Loading...
HomeMy WebLinkAbout20190146 Ver 1_Watauga 46_47_48 Final Permit Drawings_20190201Highway North Carolina Department of Transportation `� �Stormwater -- ,,,,,,,,,,, Highway Stormwater Program ��� STORMWATER MANAGEMENT PLAN �—� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.11.R.173 TIP No.: SF-940046 / 47 / 48 County(ies): Watauga Page 1 of 15 General Project Information WBS Element: 17BP.11.R.173 TIP Number: SF-940046 / 47 / 48 Pro"ect T pe: Brid e Re lacement Date: 1/23/2019 NCDOT Contact: Heath Slau hter Contractor / Desi ner: RK&K - Jonathan Whittin ton, PE Address: g01 Statesville Road Address: g00 Ridgefield Drive North Wilkesboro, 28659 Suite 350 Ralei h, NC 27609 Phone: 336-903-9202 Phone: 919-878-9560 Email: hslau hter ncdot. ov Email: 'whittin ton rkk.com Cit /Town: Count ies : Watau a River Basin s: New CAMA Coun ? No Wetlands within Project Limits? No Pro'ect Descri tion Pro'ect Len th lin. miles or feet : 820 ft 0.155 mi. Surroundin Land Use: Rural Pro osed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.5 ac. 0.3 ac. Typical Cross Section Description: 2-lanes at 9' each with 4' shoulders (2' paved and 2' unpaved) 2-lanes at approx. 9' each with 4' wide unpaved shoulders Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: Year: Existin : 250 Year: 2000 General Project Narrative: This project replaces three existing bridges with bottomless (3-sided) culverts which were specified in the 17BP.11.R.173 Design Build RFP. No blasting is anticipated. (Description of Minimization of Water #940046 is a 25'-6" single span bridge with a steel I-beam and timber floor superstructure. The proposed replacement structure will be a 24'-0" x 4-8" bottomless (3-sided) Quality Impacts) culvert with wingwalls 46' along centerline of culvert. #940047 is a 25'-10" single span bridge with a steel I-beam and timber floor superstructure. The proposed replacement structure will be a 24'-0" x 3'-9" bottomless (3-sided) culvert with wingwalls approximately 51' along centerline of culvert. #940048 is a 18'-6" single span bridge with a steel I- beam and timber floor superstructure. The proposed replacement structure will be a 24'-0" x 3'-4" bottomless (3-sided) culvert with wingwalls approximately 40' along centerline of culvert. The proposed culverts will have cast-in-place concrete footings founded on rock. The footings will be constructed up to the floodplain bench elevation to alleviate constructability issues. The floodplain benches will be armored with Class II riprap for stability. Proposed culvert #46 will have 26 LF of inlet improvements and 21 LF of outlet improvements to help stabilize the stream banks and direct the flow into the culvert. Proposed culvert #47 will have 25 LF of inlet improvements and 50 LF of outlet improvements. Proposed culvert #48 will have 35 LF of inlet improvements and 23 LF of outlet improvements. There is no significant increase in the discharge from the roadway runoff. _._. �_ ��R Surface Water Body (7): Grassy Creek NCDWR Stream Index No.: 10-1-14 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV (WS-IV) Supplemental Classification: + Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: N/A Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) HI�hWay North Carolina Department of