B GI-18C GI-18D FFE-470.05 0-9012 BUILDING METAL 1 STORY GATE BUILDING 3SD1 BIO AREA 2 BIO AREA 3 BIO AREA 4 BIO AREA 5 BIO AREA 6 BIO AREA 7 BIO AREA 8 BIO AREA 9 BIO AREA 11 BIO AREA HW-3 HW-4 10" PERF .SD SD 10" PERF .SD 10" PERF .SD 10" PERF .SD 10" PERF .CO CO8" PERFPERF8" 12" TRANSFORMER CO RD 10 BIO AREA 8" PE R F.8" PER F. LTP LTP LTP 50'25'0 50'100'150' GRAPHIC SCALE: 1"=50'-0" CG703S.HAGGARDM.MAYERC. LOWEPOST DEVELOPED HYDROLOGY EXHIBITN GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.4 - APPENDIX D EISA 438 CALCULATIONS Army LID Planning and Cost Tool Report Date 1/3/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bio 1 Project description SOF Phase 3 Bioretention Area 1 Project limit of disturbance (ac) 5.94 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)75 User Name FMM PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 6200 LID PLANNING SUMMARY Bioretention: 0 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: 13572 Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 0 0 0 0 0 16222 Total retention volume provided by BMPs (cf):16222 EISA Section 438 retention volume requirement (cf) 6200 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/3/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bioretention Area Project description SOF Phase 3 Bioretention Area 2 Project limit of disturbance (ac) 1.72 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)84 User Name PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 3783 LID PLANNING SUMMARY Bioretention: 0 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: 5078 Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 0 0 0 0 0 6069 Total retention volume provided by BMPs (cf):6069 EISA Section 438 retention volume requirement (cf) 3783 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/3/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bio 3 Project description SOF Phase 3 Bioretention Area 3 Project limit of disturbance (ac) 1.01 95% rainfall depth (in)1.8 Soil type Clay Hydrologic Soil Group (HSG) D Pre-project curve number (CN) 87 Post-project curve number (CN)92 User Name FMM PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)2758 Post-project runoff volume (cf) 3884 LID PLANNING SUMMARY Bioretention: 0 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: 1912 Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 0 0 0 0 0 123 Total retention volume provided by BMPs (cf):123 EISA Section 438 retention volume requirement (cf) 1126 LID COST SUMMARY Project does not comply with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bio 4 Project description SOF Phase 3 Bioretention Area 4 Project limit of disturbance (ac) 0.38 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)90 User Name PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 1277 LID PLANNING SUMMARY Bioretention: 2040 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 2438 0 0 0 0 0 Total retention volume provided by BMPs (cf):2438 EISA Section 438 retention volume requirement (cf) 1277 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bio 5 Project description SOF Phase 3 Bioretention Area 5 Project limit of disturbance (ac) 0.4 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)88 User Name FMM PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 1172 LID PLANNING SUMMARY Bioretention: 2040 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 2438 0 0 0 0 0 Total retention volume provided by BMPs (cf):2438 EISA Section 438 retention volume requirement (cf) 1172 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bio 6 Project description SOF Phase 3 Bioretention Area 6 Project limit of disturbance (ac) 0.3 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)88 User Name FMM PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 879 LID PLANNING SUMMARY Bioretention: 1925 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 2301 0 0 0 0 0 Total retention volume provided by BMPs (cf):2301 EISA Section 438 retention volume requirement (cf) 879 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bio 7 Project description SOF Phase 3 Bioretention Area 7 Project limit of disturbance (ac) 0.39 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)90 User Name FMM PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 1311 LID PLANNING SUMMARY Bioretention: 1925 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 2301 0 0 0 0 0 Total retention volume provided by BMPs (cf):2301 EISA Section 438 retention volume requirement (cf) 1311 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bioretention Area Project description SOF Phase 3 Bioretention Area 8 Project limit of disturbance (ac) 0.3 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)88 User Name PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 879 LID PLANNING SUMMARY Bioretention: 1925 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 2301 0 0 0 0 0 Total retention volume provided by BMPs (cf):2301 EISA Section 438 retention volume requirement (cf) 879 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bioretention Area Project description SOF Phase 3 Bioretention Area 9 Project limit of disturbance (ac) 0.3 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)88 User Name PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 879 LID PLANNING SUMMARY Bioretention: 1925 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 2301 0 0 0 0 0 Total retention volume provided by BMPs (cf):2301 EISA Section 438 retention volume requirement (cf) 879 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bioretention Area Project description SOF Phase 3 Bioretention Area 10 Project limit of disturbance (ac) 0.33 95% rainfall depth (in)1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre-project curve number (CN) 30 Post-project curve number (CN)84 User Name PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)0 Post-project runoff volume (cf) 726 LID PLANNING SUMMARY Bioretention: 2040 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 2438 0 0 0 0 0 Total retention volume provided by BMPs (cf):2438 EISA Section 438 retention volume requirement (cf) 726 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM Army LID Planning and Cost Tool Report Date 1/10/2019 Army Installation Fort Bragg Master Planner Project name SOF Phase 3 Bioretention Area Project description SOF Phase 3 Bioretention Area 11 Project limit of disturbance (ac) 0.39 95% rainfall depth (in)1.8 Soil type Sandy-Loam Hydrologic Soil Group (HSG) B Pre-project curve number (CN) 55 Post-project curve number (CN)92 User Name PROJECT INFO SITE INFO AND EISA VOLUME REQUIREMENT Pre-project runoff volume (cf)5 Post-project runoff volume (cf) 1500 LID PLANNING SUMMARY Bioretention: 2040 Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Veg. Filter Strip (Slope >2%, Tall Grass):0.00 Veg. Filter Strip (Slope <2%, Short Grass):0.00 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Reforestation (Trees - Short Grass): 0.00 Reforestation (Trees - Shrubs and Tall Grass):0.00 Structural BMP Non-structural BMP Surface area (ac) Surface area (sf) Runoff volume retained (cf) 1656 0 0 0 0 0 Total retention volume provided by BMPs (cf):1656 EISA Section 438 retention volume requirement (cf) 1495 LID COST SUMMARY Project complies with EISA Section 438. Army Command IMCOM SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.5 - APPENDIX E STORMWATER CALCULATIONS WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 10/3/2018 Project: SOF Phase 3 Units: English SubTitle: Predevelopment BioretentionHydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\Pre-Bio Basins.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ PRE BIO 1 Outlet 5.94 55 0.133 PRE BIO 2 Outlet 1.72 55 0.133 PRE BIO 3 Outlet 1.01 55 0.133 PRE BIO 4 Outlet 0.38 55 0.133 PRE BIO 5 Outlet 0.4 55 0.133 PRE BIO 6 Outlet 0.3 55 0.133 PRE BIO 7 Outlet 0.39 55 0.133 PRE BIO 8 Outlet 0.3 55 0.133 PRE BIO 9 Outlet 0.3 55 0.133 PRE BIO 10 Outlet 0.33 55 0.133 Total area: 11.07 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:08:05 PM FMM SOF Phase 3 Predevelopment BioretentionHydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- PRE BIO 1 Woods (good) B 5.94 55 Total Area / Weighted Curve Number 5.94 55 ==== == PRE BIO 2 Woods (good) B 1.72 55 Total Area / Weighted Curve Number 1.72 55 ==== == PRE BIO 3 Woods (good) B 1.01 55 Total Area / Weighted Curve Number 1.01 55 ==== == PRE BIO 4 Woods (good) B .38 55 Total Area / Weighted Curve Number .38 55 === == PRE BIO 5 Woods (good) B .4 55 Total Area / Weighted Curve Number .4 55 == == PRE BIO 6 Woods (good) B .3 55 Total Area / Weighted Curve Number .3 55 == == PRE BIO 7 Woods (good) B .39 55 Total Area / Weighted Curve Number .39 55 === == PRE BIO 8 Woods (good) B .3 55 Total Area / Weighted Curve Number .3 55 == == PRE BIO 9 Woods (good) B .3 55 Total Area / Weighted Curve Number .3 55 == == PRE BIO 10Woods (good) B .33 55 Total Area / Weighted Curve Number .33 55 === == WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:08:40 PM FMM SOF Phase 3 Predevelopment BioretentionHydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS PRE BIO 1 1.34 4.06 6.25 10.17 13.31 17.02 0.43 PRE BIO 2 0.39 1.18 1.81 2.95 3.86 4.93 0.13 PRE BIO 3 0.23 0.69 1.06 1.73 2.27 2.90 0.07 PRE BIO 4 0.09 0.26 0.40 0.65 0.85 1.08 .00 PRE BIO 5 0.09 0.28 0.42 0.69 0.90 1.16 .00 PRE BIO 6 0.07 0.21 0.32 0.52 0.67 0.86 .00 PRE BIO 7 0.09 0.27 0.41 0.67 0.88 1.12 .00 PRE BIO 8 0.07 0.21 0.32 0.52 0.67 0.86 .00 PRE BIO 9 0.07 0.21 0.32 0.52 0.67 0.86 .00 PRE BIO 10 0.08 0.23 0.35 0.57 0.75 0.95 .00 REACHES OUTLET 2.50 7.57 11.65 18.98 24.83 31.75 0.63 WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:08:24 PM WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 10/3/2018 Project: SOF Phase 3 Units: English SubTitle: Predevelopment BioretentionHydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\Pre-Bio Basins 2.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ PRE BIO 11 Outlet 0.39 55 0.133 Total area: .39 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:19:43 PM FMM SOF Phase 3 Predevelopment BioretentionHydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- PRE BIO 11Woods (good) B .39 55 Total Area / Weighted Curve Number .39 55 === == WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:12:09 PM FMM SOF Phase 3 Predevelopment BioretentionHydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS PRE BIO 11 0.09 0.27 0.41 0.67 0.88 1.12 .00 REACHES OUTLET 0.09 0.27 0.41 0.67 0.88 1.12 .00 WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:11:52 PM WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 10/3/2018 Project: SOF Phase 3 Units: English SubTitle: Postdevelopment Bioretention Hydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\Post-Bio Basins 1.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ POST BIO1 Outlet 5.94 84 0.133 POST BIO2 Outlet 1.72 87 0.133 POST BIO3 Outlet 1.01 86 0.133 POST BIO4 Outlet 0.38 93 0.133 POST BIO5 Outlet 0.4 92 0.133 POST BIO6 Outlet 0.3 92 0.133 POST BIO7 Outlet 0.39 93 0.133 POST BIO8 Outlet 0.3 92 0.133 POST BIO9 Outlet 0.3 92 0.133 POST BIO10 Outlet 0.33 90 0.133 Total area: 11.07 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:55:53 PM FMM SOF Phase 3 Postdevelopment Bioretention Hydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- POST BIO 1Open space; grass cover > 75% (good) B .06 61 Paved parking lots, roofs, driveways B .33 98 Total Area / Weighted Curve Number .39 92 === == WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:41:33 PM FMM SOF Phase 3 Postdevelopment Bioretention Hydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS POST BIO1 12.33 17.64 21.19 26.86 30.98 35.63 9.16 POST BIO2 3.97 5.53 6.56 8.20 9.39 10.72 3.03 POST BIO3 2.26 3.17 3.77 4.74 5.44 6.23 1.70 POST BIO4 1.03 1.37 1.59 1.94 2.20 2.49 0.83 POST BIO5 1.08 1.44 1.68 2.06 2.33 2.64 0.85 POST BIO6 0.80 1.07 1.25 1.53 1.74 1.97 0.64 POST BIO7 1.07 1.42 1.65 2.01 2.28 2.57 0.85 POST BIO8 0.80 1.07 1.25 1.53 1.74 1.97 0.64 POST BIO9 0.80 1.07 1.25 1.53 1.74 1.97 0.64 POST BIO10 0.84 1.14 1.34 1.66 1.88 2.14 0.66 REACHES OUTLET 24.98 34.90 41.52 52.06 59.68 68.30 18.99 WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:54:52 PM WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 10/3/2018 Project: SOF Phase 3 Units: English SubTitle: Postdevelopment Bioretention Hydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\Post-Bio Basins 1.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ POST BIO11 Outlet 0.39 92 0.133 Total area: .39 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:42:34 PM FMM SOF Phase 3 Postdevelopment Bioretention Hydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- POST BIO1 Open space; grass cover > 75% (good) B 2.31 61 Paved parking lots, roofs, driveways B 3.63 98 Total Area / Weighted Curve Number 5.94 84 ==== == POST BIO2 Open space; grass cover > 75% (good) B .51 61 Paved parking lots, roofs, driveways B 1.21 98 Total Area / Weighted Curve Number 1.72 87 ==== == POST BIO3 Open space; grass cover > 75% (good) B .34 61 Paved parking lots, roofs, driveways B .67 98 Total Area / Weighted Curve Number 1.01 86 ==== == POST BIO4 Open space; grass cover > 75% (good) B .05 61 Paved parking lots, roofs, driveways B .33 98 Total Area / Weighted Curve Number .38 93 === == POST BIO5 Open space; grass cover > 75% (good) B .07 61 Paved parking lots, roofs, driveways B .33 98 Total Area / Weighted Curve Number .4 92 == == POST BIO6 Open space; grass cover > 75% (good) B .05 61 Paved parking lots, roofs, driveways B .25 98 Total Area / Weighted Curve Number .3 92 == == POST BIO7 Open space; grass cover > 75% (good) B .05 61 Paved parking lots, roofs, driveways B .34 98 Total Area / Weighted Curve Number .39 93 === == POST BIO8 Open space; grass cover > 75% (good) B .05 61 Paved parking lots, roofs, driveways B .25 98 Total Area / Weighted Curve Number .3 92 == == POST BIO9 Open space; grass cover > 75% (good) B .05 61 Paved parking lots, roofs, driveways B .25 98 Total Area / Weighted Curve Number .3 92 == == POST BIO10Open space; grass cover > 75% (good) B .07 61 Paved parking lots, roofs, driveways B .26 98 Total Area / Weighted Curve Number .33 90 WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:55:39 PM FMM SOF Phase 3 Postdevelopment Bioretention Hydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS POST BIO11 1.04 1.39 1.62 1.99 2.26 2.55 0.83 REACHES OUTLET 1.04 1.39 1.62 1.99 2.26 2.55 0.83 WinTR-55, Version 1.00.10 Page 1 12/4/2018 3:48:35 PM FMM SOF Phase 3 Postdevelopment Bioretention Hydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- POST BIO11Open space; grass cover > 75% (good) B .06 61 Paved parking lots, roofs, driveways B .33 98 Total Area / Weighted Curve Number .39 92 === == WinTR-55, Version 1.00.10 Page 1 10/3/2018 3:42:57 PM WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 11/7/2018 Project: SOF Phase 3 Units: English SubTitle: Postdevelopment Hydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\WIN-TR55\Developed-1.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ HW6-a Outlet 0.17 39 0.167 CB-5 Outlet 0.15 86 0.167 HW6-b Outlet 0.94 32 0.167 CB-8 Outlet 0.62 71 0.167 CB-7 Outlet 0.1 92 0.167 CB-6 Outlet 0.2 91 0.167 CB-4 Outlet 0.15 98 0.167 CB-3 Outlet 0.18 93 0.167 CB-2 Outlet 0.23 71 0.167 CB-9 Outlet 0.53 60 0.167 Total area: 3.27 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 11/7/2018 12:34:37 PM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- HW6-a Open space; grass cover > 75% (good) A .17 39 Total Area / Weighted Curve Number .17 39 === == CB-5 Open space; grass cover > 75% (good) A .03 39 Paved parking lots, roofs, driveways A .12 98 Total Area / Weighted Curve Number .15 86 === == HW6-b Woods - grass combination (good) A .94 32 Total Area / Weighted Curve Number .94 32 === == CB-8 Open space; grass cover > 75% (good) A .28 39 Paved parking lots, roofs, driveways A .34 98 Total Area / Weighted Curve Number .62 71 === == CB-7 Open space; grass cover > 75% (good) A .01 39 Paved parking lots, roofs, driveways A .09 98 Total Area / Weighted Curve Number .1 92 == == CB-6 Open space; grass cover > 75% (good) A .024 39 Paved parking lots, roofs, driveways A .173 98 Total Area / Weighted Curve Number .2 91 == == CB-4 Paved parking lots, roofs, driveways A .154 98 Total Area / Weighted Curve Number .15 98 === == CB-3 Open space; grass cover > 75% (good) A .015 39 Paved parking lots, roofs, driveways A .162 98 Total Area / Weighted Curve Number .18 93 === == CB-2 Open space; grass cover > 75% (good) A .105 39 Paved parking lots, roofs, driveways A .123 98 Total Area / Weighted Curve Number .23 71 === == CB-9 Open space; grass cover > 75% (good) A .347 39 Paved parking lots, roofs, driveways A .185 98 Total Area / Weighted Curve Number .53 60 === == WinTR-55, Version 1.00.10 Page 1 11/7/2018 12:35:08 PM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS HW6-a .00 .00 .00 .00 0.09 0.15 .00 CB-5 0.32 0.45 0.53 0.67 0.77 0.88 0.24 HW6-b .00 .00 .00 .00 0.10 0.23 .00 CB-8 0.67 1.12 1.44 1.97 2.37 2.83 0.42 CB-7 0.26 0.35 0.41 0.51 0.57 0.65 0.21 CB-6 0.50 0.67 0.79 0.97 1.10 1.25 0.39 CB-4 0.43 0.55 0.63 0.76 0.86 0.96 0.35 CB-3 0.48 0.63 0.73 0.90 1.01 1.14 0.38 CB-2 0.25 0.42 0.53 0.73 0.88 1.05 0.16 CB-9 0.24 0.52 0.74 1.12 1.42 1.77 0.10 REACHES OUTLET 3.12 4.69 5.79 7.61 9.04 10.72 2.23 WinTR-55, Version 1.00.10 Page 1 11/7/2018 12:34:52 PM WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 11/21/2018 Project: SOF Phase 3 Units: English SubTitle: Postdevelopment Hydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\WIN-TR55\Developed-2.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ CB-14 Outlet 0.14 82 0.167 CB-10 Outlet 0.07 67 0.167 CB-1 Outlet 0.35 69 0.167 CB-11 Outlet 0.24 82 0.167 CB-12 Outlet 0.23 83 0.167 SDMH-8 Outlet 0.13 98 0.167 SDMH-9 Outlet 0.03 98 0.167 SDMH-7 Outlet 0.14 98 0.167 SDMH-5 Outlet 0.08 98 0.167 SDMH-2 Outlet 0.88 54 0.167 Total area: 2.29 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 11/21/2018 10:47:50 AM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- CB-14 Open space; grass cover > 75% (good) A .037 39 Paved parking lots, roofs, driveways A .098 98 Total Area / Weighted Curve Number .14 82 === == CB-10 Open space; grass cover > 75% (good) A .038 39 Paved parking lots, roofs, driveways A .034 98 Total Area / Weighted Curve Number .07 67 === == CB-1 Open space; grass cover > 75% (good) A .174 39 Paved parking lots, roofs, driveways A .179 98 Total Area / Weighted Curve Number .35 69 === == CB-11 Open space; grass cover > 75% (good) A .062 39 Paved parking lots, roofs, driveways A .173 98 Total Area / Weighted Curve Number .24 82 === == CB-12 Open space; grass cover > 75% (good) A .06 39 Paved parking lots, roofs, driveways A .169 98 Total Area / Weighted Curve Number .23 83 === == SDMH-8 Paved parking lots, roofs, driveways A .133 98 Total Area / Weighted Curve Number .13 98 === == SDMH-9 Paved parking lots, roofs, driveways A .027 98 Total Area / Weighted Curve Number .03 98 === == SDMH-7 Paved parking lots, roofs, driveways A .141 98 Total Area / Weighted Curve Number .14 98 === == SDMH-5 Paved parking lots, roofs, driveways A .081 98 Total Area / Weighted Curve Number .08 98 === == SDMH-2 Open space; grass cover > 75% (good) A .48 39 Paved parking lots, roofs, driveways A .25 98 Woods (good) A .15 30 Total Area / Weighted Curve Number .88 54 === == WinTR-55, Version 1.00.10 Page 1 11/21/2018 10:48:19 AM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS CB-14 0.26 0.38 0.46 0.59 0.69 0.79 0.19 CB-10 0.06 0.11 0.14 0.20 0.24 0.29 .00 CB-1 0.34 0.58 0.76 1.05 1.27 1.53 0.20 CB-11 0.45 0.66 0.80 1.02 1.19 1.37 0.33 CB-12 0.44 0.64 0.77 0.99 1.14 1.32 0.33 SDMH-8 0.37 0.48 0.55 0.66 0.74 0.84 0.31 SDMH-9 0.09 0.12 0.14 0.17 0.19 0.21 0.08 SDMH-7 0.41 0.53 0.60 0.73 0.82 0.92 0.34 SDMH-5 0.24 0.31 0.36 0.43 0.48 0.54 0.20 SDMH-2 0.16 0.51 0.81 1.35 1.79 2.31 .00 REACHES OUTLET 2.77 4.28 5.35 7.16 8.53 10.10 1.95 WinTR-55, Version 1.00.10 Page 1 11/21/2018 10:48:02 AM WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 11/7/2018 Project: SOF Phase 3 Units: English SubTitle: Postdevelopment Hydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\WIN-TR55\Developed-3.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ CB-19 Outlet 0.11 81 0.167 CB-13 Outlet 0.14 70 0.167 CB-18 Outlet 0.11 80 0.167 CB-17 Outlet 0.18 74 0.167 CB-16 Outlet 0.21 78 0.167 CB-15 Outlet 0.4 73 0.167 CB-20 Outlet 0.23 78 0.167 CB-21 Outlet 0.35 85 0.167 CB-22 Outlet 0.12 98 0.167 Total area: 1.85 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 11/7/2018 2:04:35 PM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- CB-19 Open space; grass cover > 75% (good) A .033 39 Paved parking lots, roofs, driveways A .08 98 Total Area / Weighted Curve Number .11 81 === == CB-13 Open space; grass cover > 75% (good) A .066 39 Paved parking lots, roofs, driveways A .072 98 Total Area / Weighted Curve Number .14 70 === == CB-18 Open space; grass cover > 75% (good) A .033 39 Paved parking lots, roofs, driveways A .075 98 Total Area / Weighted Curve Number .11 80 === == CB-17 Open space; grass cover > 75% (good) A .075 39 Paved parking lots, roofs, driveways A .106 98 Total Area / Weighted Curve Number .18 74 === == CB-16 Open space; grass cover > 75% (good) A .071 39 Paved parking lots, roofs, driveways A .141 98 Total Area / Weighted Curve Number .21 78 === == CB-15 Open space; grass cover > 75% (good) A .166 39 Paved parking lots, roofs, driveways A .231 98 Total Area / Weighted Curve Number .4 73 == == CB-20 Open space; grass cover > 75% (good) A .078 39 Paved parking lots, roofs, driveways A .149 98 Total Area / Weighted Curve Number .23 78 === == CB-21 Open space; grass cover > 75% (good) A .076 39 Paved parking lots, roofs, driveways A .273 98 Total Area / Weighted Curve Number .35 85 === == CB-22 Paved parking lots, roofs, driveways A .119 98 Total Area / Weighted Curve Number .12 98 === == WinTR-55, Version 1.00.10 Page 1 11/7/2018 2:05:15 PM WinTR-55 Current Data Description --- Identification Data --- User: FMM Date: 11/21/2018 Project: SOF Phase 3 Units: English SubTitle: Postdevelopment Hydrology Areal Units: Acres State: North Carolina County: Hoke NOAA Filename: Q:\014503 SOF Special Tactics Facility Phase 3\Design\Civil\Stormwater\WIN-TR55\Developed-4.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ CB-25 Outlet 0.04 39 0.167 CI-1 Outlet 0.24 98 0.167 CI-3 Outlet 0.08 98 0.167 CI-2 Outlet 0.21 98 0.167 CB-24 Outlet 0.09 67 0.167 SDMH-4 Outlet 2.01 85 0.167 Total area: 2.67 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.4 6.5 7.3 8.2 3.03 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type III Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 11/21/2018 10:52:00 AM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS CB-19 0.19 0.29 0.35 0.45 0.52 0.60 0.14 CB-13 0.14 0.24 0.31 0.43 0.52 0.63 0.09 CB-18 0.19 0.28 0.34 0.44 0.51 0.59 0.13 CB-17 0.23 0.37 0.46 0.62 0.74 0.87 0.15 CB-16 0.33 0.50 0.62 0.81 0.95 1.11 0.23 CB-15 0.49 0.79 1.01 1.36 1.62 1.92 0.32 CB-20 0.36 0.55 0.68 0.89 1.04 1.21 0.25 CB-21 0.73 1.04 1.24 1.57 1.81 2.07 0.55 CB-22 0.35 0.45 0.52 0.63 0.71 0.80 0.29 REACHES OUTLET 3.00 4.49 5.52 7.19 8.42 9.81 2.14 WinTR-55, Version 1.00.10 Page 1 11/7/2018 2:04:50 PM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- CB-25 Open space; grass cover > 75% (good) A .037 39 Total Area / Weighted Curve Number .04 39 === == CI-1 Paved parking lots, roofs, driveways A .24 98 Total Area / Weighted Curve Number .24 98 === == CI-3 Paved parking lots, roofs, driveways A .08 98 Total Area / Weighted Curve Number .08 98 === == CI-2 Paved parking lots, roofs, driveways A .21 98 Total Area / Weighted Curve Number .21 98 === == CB-24 Open space; grass cover > 75% (good) A .045 39 Paved parking lots, roofs, driveways A .041 98 Total Area / Weighted Curve Number .09 67 === == SDMH-4 Open space; grass cover > 75% (good) A .43 39 Paved parking lots, roofs, driveways A 1.58 98 Total Area / Weighted Curve Number 2.01 85 ==== == WinTR-55, Version 1.00.10 Page 1 11/21/2018 10:52:31 AM FMM SOF Phase 3 Postdevelopment Hydrology Hoke NOAA County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS CB-25 .00 .00 .00 .00 .00 .00 .00 CI-1 0.71 0.91 1.04 1.26 1.41 1.59 0.58 CI-3 0.24 0.31 0.36 0.43 0.48 0.54 0.20 CI-2 0.61 0.79 0.91 1.09 1.23 1.38 0.50 CB-24 0.07 0.13 0.18 0.25 0.31 0.37 .00 SDMH-4 4.17 5.92 7.08 8.94 10.31 11.82 3.12 REACHES OUTLET 5.80 8.06 9.56 11.97 13.73 15.70 4.39 WinTR-55, Version 1.00.10 Page 1 11/21/2018 10:52:14 AM Node Depth Summary Average Maximum Maximum Day of Depth Depth HGL Maximum Node Type Feet Feet Feet Depth CB-1 JUNCTION 0.33 0.33 458.25 0 CB-10 JUNCTION 0.95 0.95 455.38 0 CB-11 JUNCTION 1.06 1.07 455.29 0 CB-12 JUNCTION 1.11 1.11 454.36 0 CB-13 JUNCTION 1.11 1.11 453.84 0 CB-14 JUNCTION 0.14 0.14 458.29 0 CB-15 JUNCTION 0.32 0.32 457.03 0 CB-16 JUNCTION 0.44 0.44 456.08 0 CB-17 JUNCTION 0.44 0.44 455.39 0 CB-18 JUNCTION 0.47 0.47 454.50 0 CB-19 JUNCTION 0.50 0.51 453.96 0 CB-2 JUNCTION 0.43 0.43 457.83 0 CB-20 JUNCTION 0.31 0.31 457.31 0 CB-21 JUNCTION 0.54 0.54 456.95 0 CB-22 JUNCTION 0.62 0.62 456.74 0 CB-24 JUNCTION 0.45 0.45 457.70 0 CB-25 JUNCTION 0.45 0.45 456.88 0 CB-3 JUNCTION 0.51 0.51 457.51 0 CB-4 JUNCTION 0.59 0.59 457.34 0 CB-5 JUNCTION 0.67 0.67 457.17 0 CB-6 JUNCTION 0.78 0.78 456.87 0 CB-7 JUNCTION 0.83 0.83 456.73 0 CB-8 JUNCTION 1.05 1.05 456.48 0 CB-9 JUNCTION 1.05 1.05 455.71 0 SWMM 5.1 Page 1 Average Maximum Maximum Day of Depth Depth HGL Maximum Node Type Feet Feet Feet Depth CI-1 JUNCTION 0.69 0.69 456.35 0 CI-2 JUNCTION 0.79 0.79 456.16 0 CI-3 JUNCTION 0.79 0.79 455.88 0 HW2 OUTFALL 0.68 0.68 450.68 0 HW3 OUTFALL 0.67 0.67 445.67 0 HW6 JUNCTION 0.20 0.20 458.95 0 HW7 OUTFALL 0.45 0.45 454.45 0 SDMH-2 JUNCTION 0.58 0.58 458.81 0 SDMH-3 JUNCTION 0.58 0.58 458.29 0 SDMH-4 JUNCTION 0.67 0.67 451.67 0 SDMH-5 JUNCTION 0.69 0.69 456.97 0 SDMH-7 JUNCTION 0.91 0.91 456.48 0 SDMH-8 JUNCTION 0.24 0.24 459.42 0 SDMH-9 JUNCTION 0.24 0.24 458.70 0 SWMM 5.1 Page 2 Node Depth Summary Maximum Hour of Reported Maximum Depth Node Depth Feet CB-1 00:00 0.33 CB-10 00:05 0.95 CB-11 00:05 1.07 CB-12 00:06 1.11 CB-13 00:06 1.11 CB-14 00:00 0.14 CB-15 00:00 0.32 CB-16 00:01 0.44 CB-17 00:01 0.44 CB-18 00:02 0.47 CB-19 00:02 0.50 CB-2 00:09 0.43 CB-20 00:00 0.31 CB-21 00:11 0.54 CB-22 00:05 0.62 CB-24 00:13 0.45 CB-25 00:14 0.45 CB-3 00:09 0.51 CB-4 00:03 0.59 CB-5 00:02 0.67 CB-6 00:04 0.78 CB-7 00:04 0.83 CB-8 00:05 1.05 CB-9 00:05 1.05 SWMM 5.1 Page 3 Maximum Hour of Reported Maximum Depth Node Depth Feet CI-1 00:04 0.69 CI-2 00:03 0.79 CI-3 00:04 0.79 HW2 00:05 0.68 HW3 00:06 0.67 HW6 00:00 0.20 HW7 00:04 0.45 SDMH-2 00:12 0.58 SDMH-3 00:12 0.58 SDMH-4 00:05 0.67 SDMH-5 00:02 0.69 SDMH-7 00:04 0.91 SDMH-8 00:00 0.24 SDMH-9 00:01 0.24 SWMM 5.1 Page 4 Water Elevation Profile: Node CB-1 - HW2 11/05/2018 00:15:00 Distance (ft) 1,1001,0501,000950900850800750700650600550500450400350300250200150100500CB-1CB-2CB-3CB-4CB-5SDMH-5CB-6CB-7SDMH-7CB-8CB-9CB-10CB-11CB-12CB-13HW2Elevation (ft)468 467 466 465 464 463 462 461 460 459 458 457 456 455 454 453 452 451 450 SWMM 5.1 Page 1 Water Elevation Profile: Node HW6 - HW3 11/05/2018 00:15:00 Distance (ft) 800750700650600550500450400350300250200150100500HW6SDMH-2SDMH-3CB-24CB-25SDMH-4HW3Elevation (ft)467 466 465 464 463 462 461 460 459 458 457 456 455 454 453 452 451 450 449 448 447 446 445 SWMM 5.1 Page 1 Water Elevation Profile: Node HW7 - CB-20 11/05/2018 00:15:00 Distance (ft) 400 380 360 340 320 300 280 260 240 220 200 180 160 140 120 100 80 60 40 20 0HW7CI-3CI-2CI-1CB-22CB-21CB-20Elevation (ft)463 462.5 462 461.5 461 460.5 460 459.5 459 458.5 458 457.5 457 456.5 456 455.5 455 454.5 454 SWMM 5.1 