Loading...
HomeMy WebLinkAbout20181383 Ver 1_UMBI meeting notes_20190204Strickland, Bev From: Haupt, Mac Sent: Monday, February 04, 2019 11:45 AM To: Kichefski, Steven L CIV USARMY CESAW (US); Steve Melton; Leslie, Andrea J; Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Hamstead, Byron; Bowers, Todd Cc: Owen Carson Subject: RE: [External] French Broad River 05 UMBI meeting notes Steve K, Steve M, I concur with the site meeting notes (with the exception below), in addition, we approve of Folly Branch and Tarklin Branch moving forward as sites the preservation bank. Was there notification that Flynn was dropped, I probably just missed it... One point I don't believe I saw was regarding the discussion of the amount of preservation credit alone that may be allowed. DWR will allow a certain of percentage of preservation credit without restoration credit, but beyond that threshold, the bank credit will need to be paired with restoration credit. Also, I believe the IRT discussed incorporating a preservation policy with the onset of a number of preservation banks. Sorry for the lateness of my comments... Thanks, Mac -----Original Message ----- From: Kichefski, Steven L CIV USARMY CESAW (US) [mailto:Steven.L.Kichefski@usace.army.mil] Sent: Friday, February 1, 2019 12:57 PM To: Steve Melton <steve@equinoxenvironmental.com>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Hamstead, Byron <byron_hamstead @fws.gov>; Bowers, Todd <bowers.todd@epa.gov> Cc: Owen Carson <owen@equinoxenvironmental.com> Subject: RE: [External] French Broad River 05 UMBI meeting notes CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Steve, I know you are seeking to submit the final prospectus soon, so if anyone from the IRT has any additional comments please provide them within the next few days. Since the Flynn Branch Site is being dropped from the prospectus at this time, I will focus my comments on the Folly Branch and Tarkiln Branch Sites. Overall I agree with the notes as provided, however have a few reiterations/additional thoughts: 1) The portions of the site we visited appear high quality and suitable for preservation. In conjunction with the site quality, the approach presented for this bank with the wide buffers, lends itself towards our highest preservation ratio of 5:1 in most areas, however, final credit ratios will be determined during the draft plan stage as more details are available to the IRT for a comprehensive site review. 2) 1 recommend GPS'ing all roads and culverts for review (both those to be maintained and removed). Details will need to be worked out with the IRT during plan review regarding which roads/foot trails/culvert crossings/bridges/water intakes will remain, their current condition, whether they need to be improved and how they will be used/maintained in perpetuity via the legal easement/long term management/financials. This should take into consideration concerns for long term management of the property for issues such as fire maintenance, species management, etc. 3) There were potentially a few streams on the Folly Site that continued upstream and off the property. Have you approached the adjacent property owners about the potential of adding these small segments to complete the watershed nature of this bank site? 4) As discussed onsite, there may be some resources that do not qualify for mitigation credit due to their discontinuous nature. Final credit will be based off the jurisdictional determination, so coordinate with David Brown and myself as you put together your jd approach to the site. Overall the portions of the sites we visited were of a quality and approach suitable for a mitigation bank, however, our initial evaluation cannot be completed until we receive the final prospectus and gather more information during the public notice phase of our review. Don't forget to include the adjacent property owner information when you submit the final prospectus. Feel free to contact me with any questions as you proceed with this project. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online. -----Original Message ----- From: Steve Melton [mailto:steve@equinoxenvironmental.com] Sent: Wednesday, January 2, 2019 4:29 PM To: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Kichefski, Steven L CIV USARMY CESAW (US) <Steven. L. Kichefski @usace.army.miI>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Hamstead, Byron <byron_hamstead @fws.gov> Cc: Owen Carson <owen@equinoxenvironmental.com> Subject: [Non-DoD Source] RE: [External] French Broad River 05 UMBI meeting notes Thanks Andrea! Happy New Year to all! If no one has any further comments we will move forward with the final Prospectus. Thanks everyone Steve Melton Vice President 37 Haywood Street, Suite 100 Asheville, NC 28801 Blockedwww.equinoxenvironmental.com <Blockedhttp://www.equinoxenvironmentaI.com/> (828) 253-6856 extension 207 Check out our website and blog! Visit us at Blockedwww.equinoxenvironmental.com <Blockedhttp://www.equinoxenvironmentaI.com/> From: Leslie, Andrea J [mailto:andrea.leslie@ncwildlife.org] Sent: Thursday, December 20, 2018 7:47 AM To: Steve Melton <steve@equinoxenvironmental.com>; Steve Kichefski <Steven.I.kichefski@usace.army.mil>; Todd Tugwell <todd.tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Hamstead, Byron <byron_hamstead @fws.gov> Cc: Owen Carson <owen@equinoxenvironmental.com> Subject: RE: [External] French Broad River 05 UMBI meeting notes I apologize for the tardiness of my comments. It looks like you captured my concerns for the sites. NCWRC is very supportive especially of the Folly Creek and Tarkiln Branch sites, as they capture riparian and upland areas with significant ecological value. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) Blockedwww.ncwildlife.org <Blockedhttp://www.ncwiIdIife.org/> <Blocked https://pl us.google.com/u/0/b/104061933014720497710/104061933014720497710/a bout> <Blocked http://www.facebook.com/pages/NC-Wi Idl ife-Resou rces-Com m ission/169986143088699?sk=wa I I&fi Iter=2> <Blockedhttps://twitter.com/?tang=en&logged_out=1#!/NCWiIdlife> <Blockedhttp://www.ncwiIdlife.org/News/Blogs/NCWRCBlog.aspx> <Blockedhttp://www.youtube.com/user/NCWRC?blend=2&ob=video-mustangbase> Get NC Wildlife Update <Blockedhttp://www.ncwiIdlife.org/News/WiIdlifeEmaiIUpdate.aspx> delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Steve Melton <steve@equinoxenvironmental.com <mailto:steve@equinoxenvironmental.com> > Sent: Friday, November 02, 2018 3:29 PM To: Steve Kichefski <Steven.I.kichefski@usace.army.miI <mailto:Steven.l.kichefski@usace.army.mil> >; Todd Tugwell <todd.tugwell@usace.army.mil <mailto:todd.tugwell@usace.army.mil> >; Kim Browning <Kimberly.D.Browning@usace.army.mil <maiIto: Kimberly. D. Browning@usace.army.miI> >; Haupt, Mac <mac.haupt@ncdenr.gov <mailto:mac.haupt@ncdenr.gov> >; Leslie, Andrea J <andrea.leslie@ncwildlife.org <mailto:andrea.leslie@ncwildlife.org> >; Hamstead, Byron <byron_hamstead@fws.gov <maiIto: byron_hamstead@fws.gov> > Cc: Owen Carson <owen@equinoxenvironmental.com <mailto:owen@equinoxenvironmental.com> > Subject: [External] French Broad River 05 UMBI meeting notes CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> on Please see the attached meeting notes for the French Broad 05 Mitigation Bank. Sorry they are delayed. I had some questions for Steve Kichefski. Please respond to me with comments and concerns. Thank you and have a great weekend! Steve Melton Vice President 37 Haywood Street, Suite 100 Asheville, NC 28801 Blockedwww.equinoxenvironmental.com <Blockedhttp://www.equinoxenvironmental.com/> (828) 253-6856 extension 207 Check out our website and blog! Visit us at Blockedwww.equinoxenvironmental.com <Blockedhttp://www.equinoxenvironmentaI.com/>