Transportation °� Stormw�ter l — �,,,� Highway Stormwater Program °�� STORMWATER MANAGEMENT PLAN y`"`°��°^"'°�� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS ElBillellt: 17BP.11.R.173 TIP No.: SF-940046 / Count ies : Watau a Page 2 of 15 Bridge to Culvert Avoidance and Minimization Proposed Structure Summa Sheet No. & Station Sheet No.: 4 Station: -L- 13+04.4 Number of Barrels: 1 Draina e Area ac or sq mi : 2.39 S. Miles Barrel Width/Diameter ft : 24 Surface Water Bod : 1 Grass Creek Barrel Hei ht ft : 4'-8" Culvert T e: Bottomless 3-Sided Culvert Culvert Len th ft 46 Avoidance and Minimization Efforts: The proposed culvert is bottomless to accomodate aquatic passage and wide enough to accomodate normal channel width. The slope is (Bridge to Culvert) consistent with the existing stream slope and the low flow velocities are minimized. Sills and baffles are not required because the culvert is bottomless. The length of the Bottomless (3-Sided) Culvert is the minimum required for clear recovery without guardrail that may block flow in overtopping events. Stream Slope Fish and/or Aquatic Life Passage Existing Average Stream Slope (%): 1.35 % Existing Low Flow Channel Dimensions Approx. 10' wide from BOB to BOB and 2.5' Proposed Culvert Slope (%): 1.35 % in the Stream: deep. Approx. 16' from TOB to TOB with 1:1- Culvert Burial 2:1 bank slopes. Proposed Culvert Burial Depth (ft): N/A Existing Streambed Material: Rock and Cobble Proposed Low Flow Dimensions Approx. 14' wide from BOB to BOB with 2:1 Through the Culvert: bank slopes. Proposed Sills/Baffles: N/A Existing Low Flow Velocities in the Stream (ft/s): 6.5 ropose ow ow e oci ies roug the Cubert (ft/s): 4'8 Alternating Low Flow Sills/Baffles: N/A Culvert/Stream Alignment Stream Patterns Upstream and Downstream The culvert lies in a portion of Grassy Creek where the stream is flowing southeast. There a several meanders in the stream with the stream of the Culvert that Could Affect Fish crossing back and forth under the roadway throughout the project. The confluence with South Fork New River is downstream of the project site. Passage and Bank Stability: Bed Forms Impacted by Culvert (riffles, There are locations of exposed bedrock within the streambed throughout the project. pools, glides, etc.): Low Flow Floodplain Bench Required? Yes Excavation is necessary to the top of the culvert footing. Fill is not possible once the culvert is put in place due to the low (provide justification) clearance. Bends at Inlet/Outlet? No (describe culvert alignment with stream) Stream Realignment Necessary? (provide No justification) Bank Stabilization: Class I rip rap is used to stabilize the disturbed channel banks up to 26 feet upstream and 21 feet downstream of the culvert. Outlet Velocities Natural Stream Channel 2-yr Velocity (ftJs): 5.6 Natural Stream Channel 70-yr Velocity (ftJs): 9.3 Proposed Culvert 2-yr Outlet Velocity (ft/s): 3.5 Proposed Culvert 70-yr Outlet Velocity (ft/s): 5.6 Roadway Geometric Considerations Evaluate/Describe Roadway Geometric Constraints: This roadway section closely borders mountains along the upstream side. HI�hWay North Carolina Department of Transportation °� Stormw�ter l — �,,,� Highway Stormwater Program °�� STORMWATER MANAGEMENT PLAN