Page 1 Water Elevation Profile: Node CB-15 - HW2 11/05/2018 00:15:00 Distance (ft) 440 420 400 380 360 340 320 300 280 260 240 220 200 180 160 140 120 100 80 60 40 20 0CB-15CB-16CB-17CB-18CB-19CB-13HW2Elevation (ft)463 462.5 462 461.5 461 460.5 460 459.5 459 458.5 458 457.5 457 456.5 456 455.5 455 454.5 454 453.5 453 452.5 452 451.5 451 450.5 450 SWMM 5.1 Page 1 Water Elevation Profile: Node SDMH-8 - HW2 11/05/2018 00:15:00 Distance (ft) 550500450400350300250200150100500SDMH-8SDMH-9CB-11CB-12CB-13HW2Elevation (ft)468 467 466 465 464 463 462 461 460 459 458 457 456 455 454 453 452 451 450 SWMM 5.1 Page 1 SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.6 - APPENDIX F NRCS HOKE COUNTY SOIL SURVEY MAP United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Hoke County, North Carolina SOF Phase 3 Natural Resources Conservation Service May 11, 2016 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/portal/ nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (http:// offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means 2 for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................7 Soil Map................................................................................................................8 Legend..................................................................................................................9 Map Unit Legend................................................................................................10 Map Unit Descriptions........................................................................................10 Hoke County, North Carolina..........................................................................12 CaB—Candor sand, 1 to 8 percent slopes..................................................12 CaD—Candor sand, 8 to 15 percent slopes................................................13 VaB—Vaucluse loamy sand, 2 to 8 percent slopes....................................14 Soil Information for All Uses...............................................................................16 Soil Reports........................................................................................................16 Soil Physical Properties..................................................................................16 Engineering Properties (SOF Phase 3).......................................................16 References............................................................................................................21 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the 5 individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil- landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 6 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 7 8 Custom Soil Resource Report Soil Map 388727038873403887410388748038875503887620388769038877603887830388727038873403887410388748038875503887620388769038877603887830648530 648600 648670 648740 648810 648880 648950 648530 648600 648670 648740 648810 648880 648950 35° 7' 20'' N 79° 22' 12'' W35° 7' 20'' N79° 21' 55'' W35° 7' 1'' N 79° 22' 12'' W35° 7' 1'' N 79° 21' 55'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,830 if printed on A portrait (8.5" x 11") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hoke County, North Carolina Survey Area Data: Version 12, Sep 24, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Apr 2, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 9 Map Unit Legend Hoke County, North Carolina (NC093) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CaB Candor sand, 1 to 8 percent slopes 18.1 64.7% CaD Candor sand, 8 to 15 percent slopes 8.6 30.7% VaB Vaucluse loamy sand, 2 to 8 percent slopes 1.3 4.6% Totals for Area of Interest 28.0 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments Custom Soil Resource Report 10 on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha- Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 11 Hoke County, North Carolina CaB—Candor sand, 1 to 8 percent slopes Map Unit Setting National map unit symbol: w75q Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Candor and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Candor Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and loamy marine deposits and/or eolian sands Typical profile A - 0 to 8 inches: sand E - 8 to 26 inches: sand Bt - 26 to 38 inches: loamy sand E' - 38 to 62 inches: sand B't - 62 to 80 inches: sandy clay loam Properties and qualities Slope: 1 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: Dry Sandy Upland Woodland (F137XY001GA) Custom Soil Resource Report 12 CaD—Candor sand, 8 to 15 percent slopes Map Unit Setting National map unit symbol: w75r Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Candor and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Candor Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Backslope Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and loamy marine deposits and/or eolian sands Typical profile A - 0 to 8 inches: sand E - 8 to 26 inches: sand Bt - 26 to 38 inches: loamy sand E' - 38 to 62 inches: sand B't - 62 to 80 inches: sandy clay loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: Dry Sandy Backslope Woodland - PROVISIONAL (F137XY004GA) Custom Soil Resource Report 13 VaB—Vaucluse loamy sand, 2 to 8 percent slopes Map Unit Setting National map unit symbol: w779 Elevation: 80 to 660 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Farmland of statewide importance Map Unit Composition Vaucluse and similar soils: 80 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vaucluse Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy and sandy marine deposits Typical profile Ap - 0 to 6 inches: loamy sand E - 6 to 15 inches: loamy sand Bt - 15 to 29 inches: sandy clay loam Btx - 29 to 58 inches: sandy clay loam BC - 58 to 80 inches: sandy loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 15 to 35 inches to fragipan Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: C Ecological site: Loamy Summit Woodland - PROVISIONAL (F137XY002GA) Custom Soil Resource Report 14 Minor Components Bibb, undrained Percent of map unit: 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down-slope shape: Concave Across-slope shape: Linear Johnston, undrained Percent of map unit: 2 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Linear Custom Soil Resource Report 15 Soil Information for All Uses Soil Reports The Soil Reports section includes various formatted tabular and narrative reports (tables) containing data for each selected soil map unit and each component of each unit. No aggregation of data has occurred as is done in reports in the Soil Properties and Qualities and Suitabilities and Limitations sections. The reports contain soil interpretive information as well as basic soil properties and qualities. A description of each report (table) is included. Soil Physical Properties This folder contains a collection of tabular reports that present soil physical properties. The reports (tables) include all selected map units and components for each map unit. Soil physical properties are measured or inferred from direct observations in the field or laboratory. Examples of soil physical properties include percent clay, organic matter, saturated hydraulic conductivity, available water capacity, and bulk density. Engineering Properties (SOF Phase 3) This table gives the engineering classifications and the range of engineering properties for the layers of each soil in the survey area. Hydrologic soil group is a group of soils having similar runoff potential under similar storm and cover conditions. The criteria for determining Hydrologic soil group is found in the National Engineering Handbook, Chapter 7 issued May 2007(http:// directives.sc.egov.usda.gov/OpenNonWebContent.aspx?content=17757.wba). Listing HSGs by soil map unit component and not by soil series is a new concept for the engineers. Past engineering references contained lists of HSGs by soil series. Soil series are continually being defined and redefined, and the list of soil series names changes so frequently as to make the task of maintaining a single national list virtually impossible. Therefore, the criteria is now used to calculate the HSG using the component soil properties and no such national series lists will be maintained. All such references are obsolete and their use should be discontinued. Soil properties that influence runoff potential are those that influence the minimum rate of infiltration for a bare soil after prolonged wetting and when not frozen. These properties are depth to a seasonal high water table, saturated hydraulic conductivity after prolonged wetting, and depth to a layer with a very slow water transmission rate. Changes in soil properties caused by land management or climate changes also cause the hydrologic 16 soil group to change. The influence of ground cover is treated independently. There are four hydrologic soil groups, A, B, C, and D, and three dual groups, A/D, B/D, and C/D. In the dual groups, the first letter is for drained areas and the second letter is for undrained areas. The four hydrologic soil groups are described in the following paragraphs: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. Depth to the upper and lower boundaries of each layer is indicated. Texture is given in the standard terms used by the U.S. Department of Agriculture. These terms are defined according to percentages of sand, silt, and clay in the fraction of the soil that is less than 2 millimeters in diameter. "Loam," for example, is soil that is 7 to 27 percent clay, 28 to 50 percent silt, and less than 52 percent sand. If the content of particles coarser than sand is 15 percent or more, an appropriate modifier is added, for example, "gravelly." Classification of the soils is determined according to the Unified soil classification system (ASTM, 2005) and the system adopted by the American Association of State Highway and Transportation Officials (AASHTO, 2004). The Unified system classifies soils according to properties that affect their use as construction material. Soils are classified according to particle-size distribution of the fraction less than 3 inches in diameter and according to plasticity index, liquid limit, and organic matter content. Sandy and gravelly soils are identified as GW, GP, GM, GC, SW, SP, SM, and SC; silty and clayey soils as ML, CL, OL, MH, CH, and OH; and highly organic soils as PT. Soils exhibiting engineering properties of two groups can have a dual classification, for example, CL-ML. The AASHTO system classifies soils according to those properties that affect roadway construction and maintenance. In this system, the fraction of a mineral soil that is less than 3 inches in diameter is classified in one of seven groups from A-1 through A-7 on the basis of particle-size distribution, liquid limit, and plasticity index. Soils in group A-1 are coarse grained and low in content of fines (silt and clay). At the other extreme, soils in group A-7 are fine grained. Highly organic soils are classified in group A-8 on the basis of visual inspection. If laboratory data are available, the A-1, A-2, and A-7 groups are further classified as A-1-a, A-1-b, A-2-4, A-2-5, A-2-6, A-2-7, A-7-5, or A-7-6. As an additional refinement, the suitability of a soil as subgrade material can be indicated by a group index number. Custom Soil Resource Report 17 Group index numbers range from 0 for the best subgrade material to 20 or higher for the poorest. Rock fragments larger than 10 inches in diameter and 3 to 10 inches in diameter are indicated as a percentage of the total soil on a dry-weight basis. The percentages are estimates determined mainly by converting volume percentage in the field to weight percentage. Percentage (of soil particles) passing designated sieves is the percentage of the soil fraction less than 3 inches in diameter based on an ovendry weight. The sieves, numbers 4, 10, 40, and 200 (USA Standard Series), have openings of 4.76, 2.00, 0.420, and 0.074 millimeters, respectively. Estimates are based on laboratory tests of soils sampled in the survey area and in nearby areas and on estimates made in the field. Liquid limit and plasticity index (Atterberg limits) indicate the plasticity characteristics of a soil. The estimates are based on test data from the survey area or from nearby areas and on field examination. References: American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Custom Soil Resource Report 18 Absence of an entry indicates that the data were not estimated. The asterisk '*' denotes the representative texture; other possible textures follow the dash. The criteria for determining the hydrologic soil group for individual soil components is found in the National Engineering Handbook, Chapter 7 issued May 2007(http://directives.sc.egov.usda.gov/OpenNonWebContent.aspx? content=17757.wba). Engineering Properties–Hoke County, North Carolina Map unit symbol and soil name Pct. of map unit Hydrolo gic group Depth USDA texture Classification Fragments Percentage passing sieve number—Liquid limit Plasticit y index Unified AASHTO >10 inches 3-10 inches 4 10 40 200 In Pct Pct Pct CaB—Candor sand, 1 to 8 percent slopes Candor 80 A 0-8 Sand SM, SP- SM A-2-4, A-3 0- 0- 0 0- 1- 1 98-98-1 00 95-97-1 00 72-74- 78 6- 8- 10 6-9 -12 NP 8-26 Sand SM, SP- SM A-3, A-2-4 0- 0- 0 0- 1- 1 98-98-1 00 95-97-1 00 72-74- 78 6- 8- 10 6-9 -12 NP 26-38 Loamy sand SM, SP- SM A-2-4 0- 0- 0 0- 1- 1 98-98-1 00 95-97-1 00 74-78- 83 21-24- 28 9-12 -14 NP 38-62 Sand SM, SP- SM A-2-4, A-3 0- 0- 0 0- 3- 5 91-95-1 00 81-90-1 00 61-69- 78 5- 7- 10 6-9 -12 NP 62-80 Sandy clay loam SC, SC- SM, SM A-2-4, A-4, A-6, A-7-6 0- 0- 0 0- 3- 6 90-95-1 00 79-89-1 00 59-77- 99 28-43- 61 0-23 -45 NP-13-2 5 CaD—Candor sand, 8 to 15 percent slopes Candor 80 A 0-8 Sand SM, SP- SM A-2-4, A-3 0- 0- 0 0- 1- 1 98-98-1 00 95-97-1 00 72-74- 78 6- 8- 10 6-9 -12 NP 8-26 Sand SM, SP- SM A-3, A-2-4 0- 0- 0 0- 1- 1 98-98-1 00 95-97-1 00 72-74- 78 6- 8- 10 6-9 -12 NP 26-38 Loamy sand SM, SP- SM A-2-4 0- 0- 0 0- 1- 1 98-98-1 00 95-97-1 00 74-78- 83 21-24- 28 9-12 -14 NP 38-62 Sand SM, SP- SM A-2-4, A-3 0- 0- 0 0- 3- 5 91-95-1 00 81-90-1 00 61-69- 78 5- 7- 10 6-9 -12 NP 62-80 Sandy clay loam SC, SC- SM, SM A-6, A-7-6, A-2-4, A-4 0- 0- 0 0- 3- 6 90-95-1 00 79-89-1 00 59-77- 99 28-43- 61 0-23 -45 NP-13-2 5 Custom Soil Resource Report 19 Engineering Properties–Hoke County, North Carolina Map unit symbol and soil name Pct. of map unit Hydrolo gic group Depth USDA texture Classification Fragments Percentage passing sieve number—Liquid limit Plasticit y index Unified AASHTO >10 inches 3-10 inches 4 10 40 200 In Pct Pct Pct VaB—Vaucluse loamy sand, 2 to 8 percent slopes Vaucluse 80 C 0-6 Loamy sand SM A-2-4 0- 0- 0 0- 3- 5 89-94-1 00 78-88-1 00 59-70- 84 21-27- 35 9-12 -14 NP 6-15 Loamy sand SM A-2-4 0- 0- 0 0- 3- 5 89-94-1 00 78-88-1 00 59-70- 84 21-27- 35 9-12 -14 NP 15-29 Sandy clay loam, sandy loam SC, SC- SM A-2-4, A-4, A-6 0- 0- 0 0- 3- 5 89-95-1 00 79-89-1 00 62-77- 95 33-45- 59 20-30 -40 5-12-18 29-58 Sandy clay loam, sandy loam, sandy clay SC, SC- SM, SM A-2-4, A-4, A-6 0- 0- 0 0- 3- 4 95-97-1 00 88-92-1 00 63-79- 99 33-47- 65 10-20 -40 NP-10-2 0 58-80 Sandy loam, sandy clay loam, loamy sand SC, SC- SM, SM A-2-4, A-4, A-6 0- 0- 0 0- 1- 1 95-97-1 00 90-93-1 00 58-71- 89 23-36- 51 10-15 -30 NP-6 -12 Bibb, undrained 3 A/D 0-6 Sandy loam, loamy sand, fine sandy loam, loam ML A-4 0- 0- 0 0- 0- 0 100-100 -100 90-98-1 00 62-76- 85 29-39- 48 9-12 -14 NP 6-60 Sandy loam, loamy sand, loam, sand CL-ML, ML A-4 0- 0- 0 0- 3- 4 95-97-1 00 85-91-1 00 59-71- 85 27-36- 48 0-13 -25 NP-4 -7 60-80 Sandy loam, loamy sand, loam, sand SM, ML, SC-SM A-2-4, A-4 0- 0- 0 0- 4- 9 84-92-1 00 66-82-1 00 48-66- 89 12-21- 34 9-12 -14 NP Johnston, undrained 2 B/D 0-30 Mucky loam SM, SC- SM, ML, CL, CL- ML A-4 0- 0- 0 0- 0- 0 76-96-1 00 75-96-1 00 60-84-1 00 41-60- 75 15-20 -30 1-5 -10 30-80 Sand, loamy fine sand, loam, loamy sand, sandy loam, fine sandy loam, coarse sandy loam CL, ML, SM, SC- SM, SC A-4, A-2-4 0- 0- 0 0- 0- 0 76-96-1 00 75-96-1 00 61-88-1 00 26-43- 62 7-19 -30 NP-5 -10 Custom Soil Resource Report 20 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http://www.nrcs.usda.gov/wps/ portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 21 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 22 SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.7 - APPENDIX G SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT SOF SPECIAL TACTICS FACILITY PH. III FY 17, LI 76514 Fort Bragg, NC By Soils Section Geotechnical & HTRW Branch U.S. Army Engineer District, Savannah August 2016 Table of Contents Section Page 1. PURPOSE .................................................................................................................................. 1  2. QUALIFICATION OF REPORT ........................................................................................... 1  3. PROJECT DESCRIPTION ..................................................................................................... 1  4. EXPLORATION PROCEDURES .......................................................................................... 2  a. Site Reconnaissance ............................................................................................................ 2  b. Field Exploration ................................................................................................................ 2  c. Laboratory Soils Testing ..................................................................................................... 3  d. Soil Infiltration Testing ....................................................................................................... 3  5. SITE AND SUBSURFACE CONDITIONS ......................................................................... 4  a. Site Description ................................................................................................................... 4  b. Area and Site Geology ........................................................................................................ 4  c. Subsurface Soil Conditions ................................................................................................. 5  d. Groundwater Conditions ..................................................................................................... 6  e. Seasonal High Water Table Evaluation and Soil Infiltration Properties ............................ 7  6. CONCLUSIONS AND RECOMMENDATIONS ............................................................... 10  a. General .............................................................................................................................. 10  b. Site Preparation ................................................................................................................. 10  c. Foundation Design ............................................................................................................ 10  d. Seismic Design.................................................................................................................. 12  e. Earth Retaining Structures ................................................................................................ 12  f. Slabs-On-Grade................................................................................................................. 13  g. Pavement Design Criteria ................................................................................................. 14  h. Control of Water ............................................................................................................... 14  i. Structural Fill .................................................................................................................... 15  j. Construction Quality Control Testing ............................................................................... 16  k. Presentation of Soil Boring Data ...................................................................................... 17  l. Specifications .................................................................................................................... 17  APPENDICES APPENDIX A Soil Test Boring Location Plan APPENDIX B Legends and Logs of Soil Borings and CPT Soundings APPENDIX C Soil Laboratory Test Results APPENDIX D Soil Percolation and Permeability Test Results APPENDIX E US Department of Agriculture Soil Resource Report APPENDIX F One-Point and Two-Point Compaction Method SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT SOF Special Tactics Facility Phase III FY 17, LI 76514 Fort Bragg, NC 1. PURPOSE This report has been prepared for the design of the proposed SOF Special Tactics Facility at Fort Bragg, NC. The purpose of this report is to provide recommendations for the geotechnical and foundation design of the facilities and the design of storm water management systems for the project. The recommendations included in this report are based on the project information provided by the AE firm, Mason & Hanger Group Inc. out of Louisville, KY. This information was provided to CESAS EN-GS via the US Army Corps of Engineers’ Wilmington District project manager in a series of correspondences during the period spanning January 2016 through June 2016. The finished floor elevations and maximum column loads for the buildings were provided in the Preliminary Design Submittal (65%) and Foundation Data Forms 363. Any change in site layout, structural system, loads, or finished floor or finished grade elevations may affect the recommendations. The Soils Section, Geotechnical and HTRW Branch of the Savannah District should be notified immediately of the change(s) and provided the necessary information regarding any change(s) so that the new information can be reviewed. The recommendations in this report may then change as appropriate for the proposed project. 2. QUALIFICATION OF REPORT The field exploration performed for this report was made to determine the subsurface soil and groundwater conditions and was not intended to serve as a comprehensive assessment of site environmental conditions. No effort was made to define, delineate, or designate any area of environmental concern or of contamination. Any recommendations regarding drainage and earthwork construction are made on the basis that such work can be performed in accordance with applicable laws pertaining to environmental contamination. 3. PROJECT DESCRIPTION The purpose of the proposed Phase III Special Tactic Facility project is to construct a Special Tactics Facility comprised of a 3,450 square-foot (SF) building (Building 4), a 31,500 SF building (Building 5), a 17,100 SF building (Building 6), a 54,400 SF building (Building 7), a 12,328 SF building (Building 8), and a 100,000-gallon above-ground Water Tank. The proposed buildings are one-story structures with finish floor elevations and anticipated maximum column and wall loads as indicated in the table below. Also included in the project are related supporting facilities and utilities such as water, sanitary sewer, storm drainage, parking lots with access driveways, walks, curbs, electrical and communications systems, exterior lighting and landscaping. Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 2 Structure (No. of stories) Dimensions Max. Column Load (kips) Max. Wall load (kips/ft) Building 4 (1) 230' X 15' 60 3 Building 5 (1) 225' X 140' 60 3 Building 6 (1) 190' X 90' 70 <1 Building 7 (1) 340' X 160' 100 3 Building 8 (1) 268' X 46' 35 with -15 uplift <1 Water Tank 28' diameter X 25' height 965 1 4. EXPLORATION PROCEDURES a. Site Reconnaissance Prior to the field exploration, a geotechnical engineer visually inspected the site and surrounding areas. The observations were used in planning the exploration, in determining areas of special interest, and in relating site conditions to known geologic conditions in the area. b. Field Exploration (1) Subsurface conditions at the project site were explored by 38 soil borings and 14 Cone Penetration Test (CPT) soundings. Standard penetration tests (SPT) were performed in 18 of the soil borings, while the remaining borings were simply advanced for the soils to be examined for indications of prior saturation conditions and infiltration properties. The soil borings were drilled to depths ranging from 1 to 40 feet and the CPT soundings were pushed to depths of 15 to 85 feet. The approximate locations of the borings are shown on the plans included in Appendix A and in the project drawings. (2) The locations of the soil borings and soundings were established by an engineer in the field using a hand-held global positioning system (GPS) device having sub-meter accuracy. The ground surface elevation at each boring location was determined by interpolation from available site topography survey data. Since the measurements were not precise, the locations shown on the boring layout plans and the elevations on the drilling logs should be considered approximate. (3) The SPT soil borings were drilled by Savannah District Core Drill using a track-mounted all-terrain vehicle (ATV) CME 850 drill rig that had an automatic hammer and used hollow stem augers with a 4.25-inch inside diameter (I.D.) to advance the boreholes. Split-barrel sampling with standard penetration testing was performed at intervals shown on the boring logs. All soil sampling and SPT borings were in accordance with ASTM D 1586. In SPT borings, a soil sample (split- spoon sample) is obtained with a standard 1 3/8-inch I.D. by 2-inch outside diameter (O.D.) split- barrel sampler. The sampler is first seated 6 inches and then driven an additional 12 inches with blows from a 140 lb. hammer falling a distance of 30 inches. The number of blows required to drive the sampler the final 12 inches is recorded and is termed the “standard penetration resistance,” or the “N-value.” Penetration resistance, when properly evaluated, is an index of the soil’s strength, density, and foundation support capability. Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 3 (4) The other soil borings were also drilled by Savannah District the track-mounted ATV CME 850 drill rig fitted with 4.25-inch continuous flight spiral augers. These holes were drilled to varying depths so that a geotechnical engineer could examine the auger cuttings and conduct soil percolation tests. (5) The CPT soundings were performed by the Savannah District in accordance with ASTM D 5778-07. A 10-ton load capacity ARA Vertek cone penetrometer with a 10 square centimeter tip and 150 square centimeter sleeve was used. A 20-ton, truck-mounted rig was used to push the cone penetrometer. During a CPT sounding, an electronically instrumented cone is hydraulically pushed through the soil to measure tip stress, sleeve friction and pore water pressure at two-centimeter intervals. It is also possible to generate a shear wave at discrete intervals in order to measure its velocity in the investigated soil, as was done in the 85-foot soundings. The CPT sounding data were electrically recorded and used to determine soil stratigraphy and to estimate soil-engineering parameters such as strength and compressibility. The soil stratigraphic profiles in the CPT logs represent soil behavior types derived from the established relationships based on cone tip resistance, sleeve resistance and penetration induced pore pressure described by Robertson and Campanella (1986). Groundwater levels were estimated from the penetration induced pore pressure. (6) The soil samples and auger cuttings obtained from the soil test borings were examined by a geologist and/or a geotechnical engineer and visually field classified in accordance with ASTM D 2488 (Visual-Manual Procedure for Description of Soils). The soil classifications include the use of the Unified Soil Classification System described in ASTM D 2487 (Classification of Soils for Engineering Purposes). Since the soil descriptions and classifications are based on visual examination and manual tests, they should be considered approximate. Logs of the SPT borings graphically depicting soil descriptions and standard penetration resistances are included in Appendix B and on the project drawings. The logs of the CPT soundings depicting soil behavior types, cone tip resistances, sleeve resistance, shear wave velocity, and penetration induced pore pressures are also included in Appendix B and on the project drawings. c. Laboratory Soils Testing Sixteen of the soil samples that were obtained during the field investigations were tested in the laboratory and the results are included in Appendix C and on the project drawings. Testing was performed by the US Army Corps of Engineers Savannah District Environmental Materials Unit lab located in Marietta, GA. The tests conducted on the various samples include natural moisture content, Atterberg limits, and grain-size distribution. Tests were performed in accordance with applicable ASTM Standards to confirm the visual classifications and to aid in the evaluation of the subsurface soil conditions at the project site. Where there is a difference between the field and laboratory classification, the laboratory classification shall take precedence for the interval tested. d. Soil Infiltration Testing (1) Soil percolation tests were performed at 11 locations that were selected based on the proposed locations of storm water management areas. The percolation tests were done in Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 4 accordance with USACE SAD DM 110-1-1 July 1983 chapter 20. Soil percolation rates measured in the tests were converted to infiltration rates using the Michigan method. (2) The Michigan method uses an area reduction factor (Rf) to account for the exfiltration occurring through the sides of a percolation hole. It assumes that the percolation rate is affected by the depth of water in the hole and that the percolating surface of the hole is in uniform soil. The Michigan method could thus be used to convert soil percolation rates to infiltration rates as follows: infiltration rate = ሺ୮ୣ୰ୡ୭୪ୟ୲୧୭୬ ୰ୟ୲ୣሻ ሺ୰ୣୢ୳ୡ୲୧୭୬ ୤ୟୡ୲୭୰ሻ where reduction factor (Rf) = ሺଶୢଵି୼ୢሻ ୈ୍୅ାଵ and d1 = initial water depth (in.) Δd = average/final water level drop (in.) DIA = diameter of the percolation hole (in.) Results of the soil percolation tests and the computed infiltration rates are included in Appendix D and also shown on the project drawings. 5. SITE AND SUBSURFACE CONDITIONS a. Site Description Phase III of the SOF STF is proposed to be sited on approximately 18.1 acres in the Aberdeen training Facility (ATF) of Fort Bragg, NC. The ATF is comprised of approximately 50 acres of land on the western boundary of Fort Bragg, NC. Within the last few years the area has undergone, and is still undergoing, considerable urban development. The site for the proposed SOF STF Phase III begins approximately 850 yards due west of the ATF’s access control point and extends roughly 290 yards to the west and north. This area is mostly vegetated with sparse woods consisting of trees measuring approximately 8-to-12-inches in diameter mid-chest-level and spread roughly 30-to-50-feet apart. The topography of the project site is characterized by a depression that generally drains to the northeast, with high points on the northwestern and southeastern extremities and approximate elevations ranging from 496 to 442 feet mean sea level. b. Area and Site Geology (1) Fort Bragg is located in the Sand Hills area of the Coastal Plain physiographic province of North Carolina. The Coastal Plain extends westward from the Atlantic Ocean to the Fall Line, a distance of approximately 130 miles. The Fall Line is the boundary between the Coastal Plain and the Piedmont physiographic provinces. (2) Geologic units in the Fort Bragg area, ranging from oldest to youngest, include the Carolina Slate Belt rocks, which are the basement rocks, the Cape Fear Formation, and the Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 5 Middendorf Formation. The Cape Fear and Middendorf Formations overlie the basement rock and are a part of the generally southeastward-dipping and thickening wedge of sediments that constitute the Atlantic Coastal Plain deposits. (3) The Middendorf Formation is exposed at land surface throughout the Fort Bragg area. The formation is composed of tan, cross-bedded, medium- and fine-grained, micaceous quartz sand and clayey sand interbedded with clay or sandy clay lenses or layers. Layers of hematite-cemented sandstone occur locally throughout the Middendorf Formation as do thin layers of hard kaolin and kaolin-cemented sandstone. Below the water table, these units are generally friable or plastic. In places, the Middendorf Formation is mottled orange, gray, and tan color with streaks and laminae of red and purple hematite and manganese oxide stains. c. Subsurface Soil Conditions (1) The visual and manual examination of the samples obtained from soil borings drilled at the project site indicate the area’s subsurface to be comprised primarily of sandy soils with varying amounts of fines. Most of the soil samples recovered were field classified as silty sand, or clayey sand (SM or SC respectively). A few of them exhibited sufficient fines-content to be field classified as either lean clay or fat clay (CL or CH respectively). Generally, the sandy soils within the top 10 to 20 feet are of very loose density with N-values within the range of 0 to 4 blows per foot, or of loose density with N-values within the range 4 to 10 blows per foot. These very loose and loose sands are typically underlain by medium dense sands (N-values in the range of 10 to 30 bpf) or stiff clays (N-values in the 8 to 15 bpf range), extending to the terminations of the borings. Some of the medium dense sands and stiff clays were underlain by or interspersed with layers of sandy materials with N-values within the ranges of 0 to 10 blows per foot. The data collected in the CPT soundings correlates with the observations made in the SPT borings, with cone tip resistances typically increasing with depth and soil behavior types generally matching the soil samples collected at corresponding depths. (2) The above subsurface description is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The boring logs should be reviewed for specific information at individual boring locations. The stratifications shown on the boring logs represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratification lines shown on the boring logs represent approximate boundaries between the subsurface materials; the actual transitions are typically more gradual. (3) A Custom Soil Resource Report for Hoke County, North Carolina was obtained from the United States Department of Agriculture (USDA) Web Soil Survey website. The report was used to obtain an overview of possible soil series located within the project area for the design of storm water management features. In addition to a Soil Map, the report provides the following Map Unit Legend and typical soil profiles of the soil map units identified within the project limits: Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 6 Hoke County, North Carolina (NC093) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CaB Candor sand, 1 to 8 percent slopes 11.3 62.1% CaD Candor sand, 8 to 15 percent slopes 6.5 36.0% VaB Vaucluse loamy sand, 2 to 8 percent slopes 0.3 1.9% Totals for Area of Interest 18.1 100.0% CaB—Candor sand, 1 to 8 percent slopes 0 to 8 inches: sand 8 to 26 inches: sand 26 to 38 inches: loamy sand 38 to 62 inches: sand 62 to 80 inches: sandy clay loam CaD—Candor sand, 8 to 15 percent slopes 0 to 8 inches: sand 8 to 26 inches: sand 26 to 38 inches: loamy sand 38 to 62 inches: sand 62 to 80 inches: sandy clay loam VaB—Vaucluse loamy sand, 2 to 8 percent slopes 0 to 6 inches: loamy sand 6 to 15 inches: loamy sand 15 to 29 inches: sandy clay loam 29 to 58 inches: sandy clay loam 58 to 80 inches: sandy loam The full NRCS Soil Resource Report is included as Appendix E of this report. d. Groundwater Conditions (1) Attempts were made to measure groundwater depths in each of the SPT soil borings performed at the project site, during drilling and immediately after drilling, and when possible 24-hours after drilling. Groundwater was only encountered in the deeper borings that were performed at the lower elevations of the project site, at a depth range of 18 to 22 feet as indicated in the table below. The hilly topography and wide ranging surface elevations at the project site should be taken into account when evaluating this range of groundwater depths. Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 7 Boring No. Boring Depth (ft) 0 hrs After Drilling 24 hrs After Drilling Water Table Depth (ft) Water Table Elevation (ft) Water Table Depth (ft) Water Table Elevation (ft) B-01 25 --- --- --- --- B-02 15 --- --- --- --- B-04 10 --- --- --- --- B-05 25 --- --- --- --- B-07 15 --- --- --- --- B-08 15 --- --- --- --- B-11 25 18.0 429.5 17.0 430.5 B-12 27 18.0 428.0 16.9 429.1 B-14 25 22.5 424.5 21.0 426.0 B-16 25 --- --- --- --- B-18 30 --- --- --- --- B-21 40 --- --- --- --- B-22 20 --- --- --- --- B-25 40 --- --- --- --- B-26 35 --- --- --- --- B-28 15 --- --- --- --- B-29 15 --- --- --- --- B-30 10 --- --- --- --- Note: --- indicates water table not encountered (2) A perched-water condition occurs when the downward flow of seeping water is slowed by a soil layer with low permeability, such as silt or clay or fine-grained sand with high fines content, and saturates the more permeable soil above it. The true groundwater level can be several feet below the perched-water level. Perched-water conditions, indicated by encountering wet or saturated soils that were underlain by soils with appreciably lower moisture content, were encountered in some of the borings. It should be noted that the fine sands with high fines content as well as the layers of fines (lean and fat clays) encountered at various depths in the different SPT borings are conducive to, and indicative of the potential to encounter a perched-water condition during construction. (3) It should be noted that groundwater levels will fluctuate with seasonal and climatic variations, variations in subsurface soil conditions, and construction operations. Therefore, future groundwater conditions and groundwater conditions at other locations on the site may differ from the conditions encountered at the SPT boring locations on the dates they were performed. e. Seasonal High Water Table Evaluation and Soil Infiltration Properties (1) The depth to the seasonal high water table (SHWT) is an important parameter used in determining the suitability, and the design, of storm water management features. It is defined as the highest groundwater observed, at atmospheric pressure, for anaerobic conditions to be established. In North Carolina this typically occurs during the wet months of the winter and Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 8 spring seasons. The depth to SHWT is evaluated by correlating observations of soil properties with respect to soil color, redoximorphic features, and indications of prior saturation. Nine auger borings were advanced at discrete locations of the project site in order to investigate the aforementioned properties. Additionally, a USDA NRCS web soil survey of the site was generated. The web soil survey report, included as Appendix E, was used to obtain an overview of possible soil series located within the project area, and the survey’s results correlate with field observations. (2) The table below indicates the soil types identified by the NRCS soils survey report, the NRCS predicted depths to SHWT, and the field-investigation-determined SHWT depths. The predictions of subsurface profiles indicated by the NRCS soils report correlate with observations made in the field during the site investigation. Based on evaluation of the soils encountered in the auger borings, the SHWT should be placed at the field-investigation-determined SHWT depths indicated in the table below. SHWT Determination Boring ID NRCS Soil Report Soil type NRCS Soil Report SHWT Depth (inches) Field-Investigation- Determined SHWT Depth (inches) SHWT-01 CaD—Candor sand, 8 to 15 percent slopes 80+ 192 SHWT-02 CaD—Candor sand, 8 to 15 percent slopes 80+ 276 I-01 CaB—Candor sand, 1 to 8 percent slopes 80+ 300+ I-02 CaB—Candor sand, 1 to 8 percent slopes 80+ 300+ I-03 CaB—Candor sand, 1 to 8 percent slopes 80+ 300+ I-07 CaB—Candor sand, 1 to 8 percent slopes 80+ 246 I-08 CaB—Candor sand, 1 to 8 percent slopes 80+ 198 I-09 CaB—Candor sand, 1 to 8 percent slopes 80+ 156 I-10 CaB—Candor sand, 1 to 8 percent slopes 80+ 240 Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 9 (3) In addition to evaluating the depth to SHWT, soil infiltration properties were also assessed at discrete locations of the project site where stormwater management features are anticipated. Infiltration rates for corresponding depths and locations are presented in the following table and in the Soil Percolation and Permeability Test Results in Appendix D. Percolation Test ID Estimated depth to SHWT (SHWT boring ID) Test depth (feet) Soil Classification at percolation test depth Infiltration Rate (in/hr) I-01 In excess of 25 feet (I-01) 17.4 Silty Sand (SM) with trace clay, yellowish red, fine to medium grained 15.0 I-02 In excess of 25 feet (I-02) 2.6 Silty Sand (SM), yellowish red, trace clay, fine to medium grained 15.0 I-03 In excess of 25 feet (I-03) 7.0 Poorly Graded Sand (SP), pale brownish yellow with trace silt and clay, fine to medium grained 15.0 I-05 16 feet (SHWT-01) 1.3 Silty Sand (SM), very pale brown, fine to medium grained 15.0 I-06 16 feet (SHWT-01) 1.8 Silty Sand (SM), very pale brown, fine to medium grained 15.0 I-07 20.5 feet (I-07) 1.7 Silty Sand (SM), brownish yellow, fine to medium grained 5.2 I-08 16.5 feet (I-08) 1.2 Silty Sand (SM), brownish yellow, fine to medium grained 13.6 I-09 13 feet (I-09) 3.6 Silty Sand (SM), strong brown, little clay, fine to medium grained 0.5 I-10 20 feet (I-10) 2.6 Silty Sand (SM), brownish yellow, fine to medium grained 15.0 I-11 23 feet (SHWT-02) 1.3 Silty Sand (SM), pale brown, fine to medium grained 11.7 I-12 23 feet (SHWT-02) 1.3 Silty Sand (SM), pale brown, fine to medium grained 15.0 Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 10 6. CONCLUSIONS AND RECOMMENDATIONS a. General The following conclusions and recommendations are based on the information available on the proposed structures, observations made at the project site, interpretation of the data obtained from the soil test borings, and previous experience with soils and subsurface conditions similar to those encountered at the site. b. Site Preparation (1) Following clearing and removal of trees, structures, pavement, etc., the construction area should be grubbed and stripped of all vegetation, topsoil, organics, and other deleterious materials. Clean topsoil can be stockpiled and reused in landscaped areas. It is recommended that the zone of stripping extend a minimum of 10 feet beyond the outer edges of structures and pavements. Any utilities in the project area should be located and rerouted, as necessary. (2) Areas to receive fill and excavated subgrade areas of buildings and pavements should be prepared as follows: Exposed surface areas consisting of poorly graded sands or silty sands should be densified by compaction with a vibratory roller weighing at least 7 tons; and exposed surface areas consisting of cohesive soils such as clayey sands and clays should be compacted with sufficient passes of a loaded tandem-axle dump truck or similar rubber-tired equipment. Soils which are observed to rut or deflect excessively under the moving loads should be undercut to firm soil and backfilled with properly compacted, suitable soils. The subgrade preparation should be performed only during and following a period of dry weather. (3) Very loose and loose sandy surface soils were encountered at most of the exploration locations to depths of 1-to-3-feet beneath the existing ground surface, and should be anticipated across the entire site. It is likely that most of these very loose and loose soils will be removed or improved during site stripping, and grading operations; however, any remaining soft soils should be stabilized by compaction or undercut and replaced with suitable compacted structural fill material. c. Foundation Design (1) Allowable Bearing Pressure It is recommended to use a net allowable soil bearing pressure of 2,500 psf for the design of footings for buildings 4, 5, 6, 7, and 8; and 2,000 psf for the design of footings for the water tank, provided the recommendations in the following paragraphs are met. (2) Footing Dimensions Minimum dimensions of 30 inches for all column footings and 24 inches for all load-bearing continuous footings shall be used in foundation design to reduce the possibility of bearing capacity failure. These footings shall be embedded a minimum depth of 24 inches, as measured from the finish floor or finish grade, whichever is lower, to the bottom of the footing. All non load-bearing wall footings shall have a minimum width of 18 Subsurface Exploration and Geotechnical Report August 2016 SOF Special Tactics Facility Phase III. FY 17, LI 76514 Fort Bragg, North Carolina 11 inches and the minimum depth shall be 18 inches, as measured from finish floor or finish grade, whichever is lower, to the bottom of the footing. (3) Settlement Anticipated foundation settlements were estimated for the proposed buildings and water tank. These calculations were based on the maximum column loads and an estimated footing dimension based on the recommended allowable soil bearing pressure of 2,500 psf for the buildings and 2,000 psf for the water tank. Provided the recommendations and special requirements described in the following paragraphs are adhered to, post construction total foundation settlements are not expected to exceed an inch and differential settlements are expected to be less than one-half inch. (4) Excavation and Replacement In addition to the very loose and loose sandy surface soils encountered across the project site and described in “b. Site Preparation” above, very loose and loose sandy soils were encountered within the footprint of Building 6 from the surface and extending to depths of 4-to-8-feet. These soils, in their current condition, are unsuitable to support the proposed structure. Although a portion of these very loose and loose surface soils is likely to be removed during stripping and grading operations, stabilization of remaining very loose and loose soils by undercutting and replacement with suitable compacted fill materials will be required to an approximate elevation of 456-feet msl. The base of the excavation should extend at least 10-feet beyond the building limits. The actual undercut depth may vary and will have to be determined during undercutting. Fort cost-estimating purposes, it is recommended to anticipate the removal and replacement of 7,000-to-8,000 cubic yards of in- place material within the footprint of Building 6. The entire base of the undercut area shall be compacted prior to placing backfill material. The compacted subgrades may then be backfilled to design grade with satisfactory soils placed in compacted lifts in accordance with the specifications. Excavated soils may be used as backfill if they are free of organics and other deleterious materials, and their moisture content is within a suitable range to achieve the required compaction. The following note has been added to geotechnical Plate B-001 and, at a minimum, should be referenced on the GRADING AND DRAINAGE PLAN and the structural drawings for Building 6: “WITHIN THE FOOTPRINT OF BUILDING 6, THE VERY LOOSE AND LOOSE IN- PLACE SANDY SOILS SHALL BE EXCAVATED TO AN APPROXIMATE ELEVATION OF 456- FEET. ANY DEBRIS IN THE EXCAVATED MATERIAL SHALL BE REMOVED, AND SATISFACTORY SOIL SHALL BE REPLACED IN COMPACTED LAYERS. THE BASE OF THE EXCAVATION SHALL EXTEND A MINIMUM OF 10 FEET BEYOND THE LIMITS OF THE BUILDING’S FOOTPRINT. EXCAVATION SHALL BE PERFORMED IN ACCORDANCE WITH EM 385-1-1 AND OSHA 29 CFR 1926.652. BACKFILLING SHALL BE IN ACCORDANCE WITH SECTION 31 00 00, EARTHWORK. BEFORE BACKFILLING, THE COR SHALL BE PROVIDED CONFIRMATION FROM THE CONTRACTOR’S INDEPENDENT TESTING LABORATORY THAT THE BASE AND SIDES OF THE EXCAVATION ARE FREE OF LOOSE OR SOFT MATERIALS AND READY TO RECEIVE FILL.” Subsurface Exploration and Geotechnical Engineering Report August 2016 SOF Special Tactics Facility Ph. III, LI 76514, FY 17 Ft. Bragg, North Carolina 12 (6) Footings with Uplift The resistance of footings to be subjected to uplift from transient live loads should be represented by the total weight of concrete in the footing and the weight of soil in the vertical column directly above the footing. The effect of a groundwater table on the uplift resistance of the footing should be considered. The effect of the groundwater (or buoyancy) can be taken into account by subtracting from the total weight of concrete and soil the weight of water represented by the block of concrete and soil which is located below the groundwater level and above the bottom of the footing. The level of the groundwater should be the highest anticipated during the life of the structure. The factor of safety against uplift should not be less than 1.5. (7) Foundation Construction Foundation excavations should be concreted as soon as practical following excavation. Exposure to the environment could weaken the soils at the footing bearing level should the foundation excavations remain open for an extended period of time. Bottoms of foundation excavations should be inspected immediately prior to placement of reinforcing steel and concrete to verify that adequate bearing soils are present and that all debris, mud, and loose, frozen or water-softened soils are removed. If the bearing surface soils have been softened by surface-water intrusion or by exposure, the softened soils must be removed to firm bearing and replaced with additional concrete during the concreting or replaced to design subgrade with No. 57 or No. 67 stone, compacted to a non-yielding condition. To minimize exposure, the final excavation (4 to 6 inches) to design subgrade could be delayed until just prior to placement of reinforcing steel and concrete. Foundation excavations must be maintained in a drained/dewatered condition throughout the foundation construction process. d. Seismic Design Seismic loads should be computed in accordance with IBC 2012. The project site should be classified as Site Class D for the purpose of determining maximum considered earthquake spectral response accelerations. e. Earth Retaining Structures (1) For the design and construction of basement retaining walls with no sloping backfill and other below grade or earth retaining structures, the following earth pressure coefficients and soil parameters should be used: Coefficient of at-rest earth pressure (Ko) = 0.50 Coefficient of active earth pressure (Ka) = 0.33 Coefficient of passive earth pressure (Kp) = 3.0 Coefficient of friction (soil -vs- concrete) (μf) = 0.30 Unit weight of soil (moist) = 120 lbs/ft3 Unit weight of soil (saturated) = 125 lbs/ft3 Unit weight of soil (buoyant) = 63 lbs/ft3 Assume retained soils to be non-cohesive with an internal friction angle = 30º Assume internal friction angle of foundation soils = 30º Subsurface Exploration and Geotechnical Engineering Report August 2016 SOF Special Tactics Facility Ph. III, LI 76514, FY 17 Ft. Bragg, North Carolina 13 (2) Drainage features such as longitudinal drains, prefabricated geocomposite drains, and porous backfill shall be utilized. Since perched groundwater conditions could be encountered, additional drainage measures such as blanket and/or chimney drains may need to be included in the design of any retaining walls on this site. It is recommended to replace the in-situ material with free-draining material behind the wall for the entire height of the wall and a horizontal distance at least equal to one third of the wall height. Compaction of backfill within 10 feet of walls should be performed with hand operated equipment, such as walk behind compactors (“whacker packers” or sled tamps). If sloping backfill or toe conditions exist, the Soils Section, Geotechnical, and HTRW Branch of the Savannah District should be consulted for additional recommendations. (3) Any mechanically stabilized earth (MSE) walls at the subject site shall be designed using the American Association of State Highway and Transportation Officials (AASHTO) design methodology as published in the Federal Highway Administration (FHWA) publication “Mechanically Stabilized Earth Walls and Reinforced Soil Slope Design and Construction Guidelines (FHWA NHI-00-043, March 2001)”. Wall designs using National Concrete Masonry Association (NCMA) design methodology shall not be acceptable. f. Slabs-On-Grade (1) Previous experience and the subsurface conditions encountered at the site indicate concrete floor slabs could be supported on in-situ soils and/or on fill soils placed and compacted in accordance with the recommendations presented in this report regarding structural fill. Provided these subgrade preparation requirements are adhered to, a vertical modulus of subgrade reaction (k) value of 125 psi/in may be used for the design of slabs-on-grade. (2) All concrete slabs-on-grade in enclosed areas shall be underlain by a minimum of 4 inches of open graded, washed pea gravel or stone, referred to as a “capillary water barrier,” to prevent the capillary rise of the groundwater. Nos. 57, 67, 78, or 89 stone should be used. All drawings should be consistently labeled with the term “capillary water barrier,” since this is the term utilized in Section EARTHWORK of the Specifications. Additionally, a moisture barrier consisting of lapped polyethylene sheeting having a minimum thickness of 10 mils shall be provided beneath building floor slabs to reduce the potential for slab dampness from soil moisture. The vapor barrier material may be omitted under slabs-on-grade in unenclosed areas; however, the slab shall still be provided with a capillary water barrier. Concrete slabs should be jointed around columns and along supported walls to minimize cracking due to possible differential movement. (3) The design of thickened slabs on grade to support line loads (such as partitions and light wall loads) should be in accordance with the Unified Facilities Criteria (UFC) UFC 3-301- 01 Structural Engineering. (4) Construction activities and exposure to the environment often cause deterioration of the prepared slab-on-grade subgrade. The subgrade soils upon which slabs would be placed should be inspected and evaluated immediately prior to floor slab construction. The evaluation should include a combination of visual observations, hand rod probing, and field density tests to Subsurface Exploration and Geotechnical Engineering Report August 2016 SOF Special Tactics Facility Ph. III, LI 76514, FY 17 Ft. Bragg, North Carolina 14 verify that the subgrade has been properly prepared. If unstable soils are revealed, the affected area should be excavated to firm bearing, and material removed should be replaced to design subgrade with suitable structural fill soil placed and compacted as recommended, or replaced with additional capillary