Loading...
HomeMy WebLinkAbout20181393 Ver 1_More Info Received_20190204 Homewood, Sue From:Suzanne Herron <Suzanne.Herron@eli-llc.com> Sent:Monday, February 4, 2019 1:32 PM To:David.E.Bailey2@usace.army.mil Cc:Homewood, Sue; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke- energy.com); Suzanne Herron Subject:\[External\] PNG Line 446 (Belews Creek Gas Line) - SAW-2018-00885, DWR# 2018-1393 Attachments:re-construction plan at NC68 OptionC.PDF; NC68 Bore OptionC.PDF CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov David – As we have previously discussed, Piedmont determined that the proposed permitted crossing of stream 31 adjacent to NC Highway 68 was not able to be constructed in the location that was initially proposed in the plans. Three new options, A, B, and C were proposed. Option A was located south of the access road south of the permitted crossing. This option would not cross stream 31 or 32. Space constraints in relation to a neighboring landfill property made this alignment undesirable and the property owner would not agree to this option. Option B was located north of the permitted crossing and property owners would not agree to this option. Option C, which is south of the permitted alignment, was selected due to constructability aspects for the bore. I have attached the Re-construction plan for the crossing of streams 31 and 32 near NC Highway 68. I have also attached the bore plan for the NC Highway 68 bore. As you can see from the bore plan, the bore cannot be extended to the stream due to the slope. Please let me know if you need additional information for the permit revision. 1 Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NC) 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne.Herron@eli-llc.com From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Tuesday, December 11, 2018 12:41 PM To: Suzanne Herron; Homewood, Sue Cc: Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com) Subject: RE: PNG Line 446 (Belews Creek Gas Line) - SAW-2018-00885, DWR# 2018-1393 Hi Suzanne. I would not need the entire PCN package re-submitted. Rather, I would just need the plans for the proposed revised crossings, detailed explanation of the reason for the route change, and the avoidance, minimization and compensatory mitigation proposals for the revised crossings. The re-route of the crossing at Stream 32 is a concern given that the corridor would impact the confluence point of 2 streams. My jack and bore comment sent in a previous information request would still be applicable here. Perhaps a profile view showing the jack and bore under the roadway might better explain why it isn’t practicable to jack and bore the stream crossings too? If it is not practicable, we would need detailed restoration plans to ensure that the stream bank integrity at the stream confluence could be re-constructed/maintained. As you mentioned in your email, please also include the delineation of the add-on area around Stream 1 and any applicable wetland/upland data forms and stream forms. Thanks, and please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. 2 From: Suzanne Herron \[mailto:Suzanne.Herron@eli-llc.com\] Sent: Tuesday, December 11, 2018 12:02 PM To: Homewood, Sue <sue.homewood@ncdenr.gov>; Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Cc: Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com) <alicia.depalma@duke-energy.com>; Suzanne Herron <Suzanne.Herron@eli-llc.com> Subject: \[Non-DoD Source\] PNG Line 446 (Belews Creek Gas Line) - SAW-2018-00885, DWR# 2018-1393 Sue and David – For the Line 446 gas line project to Belews Creek, we are looking at a couple of re-routes due to property issues and buffer requirement conflicts. For the buffer issue at Stream 1 that Sue and I have talked about, we are looking at a re-route instead of going to the committee for a variance. Rahlff Ingle is going to the field tomorrow to look at the area upstream of the crossing. I will let you know how we want to proceed. We are also looking at a re-route at Stream 32. I have attached a drawing showing the proposed alignment with the JD drawing and plan sheet. Please let me know if there would be permitting issues with this re-route. David, what information would I need to submit for these? Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NC) 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne.Herron@eli-llc.com PRIVILEGED AND CONFIDENTIAL COMMUNICATION - This electronic transmission, including any attachments, may contain confidential and/or privileged information. This communication is to be used only by the intended recipient. If you received this email in error, please notify the sender and delete the email. Any disclosure, copying, distribution, or use of information received in error is strictly prohibited. 3 Y� � . ,-� ., ; lt�- ,, -` TEMP. EASEMENT 2 AREA Uj j O ar a O 0 I RECEIVING PIT BORE UNDER ROAD LAUNCHING PIT LINE 446 BELEWS CREEK PIPELINE STREAM 31 & 32 RESTORATION PLAN ORDER OF OPERATIONS: CONTRACTOR TO CONFIRM AND RECORD STREAM BANK DIMENSIONS AND DOCUMENT EXISTING CONDITIONS WITH PHOTOGRAPHS. CLEAR AND GRUB FULL PERMANENT EASEMENT (USE HAND TOOLS WITHIN 10' OF STREAM). INSTALL SILT FENCE AS THE AREA IS CLEARED. INSTALL SLOPE BREAKERS/WATER BARS. INSTALL AMERICAN EXCELSIOR CURLEX I FIBRENET OR ENGINEER APPROVED EQUIVALENT AND APPROVED SEED MIXTURE TO DISTURBED AREAS AS SOON AS POSSIBLE OR WITHIN 7 DAYS. FOLLOWING BORING OPERATIONS AT NC68, OPEN CUT AND INSTALL PIPELINE. ONCE THE PIPELINE IS INSTALLED, THE STREAM IS TO BE RESHAPED PER 'DIMENSIONS AND PHOTOS. THE CURLEX AND GRASS SEED SHOULD BE RE -INSTALLED AS SOON AS POSSIBLE. TEMP. STREAMS 31 & 32 EASEMENT AREA (INTERMITTENT) TEMPORARY IMPACT: OPEN CUT FOR GAS LINE, DEWATERING STRUCTURE, EQUIPMENT CROSSING/MAT PLACEMENT / PERM. EASEMENT \ PROPOSED GAS PIPELINE PERM. EASEMENT TEMP. EASEMENT TEMP. AREA EASEMENT \ AREA i PIPE ' ACCESS DRIVE DATE 1/16/2019 SHEET 1 OF 1 1 CORRESPONDS TO SHEET 79 \m TEMP. �N EASEMENT AREA % CURLEX MAT EXTENTS \SHOWN IN GRAY �m Z,A PREPARED BY Piedmont � ENERGY LAND is INFRASTRUCTURE, PLLC Natural Gas 1 3 PASSPORT WAY- NORTH CAROLINA # P-1 919-234-1974 WWW.ELI-LLC.COM•LICENSE # P-1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE - ENVIRONMENTAL