y`"`°��°^"'°�� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS ElBillellt: 17BP.11.R.173 TIP No.: SF-940047 Count ies : Watau a Page 3 of 15 Bridge to Culvert Avoidance and Minimization Proposed Structure Summa Sheet No. & Station Sheet No.: 4 Station: -L- 15+41.2 Number of Barrels: 1 Draina e Area ac or sq mi : 2.73 S. Miles Barrel Width/Diameter ft : 24 Surface Water Bod : 1 Grass Creek Barrel Hei ht ft : 3'-9' Culvert T e: Bottomless 3-Sided Culvert Culvert Len th ft 51 Avoidance and Minimization Efforts: The proposed culvert is bottomless to accomodate aquatic passage and wide enough to accomodate normal channel width. The slope is (Bridge to Culvert) consistent with the existing stream slope and the low flow velocities are minimized. Sills and baffles are not required because the culvert is bottomless. The length of the Bottomless (3-Sided) Culvert is the minimum required for clear recovery without guardrail that may block flow in overtopping events. Stream Slope Fish and/or Aquatic Life Passage Existing Average Stream Slope (%): 2.17 % Existing Low Flow Channel Dimensions Approx. 10' wide from BOB to BOB and 2.5' Proposed Culvert Slope (%): 2•17 % in the Stream: deep. Approx. 16' from TOB to TOB with 1:1- Culvert Burial 2:1 bank slopes. Proposed Culvert Burial Depth (ft): N/A Existing Streambed Material: Rock and Cobble Proposed Low Flow Dimensions Approx. 14' wide from BOB to BOB with 2:1 Through the Culvert: bank slopes. Proposed Sills/Baffles: N/A Existing Low Flow Velocities in the Stream (ft/s): 6'8 ropose ow ow e oci ies roug the Cubert (ft/s): 6'� Alternating Low Flow Sills/Baffles: N/A Culvert/Stream Alignment Stream Patterns Upstream and Downstream The culvert lies in a portion of Grassy Creek where the stream is flowing north. There a several meanders in the stream with the stream crossing of the Culvert that Could Affect Fish back and forth under the roadway throughout the project. The confluence with South Fork New River is downstream of the project site. Passage and Bank Stability: Bed Forms Impacted by Culvert (riffles, There are locations of exposed bedrock within the streambed throughout the project. pools, glides, etc.): Low Flow Floodplain Bench Required? Yes Excavation is necessary to the top of the culvert footing. Fill is not possible once the culvert is put in place due to the low (provide justification) clearance. Bends at Inlet/Outlet? Yes Culvert is aligned with stream at culvert location, however downstream of the culvert the channel bends to the right. (describe culvert alignment with stream) Stream Realignment Necessary? (provide No justification) Bank Stabilization: Class I rip rap is used to stabilize the disturbed channel banks up to 25 feet upstream and 50 feet downstream of the culvert. Outlet Velocities Natural Stream Channel 2-yr Velocity (ftJs): 7.6 Natural Stream Channel 70-yr Velocity (ftJs): 9.6 Proposed Culvert 2-yr Outlet Velocity (ft/s): 4.3 Proposed Culvert 70-yr Outlet Velocity (ft/s): 9.4 Roadway Geometric Considerations Evaluate/Describe Roadway Geometric Constraints: This roadway section closely borders mountains along the upstream side. HI�hWay North Carolina Department of Transportation °� Stormw�ter l — �,,,� Highway Stormwater Program °�� STORMWATER MANAGEMENT PLAN