water barrier material. g. Pavement Design Criteria Based on the subsurface investigations and previous experience in the general area, the soil types expected to be encountered during construction activities are poorly graded sands, silty sands, and clayey sands. These soil types are typically considered satisfactory material for pavement subgrade. Soils deemed unsatisfactory for use as pavement subgrade due to loose in-place density and previous undocumented fill activities may be encountered at various locations on the site. Provided any unsatisfactory subgrade soils that are encountered are removed and replaced with satisfactory soils, the following subgrade values for satisfactory soils and other listed parameters may be used for the design of the pavements: (1) Flexible (Asphaltic Concrete) Pavement: Compacted subgrade, use CBR of 8. (2) Rigid (Portland Cement Concrete) Pavement: (a) Use a corrected modulus of subgrade reaction, K of 150 psi per inch with at least 4 inches of compacted aggregate base course. (b) The concrete should have a minimum design 28-day compressive strength of at least 4000 pounds per square inch with a mix design that has been proven to produce concrete with a flexural strength of at least 650 psi. h. Control of Water Water should not be allowed to collect near the foundation or on floor slab areas of the building either during or after construction. Undercut or excavated areas should be sloped toward one corner to facilitate removal of any collected rainwater, groundwater, or surface runoff. Positive site drainage should be provided to reduce infiltration of surface water around the perimeter of the building and beneath floor slabs. The following note should be added to an appropriate civil/site plate and also to an appropriate structural foundation plate of the contract drawings: “DRAINAGE AND DEWATERING: ALL EXCAVATIONS SHALL BE PERFORMED SO THAT THE SITE AND THE AREA IMMEDIATELY SURROUNDING THE SITE WHICH AFFECTS CONSTRUCTION OPERATIONS WILL BE CONTINUALLY AND EFFECTIVELY DRAINED. THE CONTRACTOR SHALL PROVIDE DRAINAGE AND DEWATERING AS REQUIRED TO ENSURE THAT ALL FOOTING EXCAVATIONS ARE ACCOMPLISHED WITH THE SUBGRADE SOILS REMAINING DRY AND FIRM UNTIL AFTER FOOTINGS ARE PLACED AND BACKFILLED. REMOVAL OF SURFACE WATER, GROUNDWATER, AND ANY PERCHED-WATER CONDITIONS, WHICH MIGHT BE ENCOUNTERED DURING EXCAVATIONS Subsurface Exploration and Geotechnical Engineering Report August 2016 SOF Special Tactics Facility Ph. III, LI 76514, FY 17 Ft. Bragg, North Carolina 15 SHALL BE ACCOMPLISHED BY APPROVED MEANS. REFER TO SPECIFICATION 31 00 00 EARTHWORK FOR ADDITIONAL REQUIREMENTS.” i. Structural Fill In order to achieve high density structural fill, the following evaluations and recommendations are offered: (1) Based on the soil test borings, excavated on-site soils (excluding any organics/topsoil and debris) can be used as structural fill. Some moisture content adjustment will probably be necessary to achieve proper compaction. If water must be added, it should be uniformly applied and thoroughly mixed into the soil by discing. (2) It is recommended that the contractor have appropriate disc harrows on site during earthwork for mixing, drying, and wetting of the soils. (3) Materials selected for use as structural fill should be free from roots and other organic matter, trash, debris, and frozen soil, and stones larger than 3 inches in any dimension, and in general, should have a liquid limit less than 50 percent and a plasticity index of less than 30. The following soils represented by their Unified Soil Classification System (ASTM D 2487) group symbols will be suitable for use as structural fill: GP, GW, GM, GC, SP, SP-SM, SP-SC, SW, SC, SM, SM-SC, CL, and ML. Only material classified as GP, GW, GM, GC, SP, SP-SM, SP-SC, SW, SC, SM, SM-SC with less than 35% passing the #200 sieve, a liquid limit less than 35 and a plasticity index less than 10 will be suitable for use as structural fill in the geosynthetic– reinforced zone behind mechanically stabilized earth walls. The following soil types are considered unsuitable: Pt, OH, OL, CH, and MH. (4) Suitable fill soils should be placed in lifts of maximum 8 inches loose measurement. The soil should be compacted by mechanical means such as steel drum, sheepsfoot, tamping, or rubber-tired rollers. Compaction of clays is best accomplished with a sheepsfoot or tamping roller. Periodically rolling with heavily loaded, rubber-tired equipment may be desirable to seal the surface of the compacted fill, thus reducing the potential for absorption of surface water following a rain. This sealing operation is particularly important at the end of the work day and at the end of the week. Within confined areas or foundation excavations, we recommend the use of manually operated, internal combustion activated compactors (“whacker packers” or sled tamps). The compactors should have sufficient weight and striking power to produce the same degree of compaction that is obtained on the other portions of the fill by the rolling equipment as specified. Where hand operated equipment is used, the soils should be placed in lifts of maximum 4 inches loose measurement. (5) It is recommended that the structural fill and subgrades be compacted to the following minimum percents of the modified Proctor maximum dry density (ASTM D 1557): Subsurface Exploration and Geotechnical Engineering Report August 2016 SOF Special Tactics Facility Ph. III, LI 76514, FY 17 Ft. Bragg, North Carolina 16 Beneath structures and building slabs, to 5 feet beyond building and structure line, around footings and in trenches 92 percent Beneath paved areas, except top 12 inches 92 percent Beneath paved areas, top 12 inches 95 percent Beneath shoulders 90 percent Beneath sidewalks and grassed areas 85 percent Base course beneath paved areas 100 percent j. Construction Quality Control Testing (1) Prior to initiating any structural fill placement and/or compaction operations, representative samples of the soils which will be used as structural fill or subgrade, both suitable on-site soils and off-site soils (borrow), should be obtained and tested to determine their classification and compaction characteristics. The samples should be carefully selected to represent the full range of soil types to be used. The moisture content, maximum dry density, optimum moisture content, grain-size, and plasticity characteristics should be determined. These tests are required to determine if the fill and subgrade soils are acceptable and for compaction quality control of the subgrades and structural fill. Tests for the above soil properties should be in accordance with the following: Moisture Content ASTM D 2216 Maximum Dry Density and Optimum Moisture ASTM D 1557 Grain-Size (Wash No. 200, less hydrometer) ASTM D 422 and D 1140 Plasticity ASTM D 4318 (2) A representative number of in-place field density tests should be performed in the subgrade of compacted on-site soils and in the structural fill and backfill to confirm that the required degree of compaction has been obtained. In-place density tests should be performed in accordance with the sand cone method prescribed in ASTM D 1556. It is recommend at least one density test be performed for each 5,000 square feet and 12,500 square feet, or portion thereof, for buildings and pavements, respectively, of compacted native soil subgrade and in each lift of compacted structural fill. It is also recommended that at least one density test be performed for each 100 linear feet in the bearing level soils of continuous footings. Density tests should be performed at 100-foot intervals along roadway subgrades. In addition, a density test should be performed for each 100 linear feet of backfill placed per foot of depth in trenches for utilities systems. Where other areas are compacted separately by manually operated compactors, a minimum of one density test should be performed for every 250 square feet, or portion thereof, of fill placed per foot of depth. (3) Compaction control of soils requires the comparison of fill water content and dry density values obtained in the field density tests with optimum water content and maximum dry density. The performance of a laboratory compaction test on material from each field density test would provide the most accurate relation of the in-place material to optimum water content and maximum density, but it is not feasible to do this as the testing could not keep pace with fill construction. It is recommended that compaction control of the earthwork construction be Subsurface Exploration and Geotechnical Engineering Report August 2016 SOF Special Tactics Facility Ph. III, LI 76514, FY 17 Ft. Bragg, North Carolina 17 performed using a “family” of compaction curves and the one-point or two-point compaction methods. (4) Any area that does not meet the required compaction criteria should be reworked and retested. If the moisture content of the soil is within the recommended range, additional compaction may be all that is necessary to increase the density. If the moisture content is not within the recommended range, then, the moisture content should be adjusted to within the range and the area recompacted. (5) All laboratory and field density testing should be performed by a commercial testing laboratory that has been validated by the Engineer Research and Development Center Materials Testing Center (MTC) under the Corps of Engineers laboratory inspection and validation program. k. Presentation of Soil Boring Data The locations of the soil test borings drilled at the project site are shown on the boring location plan in Appendix A. The boring locations will also be provided to the AE in MicroStation format. The boring locations should be referenced and shown on the appropriate site grading and drainage plates of the contract drawings. The SPT boring location symbol (circle with the right half filled in) should also be placed in the civil legend. Soil test boring logs are shown in Appendix B. Microstation drawings containing the soil boring logs will be provided to the AE. The drawings should be directly inserted into the project drawings, and the plate titles should be included in the index. l. Specifications Savannah District’s specification 31 00 00 “EARTHWORK” and the Unified Facilities Guide Specification 31 31 16.13 “CHEMICAL TERMITE CONTROL” shall be edited by Savannah District and provided to the AE, who in turn shall include them in the specifications for this project. The unedited version of the specification 31 00 00 (in SpecsIntact format) can be found at the following website: http://www.sas.usace.army.mil/About/DivisionsandOffices/EngineeringDivision/EngineeringDes ignCriteria.aspx, under menus “SAS Guide Specifications”. APPENDICES APPENDIX A Soil Test Boring Location Plan APPENDIX B Legends and Logs of Soil Borings and CPT Soundings 1 2 1 4 2 5 6 2 Water Level Data 1 2 2 3 2 5 5 7 87 100 87 100 100 100 100 93 473.4 450.0 448.5 0.1 23.5 25.0 ORGANICS, very dark brown, dry. SILTY SAND (SM), fine; very dark brown mottled with light gray, little organics, trace rootlets. Brownish yellow, moist, no organics. No rootlets. 0.2' thick very pale brown layer. Yellowish red. Very pale brown mottled with reddish yellow. Very fine to fine. Root 0.03' x 0.1'. Trace coarse sand. Fine to medium; no coarse sand. Yellow layered with very pale brown, trace coarse sand. 0.01' iron concretion followed by 0.15' of iron staining. CLAYEY SAND (SC), fine to coarse; yellow layered with very pale brown, moist, few silt, trace rootlets. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 2 4 3 7 4 10 11 9 1 1 1 4 2 3 3 1 1 2 3 4 5 6 7 8 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 8 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498451.9415 E 1891327.1 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/30/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-01 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/30/16 Tracey Tapley, Geologist State Plane - North Carolina 473.5' 0 5 10 15 20 25 Boring Designation B-01 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-01 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 2 2 1 2 2 1 Water Level Data 2 1 2 3 2 2 100 100 100 87 93 100 461.2 460.5 454.0 7.8 8.5 15.0 SILTY SAND (SM), fine; very dark brown mottled with light gray, dry, little organics, trace rootlets. Brownish yellow, moist, no organics. Brownish yellow grades to yellow. Very pale brown. Concretion 0.04' x 0.04'. CLAYEY SAND (SC), fine; reddish yellow, moist. SILTY SAND (SM), fine; reddish yellow, moist, little mica, trace clay. Very pale brown, trace medium to coarse sand. BOTTOM OF BOREHOLE AT 15.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 4 3 3 5 4 3 7.8' - 8': Minimal material, not collected 1 1 1 1 2 1 1 2 3 4 5 6 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 6 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >15' 0' 15' N 498355.9152 E 1890594.823 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/30/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-02 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/30/16 Tracey Tapley, Geologist State Plane - North Carolina 469' 0 5 10 15 Boring Designation B-02 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-02 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 16 12 5 4 4 4 Water Level Data 18 11 6 5 5 4 93 87 73 67 87 87 463.2 463.0 453.5 0.3 0.5 10.0 Asphalt gravel base material SILTY SAND (SM), fine to medium; brown, dry, some fine gravel. No gravel. Very dark brown, trace clay. Brown, no clay. Very pale brown, moist. Reddish yellow, trace clay. Fine to coarse. Fine to medium; yellow mottled with very pale brown. Few coarse sand. No clay, no coarse sand. BOTTOM OF BOREHOLE AT 10.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 34 23 11 9 9 8 9 8 3 3 2 3 1 2 3 4 5 6 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 6 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >10' 0' 10' N 498370.7838 E 1890249.128 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/27/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-04 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/27/16 Tracey Tapley, Geologist State Plane - North Carolina 463.5' 0 5 10 Boring Designation B-04 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-04 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 1 2 1 6 1 2 5 Water Level Data 1 2 2 2 7 1 3 6 100 87 93 93 100 100 100 100 463.8 439.0 0.2 25.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; pale brown, moist, trace rootlets. Brownish yellow, trace medium to coarse sand, no rootlets. 0.02' light gray layer. Brownish yellow mottled with very pale brown. Reddish yellow. Very pale brown. Reddish yellow. Very pale brown slightly mottled with reddish yellow, no medium to coarse sand. Very fine; very pale brown. Fine; very pale brown slightly mottled with yellowish red, trace medium sand. Very fine; very pale brown, micaceous. Fine; trace concretions, no mica. Very fine; very pale brown, micaceous. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 2 3 4 3 13 2 5 11 1 1 2 1 3 0 1 3 1 2 3 4 5 6 7 8 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Dry; piezo installed N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 8 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498471.1467 E 1890282.583 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/27/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-05 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/27/16 Tracey Tapley, Geologist State Plane - North Carolina 464' 0 5 10 15 20 25 Boring Designation B-05 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-05 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 1 3 2 4 4 Water Level Data 1 2 2 1 4 5 93 100 87 93 93 87 466.3 451.5 0.2 15.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; light yellow, moist, trace rootlets. Brownish yellow, trace medium to coarse sand. Brownish yellow grades to yellow, no rootlets. Fine to medium; brownish yellow mixed with very pale brown, trace clay, trace coarse sand. Very pale brown slightly mottled with brownish yellow. BOTTOM OF BOREHOLE AT 15.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 2 3 5 3 8 9 1 1 2 2 3 3 1 2 3 4 5 6 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 6 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >15' 0' 15' N 498507.6986 E 1890406.487 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/27/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-07 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/27/16 Tracey Tapley, Geologist State Plane - North Carolina 466.5' 0 5 10 15 Boring Designation B-07 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-07 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 1 3 3 1 2 Water Level Data 0 1 2 3 2 2 100 93 80 100 100 100 456.8 442.0 0.2 15.0 ORGANICS, moist. SILTY SAND (SM), fine; pale brown, moist, trace rootlets. Brownish yellow. Trace clay. Very fine; trace concretions. Pink. Pink mixed with very pale brown. BOTTOM OF BOREHOLE AT 15.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 1 2 5 6 3 4 Weight of hammer for first 0.5-foot drive, first blow advanced 1 foot 0 1 1 3 2 2 1 2 3 4 5 6 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 6 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >15' 0' 15' N 498715.2391 E 1890434.366 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/27/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-08 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/27/16 Tracey Tapley, Geologist State Plane - North Carolina 457' 0 5 10 15 Boring Designation B-08 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-08 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 1 2 5 5 5 0 2 Water Level Data 1 1 3 6 5 6 0 3 100 87 87 100 100 100 67 80 447.3 441.0 439.0 422.5 0.2 6.5 8.5 25.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; dark brown, moist, little organics, trace rootlets. Pale brown, no organics. Reddish yellow, trace clay. No clay. Trace clay. CLAYEY SAND (SC), very fine; yellowish red mottled with reddish yellow, moist, trace rootlets. SILTY SAND (SM), very fine to fine; yellowish red, moist, trace concretions. Fine; reddish yellow, no concretions, micaceous. Fine to medium; very pale brown mottled with yellow, wet, trace coarse sand. Fine to coarse; dusky red. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 2 2 5 11 10 11 0 5 Weight of hammer for first, second, and third 0.5-foot drives Weight of hammer for first 0.5-foot drive 1 1 1 3 3 4 0 0 1 2 3 4 5 6 7 8 Reading Depth NotesDate During drilling 18.5 After drilling 18 24 hours 16.95 piezo installed N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 8 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498856.4906 E 1890400.912 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/27/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-11 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/27/16 Tracey Tapley, Geologist State Plane - North Carolina 447.5' 0 5 10 15 20 25 Boring Designation B-11 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-11 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 3 1 2 4 3 3 3 3 0 1 Water Level Data 2 3 6 3 5 5 2 0 0 100 100 100 100 80 100 100 67 133 445.8 444.0 439.5 432.5 431.5 426.5 424.5 419.0 0.2 2.0 6.5 13.5 14.5 19.5 21.5 27.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; pale brown, moist, trace rootlets. CLAYEY SAND (SC), fine to medium; reddish yellow, moist, trace rootlets. SILTY SAND (SM), fine to medium; reddish yellow, moist, trace coarse sand, trace clayey sand layers up to 0.05'. Trace clay. Very fine; no clay, micaceous, no clayey sand layers. Fine to medium. LEAN CLAY (CL), reddish yellow, moist, few silt, micaceous, trace fine silty sand layers up to 0.05'. SILTY SAND (SM), fine to medium; very pale brown mottled with reddish yellow, moist. Fine to coarse; yellowish red layered with very pale brown, wet. 0.05' concretion layer. LEAN CLAY (CL), light brown, wet, layered with light gray silt, micaceous. SILTY SAND (SM), very fine; light gray, wet, trace silt layers up to 0.1'. Very fine to fine; very pale brown slightly mottled with reddish yellow, trace silt layers up to 0.3'. BOTTOM OF BOREHOLE AT 27.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 3 5 10 6 8 8 5 0 0/0" Drill cuttings indicate material in 23.5' to 25' drive likely begins at 21.5' Weight of rod for first 0.5-foot drive, weight of hammer for second and third 0.5-foot drives Weight of hammer for first 0.5-foot drive, first blow advanced 1 foot 2 2 3 2 2 2 5 0 0 1 2 3 4 5 6 7 8 9 10 11 Reading Depth NotesDate During drilling 18.5 After drilling 18 24 hours 16.9 Piezo Installed N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 11 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >27' 0' 27' N 498862.6858 E 1890284.441 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/28/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-12 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/28/16 Tracey Tapley, Geologist State Plane - North Carolina 446' 0 5 10 15 20 25 Boring Designation B-12 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-12 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 4 4 4 3 6 4 1 Water Level Data 2 5 4 4 5 4 6 1 93 100 100 100 100 93 100 67 446.9 444.6 443.5 422.0 0.1 2.4 3.5 25.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; very dark brown, moist, little organics, trace rootlets. Pale brown. CLAYEY SAND (SC), fine to coarse; pale brown, moist. Reddish yellow. SILTY SAND (SM), fine to medium; reddish yellow, moist, trace clay. No clay. Layer with trace clay 0.4' thick. Fine. Trace clay. No clay. Layers with trace clay up to 0.1' thick. No clay. Reddish yellow slightly mottled with very pale brown. Wet. Yellow. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 3 9 8 8 8 10 10 2 1 5 3 2 2 3 2 1 1 2 3 4 5 6 7 8 9 Reading Depth NotesDate During drilling 19.7 After drilling 22.5 24 hours 21 Piezo Installed N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 9 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498991.5468 E 1890171.688 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/28/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-14 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/28/16 Tracey Tapley, Geologist State Plane - North Carolina 447' 0 5 10 15 20 25 Boring Designation B-14 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-14 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 2 2 2 3 4 2 11 Water Level Data 2 2 3 3 3 5 2 16 93 100 100 87 87 100 100 100 459.4 434.5 0.1 25.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; brownish yellow, moist, trace rootlets. Very pale brown mottled with yellow. Very pale brown. Layered very pale brown, reddish yellow, and brownish yellow. Strong brown. Wet. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 3 4 5 5 6 9 4 27 1 1 1 1 2 3 1 8 1 2 3 4 5 6 7 8 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 8 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498881.891 E 1889962.289 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/28/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-16 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/28/16 Tracey Tapley, Geologist State Plane - North Carolina 459.5' 0 5 10 15 20 25 Boring Designation B-16 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-16 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 0 1 2 2 2 4 6 8 6 Water Level Data 1 2 2 3 2 3 7 10 9 100 100 100 100 100 100 93 100 100454.5 30.0 SILTY SAND (SM), fine; brownish yellow, moist, trace rootlets. Very pale brown layered with reddish yellow, no rootlets. Reddish yellow. Yellowish red, trace clay. Fine to medium; reddish yellow slightly mottled with very pale brown, no clay. Fine; reddish yellow. BOTTOM OF BOREHOLE AT 30.0 ft 1 3 4 5 4 7 13 18 15 Weight of hammer for first and second 0.5-foot drives Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 0 1 2 2 2 3 4 4 5 1 2 3 4 5 6 7 8 9 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 9 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >30' 0' 30' N 499003.3177 E 1889712.001 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/28/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-18 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/28/16 Tracey Tapley, Geologist State Plane - North Carolina 484.5' 0 5 10 15 20 25 30 Boring Designation B-18 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-18 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 1 1 1 1 4 5 5 6 6 0 2 2 2 2 5 6 6 8 7 100 100 93 93 87 100 93 100 100 100 478.9 0.1 ORGANICS, very dark brown, dry. SILTY SAND (SM), fine; very dark brown mottled with light gray, dry, trace organics, trace rootlets. Brownish yellow, moist. Yellowish brown, no rootlets. Yellow, trace medium to coarse sand. Very pale brown. Very pale brown slightly layered with reddish yellow. Yellowish red. Very pale brown layers up to 0.02' thick. Very pale brown slightly mottled with reddish yellow. Yellowish red, trace clay, no medium to coarse sand. Trace medium to coarse sand, no clay. No medium to coarse sand. Trace medium to coarse sand. 1 3 3 3 3 9 11 11 14 13 Weight of hammer for first 0.5-foot drive, first blow advanced 1 foot 0 1 1 3 2 2 2 3 3 3 1 2 3 4 5 6 7 8 9 10 N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 2 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 11 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >40' 0' 40' N 498582.0415 E 1889626.507 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-21 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/29/16 Tracey Tapley, Geologist State Plane - North Carolina 479' 0 5 10 15 20 25 30 35 Boring Designation B-21 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-21 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 2 5 Water Level Data 4 93 440.5 439.0 38.5 40.0 Fine to coarse sand layer up to 0.1'. SILTY SAND (SM), fine; very dark brown mottled with light gray, dry, trace organics, trace rootlets. (continued) Fine to coarse sand layer up to 0.1'. CLAYEY SAND (SC), fine to medium; reddish yellow mottled with yellow, moist, trace coarse sand, indistinct layers/zones of silty sand. BOTTOM OF BOREHOLE AT 40.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 9 3 11 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken 2 SOF Special Tactics Facility Ph III SHEETS HORIZONTAL VERTICALPROJECT SHEET OFFort Bragg, NC COORDINATE SYSTEM 2 State Plane NAVD88 ELEVATION TOP OF BORINGLOCATION COORDINATES DRILLING LOG (Cont Sheet) NAD83 N 498582.0415 E 1889626.507 INSTALLATION 479' 35 40 Boring Designation B-21 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-21 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 2 of 2 1 1 2 2 2 3 4 Water Level Data 2 1 1 2 2 4 5 100 100 93 100 100 100 100 475.4 455.5 0.1 20.0 ORGANICS, dark brown, moist. SILTY SAND (SM), fine; brown, moist, trace rootlets. Brownish yellow. Yellowish brown, trace medium to coarse sand, no rootlets. Brownish yellow. Yellow. Very pale brown. Very pale brown mottled with reddish yellow. BOTTOM OF BOREHOLE AT 20.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 3 2 3 4 4 7 9 1 1 1 1 1 1 3 1 2 3 4 5 6 7 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 7 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >20' 0' 20' N 498608.0615 E 1889712.001 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-22 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/29/16 Tracey Tapley, Geologist State Plane - North Carolina 475.5' 0 5 10 15 20 Boring Designation B-22 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-22 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 0 1 2 2 2 5 2 1 2 2 1 1 2 3 3 4 3 2 4 3 100 100 100 100 100 93 93 100 100 100 SILTY SAND (SM), fine; very dark brown, moist, few organics, trace rootlets. Yellowish brown. Reddish yellow. Reddish yellow grades to yellow. No rootlets. Very fine to fine; yellowish red. Fine. Fine to medium. 