HomeMy WebLinkAbout20190147 Ver 1_PCN Form Submission_20190201D1�VR
�irlslan af Water Resources
Initial Review
Pre-Construction Notification (PCN) Form
September 29, 2018 Ver 3
Has this project met the requirements for acceptance in to the review process?*
F Yes
C' No
Is this project a public transportation project?"
� Yes r No
Change only rf needed.
BIMS # Assigned *
20190147
Is a payment required for this project?*
f• No payment required
f Fee received
f Fee needed - send electronic notification
Select Project Reviewer"
Dave Wanucha:eads\djwanucha
Information for Initial Review
1a. Name of project:
Replace Surry Bridge #12
1a. Who is the PrimaryContact?*
Heath Slaughter
1b. PrimaryContact Email:*
hslaughter@ncdot.gov
Date Submitted
2/1 /2019
Nearest Body of Water
Snow Creek
Basin
Yadkin-PeeDee
Water Classification
C
Site Coordinates
Latitude:
36.33039
Longitude:
-80.77170
A. Processing Information
County (or Counties) where the project is located:
Surry
Is this project a public transportation project?*
r Yes r No
Is this a NCDOT Project?*
G Yes r No
(NCDOT only) T.I.P. or state project number:
WBS # (�)
17BP.11.R.183
1a. Type(s) of approval sought from the Corps:
Ve rsion# *
1
Reviewing Office *
Winston-Salem Regional Office - (336) 776-
9800
1c. PrimaryContact Phone:*
(336)903-9202
::
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified bythe Corps?
C' Yes r No
Nationwide Permit (NWP) Number:
03 - Maintenance
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - Regular
r' Non-404 Jurisdictional General Permit
r Individual Permit
1e. Is this notification solelyfor the record because written approval is not required?
Forthe record onlyfor DWR401 Certification:
For the record onlyfor Corps Permit:
1f. Is this an after-the-fact permit application?*
� Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
C' Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
� Yes r No
Acceptance LetterAttachment
1h. Is the project located in any of NC's twenty coastal counties?
C' Yes r No
1j. Is the project located in a designated trout watershed?
� Yes r No
B. Applicant Information
1d. Who is applying for the permit?
fJ Owner r Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
f Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
NCDOT
2b. Deed book and page no.:
2c. Responsible party:
2d. Address
Street Address
801 Statesville Road
Address Line 2
�Y
North Wilkesboro
Fbstal / Zip Code
28659
2e. Telephone Number:
(336)903-9202
2g. Email Address:*
r 401 Water Quality Certification - E�ress
r Riparian Buffer Authorization
State / Aovince I F�gion
NC
Country
USA
2f. Fax Number:
x
C•' Yes C' No
C' Yes G No
hslaughter@ncdot.gov
C. Project Information and Prior Project History "
1. Project Information
1b. Subdivision name:
(rf appropriate)
1c. Nearest municipality/town:
Elkin
2. Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
Address Line 2
ary
Fbstal I Zip Code
2b. Property size:
State / Aovince / Re3ion
Country
3. SurFace Waters
3a. Name of the nearest body of water to proposed project:*
Snow Creek
3b. Water Resources Classification of nearest receiving water:*
C
3c. What river basin(s) is your project located in?*
Yadkin-PeeDee
3d. Please provide the 12-digit HUC in which the project is located.
030401010503
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Old bridge to be replaced in rural area.
46. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
f Yes �' No r Unknown
4d. Attach an 8 1/2 X 77 excerpt from the most recent version of the USGS topogrephic map indicating the location of the project site. (for DWR)
Surry #12_Topo.pdf 1.83MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
200
4h. Explain the purpose of the proposed project:*
Bridge Replacement
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
See attached cover letter
4j. Please upload project drawings for the proposed project.
Surry #12_Final Permit Drawings.pdf 14.58MB
5. Jurisdictional Determinations
Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?"
� Yes r No r Unknown
Comments:
Sb. If the Corps made a jurisdictional determination, what type of determination was made?"
� Preliminary r Approved � Not Verified � Unknown r WA
Corps AID Number:
Sc. If Sa is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company: RK&K
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
C' Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
no
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands I17 Streams-tributaries r Buffers
r Open Waters I� Pond Construction
3. Stream Impacts
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
15 43
3i. Total stream and ditch impacts:
58
3j. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Replacing bridge with another bridge
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:
All appropriate BMPs will be used during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C' Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Only bank stabilization.
I F. Stormwater Management and Diffuse Flow Plan (required by DWR) " I
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
C' Yes r No
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
F Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?*
r Yes �' No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environme ntal Policy Act (NEPAISEPA)? *
C' Yes r No
Comme nts: *
MCDC
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
f Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water qualit�/?*
C' Yes r No
3b. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
f Yes r No � WA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
� Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
C' Yes r No
Sd. Is another Federal agency involved?*
C' Yes � No
Se. Is this a DOT project located within Division's 1-8?
f Yes r No
Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.?
C' Yes r No
Sg. Does this project involve bridge maintenance or removal?
F Yes r No
Sg(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.?
r Yes r No
If you answered "Yes" to Sg(1), did you discover any signs of bat use?
� Yes r No � Unknown
Sh. Does this project involve the construction/installation of a wind turbine(s)?*
C' Yes r No
r Unknown
Si. Does this project involve (7) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
C' Yes r No
Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
NHP and visual observation
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
� Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Project was reviewed by HEU and SHPO.
7c. Historic or Prehistoric Information Upload
850012 No Adverse Effect Historic Property.pdf
Surry 12 No Survey form Archaeology.pdf
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
G Yes r No
Sb. If yes, explain how project meets FEMA requirements:
Project was reviewed by NCDOT hydraulics unit.
Sc. What source(s) did you use to make the floodplain determination?*
attached link.
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
NHP project_report_surry_bridge_12.pdf
Surry #12_Letter.pdf
Surry #12_Location Map.pdf
Signature
*
rJ By checking the box and signing below, I certify that:
58.48KB
227MB
675.35KB
798.94KB
387.3KB
• I have given true, accurate, and complete information on this form;
• I agree that submission of thls PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY');
. I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
. I intend to electronically sign and submit the PCN form.
Full Name:
Heath Slaughter
Signature
�7`/f'l,l�i/ 2�%lC�i/l-!''!
.
�
Date
2/1 /2019