y`"`°��°^"'°�� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS ElBillellt: 17BP.11.R.173 TIP No.: SF-940048 Count ies : Watau a Page 4 of 15 Bridge to Culvert Avoidance and Minimization Proposed Structure Summa Sheet No. & Station Sheet No.: 4 Station: -L- 18+00.9 Number of Barrels: 1 Draina e Area ac or sq mi : 2.76 S. Miles Barrel Width/Diameter ft : 24 Surface Water Bod : 1 Grass Creek Barrel Hei ht ft : 3'-4" Culvert T e: Bottomless 3-Sided Culvert Culvert Len th ft 40 Avoidance and Minimization Efforts: The proposed culvert is bottomless to accomodate aquatic passage and wide enough to accomodate normal channel width. The slope is (Bridge to Culvert) consistent with the existing stream slope and the low flow velocities are minimized. Sills and baffles are not required because the culvert is bottomless. The length of the Bottomless (3-Sided) Culvert is the minimum required for clear recovery without guardrail that may block flow in overtopping events. Stream Slope Fish and/or Aquatic Life Passage Existing Average Stream Slope (%): 1.47 % Existing Low Flow Channel Dimensions Approx. 10' wide from BOB to BOB and 2.5' Proposed Culvert Slope (%): 1.47 % in the Stream: deep. Approx. 16' from TOB to TOB with 1:1- Culvert Burial 2:1 bank slopes. Proposed Culvert Burial Depth (ft): N/A Existing Streambed Material: Rock and Cobble Proposed Low Flow Dimensions Approx. 14' wide from BOB to BOB with 2:1 Through the Culvert: bank slopes. Proposed Sills/Baffles: N/A Existing Low Flow Velocities in the Stream (ft/s): $'� ropose ow ow e oci ies roug the Cubert (ft/s): 5'8 Alternating Low Flow Sills/Baffles: N/A Culvert/Stream Alignment Stream Patterns Upstream and Downstream The culvert lies in a portion of Grassy Creek where the stream is flowing southeast. There a several meanders in the stream with the stream of the Culvert that Could Affect Fish crossing back and forth under the roadway throughout the project. The confluence with South Fork New River is downstream of the project site. Passage and Bank Stability: Bed Forms Impacted by Culvert (riffles, There are locations of exposed bedrock within the streambed throughout the project. pools, glides, etc.): Low Flow Floodplain Bench Required? Yes Excavation is necessary to the top of the culvert footing. Fill is not possible once the culvert is put in place due to the low (provide justification) clearance. Bends at Inlet/Outlet? Yes Culvert is aligned with stream at culvert location, however upstream of the culvert the channel bends to the right. (describe culvert alignment with stream) Stream Realignment Necessary? (provide No justification) Bank Stabilization: Class I rip rap is used to stabilize the disturbed channel banks up to 35 feet upstream and 23 feet downstream of the culvert. Outlet Velocities Natural Stream Channel 2-yr Velocity (ftJs): 7.7 Natural Stream Channel 70-yr Velocity (ftJs): 9.9 Proposed Culvert 2-yr Outlet Velocity (ft/s): 4.9 Proposed Culvert 70-yr Outlet Velocity (ft/s): 6.7 Roadway Geometric Considerations Evaluate/Describe Roadway Geometric Constraints: This roadway section closely borders mountains along the upstream side. Lat: 36.26494, Long: -81.599549 � . . ���`,� � ��� � � r3 � ,�� . ry � ; ' . � � � �j�- � , a°+.� ' • ,, , �� :mt` � .. '- ,,,}P ,t, ��' �* �, �5 I � � .�-r 3L �� s3e' i. • . �� ,.