Loading...
HomeMy WebLinkAbout20180087 Ver 1_More Info Received_20190131Strickland, Bev From: Mike Kiser <mlkiser@bellsouth.net> Sent: Thursday, January 31, 2019 5:36 PM To: Johnson, Alan Subject: [External] RE: shoreline work Attachments: 163324.PDF External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Alan, Please see the attached sketch. Thanks, Michael L. Kiser, P.E. Worldwide Engineering, Inc. 704-483-5225 mlkiser@bellsouth.net wwegeo.com From: Johnson, Alan [mailto:alan.johnson@ncdenr.gov] Sent: Monday, January 28, 2019 2:05 PM To: mlkiser@bellsouth.net Subject: shoreline work What is the length and width and total area to be removed? You show a riprap slope. Will this extend into the pre- existing shoreline? What will that impact be above (buffer) and below the 760 elevation. In stabilization the slope should be kept to a minimum to reduce the impact to the buffer. Hopefully the diagrams are helpful. Thanks, Alan Johnson REMOVAL OF FILL. AREA? 1 AREA OF BUFFER IMPACT AND LAKE IMPACT TO SHORELINE STABILIZATION PERMANG14T IBI) F r -E R IMPACT ? FT IF ? FT BELOW � + r + All Dhrkl-an of Water Ikesources Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. DWR Dm awa,,R. ,me RBRY zw BYBAR IWA{Ci 07 " Mike Kiser From: Johnson, Alan <alan.johnson@ncdenr.gov> Sent: Monday, January 28, 2019 2:05 PM To: mlkiser@bellsouth.net Subject: shoreline work What is the length and width and total area to be removed? You show a riprap slope. Will this extend into the pre- existing shoreline? What will that impact be above (buffer) and below the 760 elevation. In stabilization the slope should be kept to a minimum to reduce the impact to the buffer. Hopefully the diagrams are helpful. Thanks, Alan Johnson REMOVAL OF FILL. AREA? AREA OF BUFFER IMPACT AND LAKE IMPACT TO SHORELINE STABILIZATION PERMANEN�T BUFFER WPACT FT BELOW 440 N� w�- DWR E3hi�iv€r of WAter Resaurce. Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 F�-teloylk_ 760 rle✓; v