1 2 4 5 5 9 5 3 6 5 Weight of hammer for first and second 0.5-foot drives 0 1 2 2 2 3 2 1 1 1 1 2 3 4 5 6 7 8 9 10 N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 2 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 11 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >40' 0' 40' N 498792.6796 E 1889725.631 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/28/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-25 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/28/16 Tracey Tapley, Geologist State Plane - North Carolina 477' 0 5 10 15 20 25 30 35 Boring Designation B-25 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-25 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 2 4 Water Level Data 5 80437.0 40.0 SILTY SAND (SM), fine; very dark brown, moist, few organics, trace rootlets. (continued) BOTTOM OF BOREHOLE AT 40.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 9 2 11 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken 2 SOF Special Tactics Facility Ph III SHEETS HORIZONTAL VERTICALPROJECT SHEET OFFort Bragg, NC COORDINATE SYSTEM 2 State Plane NAVD88 ELEVATION TOP OF BORINGLOCATION COORDINATES DRILLING LOG (Cont Sheet) NAD83 N 498792.6796 E 1889725.631 INSTALLATION 477' 35 40 Boring Designation B-25 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-25 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 2 of 2 1 1 2 2 3 7 4 4 3 3 1 2 1 2 4 7 6 6 4 4 67 100 93 100 100 93 87 100 100 100440.0 35.0 SILTY SAND (SM), fine; very dark gray mottled with light gray, moist, little organics, trace rootlets. Brownish yellow. Yellowish brown. Brownish yellow. Yellow. Yellow grades to very pale brown. Strong brown. 0.1'-0.2' thick layers of strong brown, yellow, and very pale brown. Yellowish red, trace medium to coarse sand. No medium to coarse sand. Fine to medium; reddish yellow. BOTTOM OF BOREHOLE AT 35.0 ft 2 3 3 4 7 14 10 10 7 7 Weight of hammer for first 0.5-foot drive Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 0 1 1 2 3 3 3 2 1 2 1 2 3 4 5 6 7 8 9 10 N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 2 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 10 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >35' 0' 35' N 498865.1639 E 1889771.475 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/28/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-26 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/28/16 Tracey Tapley, Geologist State Plane - North Carolina 475' 0 5 10 15 20 25 30 35 Boring Designation B-26 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-26 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 2 Water Level Data Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken 2 SOF Special Tactics Facility Ph III SHEETS HORIZONTAL VERTICALPROJECT SHEET OFFort Bragg, NC COORDINATE SYSTEM 2 State Plane NAVD88 ELEVATION TOP OF BORINGLOCATION COORDINATES DRILLING LOG (Cont Sheet) NAD83 N 498865.1639 E 1889771.475 INSTALLATION 475' Boring Designation B-26 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-26 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 2 of 2 1 3 4 6 6 3 Water Level Data 3 3 6 7 8 3 80 80 87 100 100 100 450.2 447.8 444.0 442.0 441.4 437.0 435.5 0.3 2.7 6.5 8.5 9.1 13.5 15.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; very dark brown, some organics. Pale brown, trace rootlets, no organics. CLAYEY SAND (SC), fine; brownish yellow, moist, trace rootlets, trace concretions. Fine to medium; reddish yellow. SILTY SAND (SM), fine to medium; reddish yellow, moist, trace clay. 0.1' clayey sand layer. CLAYEY SAND (SC), fine; reddish yellow, moist. SILTY SAND (SM), fine to medium; reddish yellow, moist. CLAYEY SAND (SC), very fine to fine; reddish yellow, moist, little silt. Trace silty sand layers up to 0.1'. BOTTOM OF BOREHOLE AT 15.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 4 6 10 13 14 6 1 2 3 5 3 2 1 2 3 4 5 6 7 8 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 8 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >15' 0' 15' N 498731.9663 E 1890171.688 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/28/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-28 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/28/16 Tracey Tapley, Geologist State Plane - North Carolina 450.5' 0 5 10 15 Boring Designation B-28 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-28 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 1 2 5 2 5 2 Water Level Data 0 6 5 3 6 2 80 100 87 87 93 87 457.8 456.0 451.5 443.0 0.2 2.0 6.5 15.0 ORGANICS, very dark brown, moist. SILTY SAND (SM), fine; yellow, moist, trace rootlets. CLAYEY SAND (SC), fine to medium; very pale brown, moist. Yellowish red. Reddish yellow. SILTY SAND (SM), fine to medium; reddish yellow mottled with very pale brown, moist. 0.3' thick reddish yellow sandy silt layer. Fine; reddish yellow. Fine to medium; reddish yellow mottled with very pale brown. Fine; very pale brown. Yellow. BOTTOM OF BOREHOLE AT 15.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 1 8 10 5 11 4 Weight of hammer for first 0.5-foot drive, first blow advanced 1 foot 0 2 3 1 1 2 1 2 3 4 5 6 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 6 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >15' 0' 15' N 498653.9062 E 1890019.285 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL Ed Ratliff 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-29 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/29/16 Tracey Tapley, Geologist State Plane - North Carolina 458' 0 5 10 15 Boring Designation B-29 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-29 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 0 2 1 4 3 Water Level Data 1 3 3 4 3 100 87 87 100 100 456.5 451.0 450.0 3.5 9.0 10.0 SILTY SAND (SM), fine; very dark brown, moist, few organics, trace rootlets. Yellow. CLAYEY SAND (SC), fine; reddish yellow, moist, little silt, micaceous. SILTY SAND (SM), fine to medium; yellow, moist. BOTTOM OF BOREHOLE AT 10.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. N-Value: Total blows over middle 1.0 foot of 2.0-foot driven interval, unless otherwise indicated, using a 1 3/8-inch ID splitspoon with 140-pound hammer falling 30 inches. 3. The CME 850 drilling rig utilizes an automatic trip hammer. 1 5 4 8 6 First drive advanced 1 foot 1 2 2 2 2 1 2 3 4 5 6 Reading Depth NotesDate During drilling Dry After drilling Dry 24 hours Not Taken N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 4 1/4" Hollow-Stem Auger INSTALLATION 0 6 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >10' 0' 10' N 498509.5572 E 1890118.409 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES B-30 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/29/16 Tracey Tapley, Geologist State Plane - North Carolina 460' 0 5 10 Boring Designation B-30 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation B-30 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 476.5 471.5 456.5 5.0 10.0 25.0 SILTY SAND (SM), fine to medium; dark brown, rootlets. Fine to medium; strong brown, no rootlets. POORLY GRADED SAND (SP), fine to medium; yellow. SILTY SAND (SM), fine to medium; yellowish red, moist, few clay. Moist, trace clay. Few clay. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 25'. 3. No indication of Seasonal High Water Table (SHWT). N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498906.05 E 1889709.52 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/26/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES I-01 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/26/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 481.5' 0 5 10 15 20 25 Boring Designation I-01 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation I-01 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 441.0 25.0 SILTY SAND (SM), light brown, trace rootlets. Fine to medium; moist, no rootlets, trace clay. Yellowish red. Strong brown. Pale yellowish brown, no clay. Yellowish red, trace clay. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 25'. 3. No indication of Seasonal High Water Table (SHWT). N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498832.95 E 1889876.79 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/26/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES I-02 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/26/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 466' 0 5 10 15 20 25 Boring Designation I-02 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation I-02 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 466.5 456.0 446.0 4.5 15.0 25.0 SILTY SAND (SM), dark brown. Pale brown. Strong brown. POORLY GRADED SAND (SP), fine to medium; pale brownish yellow, trace silt, trace clay. SILTY SAND (SM), fine to medium; pale yellowish red, trace clay. Fine to medium; strong brown, few clay. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 25'. 3. No indication of Seasonal High Water Table (SHWT). N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498534.34 E 1889791.3 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/26/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES I-03 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/26/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 471' 0 5 10 15 20 25 Boring Designation I-03 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation I-03 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 428.5 25.0 SILTY SAND (SM), fine to medium; brown, rootlets. Pale brown, no rootlets. Brownish yellow. Reddish yellow. Pale brown. Reddish yellow, trace clay. Pale brown, no clay. Reddish yellow, little clay. Low plasticity, some clay. Gray mottled with red. Pale gray mottled with red. White. Wet. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 25'. Place Seasonal High Water Table (SHWT) at a depth of 20.5' N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498820.56 E 1890478.97 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES I-07 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/29/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 453.5' 0 5 10 15 20 25 Boring Designation I-07 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation I-07 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 464.0 461.5 441.0 2.0 4.5 25.0 SILTY SAND (SM), fine to medium; dark brown, roots and organics. Brownish yellow, no roots. POORLY GRADED SAND (SP), brownish yellow, trace silt. SILTY SAND (SM), fine to coarse; reddish yellow, moist, little clay, few roots. Very pale brown. Mottled with gray, some clay. Fine to medium; some clay. Fine; very pale brown, no clay. Mottled with gray and red. Increased mottling. White mottled with red. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 25'. Place Seasonal High Perched Water Table (SHPWT) at a depth of 16.5' N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498637.18 E 1890493.84 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES I-08 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/27/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 466' 0 5 10 15 20 25 Boring Designation I-08 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation I-08 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 451.0 446.0 15.0 20.0 SILTY SAND (SM), fine to medium; dark brown, rootlets. Pale brown. Brownish yellow, no rootlets. Strong brown, little clay. Reddish brown. Slightly mottled with gray. Fine; stiff. FAT CLAY (CH), light gray, moist, trace fine to medium sand. BOTTOM OF BOREHOLE AT 20.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 20'. Place Seasonal High Water Table (SHWT) at a depth of 13' N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' -5' 20' N 498368.31 E 1890367.46 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/26/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES I-09 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/26/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 466' 0 5 10 15 20 Boring Designation I-09 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation I-09 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 458.5 452.5 438.5 5.0 11.0 25.0 SILTY SAND (SM), fine to medium; pale brown, rootlets. Brownish yellow, trace rootlets. No rootlets. POORLY GRADED SAND (SP), fine to medium; pale brown. Mottled with red. Reddish yellow, trace silt. SILTY SAND (SM), fine; very pale brown. Trace coarse sand. Fine; no coarse sand. White. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 25'. Place Seasonal High Water Table (SHWT) at a depth of 20' N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498463.71 E 1890258.42 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES I-10 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/27/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 463.5' 0 5 10 15 20 25 Boring Designation I-10 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation I-10 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 434.5 433.5 425.5 11.0 12.0 20.0 SILTY SAND (SM), fine to medium; dark brown, rootlets. Fine to medium; very pale brown. Reddish yellow, trace clay. Pale brown slightly mottled with red, no clay. Reddish yellow, trace clay. POORLY GRADED SAND (SP), pale brown mottled with red. SILTY SAND (SM), reddish yellow, trace clay. Pale brownish yellow. Very pale brown, very moist. Pale gray, very moist. Wet. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 20'. Place Seasonal High Water Table (SHWT) at a depth of 16' N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498939.51 E 1890326.57 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES SHWT-01 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/29/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 445.5' 0 5 10 15 20 25 Boring Designation SHWT-01 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation SHWT-01 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 449.5 446.0 435.5 11.0 14.5 25.0 SILTY SAND (SM), fine to medium; dark brown, rootlets. Pale brown, few rootlets. Brownish yellow, no rootlets. Slightly mottled with red. Yellowish red. SANDY FAT CLAY (CH), gray mottled with red. SILTY SAND (SM), fine to coarse; yellowish red, little clay. Red mottled with gray. Fine to coarse; pale brown mottled with red, trace clay. Increased mottling and seperation of fines. BOTTOM OF BOREHOLE AT 25.0 ft Notes: 1. Soils visually field classified in accordance with the Unified Soil Classification System. 2. Terminated at 25'. Place Seasonal High Water Table (SHWT) at a depth of 23' N/A 14. ELEVATION GROUND WATER SHEET --- Fort Bragg, NC DISTURBED 6. THICKNESS OF OVERBURDEN 7. DEPTH DRILLED INTO ROCK 8. TOTAL DEPTH OF BORING STARTEDVERTICAL 1. PROJECT UNDISTURBED NAVD88 2. HOLE NUMBER 18. SIGNATURE AND TITLE OF INSPECTOR CME-850 BEARING 3. DRILLING AGENCY 1 1 OF COMPLETED15. DATE BORING DEG FROM VERTICAL HORIZONTAL 3 1/4" Continuous Flight Sprial Auger INSTALLATION 0 0 0 INCLINED U.S. Army Corps of Engineers - Savannah District 4. NAME OF DRILLER 5. DIRECTION OF BORING 9. COORDINATE SYSTEM 10. SIZE AND TYPE OF BIT NAD83SOF Special Tactics Facility Ph III FY-17, LI 76514 >25' 0' 25' N 498547.9677 E 1890068.85 LOCATION COORDINATES 16. ELEVATION TOP OF BORING VERTICAL John Verrett 17. TOTAL CORE RECOVERY FOR BORING 4/29/16 SHEETSDRILLING LOG 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES SHWT-02 DIVISION 11. MANUFACTURER'S DESIGNATION OF DRILL South Atlantic Division See Remarks 4/29/16 Forpu Njikam, Geotechnical Engineer State Plane - North Carolina 460.5' 0 5 10 15 20 25 Boring Designation SHWT-02 FEB 08 % RECELEV LEGENDDEPTH SAS FORM 1836-A FIELD CLASSIFICATION OF MATERIALS (Description)N-ValueBoring Designation SHWT-02 REMARKS Blows/0.5 ftSamp No.RQD%SHEET 1 of 1 Normalized Soil Behavior Types - Robertson & Campanella (1990) 14 Electronic Filename: B-03.cpt Depth (ft) 0 5 10 15 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 468.5 15.3 ftProbe ID/Net Area Ratio: Apr. 29, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498379.457 1890444.898 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent (N1)60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 465 460 455 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-03 Electronic Filename: B-06.cpt Depth (ft) 0 5 10 15 20 25 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 465.5 25.3 ftProbe ID/Net Area Ratio: Apr. 27, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DSG1071 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498533.719 1890319.135 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 465 460 455 450 445 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-06 Electronic Filename: B-09.cpt Depth (ft) 0 5 10 15 20 25 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 457.0 25.1 ftProbe ID/Net Area Ratio: Apr. 27, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DSG1071 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498653.287 1890284.441 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 455 450 445 440 435 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-09 Electronic Filename: B-10.cpt Depth (ft) 0 5 10 15 20 25 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 449.0 25.1 ftProbe ID/Net Area Ratio: Apr. 27, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DSG1071 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498777.192 1890332.764 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 445 440 435 430 425 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >> >>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-10 Electronic Filename: B-13.cpt Depth (ft) 0 5 10 15 20 25 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 451.0 25.1 ftProbe ID/Net Area Ratio: Apr. 28, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498881.891 1890171.068 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 450 445 440 435 430 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-13 Electronic Filename: B-15.cpt Depth (ft) 0 5 10 15 20 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 453.0 24.9 ftProbe ID/Net Area Ratio: Apr. 28, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DSG1071 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498922.16 1890083.096 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 450 445 440 435 430 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< Cone Penetration Test B-15 Electronic Filename: B-17.cpt Depth (ft) 0 5 10 15 20 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 460.0 24.9 ftProbe ID/Net Area Ratio: Apr. 28, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DSG1071 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 499003.318 1889966.006 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 460 455 450 445 440 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< Cone Penetration Test B-17 Electronic Filename: B-19.cpt Depth (ft) 0 5 10 15 20 25 30 35 40 45 50 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 487.0 51.2 ftProbe ID/Net Area Ratio: Apr. 28, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498832.329 1889629.604 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 485 480 475 470 465 460 455 450 445 440 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> Cone Penetration Test B-19 Electronic Filename: B-20.cpt Depth (ft) 0 5 10 15 20 25 30 35 40 45 50 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 481.0 39.6 50.0 ftProbe ID/Net Area Ratio: Apr. 28, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498712.141 1889646.332 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 480 475 470 465 460 455 450 445 440 435 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-20 Electronic Filename: B-23.cpt Depth (ft) 0 5 10 15 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 463.0 15.1 ftProbe ID/Net Area Ratio: Apr. 29, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498512.035 1889861.306 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent (N1)60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 460 455 450 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-23 Electronic Filename: B-24.cpt Depth (ft) 0 5 10 15 20 25 30 35 40 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 472.5 30.56 40.0 ftProbe ID/Net Area Ratio: Apr. 29, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498572.749 1889768.997 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 470 465 460 455 450 445 440 435 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-24 Electronic Filename: B-27.cpt Depth (ft) 0 5 10 15 20 25 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 465.0 25.1 ftProbe ID/Net Area Ratio: Apr. 28, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498731.347 1889876.175 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Elev (ft) 465 460 455 450 445 440 Tip Resistance qt(tsf) 80 160 240 320 Friction Ratio Rf(%) 2 4 6 8 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test B-27 Electronic Filename: CPT-01.cpt Depth (ft) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 471.5 30.32 84.3 ftProbe ID/Net Area Ratio: Apr. 28, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498754.889 1889796.256 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Shear Wave Velocity Vs(ft/sec) 800 1600 2400 3200 Elev (ft) 470 465 460 455 450 445 440 435 430 425 420 415 410 405 400 395 390 Tip Resistance qt(tsf) 80 160 240 320 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >>>>>> >>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Cone Penetration Test CPT-01 >> Electronic Filename: CPT-02.cpt Depth (ft) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 Page 1 of 1 Project No: 76514, FY17 SOF Special Tactics Facility Fort Bragg, NC Elevation: Water Depth: Total Depth: 474.5 41.16 85.8 ftProbe ID/Net Area Ratio: Apr. 29, 2016 Riehl USACE, Savannah District Date: Operator: Drilling Agency:DDG1117 / 0.8 CPT REPORT - DYNAMIC BOTTOM LEGEND SOF STF 2016.GPJ USACE WITH RAPID CPT 2012_09_01.GDT 8/4/16Northing: Easting: 498465.571 1891329.578 1 - sensitive fine-grained 2 - organic soil: clays, peats 3 - clays: clay to silty clay 4 - silt mixtures: clayey silt & silty clay 5 - sand mixtures: silty sand to sandy silt 6 - sands: clean sands to silty sands 7 - dense sand to gravelly sand 8 - stiff sand to clayey sand (*) 9 - stiff fine-grained (*) 1 10 100 Equivalent N60 -60 80 220 360 Pore Pressure u2(psi) -60 80 220 360 u0 Shear Wave Velocity Vs(ft/sec) 800 1600 2400 3200 Elev (ft) 470 465 460 455 450 445 440 435 430 425 420 415 410 405 400 395 390 Tip Resistance qt(tsf) 80 160 240 320 Sleeve Friction fs(tsf) 1 2 3 4 1 2 3 4 5 6 7 8 SBT Fr Normalized MAI = 1 (1990) 2418126qt(tsf) >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>> >>>>>>>>>>>>>>>>>>>> Cone Penetration Test CPT-02 APPENDIX C Soil Laboratory Test Results PROJECT:  SOF Special Tactics Facility Phase III                  LOCATION: Fort Bragg, North Carolina21‐Jun‐16REQUISITION NO: W33SJG60623206              WORK ORDER: 981eD2216LAB Hole Sample Depth 1 in 3/4 in 1/2 in 3/8 in No.4 No.10 No.20 No.40 No.60 No.100 No.140 No 200 LL PL PI MC% Color Class.Number Number Number (ft)%%%%%%%%%%%%K6/6336 B‐01 3 3.5 to 5.0 100 99.6 93.7 65.1 33.1 15.2 9.1 6.1 3.4Brownish YellowSP‐SMPoorly Graded Silty Sand (SP‐SM).K6/6337 B‐01 5 8.5 to 10.0 100 100 99.4 89.3 23.8 10.5 9.4 8.6 5.4Reddish YellowSP‐SMPoorly Graded Silty Sand (SP‐SM).K6/6338 B‐02 3 3.5 to 8.0 100 99.9 96.4 66.7 27.9 8.3 3.7 2.3 3.5Brownish YellowSPPoorly Graded Sand (SP).K6/6339 B‐02 4 6.5 to 7.8 100 91.1 91.1 91.1 90.9 90.2 85.2 60.4 30.6 12.3 7.4 4.7 4 Pale Brown SPPoorly Graded Sand (SP), with a trace of gravel.K6/6340 B‐05 2 2.0 to 3.5 100 99.9 96.2 72.7 44.8 26.6 20.7 17 20 17 3 8.3Strong BrownSM Silty Sand (SM).K6/6341 B‐05 4 6.5 to 8.0 100 99.9 98.2 85.2 51.7 26.3 19.1 15 22 19 3 8.4Yellowish BrownSM Silty Sand (SM).K6/6342 B‐05 5 8.5 to 10.0 100 99.1 98.7 97.3 87 61.3 31.6 14.9 10.1 7.6 19 17 2 5.3Reddish Yellow & Light BrownSP‐SMPoorly Graded Silty Sand (SP‐SM), with a trace of gravel.K6/6343 B‐11 2 2.0 to 3.5 100 99.8 96.3 74.4 42.8 22.6 16 13.3 23 18 5 8.9 Light Brown SC‐SMClayey Silty Sand (SC‐SM).K6/6344 B‐11 5 8.5 to 10.0 100 98.8 97.9 97 91.4 70.3 49.6 35.8 28.5 22.4 28 19 9 10.4 Red SCClayey Sand (SC), with a trace of gravel.K6/6345 B‐12 2 2.0 to 3.5 100 98.8 84.7 64.4 49 38.1 33.5 31.8 30.3 35 20 15 14.7Strong BrownSCClayey Sand (SC), with a trace of gravel.K6/6346 B‐16 3 3.5 to 5.0 100 99.9 92.9 63.3 36.4 16.8 8.9 5 4.8Reddish YellowSPPoorly Graded Sand (SP).K6/6347 B‐16 5 8.5 to 10.0 100 99.7 89.7 47.4 23.8 12.1 6.6 3.3 3.2 Light Brown SPPoorly Graded Sand (SP).K6/6348 B‐18 5 8.5 to 10.0 100 100 96.4 62.7 31.5 12.2 6.5 4.3 4.4Yellowish RedSPPoorly Graded Sand (SP).K6/6349 B‐21 5 8.5 to 10.0 100 99.9 97 75.8 39.9 15.1 7.1 3.5 3.2 Light Brown SPPoorly Graded Sand (SP).K6/6350 B‐25 6 13.5 to 15.0 100 100 99.6 91 57.5 22.9 11.2 7.1 5.5Reddish YellowSP‐SMPoorly Graded Silty Sand (SP‐SM).K6/6351 B‐25 8 23.5 to 25.0 100 100 99 82.3 51.4 24.8 12.2 5.8 4.7Reddish YellowSP‐SMPoorly Graded Silty Sand (SP‐SM).US Army Corps of Engineers ‐Materials Testing Regional Technical Center of Expertise ‐ Marietta, GA 30062ASTM D422 Percent Passing D4318 Atterberg LimitsASTM D2487 Unified Soil Classification SystemSUMMARY OF MATERIAL PROPERTIES 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 3.4 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-01 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 3 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-01PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 3.5 to 5.0 6 Brownish Yellow, Poorly Graded Silty Sand (SP-SM). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6336 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 5.4 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-01 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 5 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-01PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 8.5 to 10.0 6 Reddish Yellow, Poorly Graded Silty Sand (SP-SM). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6337 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 3.5 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-02 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 3 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-02PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 3.5 to 8.0 6 Brownish Yellow, Poorly Graded Sand (SP). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6338 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 4.0 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-02 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 4 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-02PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 6.5 to 7.8 6 Pale Brown, Poorly Graded Sand (SP), with a trace of gravel. Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6339 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 8.3 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-05 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM 17 SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 2 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-05PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 3 6/21/16 2.0 to 3.5 6 Strong Brown, Silty Sand (SM). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 20 0.5 16 K6/6340 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 8.4 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-05 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM 19 SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 4 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-05PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 3 6/21/16 6.5 to 8.0 6 Yellowish Brown, Silty Sand (SM). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 22 0.5 16 K6/6341 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 5.3 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-05 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM 17 SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 5 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-05PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 2 6/21/16 8.5 to 10.0 6 Reddish Yellow & Light Brown, Poorly Graded Silty Sand (SP-SM), with a trace of gravel. Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 19 0.5 16 K6/6342 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 8.9 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-11 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM 18 SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 2 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-11PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 5 6/21/16 2.0 to 3.5 6 Light Brown, Clayey Silty Sand (SC-SM). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 23 0.5 16 K6/6343 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 10.4 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-11 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM 19 SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 5 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-11PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 9 6/21/16 8.5 to 10.0 6 Red, Clayey Sand (SC), with a trace of gravel. Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 28 0.5 16 K6/6344 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 14.7 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-12 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM 20 SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 2 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-12PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 15 6/21/16 2.0 to 3.5 6 Strong Brown, Clayey Sand (SC), with a trace of gravel. Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 35 0.5 16 K6/6345 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 4.8 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-16 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 3 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-16PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 3.5 to 5.0 6 Reddish Yellow, Poorly Graded Sand (SP). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6346 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 3.2 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-16 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 5 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-16PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 8.5 to 10.0 6 Light Brown, Poorly Graded Sand (SP). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6347 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 4.4 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-18 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 5 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-18PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 8.5 to 10.0 6 Yellowish Red, Poorly Graded Sand (SP). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6348 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 3.2 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-21 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 5 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-21PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 8.5 to 10.0 6 Light Brown, Poorly Graded Sand (SP). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6349 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 5.5 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-25 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 6 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-25PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 13.5 to 15.0 6 Reddish Yellow, Poorly Graded Silty Sand (SP-SM). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6350 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.1110100 30 4.7 HYDROMETER 20 100 GRAIN SIZE IN MILLIMETERS 10 B-25 COBBLES FINE 100 140 200 Depth (ft)Classification DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT U.S. STANDARD SIEVE NUMBERS WORK ORDER: 981e SOF Special Tactics Facility Phase IIIASTM D2487 3/8 3 4 0.05 0.005 8 U.S. STANDARD SIEVE OPENING IN INCHES MEDIUM SAND COARSE 6 14 Hole No. Soil Testing Fort Bragg, North Carolina GRAVEL 8 500 50 5 REQUISITION: W33SJG60623206 PL PERCENT COARSER BY WEIGHT4 GRADATION CURVES CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062 0 10 20 30 40 50 60 70 80 90 B-25PERCENT FINER BY WEIGHTSample No. Date FINE COARSE SILT OR CLAY 6/21/16 23.5 to 25.0 6 Reddish Yellow, Poorly Graded Silty Sand (SP-SM). Nat w% 40 50 70321.5 1 3/4 1/2 PI ProjectLL Lab No. 0.5 16 K6/6351 Other tests, when reported, were conducted in general accordance with ASTM's D422, D854, D2216, D2487 & D4318. APPENDIX D Soil Percolation and Permeability Test Results SOF Special Tactics Facility Ph. IIILI 76514 FY17Fort Bragg, NC (Aberdeen Training Facility)Tests I-1, 1-2, 1-3, and I-9 were performed by Forpu Njikam during the period spanning 26 to 27 April 2016Tests I-5, I-6, I-7, I-8, I-10, I-11, and I-12 were performed by Forpu Njikam during the period spanning 29 to 30 April 2016Soil percolation tests were performed in accordance with DM 110-1-1, Jul 83, chapter 20.Weather Conditions were 85 - 90F with clear skies on the testing dates during this period (26 to 30 April 2016)Various lengths of slotted pvc pipe screens were placed in each hole to minimize difficulties associated with hole cave-in, and2 - 3" of pea gravel was placed in the bottom of the holes before water was added. Water levels were measured by a water level indicator with reference point on the inserted slotted pipe screen.A minimum 6" water column above gravel was used as the initial height of water, subsequently recharged tothis level after each reading as necessary. All times were noted by digital watch and stop watch.The Michigan method is used to estimate infiltration rates from percolation rates.The infiltration rate to use for the design of affected ponds and bioswales is in bold print.A 25-ft. auger boring was advanced to a depth of 25 feet within the proposed footprint of each of the detention ponds, or a 25-ft companionboring was advanced within 5 feet of the test holes where bioswales are proposed; in order to determine the Seasonal High Water Table . The soil profiles observed in the SHWT determination auger borings and companion borings correlate with the profiles observed inthe corresponding test holes to corresponding depths. Percolation Test #I-1Percolation test hole: 8" diameter x 208.8" (17.4') deepStart and End TimesElapsed initial reading final readingtime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)1334 - 133441018.5519.656.6079.203.25 24.371345 - 13551017.9019.6510.50 126.004.23 29.821355 - 14051018.2019.658.70104.403.78 27.661405 - 14201518.0019.656.6079.204.08 19.441420 - 1425517.9019.6521.00 252.004.2359.64Percolation Test # I-2Percolation test hole:3.5" diameter x 31.2" (2.6') deepStart and End TimesElapsed initial reading final readingtime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)1310 - 131552.003.6519.80 237.607.82 30.371318 - 132021.803.6555.50 666.008.51 78.271322 - 132531.703.6539.00 468.008.85 52.87Percolation Test # I-3Percolation test hole: 8" diameter x 84" (7.0') deepStart and End TimesElapsed initial reading final readingtime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)0925 - 0955308.509.151.3015.602.58 6.060955 - 100058.359.159.60115.202.80 41.141000 - 100558.459.158.40100.802.65 38.04Soil profile matches companion boring I-01 augered to 25', SHWT at this location estimated at a depth in excess of 25'Soil profile matches companion boring I-02 augered to 25', SHWT at this location estimated at a depth in excess of 25'*** 52.87 in/hr is high, recommend a conservative assumption of 15.00 in/hr (roughly 6-in drop in 10 min.) ***Soil profile matches companion boring I-03 augered to 25', SHWT at this location estimated at a depth in excess of 25'*** 38.04 in/hr is high, recommend a conservative assumption of 15.00 in/hr (roughly 6-in drop in 10 min.) ***percolation rateInfiltration ratepercolation rateInfiltration ratepercolation rateInfiltration rate*** 59.64 in/hr is high, recommend a conservative assumption of 15.00 in/hr (roughly 6-in drop in 10 min.) *** Percolation Test # I-5Percolation test hole: 3" diameter x 15.6" (1.3') deepStart and End TimesElapsed initial reading final readingtime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)0833 - 0843101.402.033.7845.365.68 7.990920 - 092221.252.0323.40 280.806.28 44.710922 - 092531.152.0317.60 211.206.68 31.620925 - 092941.102.0313.95 167.406.88 24.330929 - 093341.052.0314.70 176.407.08 24.92Percolation Test # I-6Percolation test hole: 3" diameter x 22.2" (1.85') deepStart and End TimesElapsed initial reading final readingtime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)0830 - 083550.802.0515.00 180.008.00 22.500837 - 084141.202.0512.75 153.006.40 23.910847 - 085031.202.0517.00 204.006.40 31.880850 - 085331.102.0519.00 228.006.80 33.530853 - 085631.102.0519.00 228.006.80 33.53Percolation Test # I-7Percolation test hole: 3" diameter x 20.4" (1.7') deepStart and End Times Elapsed initial reading final reading percolation rateInfiltration ratetime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)0826 - 0836 100.501.747.4489.28 8.60 10.380836 - 0846 100.801.645.0460.48 7.80 7.750846 - 0856 100.701.605.4064.80 8.36 7.750856 - 0906 100.701.374.0248.24 9.28 5.200906 - 0916 100.701.374.0248.24 9.285.20Soil profile matches companion boring SHWT-01 augered to 20', SHWT at this location estimated at a depth of 16'Soil profile matches companion boring SHWT-01 augered to 20', SHWT at this location estimated at a depth of 16'*** 24.92 in/hr is high, recommend a conservative assumption of 15.00 in/hr (roughly 6-in drop in 10 min.) ****** 33.53 in/hr is high, recommend a conservative assumption of 15.00 in/hr (roughly 6-in drop in 10 min.) ***Soil profile matches companion boring I-07 augered to 25', SHWT at this location estimated at a depth of 20.5' percolation rateInfiltration ratepercolation rateInfiltration rate Percolation Test # I-8Percolation test hole: 3" diameter x 14.4" (1.2') deepStart and End Times Elapsed initial reading final reading percolation rate Infiltration ratetime (min.from top of riser, ft from top of riser, ft ft/hr in/hr Rf Inf rate (in/hr)1037 - 1039 2.00 0.90 1.55 19.50 234.00 5.60 41.791039 - 1044 5.00 0.70 1.55 10.20 122.40 6.40 19.131044 - 1048 4.00 0.70 1.55 12.75 153.00 6.40 23.911048 - 1054 6.00 0.70 1.55 8.50 102.00 6.40 15.941054 - 1101 7.00 0.70 1.55 7.29 87.43 6.4013.66Percolation Test # I-9Percolation test hole: 8" diameter x 43.2" (3.6') deepStart and End Times Elapsed initial reading final reading percolation rate Infiltration ratetime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)0913 - 0943 303.406.355.9070.80 0.84 84.790943 - 1013 303.503.700.404.80 4.66 1.031013 - 1043 303.703.970.546.48 3.96 1.641043 - 1113 303.974.050.161.92 3.43 0.561113 - 1143 304.054.120.141.68 3.210.52Percolation Test # I-10Percolation test hole: 3" diameter x 31.2" (2.6') deepStart and End Times Elapsed initial reading final reading percolation rateInfiltration ratetime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)1127 - 1129 23.654.6730.60 367.20 7.32 50.161130 - 1132 23.004.6750.10 601.20 9.92 60.601132 - 1135 33.004.6733.40 400.80 9.92 40.401135 - 1139 43.004.6725.05 300.60 9.92 30.301139 - 1141 23.704.6729.10 349.20 7.12 49.04*** 49.04 in/hr is high, recommend a conservative assumption of 15.00 in/hr (roughly 6-in drop in 10 min.) ***Soil profile matches companion boring I-09 augered to 20', SHWT at this location estimated at a depth of 13' (perched WT)Soil profile matches companion boring I-10 augered to 25', SHWT at this location estimated at a depth of 20' Soil profile matches companion boring I-08 augered to 25', SHWT at this location estimated at a depth of 16.5' Percolation Test # I-11Percolation test hole: 3" diameter x 15.6" (1.3') deepStart and End Times Elapsed initial reading final reading percolation rate Infiltration ratetime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)0942 - 0945 30.831.3510.40 124.80 4.68 26.670946 - 0951 50.651.358.40100.80 5.40 18.670951 - 0957 40.601.3511.25 135.00 5.60 24.110957 - 1004 70.501.357.2987.43 6.00 14.571004 - 1011 70.801.354.7156.57 4.8011.79Percolation Test # I-12Percolation test hole: 3" diameter x 15.6" (1.3') deepStart and End Times Elapsed initial reading final reading percolation rateInfiltration ratetime (min.)from top of riser, ft from top of riser, ft ft/hrin/hr Rf Inf rate (in/hr)1015 - 1018 30.831.3510.40 124.80 5.08 24.571018 - 1020 20.501.3525.50 306.00 6.40 47.811020 - 1022 20.501.3525.50 306.00 6.40 47.811022 - 1024 20.501.3525.50 306.00 6.40 47.811024 - 1027 30.501.3517.00 204.00 6.40 31.88Soil profile matches companion boring SHWT-02 augered to 25', SHWT at this location estimated at a depth of 23'*** 31.88 in/hr is high, recommend a conservative assumption of 15.00 in/hr (roughly 6-in drop in 10 min.) ***Soil profile matches companion boring SHWT-02 augered to 25', SHWT at this location estimated at a depth of 23' APPENDIX E US Department of Agriculture Soil Resource Report United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Hoke County, North Carolina SOF STF Ph III Natural Resources Conservation Service August 6, 2016 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/portal/ nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (http:// offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means 2 for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................7 Soil Map................................................................................................................8 Legend..................................................................................................................9 Map Unit Legend................................................................................................10 Map Unit Descriptions........................................................................................10 Hoke County, North Carolina..........................................................................12 CaB—Candor sand, 1 to 8 percent slopes..................................................12 CaD—Candor sand, 8 to 15 percent slopes................................................13 VaB—Vaucluse loamy sand, 2 to 8 percent slopes....................................14 References............................................................................................................16 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the 5 individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil- landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 6 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 7 8 Custom Soil Resource Report Soil Map 38873203887390388746038875303887600388767038877403887320388739038874603887530388760038876703887740648500 648570 648640 648710 648780 648850 648920 648990 649060 649130 649200 648500 648570 648640 648710 648780 648850 648920 648990 649060 649130 649200 35° 7' 18'' N 79° 22' 13'' W35° 7' 18'' N79° 21' 45'' W35° 7' 2'' N 79° 22' 13'' W35° 7' 2'' N 79° 21' 45'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 150 300 600 900 Feet 0 45 90 180 270 Meters Map Scale: 1:3,300 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hoke County, North Carolina Survey Area Data: Version 12, Sep 24, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Apr 2, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 9 Map Unit Legend Hoke County, North Carolina (NC093) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CaB Candor sand, 1 to 8 percent slopes 11.3 62.2% CaD Candor sand, 8 to 15 percent slopes 6.5 36.0% VaB Vaucluse loamy sand, 2 to 8 percent slopes 0.3 1.9% Totals for Area of Interest 18.1 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments Custom Soil Resource Report 10 on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha- Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 11 Hoke County, North Carolina CaB—Candor sand, 1 to 8 percent slopes Map Unit Setting National map unit symbol: w75q Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Candor and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Candor Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and loamy marine deposits and/or eolian sands Typical profile A - 0 to 8 inches: sand E - 8 to 26 inches: sand Bt - 26 to 38 inches: loamy sand E' - 38 to 62 inches: sand B't - 62 to 80 inches: sandy clay loam Properties and qualities Slope: 1 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: Dry Sandy Upland Woodland (F137XY001GA) Custom Soil Resource Report 12 CaD—Candor sand, 8 to 15 percent slopes Map Unit Setting National map unit symbol: w75r Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Candor and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Candor Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Backslope Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and loamy marine deposits and/or eolian sands Typical profile A - 0 to 8 inches: sand E - 8 to 26 inches: sand Bt - 26 to 38 inches: loamy sand E' - 38 to 62 inches: sand B't - 62 to 80 inches: sandy clay loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: Dry Sandy Backslope Woodland - PROVISIONAL (F137XY004GA) Custom Soil Resource Report 13 VaB—Vaucluse loamy sand, 2 to 8 percent slopes Map Unit Setting National map unit symbol: w779 Elevation: 80 to 660 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Farmland of statewide importance Map Unit Composition Vaucluse and similar soils: 80 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vaucluse Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy and sandy marine deposits Typical profile Ap - 0 to 6 inches: loamy sand E - 6 to 15 inches: loamy sand Bt - 15 to 29 inches: sandy clay loam Btx - 29 to 58 inches: sandy clay loam BC - 58 to 80 inches: sandy loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 15 to 35 inches to fragipan Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: C Ecological site: Loamy Summit Woodland - PROVISIONAL (F137XY002GA) Custom Soil Resource Report 14 Minor Components Bibb, undrained Percent of map unit: 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down-slope shape: Concave Across-slope shape: Linear Johnston, undrained Percent of map unit: 2 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Linear Custom Soil Resource Report 15 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http://www.nrcs.usda.gov/wps/ portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 16 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 17 APPENDIX F One-Point and Two-Point Compaction Method PROCEDURE: 1. Point A is the result of a one-point compaction test on material from field density test. This point must be on the dry side of optimum water content. 2. Point O is the estimated optimum water content and maximum density of the fill material based on a projection of point A approximately parallel to the adjacent compaction curves. 3. Point A must plot within 3 percent of the line of optimums. Figure 1. Illustration of one-point compaction method. PROCEDURE: 1. Points A and B are results of a two-point compaction test on material from field density test. Points A and B must be on the dry side of optimum water content. 2. The estimated compaction curve based on Points A and B establishes Point O on the locus, which is the estimated maximum dry density and optimum water content of the fill material. 3. One point must plot within 3 percent of the line of optimums. Figure 2. Illustration of two-point compaction method. SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.8 - APPENDIX H NCDEQ BIORETENTION CELL SUPPLEMENT FORMS Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 1 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 3.63 acres Area 0 sf Area 158,071 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 10,418 cf Predevelopment Open Area Developed Open Area Area 5.94 acres Area 2.31 acres Area 258,605 sf Area 100,534 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 5.94 acres Area 5.94 acres Total 0 cf Total 10,418 cf Storage Required 10,418 cf Surface Area 13,572 sf Riser 10 in Storage Provided 11,310 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 2 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 1.22 acres Area 0 sf Area 52,862 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 3,484 cf Predevelopment Open Area Developed Open Area Area 1.72 acres Area 0.5 acres Area 75,048 sf Area 22,186 sf CN 30 CN 49 S 23.33 S 10.41 ia 4.67 in ia 2.08 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 1.72 acres Area 1.72 acres Total 0 cf Total 3,484 cf Storage Required 3,484 cf Surface Area 5,078 sf Riser 9 in Storage Provided 3,809 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 3 Date:1/10/2019 Soil Group:D Predevelopment BUA Developed BUA Area 0.48 acres Area 0.67 acres Area 20,909 sf Area 29,185 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 1,378 cf V 1,924 cf Predevelopment Open Area Developed Open Area Area 0.53 acres Area 0.34 acres Area 23,087 sf Area 14,810 sf CN 77 CN 80 S 2.99 S 2.50 ia 0.60 in ia 0.50 in P 1 in P 1 in Q 0.05 in Q 0.08 in V 92 cf V 103 cf Area 1.01 acres Area 1.01 acres Total 1,470 cf Total 2,026 cf Storage Required 556 cf Surface Area 1,912 sf Riser 12 in Storage Provided 1,912 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 4 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 0.33 acres Area 0 sf Area 14,813 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 976 cf Predevelopment Open Area Developed Open Area Area 0.38 acres Area 0.05 acres Area 16,553 sf Area 1,740 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.38 acres Area 0.38 acres Total 0 cf Total 976 cf Storage Required 976 cf Surface Area 2,040 sf Riser 6 in Storage Provided 1,020 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 5 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 0.33 acres Area 0 sf Area 14,221 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 937 cf Predevelopment Open Area Developed Open Area Area 0.4 acres Area 0.07 acres Area 17,417 sf Area 3,196 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.4 acres Area 0.4 acres Total 0 cf Total 937 cf Storage Required 937 cf Surface Area 2,040 sf Riser 6 in Storage Provided 1,020 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 6 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 0.25 acres Area 0 sf Area 10,534 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 694 cf Predevelopment Open Area Developed Open Area Area 0.3 acres Area 0.05 acres Area 12,860 sf Area 2,326 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.3 acres Area 0.3 acres Total 0 cf Total 694 cf Storage Required 694 cf Surface Area 1,925 sf Riser 6 in Storage Provided 963 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 7 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 0.34 acres Area 0 sf Area 14,555 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 959 cf Predevelopment Open Area Developed Open Area Area 0.39 acres Area 0.05 acres Area 16,881 sf Area 2,326 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.39 acres Area 0.39 acres Total 0 cf Total 959 cf Storage Required 959 cf Surface Area 1,925 sf Riser 6 in Storage Provided 963 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 8 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 0.24 acres Area 0 sf Area 10,534 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 694 cf Predevelopment Open Area Developed Open Area Area 0.30 acres Area 0.05 acres Area 12,860 sf Area 2,326 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.30 acres Area 0.30 acres Total 0 cf Total 694 cf Storage Required 694 cf Surface Area 1,925 sf Riser 6 in Storage Provided 963 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 9 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 0.24 acres Area 0 sf Area 10,534 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 694 cf Predevelopment Open Area Developed Open Area Area 0.30 acres Area 0.05 acres Area 12,860 sf Area 2,326 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.30 acres Area 0.30 acres Total 0 cf Total 694 cf Storage Required 694 cf Surface Area 1,925 sf Riser 6 in Storage Provided 963 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 10 Date:1/10/2019 Soil Group:A Predevelopment BUA Developed BUA Area 0 acres Area 0.25 acres Area 0 sf Area 11,026 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 727 cf Predevelopment Open Area Developed Open Area Area 0.33 acres Area 0.08 acres Area 14,375 sf Area 3,349 sf CN 30 CN 39 S 23.33 S 15.64 ia 4.67 in ia 3.13 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.33 acres Area 0.33 acres Total 0 cf Total 727 cf Storage Required 727 cf Surface Area 2,040 sf Riser 6 in Storage Provided 1,020 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Discrete SCS Curve Number Method (NCDEQ Stormwater BMP Manual 3.3.2) Location:Bioretention Area 11 Date:1/10/2019 Soil Group:B Predevelopment BUA Developed BUA Area 0 acres Area 0.33 acres Area 0 sf Area 14,375 sf CN 98 CN 98 S 0.20 S 0.20 ia 0.04 in ia 0.04 in P 1 in P 1 in Q 0.79 in Q 0.79 in V 0 cf V 947 cf Predevelopment Open Area Developed Open Area Area 0.39 acres Area 0.06 acres Area 16,998 sf Area 2,623 sf CN 55 CN 61 S 8.18 S 6.39 ia 1.64 in ia 1.28 in P 1 in P 1 in Q 0.00 in Q 0.00 in V 0 cf V 0 cf Area 0.39 acres Area 0.39 acres Total 0 cf Total 947 cf Storage Required 947 cf Surface Area 2,040 sf Riser 6 in Storage Provided 1,020 cf Note: Runnoff depth for CN <= 70 set to 0.00 for 1.0" rainfall event based upon TR55 Urban Hydrology for Small Watersheds Table 2-1 Quantity Infiltration System Bioretention Cell 11 Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader-Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Applicant: Name and Title: Organization: Street address: City, State, Zip: Phone number(s): Email: Designer Certification Statement: Signature of Designer Date Please indicate the types, quantities and locations of SCMs that will be used on this project: mike.mayer@masonandhanger.com Phone number(s): F Michael Mayer Mason & Hanger 300 W Vine St Suite 1300 Lexington, KY 40507 859-280-3557 SUPPLEMENT-EZ FORM COVER PAGE Seal violations as well as a report being made to my professional board. - that the information provided in the form is, to the best of my knowledge - that the engineering plans, specifications, operation and maintenance the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing and belief, true, accurate, and complete; and agreements and other supporting information are consistent with I certify, under penalty of law: that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; Designer information for this project: Location(s) Project Name: Address City / Town Fort Bragg DPW Lee Ward SOF Complex Phase 3 Fort Bragg Email: Bldg 3-1333 Butner Rd Fort Bragg. NC 28310 Company: Contact: Mailing Address: City, State, Zip: Cover Page 1 1:31 PM 11/21/2018 BIORETENTION CELL1Drainage area number1Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)82704 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)3400 sfTotal drainage area (sq ft)258605 sf - Roof (sq ft)71967 sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)158071 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area61%Total BUA (sq ft)158071 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)10418 cfDesign volume of SCM (cu ft)11310 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)428 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)442 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)14 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)13572 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)11310 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)10 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?Yes#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)14.4 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)444 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)447 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.5 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.SOF Complex Phase 3Bioretention110:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 32Drainage area number2Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)26397 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)1400 sfTotal drainage area (sq ft)75048 sf - Roof (sq ft)25065 sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)52862 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area70%Total BUA (sq ft)52862 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)3484 cfDesign volume of SCM (cu ft)3809 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)431 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)442 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)12 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)5078 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)3809 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)9 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)5.2 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)448 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)452 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 5.