�. - � t .9tP.� � � - 'rt/. /,' i � «.i . . '�° .: ,r' R *� '� ��;- � ' �,�` ,—� �'"?�,� ���r�� � � � �,� �"9r f� Y � �[ 4.� ,,�- yr+�y�" � �;� '�y E ,`�,�, � ..;x F �� � f _� ��,�� '� �� � ' �� h�� , � y � � �6�- ` . � � � , � ,� y - . •� ..�'v z�> . �� .,.�, � ^+ k - fl !, ■ r, r .�' ' :,' . :`� � . p � � ,�! a. r` ,� / ,'� � � ' - � • � ��',�i� � �+r, �� �: f �,�� � ,. �� ' ^ -. � .� rf f� ����� �'` �' � � '� � 's� � " � . .r -'� �: �!�� �,��/' i , r� r �� � V . ✓'� Ai`.. + . ..a. '� "� .� � '� � r� �,,�� '� i�A � !`.�� ' �� � � ` '�`y� ;�' ,�" � t � � ��� ,_'� � J �' 4 d' , y � s � [ :�` ,�' • y�' � � a�'c .�� x � �� ,d � s �, r � . , �°�r'� ,-�t; �� �' � „�.,. � � �': � �. � ��. � ., � r i -. rr . � . � � ? , �; � ,.. . _ k � ,.. , ��� ��'.. F`� �i N i �"'i �� � x ' .�',� �' ��, . zw r . fe ��x�,F � � � _ � � ' ,� � � ; w.a , � �� �"° � � Y�� . � . , `i�i% . . _ „ '� n, �,r '�� y • � .� � � � �� � � v � �� f= ' - �, g - - F ,� :N,: �. ..,y� ,.n�. .,� , . � � �"�. � �: � .�� � �, � , �� �: . .� 1 � ,�' r # ,t `� � r ��" ��;i� . y � " ht(, � $��' p _ ' ` , `��k'' � , � > � '�'.'' � '��,•+�'��+ °, ��' � �! �✓'` °'+'� .de� , , `s'� : �+Y" � ° ,:e�".J � ' ���� ,_�� ��y� '� �+� r a� f ' . ... � �.��1�:,: �, .. , . M . .� r*` �N �`��N� � r �:�c'^ f�"rt . �� �• � �.{+.Pse� �i+'� �� • � �, � 'i rr � � � ��� s � ^ �� " _5,� , ... '� .�, � I°' '�,t '�,���; Yr s 7 . • y� . � ' • w ' ����,'a�.,� x �F� ,�� � � �, • . I' ir E� t. . � ~ C�,mxr y�� � � �� � � � .�d � � ' �'k -a �� ,� � � � �� r ` ;�i a �'�„� -.q �'�` °� �c . ��� d. .�'b`r. f � � � . a � �� a :. � � � A �,.... .; �'Y�,°w� �� �`� ` � ��� ^` ' �"6�R�. � : � � � �r � k- ...d �,, fP' 'f +�� c� � � y G'k i ��� lP 1 � �4 ' . ri ��� •: � f ..� �'��j1 . .'� `4 r'f � �' �' � Y i�'. _: ' . . .r`w i . ..'��� � ,i. � � < �+'i � ��N' � r� � . �f ': , , i�" i�"� �a''* � ��� �Y �j z"'� se�•.�,, � �i .� ��.; •� s . :� ;� . � � f� . �S e. �' ,.. ,i e�. � � � `s �f s �" � , • � ,TM" � � ���r� �� » ��� j' ry .i � `..f,....x �s ,.. ,�.? !£"D � _ � . ,:r!^r' � �'y`�-'� - ,�,f '�; f �• "' . '� �&'� ��^°° �?., � F ,� a`u ` �, r '] -.:�� � �,� � . r a 3 i � � ' � '�` �� � : �t .�. � ��e , ` ,� , �' ,� � d` , r U'':r 7 ' ,Y* '"a ..,,§ .i,1 f iy �� ,�,�, '� 4 �;;� ����a „� 3� � d1�'p. A� h � , f� � �P :..� . a✓.' °� „b rlr �n1. �� :�� �`:. ,�.�,�4;.,� ����.�y.. F��, � �`a {,.. y � � /' X .Y F �.. .�.fy P ..� � '. � �� � 4"" �'�gP� �LA es f;�� .�.�.` : h �. f.' .1 k''�'F �� i � � +� � 9� ._,� ,�. � �e �F: � �"�� - r 4a _ � g �f�'�' � �r ,; � 3� i4 ;;ps�fi 1��� .��. r:�, i+� � : . .� y . _q � i ..' ` :...$ �' WF � da` dt:� 1� II I� 7 �.•�!+' �,r 7�r '9"t` �^ a�i� �. , rJ!.1�" i, ; s°: -�.. r. �, ' �. . ..� � � .�.y s � � � ��f� � , ",:n � �' �, '. ��:� `k ' � � �'� �+.�� � � � 4 3` - � � � . � fg� �. . � � ��� yy... � . . �.� � i� t .�ca.� : � �'rC � ,zc .r." �}-�. '",k, 'F' � s ki�' + `• `� ��,. �, � � "'��Y mp � - t � � i r �� T'�� �; �,, �t.�`� e° �,,� � �' � � � .. ��� �e r X�� �' �� '�� r� �,P�� � �� �e�� �S '1 �+,a � � � �'�".�I� ; �+ r + '��.. �� . jS k .r��'M i ..`§,, ..M ryi � �,rr ^ �, . 6.�v dr'+�, � � . �,� 4 � 4 ,- M �. ' h � ' � • „, �: �.., � � �� s .d , � . �e�.S ��� ���� F. � L�'y' 't �', �, ����'.' � . S ':A �� � � � � : � �� � � � � � � �. � � .�, _ `�,''�� : ;. � �-.