From: Mike Kiser <mlkiser@bellsouth.net>
Sent: Thursday, January 31, 2019 5:36 PM
To: Johnson, Alan
Subject: [External] RE: shoreline work
Attachments: 163324.PDF
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Alan,
Please see the attached sketch.
Thanks,
Michael L. Kiser, P.E.
Worldwide Engineering, Inc.
704-483-5225
mlkiser@bellsouth.net
wwegeo.com
From: Johnson, Alan [mailto:alan.johnson@ncdenr.gov]
Sent: Monday, January 28, 2019 2:05 PM
To: mlkiser@bellsouth.net
Subject: shoreline work
What is the length and width and total area to be removed? You show a riprap slope. Will this extend into the pre-
existing shoreline? What will that impact be above (buffer) and below the 760 elevation. In stabilization the slope
should be kept to a minimum to reduce the impact to the buffer.
Hopefully the diagrams are helpful. Thanks, Alan Johnson
REMOVAL OF FILL. AREA?
1
AREA OF BUFFER IMPACT AND LAKE IMPACT TO SHORELINE STABILIZATION
PERMANG14T IBI) F r -E R
IMPACT
? FT
IF ? FT
BELOW � +
r +
All
Dhrkl-an of Water Ikesources
Alan D Johnson — Senior Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2200 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
DWR
Dm awa,,R. ,me
RBRY zw BYBAR
IWA{Ci
07 "
Mike Kiser
From: Johnson, Alan <alan.johnson@ncdenr.gov>
Sent: Monday, January 28, 2019 2:05 PM
To: mlkiser@bellsouth.net
Subject: shoreline work
What is the length and width and total area to be removed? You show a riprap slope. Will this extend into the pre-
existing shoreline? What will that impact be above (buffer) and below the 760 elevation. In stabilization the slope
should be kept to a minimum to reduce the impact to the buffer.
Hopefully the diagrams are helpful. Thanks, Alan Johnson
REMOVAL OF FILL. AREA?
AREA OF BUFFER IMPACT AND LAKE IMPACT TO SHORELINE STABILIZATION
PERMANEN�T BUFFER
WPACT
FT
BELOW
440
N�
w�-
DWR
E3hi�iv€r of WAter Resaurce.
Alan D Johnson — Senior Environmental Specialist