Loading...
HomeMy WebLinkAboutHigh Hampton Resort Core - Lucas 1-14-19WGLA Engineering, PLLC  724 5th Avenue West  Hendersonville, NC  28739  (828) 687‐7177  wgla.com    CIVIL ENGINEERS & LAND PLANNERS      January 14, 2019     Ms. Annett Lucas, P.E.   Stormwater Program Supervisor   NCDEQ – Energy, Mineral and Land Resources   1612 Mail Service Center   Raleigh, NC  27699‐1612     RE: High Hampton – Resort Core    Jackson County, NC      Post Construction Stormwater Submittal    WGLA# 14170     Dear Ms. Lucas:    Please find enclosed the submittal for post construction stormwater permitting for the Resort Core  area in the High Hampton Community in Jackson County, NC.  This is a high density project located in  a Tr+ waters, so post construction stormwater management is required.      With this letter, please find enclosed two copies of the stormwater management plans, supporting  calculations and narrative, completed permit application and signed operation and maintenance  agreement.  Also, I have enclosed a CD with PDF files with all this information.      If you have any questions about this submittal or if you need more information, don’t hesitate to  contact our office.      Sincerely,  WGLA Engineering, PLLC        William R. Buie, P.E.