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.GENERAL MDC FROM 02H .1050Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONBioretention210:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 33Drainage area number3Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft) sfTotal surface water area (sq ft) sf - Sidewalk (sq ft) sfTotal drainage area (sq ft)43998 sf - Roof (sq ft) sfBUA associated with existing development (sq ft)20909 sf - Roadway (sq ft)29185 sfProposed new BUA (sq ft)8276 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area66%Total BUA (sq ft)29185 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)556 cfDesign volume of SCM (cu ft)1912 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)453 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)455 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)2 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)1912 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)1912 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)12 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in)na #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in)na#4 Infiltration rate of the in situ soil (inch/hour).5 in/hr#4 Diameter of the underdrain pipes (if applicable)8 in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)458 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)461 ft #12 How many clean out pipes are being installed?5#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMMinimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are required as infiltration rate less than 2in/hr. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Stormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Bioretention310:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 34Drainage area number4Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)14513 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)300 sfTotal drainage area (sq ft)16509 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)14813 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area90%Total BUA (sq ft)14813 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)976 cfDesign volume of SCM (cu ft)1020 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)435 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)455 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)20 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)2040 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)1020 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)15.0 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)457 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)460 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Bioretention410:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 35Drainage area number5Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)14221 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft) sfTotal drainage area (sq ft)17417 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)14221 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area82%Total BUA (sq ft)14221 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)937 cfDesign volume of SCM (cu ft)1020 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)435 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)456 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)21 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)2040 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)1020 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)15.0 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)458 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)461 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREAEISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):BIORETENTION CELL MDC FROM 02H .1052ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Bioretention510:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 36Drainage area number6Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)10234 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)300 sfTotal drainage area (sq ft)12860 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)10534 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area82%Total BUA (sq ft)10534 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)694 cfDesign volume of SCM (cu ft)963 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)435 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)455 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)20 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)1925 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)963 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)15.0 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)457 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)460 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inCOMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Break down of BUA in the drainage area (both new and existing):THE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Bioretention610:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 37Drainage area number7Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)14555 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft) sfTotal drainage area (sq ft)16881 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)14555 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area86%Total BUA (sq ft)14555 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)959 cfDesign volume of SCM (cu ft)963 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)436 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)456 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)20 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)1925 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)963 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)15.0 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)458 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)461 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inBreak down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGTHE DRAINAGE AREAPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.GENERAL MDC FROM 02H .1050Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONBIORETENTION CELL MDC FROM 02H .1052Bioretention710:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 38Drainage area number8Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)10234 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)300 sfTotal drainage area (sq ft)12860 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)10534 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area82%Total BUA (sq ft)10534 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)694 cfDesign volume of SCM (cu ft)963 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)435 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)455 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)20 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)1925 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)963 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)15.0 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)457 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)460 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inBreak down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMTHE DRAINAGE AREAMinimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Stormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.BIORETENTION CELL MDC FROM 02H .1052Bioretention810:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 39Drainage area number9Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)10234 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)300 sfTotal drainage area (sq ft)12860 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)10534 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area82%Total BUA (sq ft)10534 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)694 cfDesign volume of SCM (cu ft)963 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)436 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)456 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)20 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)1925 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)963 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)15.0 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)458 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)461 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Bioretention910:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 310Drainage area number10Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)10726 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)300 sfTotal drainage area (sq ft)14375 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)11026 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area77%Total BUA (sq ft)11026 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)727 cfDesign volume of SCM (cu ft)1020 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)435 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)455 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)20 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)2040 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)1020 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)15.0 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)457 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)460 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Bioretention1010:28 AM 1/10/2019 BIORETENTION CELLSOF Complex Phase 311Drainage area number11Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft)14075 sfTotal surface water area (sq ft) sf - Sidewalk (sq ft)300 sfTotal drainage area (sq ft)16988 sf - Roof (sq ft) sfBUA associated with existing development (sq ft) sf - Roadway (sq ft) sfProposed new BUA (sq ft)14375 sf - Other, please specify in the comment box below (sq ft) sfPercent BUA of drainage area85%Total BUA (sq ft)14375 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)947 cfDesign volume of SCM (cu ft)1020 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out?Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils?No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)?3:1#9 Does the drainage easement comply with General MDC (9)?Yes#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?Yes#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)436 ft #6 Percentage of medium to coarse washed sand by volume 85%#1 Bottom of the bioretention cell (fmsl)456 ft #6 Percentage of fines (silt and clay) by volume10%#1 Distance from bottom to SHWT (feet)20 ft #6 Percentage of organic matter by volume 5%#2 Surface area of the bioretention cell (square feet)2040 sf#6 Type of organic materialEngineered Fill#2 Design volume of the bioretention cell (cubic feet)1020 cf#7 Phosphorus Index (P-Index) of media (unitless) 10#2 Ponding depth of the design storm (inches)6 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation?No#9 Will cell be maintained to a one inch/hour standard?Yes#3 Depth of peak attenuation over planting surface (in) in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in) in#4 Infiltration rate of the in situ soil (inch/hour)11.7 in/hr#4 Diameter of the underdrain pipes (if applicable) in#4 Does the design include Internal Water Storage (IWS)?Yes #11 Depth of mulch, if applicable (inches) in#4 if so, elevation of the top of the IWS (fmsl)458 ft #11 Type of mulch, if applicablena#4 Elevation of the planting surface (fmsl)461 ft #12 How many clean out pipes are being installed?0#5 Will the cell contain trees and shrubs?No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):EISA 438, ARMY LID, FORT BRAGG IDGGENERAL MDC FROM 02H .1050Break down of BUA in the drainage area (both new and existing):Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the user for cell. User requires no hardwood mulch within cell.Minimum 3' sod strip. All outlet headwalls to cell have rip-rap outlet protection per NCDEQ requirements.ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:Underdrain pipes are not required as infiltration rate greater than 2in/hr. However limited underdrains provided for factor of safety. 2.0 feet of open graded aggregate being provided under engineered fill/media depth in order to provide additional storage volume within cell to meet requirements for EISA 438. This IWS is in addition to IWS within the media mix. Total IWS greater than 48" for all cells. Additionally, behive grated catch basins are provided as first-line overflow, above required storage volume. Additional storage provided up to emergency overflow, but not for peak attenuation volume. Maximum depth of storage of cell to emergency overflow is 24". Emergency overflow weir designed for 100yr storm event. Project based entirely within Fort Bragg (US Gov't property). No easements required. User requires no hardwood mulch due to maintenance issues.Bioretention1110:28 AM 1/10/2019 SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.9 - APPENDIX I OUTLET PROTECTION CALCULATIONS User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW1Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)15Tailwater depth (in.) 4.5Minimum/Maximum tailwater? Min TW (Fig. 8.06a)Discharge (cfs) 2.61Velocity (ft./s) 7.77 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.5Minimum apron length, La (ft.)10Apron width at pipe outlet (ft.) 3.75 3.75Apron shape TRAPApron width at outlet end (ft.) 11.25 1.25 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 0.75 0 Minimum TW Maximum TWApron Thickness(ft.) 1.125 0 User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW2Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)24Tailwater depth (in.) 9Minimum/Maximum tailwater? Min TW (Fig. 8.06a)Discharge (cfs) 15.51Velocity (ft./s) 14.78 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.75Minimum apron length, La (ft.)12Apron width at pipe outlet (ft.) 6 6Apron shape TRAPApron width at outlet end (ft.) 14 2 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 1.125 0 Minimum TW Maximum TWApron Thickness(ft.) 1.6875 0 User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW3Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)24Tailwater depth (in.) 5Minimum/Maximum tailwater? Min TW (Fig. 8.06a)Discharge (cfs) 3.6Velocity (ft./s) 8.16 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.5Minimum apron length, La (ft.)10Apron width at pipe outlet (ft.) 6 6Apron shape TRAPApron width at outlet end (ft.) 12 2 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 0.75 0 Minimum TW Maximum TWApron Thickness(ft.) 1.125 0 User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW4Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)15Tailwater depth (in.) 1Minimum/Maximum tailwater? Min TW (Fig. 8.06a)Discharge (cfs) 1Velocity (ft./s) 2 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.5Minimum apron length, La (ft.)10Apron width at pipe outlet (ft.) 3.75 3.75Apron shape TRAPApron width at outlet end (ft.) 11.25 1.25 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 0.75 0 Minimum TW Maximum TWApron Thickness(ft.) 1.125 0 User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW5Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)15Tailwater depth (in.) 12Minimum/Maximum tailwater? Max TW (Fig. 8.06b)Discharge (cfs) 5.28Velocity (ft./s) 4.75 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.5Minimum apron length, La (ft.)10Apron width at pipe outlet (ft.) 3.75 3.75Apron shape TRAPApron width at outlet end (ft.) 11.25 1.25 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 0.75 0 Minimum TW Maximum TWApron Thickness(ft.) 1.125 0 User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW7Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)18Tailwater depth (in.) 4.5Minimum/Maximum tailwater? Min TW (Fig. 8.06a)Discharge (cfs) 4.93Velocity (ft./s) 10.69 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.5Minimum apron length, La (ft.)10Apron width at pipe outlet (ft.) 4.5 4.5Apron shape TRAPApron width at outlet end (ft.) 11.5 1.5 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 0.75 0 Minimum TW Maximum TWApron Thickness(ft.) 1.125 0 User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW8Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)18Tailwater depth (in.) 7Minimum/Maximum tailwater? Min TW (Fig. 8.06a)Discharge (cfs) 2.16Velocity (ft./s) 3.85 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.5Minimum apron length, La (ft.)10Apron width at pipe outlet (ft.) 4.5 4.5Apron shape TRAPApron width at outlet end (ft.) 11.5 1.5 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 0.75 0 Minimum TW Maximum TWApron Thickness(ft.) 1.125 0 User Input DataCalculated ValueReference Data Designed By:FMM Date:12/9/2016Checked By: Date:Company:Mason & HangerProject Name:SOF STF Phase 3Project No.:145.03 Site Location (City/Town)AberdeenCulvert Id.HW9Total Drainage Area (acres)(see report) Rational Method for Flow Outlet pipe diameter, Do (in.)15Tailwater depth (in.) 2.5Minimum/Maximum tailwater? Min TW (Fig. 8.06a)Discharge (cfs) 0.28Velocity (ft./s) 2.24 Minimum TW Maximum TWFigure 8.06a Figure 8.06bRiprap d50, (ft.)0.5Minimum apron length, La (ft.)10Apron width at pipe outlet (ft.) 3.75 3.75Apron shape TRAPApron width at outlet end (ft.) 11.25 1.25 Minimum TW Maximum TWMax Stone Diameter, dmax (ft.) 0.75 0 Minimum TW Maximum TWApron Thickness(ft.) 1.125 0 SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.10 - APPENDIX J LANDSCAPE PLANS BSDLP101.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP101.dgn2/13/20176:16:06 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE GI-17B WMRD6" 6" 6"RDRD6"10"10"RD RD RD 6"RDRDRD 2:1 2:12:1 2:12:1 2:1 2:1 2:12:1 2:13:13:13:13:13:13:1 3:13:13:13:1WETLANDS JUNCTION BOX 499 498 497 496 494 493 492 491 489 488 487 486 484 483 482 481 479 478 477 476 474 473 472 471 469 468 467 466 464 463 462 461 459 458 457 456 454 453 452 451 449 448 447 446 444 443 443 444 444 443 442 441 439 439 441 442 443 444 449 448447446 459 458 457 456 454 453 452 451 469 468 467 466 464 463 462 461 479 478 477 476 474 473 472 471 474 474 471 471 471 471 472 473 474 466 466 466 464 463 462 461 459 458 457 456 454 453 452 451 454 454 449 448 447 499 498 497 496 494 493 492 491 489 488 487 486 484 483 482 481 464 463 451 469 10pi 6CD 8CD 6CD 8 8 8 10 10 10 10 10 10 10 12 12 12 12 12 12 10 10 10 12 12 12 6 8 10 12 8 8 8 8 8 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 12 12 8 12 12 5 FORMER TRANS- GI-17 GI-17ASD15"SS CO SSMH 4234254 25 4 24 426426 427 428427 430 4 3 0 429 4314 31 432433 4334 3 2433 4 3 2433434 434 434434434435435435436436 436 436436437438 438 437437 437438437438 4 3 9 439 439 439441441441441 440 440 440 440 4 4 0 441 441443443442442 442443 443 442 442 443 442443 444 444444 444444 444 444 444 445 445445445445 445 44544544544 5446 446446446 446 445 445 446 44644744744744744 7 447 447 447 448448448 12 449 448 448449449448449448 448 449 449 448 449 449 449 448 CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD CO RD RD CO 450 450 4504504504504 5 1 451450450450495 490 485 480 475 470 465 460 455 450 445 440 440 445 450 460 455 470 465 480 475 475 475 470 470 465 460 450 455 495 490 485 465460 470 450 450 450450 450 450450 450450 4 5 0450 451451 451 451450 450 450450 451 450 45145245245210 452 452 452 452452 45245445445445445445345510 454453 453 454 453 454 4534 54 453 454 453 454 455 455455 455 455455 12 8 10 10 455 455 455 455 455455455455455 455455 455 455456 456 456 4 56 4 5 5455 456 455 456 457 18"CMP 457 457 457 45 7 45 7 459 45 9GATE INV.-457.32 HW C 10 458 459458 459 458 459 459 458459 458458 459 460 460 460 460460 460 460 460 460 460 460 4604604604BO 4BO 4BO 4BO 4BO 8 12 460 460 460 460 4604604604 6 0 460460460460460 460 460 460 460 460 460 18"CMP462 462462 462462 462 462 462 462462 461461461461461461462 461 461 461 462 461461461 462 461 461 462461 461461 462 462 46 1461 461461 461 462 462 462 462 462462 462 462461 461 461 462 462 462 462462462462461462462462461 461462461461 12 461 461462 462462 461462 461 462 461 462 462 461 462462 461 462 462461 462 46115"CM PTOP-463.20 INV.-460.00 YI INV.-461.34 TOP-463.24 YI 24"464 463 463463463 464463 4 6 3 464 463 463 463 463 463 463 464 464 464 463 463 464 464 463 463 463 463463464463 463 463 463 464464464 46 3 463 46446446 44 64 464 464 463 464464463 464464 463463463 463 463 46 3464464464 464 463GATE C 10 12 10 4634 6 3 464464 463 464 464464 463 464 463 464 463 464 464 463 464463 463 464 464463464 463 463 464 464 464463 EJB 465465465465 465 465465465465465 465 465 465465 465465465 465 465 465 465 4 6 5 465465465465 465465 465 465465465465465465 8' CHAIN LINK FENCEC 810 465 465 465 465 465 465 4654 6 5465 465 4654 65 465 465465465465465 465 465 465 4 6 5 465 4654 6 5 465 46 5465466467 467 467 467 466 466 467466 467 466 467 467466 467466 467 467 467466 8 10467466466466466466 467467 467 467 466 4 66466466 466466 466 467467466467 466 467 467 466 466 466 467 467466 4 64 463 467 467466 12' CHAIN LINK FENCE 468 468 468 468 C469468 468 468468468 468 469 468 468468469 468 469 469 468 468 469 469468 462 461 468 4 69469468469 469 469470470470470470470 EM TRANSFORMER 12 12 470 470 470 470470470470470470 4 7 0 470 470 47047 0470 470470470 4 7 0 470 8 6 471 471 471 471471472 471 4 7 2 471 472 471RD WELLHEAD & PUMP 6BO 8 8 10 1010 1010 12 12 10 6 8 8 8 8 8 8 12 8 10 10 10 10 6 8473 473 473475475475 475475475 4 7 4 4 7 4 10' CHAIN LINK FENCE 12 10 12 8 8 10 6475475475475475474 4 74475475 474 CO RD CO RD477477 476 4774774 7 6 476C 6BO 6BO 6BO 88 8 10 10 8 8 8 8 8 6 6476477 476 4 764774774764784784784786BO 8 10 8 8 8 10 10 8 8 8 8 8 8 10 12 12 8 8 8 8 8 10 6 6 6478 4 7 8 478 478480480 4 8 0 480 480480 480480 479479479479 10 8 10 10 12480480480480480479 479 47 9 479 4 7 9 480480 481 481 4 82 4 82 8 8 8 8 8 10 10481482 481481 481 4828 648348548548548512 8485485485485485484 8486487488490490490 84904904904904894914924934948' CHAIN LINK FENCE 495495495494496497498499 FFE = 466.00' BUILDING 7 FFE = 466.00'FFE = 466.00' BUILDING 7 FFE = 463.25' FFE = 462.00' BUILDING 4 BUILDING 5 FFE = 463.00'FFE = 463.00' BUILDING 5 GEN STAGING AREA CONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7 SAR BARN BID ITEM 5) (OPTIONAL FFE = 466.00' BID ITEM 3) (OPTIONAL SD SD SDSDSDSDSDSD SD SDSD SD SD SD SD SDSDCB-7 CB-6 CB-5 CB-3 CB-2 CB-1 GI-8 GI-1GI-2GI-3 GI-4 SD CB-16 CB-17 CB-18 CB-19 CB-13 CB-12 CB-21 CB-22 SD SD GI-7 GI-6 GI-5 GI-9GI-10GI-11GI-12 GI-13 GI-14GI-15 CB-8 CB-20 CB-25 SD SD SS CO SS COSDSD GI-19 GI-18 MH SS MH SS MH SS MH SS HW-1 HW-2 MH SS MH SS MH SS MH SS HW-5 HW-6 HW-7 CI-1 CI-2 CI-3 SDSDSDSDSDSDCB-24 GI-16 SDCB-4 SDSDGI-20 S DSDSD SD SD SD SDS D SDSDSDSDSDSDSDSDSD2 4" 2 4" 24" 24" 2 4"15"SD15" 15"15"18" 15"SD1 5"SD18"18"SD18"SD18"18"SD18"15"24"24"SD 24"15"15"15"15"15"18"18"18"24"15"24"24"24"18"18"CB-9 CB-10 CB-11 CB-14 CB-15 CI-4 CI-5 CI-6 CI-7 HW-8 HW-9 8" PERF.8" PERF. 8" PERF. 8" PERF. 8" PERF. 8" PERF. 8" PERF.15"SDSDSDSS CO SD 15" S D24" MH-1 SD MH-3 SD MH-2 SD MH-4 SD18"SD SD SD SD SD 8" PERF. SD SD SDSD15"15"15"15"15"SD SD18"15" CB-26 CB-27 RDRDRDRD10"S DSD RD RDRD RDRD RD RD RD RDRDRDRDRD6"6"10"6"6"6"6"6"6"6"10" 10"6"6"6" 10"6"6"6"6"10"10" 6" 6"6"6"6"6"6"10"10"6"6"6"6"6"10"6"6"10"RDRDRD RD6"6"10"6"10"SD SDSD6"10"RD MH-9 SD MH-8 SD MH-5 SD MH-7 SD MH-6 SD 15"15"15"SDCB-2818"24"8" PERF.8" PERF.SDSDGI-18A GI-18B GI-18C GI-18D 14" 447 AND SCRUB SCATTERED TREES AND SCRUB SCATTERED TREES AND SCRUB SCATTERED TREES AND SCRUB SCATTERED TREES 66 6 666 55 5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 12 12 9 9 9 9 9 9 9 7 77 7 7 4 10 10 10 10 1010 10 11 10 9 14 13 13 11 11 8 88 8 7 74 9 4 7 7 0-9116 BUILDING 0-9117 BUILDING FFE-470.05 0-9012 BUILDING METAL 1 STORY GATE HW-3 HW-4 10" PERF. SD SD 10" PERF.SD 10" PERF .SD 10" PERF. SD 10" PERF .TRANSFORMER CO RD LTP LTP LTP LTP LTP RIP RAP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) ROAD (ASPHALT GOOD COND.) ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN "SPEED LIMIT SIDEWALK PARKING SIGNS "RESERVED FOR HANDICAP" WALL 4' HAND RAIL 4' HAND RAIL 4' HAND RAIL 4' HAND RAIL WALL WALL 20 MPH" SIGN "SPEED LIMIT W/ BARBED WIRE 9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PAD ENTRY GATE ON. CONC. PAD SWING GATE "DO NOT ENTER" SIGN TANK FFE=472.11 FFE=472.16 CONC. PAD TANK ON CONC. PAD TANK ON 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK "DO NOT ENTER" SIGN BOLLARD(S) BOLLARD(S) SIDEWALK SIDEWALK "RESERVED/HANDICAP" SIGNS FFE=450.26 BLD. FROM TANKS MULTIPLE PIPES INTO SIDE WALK 3' HAND-RAIL LP101S.HAGGARDM.MAYERC. LOWEOVERALLLANDSCAPE PLAN80'40'0 80'160'240' GRAPHIC SCALE: 1"=80'-0"N GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. LP113 LP114 LP115 LP116 LP117 LP111LP110 LP112 BSDLP110.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP110.dgn2/13/20176:16:10 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE 2:1 499 498 497 496 494 493 499 498 497 496 10 10 10 10 10 10 12 12 495 495 4BO 4BO 4BO 4BO 4754788 8 8 4804794794854904904914924934948' CHAIN LINK FENCE 495495495494496497498499 GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP110S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANRC 6 NGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. WO 1 RC 6 BSDLP111.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP111.dgn2/13/20176:16:12 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISERDRDRD 2:1 2 :1 2 :1 2:13:1492 491 489 488 487 486 484 483 482 481 479 478 477 476 474 473 472 471 469 468 467 466 464 463 462 461 459 458 457 456 454 453 452 T T 490 485 480 475 470 465 460 455 455 455455460 460 460460 460460462 462 461 462 462 462 462 462462462462462 4 6 4 463 463 463463464463 463 463 463 463 464464464 463463463 465 465 465465465465465465 465465465465 465465465466467468469470470470 470470470471472473475475 475475475474477477 476 476477478478478480480 479480480 480479481482483485485485485484486487488490490490490489491SDSD SDCB-7 CB-6 GI-3 GI-4 SD CB-8 DYH SD SDSD18"18" SD 18"15"24" CB-9 CB-10 CB-11 CB-14 8" PERF. S D24" SDRDRDRD10"S DSD RD RDRD RD6"6"6"10"10"6"6"6"6"6"6"10"10"6"SDSDMH-7 SD MH-6 SD 15"15"18"DYHFFE = 466.00' BUILDING 7 BUILDING 5 FFE = 463.00' GEN FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7 SAR BARN BID ITEM 5) (OPTIONAL FFE = 466.00' GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP111S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANER 1 NGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. RC 6 RC 5 WO 1 WO 1 LP 4 LP 7 LP 2 WO 1 WO 1 ER 1 ER 1 SP 2 ML 2 RC 1 FD 1 ER 1 FD 1 BSDLP112.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP112.dgn2/13/20176:16:14 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE GI-17B T RD6" 6" 6"RD6"10"RD RD RD 6"3:13:1 3:13:13:13:1451 10pi 8 8 10 10 10 10 10 10 10 10 8 GI-17 GI-17ASD15"441443443442442444 444444 444445 445445 445445446 446446447447 447447447448448448 12 449448 448449449448449448 450 450 4504504504504 5 1 451450450450 450450 4504 5 0450 451451 45245245210 452 452 454454454454454453 45510 454453 453 454 455 455455 4 5 54558 10 10 455 455455455 456 456 457 457 457 INV.-457.32 HW 458 459458 460 460460 46046046012 460 462 462 462 4614614614614614614614 6 2 461461 461461 461 462 462462461 461 461462461461462 24"12 4 6 5 12 FFE = 462.00' BUILDING 4 FFE = 463.00' BUILDING 5 SDSDSDSDSD SD GI-1 GI-2 CB-18 CB-19 CB-13 CB-12 GI-6 GI-5 SD GI-19 GI-18 HW-1 HW-2 HW-5 HW-7 CI-1 CI-2 CI-3 SDSDSDSDSDSDSD24"SD 24"18"18"18"24"15"24"18"18"8" PERF.SDSDMH-1 SD DYH MH-4 SD18"SD 8" PERF. SD SDSD15"15"15"15"RD SD24"8" PERF.8" PERF.SDSDGI-18A GI-18B GI-18C GI-18D HW-3 HW-4 10 " PERF .SD SD 10 " PERF .SD 10 " PERF .SD 10 " PERF .SD 10 " PERF .GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP112S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANNGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. LP 7 LP 6 WO 4 RC 5 WO 3 WO 3 WO 1 RC 1 RC 1 ER 1 ER 1 ER 1 ER 1 FD 1 FD 1 FD 1 ML 2SP2 SR 400 TG 1200 TG 200 BW 200 BW 200 CF 500 CF 240 SR 140 FD 1 BSDLP113.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP113.dgn2/13/20176:16:17 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE 2:1 494 493 492 491 489 488 487 486 484 483 482 10 10 10 10 10 10 10 10 10 10 10 490 485 4754774774 7 6478 8 480480 481 481482482485485485485490 GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP113S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANNGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. RC 6 BSDLP114.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP114.dgn2/13/20176:16:19 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE 2:1 2:1 2:1 2:13:13:1479 478 477 476 474 473 474 474 481 8 10 480 475 475 475 460 460 4 6 0 462 461 461 462 462 461462 464 4 6 3 4 6 3 463 463 463 46 4464 463 463 464 464 4 6 3 463 4 6 3 464464464 464 4634 6 3 4 64 465465465 465 465 465465465465 465 4 65 465 465465465 4 6 54 6 4 463 462 461470470470 470470RD 8 10 1010 12 10 64754754 7 4 10' CHAIN LINK FENCE 124754754754768 10 4 8 0 480480 479 12480480 8 8 12FFE = 466.00'FFE = 466.00' BUILDING 7 (OPTIONAL BID ITEM 4)BUILDING 8SD SD SD SDSD SD CB-5 CB-3 CB-2 CB-1 GI-8 SD GI-7 GI-11 GI-12 GI-15SD GI-16 DYHCB-4 15"SD15"SD18"18"SD18"8" PERF. 8" PERF. 8" PERF. SD SD SD RD RD RD RD RDRDRDRDRD6"6"10"6"6"6"6"6"6"6"10" 10"6"6"6" 10"6" 6"6"6"10"6"10"SD6"10"RDMH-9 SD MH-8 SD MH-5 SD 15" GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP114S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANNGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. WO 1 RC 3 WO 1 RC 4 WO 1 WO 1 WO 2 WO 1 WO 1 RC 3 RC 1 RC 1 RC 1 RC 3 FD 1 FD 1 FD 1 FD 1 FD 1 FD 1 ER 1 ER 1 ER 1 ER 1 ER 1 ER 1 BSDLP115.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP115.dgn2/13/20176:16:21 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE WM T RD10"3:1JUNCTION BOX 464 463 8 8 10 10 10 12 8 8 10 465460455459459 458 459 460 460 4BO 460 460460 18"CMP462 462462 462462461 462 461 461 461 462 461 461 462461 461461462 462462 462 462461461 461 462462 461 462 461 15"CM PTOP-463.20 INV.-460.00 YI INV.-461.34 TOP-463.24 YI 463 463463463 464463 4 63 46 4464464464 464464464 464 463 464464463 463 463463464463 464 464464 463 464 463 463 464 465465465465 4 6 5 465 4654 65 465 4 6 5 465 4654 65465465 465465 466 467467 467 467 466 466 467 466 467 467466 467466 467 467466467466 466 466466 467467 466466466467467466 466 468 468 468 468469468 468468468 468 469468 469 469 469 EM TRANSFORMER 12 4704708 WELLHEAD & PUMP 6BO 8 10 10 12 10 12 10 8 8 6BO 6BO 6BO 10 10 8 8 8 10 8 8 10 10 FFE = 463.25' STAGING AREA CONTRACTOR BUILDING 6 BID ITEM 3) (OPTIONAL SDSD CB-16 CB-17 CB-21 CB-22 SD GI-9GI-10 GI-13 GI-14 CB-20 CB-25 DYHHW-6 CB-24 SDSDGI-20SD SDSD SD SD SD SDS D SDSDSDSDSDSDSDSDSD2 4" 2 4" 24" 24"24"15"SD15" 15"15"18"15"15"15"15"15"24"24"CB-15 CI-4 CI-5 CI-6 CI-7 HW-8 HW-9 8" PERF. 8" PERF.15"SDSD 15" MH-3 SD MH-2 SD SD 15"SD SD18"15" CB-26 CB-27 6"6"6"6"10"6"6"10"RDRDRDRD CB-28 FFE-470.05 0-9012 BUILDING METAL 1 STORY ROAD (ASPHALT GOOD COND.) GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP115S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANNGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. WO 5 RC 1 RM 1 RC 3 RC 1 RC 1 RC 1 RM 1 WO 1 LP 4 ER 1 ER 1 ER 1 ER 1 ER 1 ER 1 FD 1 FD 1 FD 1 FD 1 FD 1 FD 1 FD 1 SP 3 SP 3 SR 100 TG 200 BW 100 FD 2 BSDLP116.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP116.dgn2/13/20176:16:24 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE 469 471 469 8 12 470 470 4 5 5 4 5 64 5 7 458 459 4 5 8459460 460 460461 462 462 463 464 463464 465 465 465 467 466 466 467 466 467SDC 468 469 468 468 469 468 469 TRANSFORMER 470 470 470 470 470470 470470471 471 471 471 471 6 8 6BO 8 6BO 6 STOP SIGN STOP SIGN HEADWALL ROAD (ASPHALT GOOD COND.) ROAD (ASPHALT GOOD COND.) INV.OUT=464.94 12" CMP GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP116S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANNGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. ER 1 BSDLP117.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP117.dgn2/13/20176:16:26 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE 5 455 CB CBCBSD S DSDCB C 459 458459 458SD 460 460 460 460 460 SD462 461 462 461 462 C 464 463 464463463 4 6 4 464C 4 6 5 4654 6 5 465 4 6 5465SD467 466 469 468 470 4 7 0 470 CB 471 4 7 2 471 472 CB 473 4 7 3 4 7 4 4744754 7 4C 476 4764774774764 7 8 478 478 4794 7 9 14" AND SCRUB SCATTERED TREES AND SCRUB SCATTERED TREES 66 6 666 55 5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 12 12 9 9 9 9 9 9 9 7 77 7 7 4 10 10 10 10 1010 10 11 10 9 14 13 13 11 11 8 88 8 7 74 9 4 7 7 0-9117 BUILDING ????" RCP=195.96 ????" RCP=196.10 SUMP=?????? EL.=472.46 DI 18" RCP=452.67 24" RCP=452.62 EL.=457.52 DI 18" RCP=453.25 18" RCP=453.30 18" RCP=453.30 18" RCP=453.30 EL.=456.89 DI 18" RCP=453.46 EL.=456.88 DI 18" RCP=455.50 18" RCP=455.55 EL.=459.05 DI ???" RCP=453.84 18" RCP=453.94 EL.=457.04 DI ????" RCP=462.84 ????" RCP=462.99 EL.=471.34 DI ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN "SPEED LIMIT SIDEWALK WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN "SPEED LIMIT W/ BARBED WIRE 9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN TANK FFE=472.11 FFE=472.16 CONC. PAD TANK ON CONC. PAD TANK ON SIDEWALK SIDEWALK BLD. FROM TANKS MULTIPLE PIPES INTO GENERAL NOTES 6. 5. 4. 3. 2. 1. LP601 FOR LANDSCAPE PLANT SCHEDULE. LANDSCAPE DETAILS. REFER TO LANDSCAPE SHEET REFER TO LANDSCAPE SHEETS LP501 FOR (FAYETTEVILLE) - PLANT HARDINESS ZONE 8. THE NORTH CAROLINA STATE REGION PLANT VEGETATION MUST BE ADAPTABLE TO PERIMETER OF THE BUILDING. LOCATED A MINIMUM OF 13 FEET AWAY FROM THE TREES, SHRUBS AND PERENNIALS SHALL BE ALL NEW LANDSCAPE PLANT MATERIAL, E.G. PLANT TO CREATE A PLANTER BED LOOK. TO ALSO RECEIVE MULCH SPREAD AROUND EACH NEWLY PLANTED TREE AND SHRUB. PERENNIALS OF SHREDDED HARDWOOD MULCH AROUND EACH PROVIDE 3" DEPTH, 1'-6" RADIUS (3'-0" DIAMETER) 8 LATERAL FEET AWAY FROM BURIED UTILITY LINES. TREES AND SHRUBS SHALL BE LOCATED AT LEAST CURBS AND WALKS. TREES SHALL NOT BE LOCATED WITHIN 4 FEET OF PLANT LEGEND LT X MT X MS X SS X FG X REMAIN EXISTING VEGETATION TO CONSTRUCTION LIMITS VEGETATION SETBACK LIMITS PROTECTION (AT/FP) PLANT 16' ANTI-TERRORISM / FORCE QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' WM N FORMERTRANS- JUNCTION BOX KEY MAP GATE C C EJB 8' CHAIN LINK FENCE C 12' CHAIN LINK FENCE EM TRANSFORMER WELLHEAD& PUMP 10' CHAIN LINK FENCE C 8' CHAIN LINK FENCE 0-9116BUILDING FFE-470.050-9012BUILDINGMETAL1 STORY GATE FFE = 466.00'BUILDING 7 FFE = 466.00'FFE = 466.00'BUILDING 7 FFE = 463.25' FFE = 462.00'BUILDING 4 BUILDING 5FFE = 463.00'FFE = 463.00'BUILDING 5 GEN STAGING AREACONTRACTOR BUILDING 6(OPTIONAL BID ITEM 4)BUILDING 8FFE = 466.00'(OPTIONAL BID ITEM 4)BUILDING 8BUILDING 7SAR BARN BID ITEM 5)(OPTIONAL FFE = 466.00' BID ITEM 3)(OPTIONALLP114LP113 LP112 LP111LP110 LP115 LP116 LP117 TRANSFORMER LTP LTPLTP STOP SIGN STOP SIGN ROAD (ASPHALT GOOD COND.) 20 MPH" SIGN"SPEED LIMIT SIDEWALK PARKING SIGNS"RESERVED FOR HANDICAP"WALL 4' HAND RAIL 4' HAND RAIL 20 MPH" SIGN"SPEED LIMIT W/ BARBED WIRE9' CHAIN LINK BOLLARD(S) "NO PARKING" SIGN "NO PARKING" SIGN ON. CONC. PADENTRY GATE ON. CONC. PADSWING GATE 3' HAND-RAIL3' HAND-RAILSTEPSSIDEWALK SIDEWALK 3' HAND-RAIL SIDEWALK SIDEWALK FFE=450.26 SIDEWALK 3' HAND-RAIL LP117S.HAGGARDM.MAYERC. LOWELANDSCAPE PLANNGRAPHIC SCALE: 1"=20'-0" 60'40'20'010'20' GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION. BSDLP501.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP501.dgn2/13/20176:16:28 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE NO SCALE AND STAKING DETAIL DECIDUOUS TREE PLANTING AND STAKING DETAIL EVERGREEN TREE PLANTING NO SCALE (BALLED & BURLAPPED OR CONTAINER) (BALLED & BURLAPPED OR CONTAINER) CL CL (BALLED AND BURLAPPED OR CONTAINER) MIN.MIN. VARIES MIN. 24" 18" to 24" 18" to NO SCALE NO SCALE (SINGLE / MULTI-TRUNK) (BALLED & BURLAPPED OR CONTAINER) PLANTING DETAIL MEDIUM SHRUB PLANTING DETAIL SMALL SHRUB SOIL MIX BELOW ROOT BALL. PLANT ALL NEW PLANT MATERIAL AT ORIGINAL FIELD GROWN LEVEL. TAMP THE ROOTS OF THE PLANT. THIS IS TO ENSURE ADEQUATE RECEPTION OF OXYGEN AND MOISTURE TO SET AT GROUND LEVEL OR NO MORE THAN 2" ABOVE THE EXISTING GRADE. HAS BEEN FIRMLY PLACED AROUND THE ROOTS OR BALL. PLANTS SHALL BE PLANTS SHALL BE SET PLUMB AND HELD IN POSITION UNTIL SUFFICIENT SOIL EACH PLANT AS FINAL ADJUSTMENTS ARE MADE. AND/OR TO COMPENSATE FOR SETTLING. SOIL SHALL BE FIRMED AROUND NECESSARY TO ENSURE CORRECT DEPTH OF PLANTING, VERTICAL ALIGNMENT AND IMMEDIATELY AFTER WATERING, ALL PLANTS SHALL BE ADJUSTED AS WITHIN THE SAME WORKING DAY UPON WHICH THEY WERE PLANTED. DURING ALL PLANTS SHALL BE "WATERED IN" BY FLOODING THE BACKFILLED HOLE SHALL BE THE SAME DIAMETER OR SLIGHTLY LARGER THAN THE ROOT BALL. PIT AS WELL TO FORM A SAUCER 2" TO 3" HIGH AROUND THE PLANT. SAUCERS DIGGING HAS BEEN COMPLETED. USE ANY EXCESS SOIL FROM THE PLANTING ALL TOPSOIL SHALL BE RETAINED AND REUSED IN PLANTING HOLES AFTER 4. 3. 2. 1. SHEET NOTES: 8. 7. 6. 5. LP501 1 OUT THE GUARANTEE PERIOD. A PLUMB POSITION THROUGH- FOR MAINTAINING TREES IN CONTRACTOR IS RESPONSIBLE TREES. HOWEVER, THE OPTION ON HOW TO STAKE IT IS THE CONTRACTOR'S NOTE: 2. 1. OF HOLE PRIOR TO PLANTING. SCARIFY BOTTOM AND SIDES TO BE IN CONTACT WITH TRUNK. NOTED OTHERWISE. NO MULCH HARDWOOD MULCH UNLESS CONIFER TO HAVE SHREDDED NOTE: BALL. PENETRATE ROOT STAKE SHALL NOT NOTE: BALL. PENETRATE ROOT STAKE SHALL NOT NOTE: LP501 2 LP501 3 LP501 4 MIN. 1'-0"MIN.4'-0"6"2'-0" MIN.VARIES(1 1/2" WIDE STRAP, TYP.) OR POLYETHYLENE 1'-4" POLYPROPYLENE STAKE 2"x2"x8'-0" PER WIRE FLAGGING - ONE DRAWINGS REFER TO CIVIL SEEDED MULCH AREA, OF TOTAL BACKFILL SOIL APPOXIMATELY ONE THIRD OTHER ORGANIC MATERIAL COTTON COMPOST, OR MIXTURE WITH CLAY BUSTER, ALONG WITH PLANTING SOIL SOIL FROM ALTERED GRADE TIP OF TREE OR DAMAGE DO NOT PRUNE LEADER DO NOT CUT ORIGINAL SOIL AND TAPERS DOWN TO ROOT BALL "KNEES" BACKFILL SOIL COVERS STEEL T-POST HARDWOOD MULCH 3" DEPTH SHREDDED TOP OF ROOT BALL NO BACKFILL SOIL COVERS OR FROZEN. CONDITIONS. NO PLANTING SHALL OCCUR IF THE GROUND IS MUDDY AND COMPLETED PRIOR TO DECEMBER 15, DEPENDING ON WEATHER FALL PLANTING SHALL BE ACCOMPLISHED BEGINNING OCTOBER 15 PLISHED BEGINNING MARCH 1 AND COMPLETED PRIOR TO JUNE 1. SPRING PLANTING FOR TREES AND SHRUBS SHALL BE ACCOM- SHOULD COVER THE ENTIRE SAUCER AREA OF EACH PLANT. INDIVIDUALLY PLANTED TREE, SHRUB AND PERENNIAL FLOWER AND SPREAD TO A DEPTH OF 3" AND AT A RADIUS OF 16" AROUND EACH OF NEW PLANT MATERIAL. SHREDDED HARDWOOD MULCH SHALL BE MATERIAL SHALL BE COMPLETED WITHIN 48 HOURS AFTER PLANTING INSTALLATION OF SHREDDED HARDWOOD MULCH AROUND PLANT BRAGG, FAYETTEVILLE AREA AND OR STATE OF NORTH CAROLINA. BE PURCHASED FROM LOCAL AREA NURSERIES AROUND THE FT. ZONE 8 OF THE UNITED STATES. ALSO, PLANT MATERIAL SHOULD PURCHASE STOCKED PLANTS THAT ARE ADAPTED TO HARDINESS THE EXISTING LANDSCAPE UNLESS PLANTING ON A SLOPE. WITHIN 5'-0" OF THE PLANTING HOLE. GRADE THE AREA TO MEET CLEAR, REMOVE AND DISPOSE OF BRUSH, SNAGS, AND RUBBISH SECOND BRANCH TREE WRAP TO WIRE TWISTED GAUGE GALV. (2) STRANDS NO. 14 GRADE TO 2" ABOVE BALL RISES 1" TOP OF ROOT MULCH HARDWOOD SHREDDED 3" DEPTH HOLE PLANTING SHAPED SAUCER- NO SCALE CL CL MATERIAL, (TYP.) OF CONTAINERIZED HAND LOOSEN ROOTS NOTE: PLANTING DETAIL PERENNIAL FLOWER / LP501 5 UNDISTURBED SOIL TREE SITS ON BALL DIAMETER SIZE OF ROOT SHALL BE 3 TIMES PLANTING HOLE FROM THE ROOT BALL AND BURLAP AWAY 12" OF WIRE BASKET REMOVE UPPER 2/3 OR MIN.4"MIN. 4" O.C., (TYP.) 1'-4" SEE PLANT SCHEDULE VARIES OF TOTAL BACKFILL SOIL APPOXIMATELY ONE THIRD OTHER ORGANIC MATERIAL COTTON COMPOST, OR MIXTURE WITH CLAY BUSTER, ALONG WITH PLANTING SOIL SOIL FROM ALTERED GRADE PERENNIAL FLOWER PLANTING EXISTING SUBSOIL GRADE TO 4" ABOVE SOIL SAUCER 2" SUBGRADE SOIL) OF TOTAL BACKFILL APPROXIMATELY 1/3 ORGANIC MATERIAL COMPOST, OR OTHER BUSTER, COTTON MIXTURE WITH CLAY AMEND PLANTING SOIL HARDWOOD MULCH 3" (DEPTH) SHREDDED EVERY 3" 1/8" to 1/4" DEEP VERTICAL SCORE OR POTS WIRE BASKS AND/ REMOVE ALL TIES, GRADE SURROUNDING 2" TO 4" ABOVE SHOULD BE TOP OF BALL SOIL) OF TOTAL BACKFILL APPROXIMATELY 1/3 ORGANIC MATERIAL COMPOST, OR OTHER BUSTER, COTTON MIXTURE WITH CLAY AMEND PLANTING SOIL ROOT BALL COVERS TOP OF NO BACKFILL SOIL DRAWINGS REFER TO CIVIL SEEDED MULCH AREA, 2" x 2" x 8'-0" STAKE INTERVALS, (TYP.) AT 120 DEGREE 14 GA. WIRE - 3'-0" DOUBLE STRAND TYP.) (1 1/2" WIDE STRAP, OR POLYETHYLENE 1'-4" POLYPROPYLENE PER WIRE FLAGGING - ONE BACKFILL SOIL) APPROXIMATELY 1/3 OF TOTAL OTHER ORGANIC MATERIAL COTTON COMPOST, OR MIXTURE WITH CLAY BUSTER, AMEND PLANTING SOIL SET AT ANGLE WOOD STAKE 2" x 2" x 2'-0" DRAWINGS REFER TO CIVIL SEEDED MULCH AREA, ORIGINAL SOIL AND TAPERS DOWN TO ROOT BALL "KNEES" BACKFILL SOIL COVERS HARDWOOD MULCH 3" DEPTH SHREDDED ROOT BALL COVERS TOP OF NO BACKFILL SOIL UNDISTURBED SOIL TREE SITS ON GRADE TO 2" ABOVE BALL RISES 1" TOP OF ROOT MULCH HARDWOOD SHREDDED 3" (DEPTH) HOLE PLANTING SHAPED SAUCER- BALL DIA. SIZE OF ROOT BE 3 TIMES HOLE SHALL PLANTING FROM THE ROOT BALL AND BURLAP AWAY 12" OF WIRE BASKET REMOVE UPPER 2/3's OR CIVIL DRAWINGS AREA, REFER TO SEEDED MULCH SURROUNDING GRADE BE 2" TO 4" ABOVE TOP OF BALL SHOULD TO CIVIL DRAWINGS HARDWOOD MULCH, REFER 3" (DEPTH) SHREDDED CIVIL DRAWINGS AREA, REFER TO SEEDED MULCH CUT LEADER DO NOT SAUCER MULCH HARDWOOD SHREDDED BERM EARTH GRADE BASE UNDISTURBED FIRM, .03'VARIES 24" MIN. 18" to FIRM, UNDISTURBED BASE BALL DIAMETER BE 3 TIMES SIZE OF ROOT PLANTING HOLE SHALL HARDWOOD MULCH 3" (DEPTH) SHREDDED SAUCER EARTHEN GRADE ABOVE SURROUNDING SHOULD BE 2" TO 4" TOP OF ROOT BALL ESTABLISHMENT PERIOD. PLANTED TREES FOR THE DURATION OF THE IRRIGATION OR OTHER WATERING METHODS FOR ALL CONTRACTOR TO PROVIDE GATOR BAG, TEMPORARY TREES. CONTAIN SUFFICIENT MOISTURE TO SUPPORT THE PLANTING SOIL SHALL NOT BE COMPACTED AND SHALL REMOVE TREE STAKES 90 DAYS AFTER PLANTING. CONDITIONS. REFER TO SEEDING SPECIFICATION 32 92 19. SEPTEMBER 1 THROUGH FEBRUARY 28 DEPENDING ON WEATHER AND "WARM SEASON" GRASSES SHALL BE PERFORMED FROM PERMANENT AND TEMPORARY SEEDING FOR "COOL SEASON" 12. 11. 10. 9. LP501S.HAGGARDM.MAYERLANDSCAPE DETAILSC. LOWE BSDLP601.dgnU.S. ARMY CORPS OF ENGINEERSWILMINGTON, NORTH CAROLINAANSI DCHECKED BY:DRAWN BY:ISSUE DATE:XXXXXX-XX-X-XXXXSHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 SOLICITATION NO.:DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONMASON & HANGERQ:\014503 SOF Special Tactics Facility Phase 3\CAD_BIM\_Sheets\06_Lndscp\BSDLP601.dgn2/13/20176:16:30 PMFORT BRAGG, NC69 DARLINGTON AVENUEWILMINGTON DISTRICT141-86-05FY17, PN 76514SOF SPECIAL TACTICS FACILITY, PHASE 3SITEFEBRUARY 2017W912PM-17-R-0001READY TO ADVERTISE GENERAL NOTES LT X SS X SCIENTIFIC NAME COND.QTY SIZE REMARKSHEIGHTCOMMON NAMEPLANT SYMBOL --- DETAIL P L A N T S C H E D U L E ------ --- --- --- 2" CALIPER 1 1/2" to --- --- EASTERN REDBUD Cercis canadensis --- TREES - (Medium/Ornamental: 15' to 30' Height) TREES - (Large: 30' to 100' Height) CONT. 3 GAL. Juniperus virginiana FLOWERING DOGWOOD Cornus florida EASTERN RED CEDAR WAX MYRTLE DOWNY SERVICEBERRY Amelanchier arborea Myrica cerifera --- CONT. 3 GAL.--- SHRUBS - (Medium: 4' to 12' Height) Kalmia latifoliaKALMIA (MOUNTAIN-LAUREL) --- --- 2" CALIPER 1 1/2" to --- 6'-0" HEIGHT 4'-0"to 6'-0" HEIGHT 4'-0"to 6'-0" HEIGHT 4'-0"to 6'-0" HEIGHT 4'-0"to 6'-0" HEIGHT 4'-0"to CONT. 1 GAL. OF SOILS. VERY DROUGHT RESISTANT. WOOD IS FRAGRANT. FOLIAGE IS BRIGHT GREEN TO DARK GREEN. DENSE CONICAL CROWN (VARIED OR IRREGULAR). DARK BLUE FRUIT IS BERRY-LIKE. CAN GROW ON VARIETY PLANT APPROX. AT 20'-0" O.C. REACHES 30'-0" to 45'-0" IN HEIGHT. THE TRUNK IS STRAIGHT AND HAS A POINTED, GROWS IN ACIDIC, MOIST WELL DRAINED SOILS. PARTIAL SHADE. WHITE SPRING FLOWERS GIVE WAY TO 1/4" FRUIT LOVED BY BIRDS. BEAUTIFUL FALL COLOR. PLANT APPROX. AT 15'-0" O.C. REACHES 15'-0" to 25'-0" IN HEIGHT. MEDIUM GROWTH RATE. FULL SUN TO A ROSY-PINK WITH PURPLISH TINGE. FLOWERS FOR 2 TO 3 WEEKS. GREEN BUT CAN BE AN EXCELLENT YELLOW. FLOWERS ARE PERFECT, REDDISH PURPLE IN BUD, OPENING TO PLANT APPROX. AT 30'-0" O.C. REACHES 20'-0" to 30'-0" IN HEIGHT. FALL COLOR IS USUALLY A POOR YELLOW- AUTUMN. BRACTS BLOOM WHITE IN SPRING FOR 2-3 WEEKS. CLUSTERS OF BRIGHT RED FRUIT INTO WINTER. WITH HORIZONTAL BRANCHES. OPPOSITE, DECIDUOUS MIDGREEN LEAVES THAT TURNS RED AND PURPLE IN PLANT APPROX. AT 25'-0" O.C. REACHES 25'-0" to 30'-0" IN HEIGHT. SHORT TRUNK WITH FULL, ROUNDED CROWN THICKETS. ALSO KNOWN AS SPOONWOOD SINCE NATIVE AMERICANS MADE THEIR SPOONS FROM PLANT. TO JUNE. LEAVES TURN A WINE COLOR IN FALL. FLOWERS ARE STAR SHAPED. PLANT CAN GROW IN LARGE PLANT APPROX. AT 8'-0" O.C. REACHES 5'-0" (to 12'-0") IN HEIGHT. TERMINAL WHITE FLOWER CLUSTERS APRIL FLAMMABLE PLANT. PREFERS MOIST SANDY SOILS. FRUITS MATURE IN AUTUMN AND PERSIST UNTIL SPRING. AS A DENSE HEDGE FOR SCREENING. FRUIT WAS USED BY COLONISTS TO MAKE BAYBERRY CANDLES. A VERY PLANT APPROX. AT 20'-0" O.C. REACHES 20'-0" to 30'-0" IN HEIGHT. POPULAR LANDSCAPE TREE. OFTEN GROWN ACORNS ARE SMALL AND TAPERED IN SHAPE. SHORT THICK TRUNK WITH PICTURESQUE HORIZ. BRANCHING. OPEN REACH APPROXIMATELY 50' WITH CROWNS OF 150' OR MORE. BARK IS LONGITUDINALLY FURROWED. PLANT ACCORDING TO LOCATION ON PLANS. REACHES to 40'-0" to 80'-0" IN HEIGHT. TREES GROWING IN THE CONT. CONT. CONT. CONT. CONT. CONT. RED MAPLE 'RED SUNSET'Acer rubrum 2" CALIPER 1 1/2" to --- LANDSCAPE DESIGNERS. SOFT GRAY BARK COLOR. SOIL TOLERANT. ORANGE TO RED FALL COLOR. ONE OF THE BEST RED MAPLE CULTIVARS CONSIDERED BY NURSERYMEN AND PLANT APPROX. AT 50'-0" O.C. REACHES 40'-0" to 60'-0" IN HEIGHT. MEDIUM - FAST GROWTH RATE. EXCELLENT CONT. WILLOW OAK Quercus phellos 2" CALIPER 1 1/2" to --- DROUGHT, POLLUTION, AND STANDING WATER. LEAVES EASY TO CLEAN UP. MODERATE WATER REQUIREMENTS. FALL COLOR IS YELLOW TO YELLOW-BROWN. TOLERANT OF HEAT AND PLANT APPROX. AT 45'-0" O.C. REACHES 60'-0" to 75'-0" IN HEIGHT. A RELATIVELY FAST GROWING SPECIES. CONT. DWARF YAUPON HOLLY ------ CONT. 1 GAL. CONT. 1 GAL.------ CONT. 1 GAL.------ CONT. 1 GAL.------ CONT. 1 GAL.------ CONT. 1 GAL.------ CONT. 1 GAL.------ MT X MS X QUANTITY INDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Medium to Large: 4' to 12' PLANT SYMBOL LEGEND CONT. 1 GAL.------ FG X QUANTITY IDENTIFICATION NUMBER in Height at Maturity) PERENNIAL FLOWER / GRASS - (.5' to 4' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Large: 30' to 100' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) TREE - (Medium/Ornamental: 15' to 30' QUANTITY IDENTIFICATION NUMBER in Height at Maturity) SHRUB - (Small: 2' to 8' SHRUBS - (Small: 2' to 8' Height) PERENNIAL FLOWER / GRASS - (Small to Medium: .5' to 4' Height) CONT. 1 GAL.------ CONT. 1 GAL.------ CHOKEBERRY 'UPRIGHT RED'Aronia arbutifolia 'Erecta' INKBERRY Ilex glabra CARDINAL FLOWER PICKERELWEED TALL SEDUM SOFT RUSH SWEET FLAG Lobelia cardinalis Pontederia cordata Sedum x 'Matrona' (Crassulaceae) Juncus effusus Acorus calamus 5/LP501 4/LP501 3/LP501 3/LP501 2/LP501 1/LP501 1/LP501 1/LP501 1/LP501 1/LP501 1/LP501 1/LP501 1/LP501 5/LP501 5/LP501 5/LP501 5/LP501 5/LP501 5/LP501 4/LP501 4/LP501 4/LP501 2. 1. IN MAY PRECEDE THE FRUIT (NOT EATEN BY BIRDS) IN SUMMER. QUITE SHADE TOLERANT. SLOW GROWING. RED FALL COLOR. ALSO HAS A PROFUSE PRODUCTION OF RED FRUIT. THE PROFUSION OF WHITE FLOWERS PLANT APPROX. AT 2'-0" O.C. REACHES 5'-0" to 7'-0" IN HEIGHT. IS A VERY UPRIGHT SHRUB WITH EXCEPTIONAL TO PART SHADE. CANE-LIKE STEMS AND COMPOUND LEAVES RESEMBLE BAMBOO. INTERESTING FOILAGE AND SPECTACULAR RED FRUIT DISPLAY. DROUGHT AND SHADE TOLERANT. FULL SUN PLANT APPROX. AT 2'-0" O.C. REACHES 1'-0" to 2'-0" IN HEIGHT. UPRIGHT, EVERGREEN SHRUB GROWN FOR NEEDS MINIMAL PRUNING. WHITE FLOWERS ARE NOT SHOWY. EVERGREEN SHRUB. ATTRACTS BIRDS. POLLINATE FEMALE PLANTS TO PRODUCE BERRY LIKE DRUPES. FULL SUN TO PART SHADE. GENERALLY PLANT APPROX. AT 6'-0" O.C. REACHES 5'-0" to 8'-0" IN HEIGHT. PLANT A MALE PLANT NEARBY IN ORDER TO BIRDS BUT NOT CARDINALS. BLOOMS IN JULY TO SEPTEMBER. BLOOM COLOR IS PINK, RED AND WHITE. SHORT-LIVED CLUMP FORMING PERENNIAL. FLOWERS ARE VERY ATTRACTIVE TO BUTTERFLIES AND HUMMING- PLANT APPROX. AT 1'-6" O.C. REACHES 2'-0" to 4'-0" IN HEIGHT. TYPICALLY GROWS IN MOIST LOCATIONS. A MARGINAL AQUATIC PERENNIAL. FULL SUN. EDIBLE FRUIT. ATTACTS BUTTERFLIES. BLOOMS FROM JUNE TO OCTOBER. SOFT BLUE FLOWER COLOR. A VIGOROUS, DECIDUOUS, EMERGENT PLANT APPROX. AT 1'-6" O.C. REACHES 2'-0" to 4'-0" IN HEIGHT. NEEDS FULL SUN FOR BEST FLOWERING. THAN SEDUM 'AUTUMN JOY.' AVERAGE TO DRY SOILS. REMINDS US OF AN OLD GRAMDMA IN A PINK BANDANA. REDDISH-PURPLE UPRIGHT STEMS, AND LARGE, PALE PINK FLOWER HEADS IN LATE SUMMER. 4-6" TALLER PLANT APPROX. AT 2'-0" O.C. REACHES 2'-0" to 3'-0" IN HEIGHT. BRONZY-GREEN FOILAGE; STRONG, SHINY, BLOOM COLOR FROM JUNE TO AUGUST. LOW MAINTENANCE. WILL NATURALIZE. ING STANDING WATER TO 4" DEEP. TOLERATES LIGHT SHADE, BUT BEST IN FULL SUN. YELLOWISH-GREEN PLANT APPROX. AT 3'-0" O.C. REACHES 2'-0" to 4'-0" IN HEIGHT. EASILY GROWN IN MOIST TO WET SOILS, INCLUD- FLOWER BLOOM COLOR IS NOT SHOWY. LOW MAINTENANCE. TOLERATES WET SOIL, DENSE SHADE. PERENNIAL THAT FEATURES IRIS-LIKE, SWORD-SHAPED LEAF BLADES. FULL SUN TO PART SHADE. GREENISH PLANT APPROX. AT 1'-6" O.C. REACHES 2'-0" to 2'-6" IN HEIGHT. A DECIDUOUS, SPREADING, MARGINAL AQUATIC Ilex vomitoria 'Nana' CONT. Ceanothus Americanus RC X PO X POST OAK Quercus stellata RM X LONGLEAF PINE Pinus Palustris DROUGHT, HEAT TOLERANT. GENERATIONS. GROWS AT MODERATE PACE. GROWS ONE WELL DRAINED USUALLY SANDY SOIL. PLANT APPROX. AT 20'-0" O.C. REACHES 90'-0" to 120'-0" IN HEIGHT. LONG-LIVED TREE LASTING FOR LP X WO X X FD X DS ML X SWEET PEPPERBUSH Clethra alnifoliaSPX WHITE OR VERY PALE PINK, BLOOMING IN LATE SUMMER. LEAVES WITH A SERRATED MARGIN. GREEN TURNING YELLOW-GOLDEN DURING AUTUMN. THE FLOWERS ARE PLANT APPROX. AT 6'-0" O.C. REACHES 4'-0" to 10-0" IN HEIGHT. DECIDUOUS SHRUB WITH OBOVATE TO OBLONG WM X NTX IB X YH X CBX CF X SR X SF X PW X TS X TG X BUTTERFLY WEED Asclepias tuberosa TICKSEED Coreopsis spp. NEW JERSEY TEA TO EARLY FALL. GROWN IN SHALLOW STANDING WATER UP TO 2-4". REQUIRES FULL SUN. FLOWERS FROM EARLY SUMMER PLANT APPROX. AT 2'-0" O.C. REACHES 1'-0" to 3'-0" IN HEIGHT. GROW IN MEDIUM TO WET SOILS. MAY BE SOIL DRAINED IS CRITICAL. A GOOD MASS PLANTING FOUNDATION SHRUB. HEAT TOLERANT. SUMMER, SPRING. BROADLEAF EVERGREEN SHRUB. PARTIAL SUN TO SUN. CAN PRUNE AT ANY TIME. GOOD PLANT APPROX. AT 5'-0" O.C. REACHES 3'-0" to 5'-0" IN HEIGHT. WHITE, BUT NOT SHOWY FLOWER IN EARLY PLANT APPROX. AT 1'-0" O.C. REACHES 1'6" to 48" IN HEIGHT. X ER BW X APPEARANCE. ALL RELATED PLANT SPECIES SHALL BE SIMILAR IN LANDSCAPE PLANS. PLAN AND SHEETS LP110 THROUGH LP114 FOR ENLARGED REFER TO SHEET LP101 FOR OVERALL LANDSCAPE 31 2 49 19 22 20 4 10 500 740 1600 640 LP601S.HAGGARDM.MAYERLANDSCAPE PLANT SCHEDULEC. LOWE SOF STF Phase 3 Fort Bragg, Hoke County, North Carolina Mason & Hanger Page - a.11 - APPENDIX K SKIMMER SEDIMENTATION BASIN CALCULATIONS FMM SOF Phase 3 Skimmer Basins Hoke NOAA-B County, North Carolina Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.68 4.66 5.44 6.52 7.38 8.28 3.04 Storm Data Source: Hoke NOAA-B County, NC (NRCS) Rainfall Distribution Type: Type NO_B Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 4/18/2018 5:52:21 PM FMM SOF Phase 3 Skimmer Basins Hoke NOAA-B County, North Carolina Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 10-Yr Identifier (cfs) ---------------------------------------------------------------------------------- SUBAREAS Basin 1 38.29 Basin 2 23.61 REACHES OUTLET 61.90 WinTR-55, Version 1.00.10 Page 1 4/18/2018 5:52:32 PM FMM SOF Phase 3 Skimmer Basins Hoke NOAA-B County, North Carolina Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- Basin 1 Newly graded area (pervious only) A 9.78 77 Total Area / Weighted Curve Number 9.78 77 ==== == Basin 2 Newly graded area (pervious only) A 6.03 77 Total Area / Weighted Curve Number 6.03 77 ==== == WinTR-55, Version 1.00.10 Page 1 4/18/2018 5:52:48 PM Okay 9.78 Disturbed Area (Acres) 38.29 Peak Flow from 10-year Storm (cfs) 17604 Required Volume ft3 12444 Required Surface Area ft2 78.9 Suggested Width ft 157.8 Suggested Length ft 70 Trial Top Width at Spillway Invert ft 168 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 2 Trial Depth ft (2 to 3.5 feet above grade) 58 Bottom Width ft 156 Bottom Length ft 11700 Bottom Area ft2 26514 Actual Volume ft3 Okay 14814 Actual Surface Area ft2 Okay 40 Trial Weir Length ft 0.5 Trial Depth of Flow ft 42.4 Spillway Capacity cfs Okay 4 Skimmer Size (inches) Skimmer Size 0.333 Head on Skimmer (feet) (Inches) 1.75 Orifice Size (1/4 inch increments) 1.5 4.31 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin Okay 6.03 Disturbed Area (Acres) 23.61 Peak Flow from 10-year Storm (cfs) 10854 Required Volume ft3 7673 Required Surface Area ft2 61.9 Suggested Width ft 123.9 Suggested Length ft 55 Trial Top Width at Spillway Invert ft 140 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 2 Trial Depth ft (2 to 3.5 feet above grade) 43 Bottom Width ft 128 Bottom Length ft 5504 Bottom Area ft2 12544 Actual Volume ft3 Okay 7700 Actual Surface Area ft2 Okay 24 Trial Weir Length ft 0.5 Trial Depth of Flow ft 25.5 Spillway Capacity cfs Okay 4 Skimmer Size (inches) Skimmer Size 0.333 Head on Skimmer (feet) (Inches) 1.5 Orifice Size (1/4 inch increments) 1.5 3.62 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin Mason & Hanger 300 West Vine Street Suite 1300 Lexington, KY 40507 859.252.9980 masonandhanger.com