� '�s� s�� � „� �� �, f � M�,r� ��, .: .,� ,� � w �� � � ��s+�.� � ; . v lY d . a . + � �. �. 3�- ,'�4 , t� 1 ',� x��m �r.' `t b.� t.^ }s' ,r ' " K .s� �. �p ,�.. Aq, � ; � .�� r rs. � .} �t ^^r�'Yf � b �.� i�l`�' '''�'* Y^ `� � :� �7 � ` r(* {�,�} . . '���� .�� .. � .,, 31�;: y �y, :�'" � � � °J -U �' �• �4� • q ��y� .. s ., a . �,� � } '� �.a$"'�� �6:� 'r �rt6 ..�� � ��{'.y s '� ,` il;r�. T .-��� y� �� ,v �52,r� , y � .�i .: ��. �NC OneMap, NC,C*enter for Geograph;c+lnformation and Analy�sis�: lr.� J � 421 221 i `,--•_i 321 WATAUGA 194 O �.` �, _y •� r,-.. ' 194 321 � � � �� , -� 105 ' ��� � 421 _-�;�° ;'�, Year 6 Express - Division 11 i' � .' WATAUGA '��r;- ----------- -------------.�, WILKES COUNTY � ' �� �---•-�-� BRIDGE 940046 ._ �,,, ' = � � ',,-,. WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 12+71 LT Temporary Dewatering 10 1 -L- 12+76 LT Bank Stabilization 26 1 -L- 12+88 LT Bridge Replacement w/ 3 Sided Culvert 26 1 -L- 13+04 RT Bank Stabilization 21 1 -L- 13+18 RT Temporary Dewatering 10 2 -L- 12+76 RT Temporary Dewatering 10 2 -L- 12+78 RT Stream Relocation 27 3 -L- 14+98 RT Temporary Dewatering 10 3 -L- 15+11 RT Bank Stabilization 25 3 -L- 15+26 RT Bridge Replacement w/ 3 Sided Culvert 29 3 -L- 15+41 LT Bank Stabilization 50 3 -L- 15+96 LT Temporary Dewatering 10 4 -L- 17+59 LT Temporary Dewatering 10 4 -L- 17+71 LT Bank Stabilization 35 4 -L- 17+93 LT Bridge Replacement w/ 3 Sided Culvert 16 4 -L- 17+97 RT Bank Stabilization 23 4 -L- 18+06 RT Temporary Dewatering 10 TOTALS': 278 70 0 *Rounded totals are sum of actual impacts NOTES: Total amount of clearing = 0.15 acres #940046 Existing bridge is a single span at 25'-6", 20.8' Out-Out Proposed 24'-0" x 4-8" Bottomless (3-Sided) Culvert is 46 LF with a slope of 1.35% #940047 Existing bridge is a single span at 25'-10", 20.2' Out-Out Proposed 24'-0" x 3'-9" Bottomless (3-Sided) Culvert is 51 LF with a slope of 2.17% #940048 Existing bridge is a single span at 18'-6", 20.1' Out-Out Proposed 24'-0" x 3'-4" Bottomless (3-Sided) Culvert is 40' LF with a slope of 1.47% � I I I I I � � l 9400469 940047 & 940048 PROJECT REFERENCE NO. SHEET NO. ; � STANDARD 'V' DITCH � � � S E E D ETAI L C, S H T. 2 D-1 D E L. � A C o l7BPelleRel73 4 � , � ��= �� -L — PT Stao l2 +87a03 .� � q" s o � i � � �w SHEET NO. ; � � � �, , I COPPER � AN D B o 6 3 8 I P G � q gMITH � ROADWAY DESIGN HYDRAULICS � I ; � � 1� '��� I � � ��TOE PROTECTION - L- P R� C 1� t oe 1 4+ 5 3v O 7 BEG�N CULVERT ENGINEER ENGINEER , �, —L — PCC Staa ll +23084 ; , � � M A R C A o '� o � S E E D ETAI L A S HT. 2 D- -L - Stoe l5 +25e77 � & CAROL Lo ,,� o � �" 46-3 q,3 � �- Y 0 R K S 0 N �' �`� � � BEGIN CULV ERT o ' T � E `� , `" � z P P E R M I T D R A W I N G � D B 4 7 4 P G 2 2 0 ; � ;� � T OE PROTECTION ! ��, T� 46 —2 � '� � —L — Stae l2 +9/a37 N w � 2 s F � _ H E ET F 1 � ; �_ E ��MT�,� � o�, X X � SEE DETAIL A, SHT. 2D 1 7 5 � T� CTION �MPERVIOUS —i�- SITE 1 m o .,u � � T� � � cn FFE= � GARDEN � ioogg� so�io IRON-R/W � � DIKE N 68 29 OSoB l ' SEE DE AIL`�;' � � V 302 � X � + � � ,� � . � ; � ��, � �� � �, woo�s SITE 3 S —L— PRC S �o /7 85066 66e64' R/W-COR ; TZ RDa �\ F SHT. Z D-1 ��� i� =� � I� E �� / �S c� E NG � 2�� P�s TME IMPEDRK OUS � W SITE 4 G ; �� �, ----- , , �� BA I W� P�S C Sta, 16+28e35 � � � � � � �. ; � W � I � � � _� � . \ , - , 1 c � � � � E � �O � � (�, Q\nI � + h/ ( � i \ \\ � �,'�jn C5� � rt' —L � / �o l3 f27oV o � � Q� � � O TB TB T8 B TB� , \ v` / � O U I� C li e H O q S U V V � y-� � I / TB- � i \ � �/ � � / � ° TB o� ' ; 20� `. - -- �- (2)-24 INCH �W � �� �, �8 F J , - - �S _ TB � � DB 358 � GRASSY CREEK T I 2 R � W ' �� � , ti!O TEMPORARY � ��'///��� � / � - -�� � '��; � ���� '��, . � eP� ��� --- �S � - - T �/ — PT t lQ i - - � �\\ \ � PIPES ��� / �� � TB � TB -T8 TB TB TB T �--�� ; X . S ao ✓ � ■ � � � i _ - _ ` B � � `��J ' \� ✓ \�� � \ ''� �\ - �o —� � � '��,�� _�v � q S B IMPERVIOUS i7 � , — - ' � �. F_- F `-�-' �, � — � ,- � � — i BE� - _ -__ \ ����\ —, \ � x 4—� S 5„RCP G'/�� �\ _______ ____F__— � --DIKE__ _----�'� � __ " CMP _ ---_ �� �� � —L — ST Ae //+0 a . � 93 �� �� , , w — „ __ _ �— �--------- ;� _ o 0 ' J \re ��� \ �� -- -- REM�VE'� - N o ; —L — PRC Staa ll f o � TB � � � SITE 2 ��� � \` �''-- ------- - - - - — PAVED ' , o , N o � � � ; ROGER De AND �� , \��— - � SR l 5/ CASTLE FORD RDa o 0 0 ,���-' � LORI Pe C00K EXISTING ACCESS ,, PAV D ,- — I5" CM �5- � DB 669 PG 810 BRIDGE � - ,�--- -------- -----_-- - (2)-24 �NCH �� '"' .�IN�w EXI ' IMPE VIOUS � � � � '�� F���'� ��—�F� - - � - � — � REMOVE TE PPORARY �' / ' CHANNEL RELOCATION pi � �'��,,, — �' � � � ;� �_��� 46-5 SEE DETAIL B, SHT. 2D-1 �'a �- ----��---��_--�----_�--- - �� i s ,,,� � � � ; � 84" PL MESH W/ 4SB1� , ' � �' . EN ��J � . o �,� � � � ; E I L x; �' ° R END CUL � �'� �, — — � � STI NG �, � PERVIOUS �� �� I.� S. � C�aOO J�e i -� T E DIKE " —L — SfOo 042 , PE I L - �� � _ � BASI � � � � ' ° � 2 —24 INCH � � STILLING � � G e� ; , < � �>>-24 INCH �� END C VERT � 46�-3 BE�IN CULVERT A N BA , ' DE END G� � SS� �� ; � , � IMPERVIOUS � TEMPORARY � TEMPORARY �' O �, , � PIPES —L SfOo I7 fS8o36 �n^ — — / � �, , —L — Sta l3 +17e43 0 R C H A R D DI KE �,,, _ �� t o g+ iWOODS PIPE �. ,� > X X__ -x ��, �� �� W PERVIOUS e,�' e��� � ; 1 ' r� , � DELLA Ca ,, , j JS , � � I �� -� � — � - � � - � AND JOHNNIE De SMITH STANDARD V DITCH — S�� � ; , . X P� h� �ORCHARD , DB 638 PG 49 SEE DETAIL D, SHT. 2D-1 Te ��� ; ' / . r Ts � � �m � �� � ' � ' / � � �m e � ✓ ' ; LEGEND � x�,� �� � � � � �, �, � � i DENOTES IMPACTS IN � e� 9 0� � / ~� ��' �-� � . s -� � �� ; SURFACE WATER •e � / ' \ T� — � / i DENOTES TEMPORARY � � `ra � `e ~m � � n�� / � ; IMPACTS IN SURFACE WATER � �re �s �° ' �\Te C��° ���g' / � op. �0 WETLAN D AN D SU RFACE WATER IMPACTS PERMIT � _ � , ; . . . � Pl = ll +60°00 � CULV ERT HYDRAULIC DAT A CULV ERT HYDRAULIC DAT A � EL = 3,�4/e73� ' I STR *940047 Sto.l5+4/.2 —L— STR #940048 Sta.18+00.9 —L— i �` VC = SO� � � I DESIGN FREQUENCY = 5 YRS DESIGN FREQUENCY = 25 YRS ; ` K= 67 DESIGN DISCHARGE = 440 CFS DESIGN DISCHARGE = 850 CFS ' Pl = l2 +57v00 � �� V= 4OMPH � DESIGN HW ELEVATION = 3,0/9.9 FT DESIGN HW ELEVATION = 3.0/6.9 FT ; `���.� I EL = 3,0.34032� l00 YEAR FREQUENCY = l00 YRS l00 YEAR FREDUENCY = l00 YRS � V C = IOO� l00 YEAR DISCHARGE _ 1,200 CFS l00 YEAR DISCHARGE _ 1,200 CFS ; l00 YEAR HW ELEVATION = 3,023.5 FT l00 YEAR HW ELEVATION = 3.0/8.7 FT ; , K=32 � ' V= 27MPH � � OVERTOPPING FREQUENCY = l0 + YRS OVERTOPP/NG FREQUENCY = 50 + YRS � OVERTOPPING DISCHARGE = 600 CFS OVERTOPP/NG DISCHAR�E _ 1,000 CFS ; � � � OVERTOPPING ELEVATION = 3,02/2 FT OVERTOPPING ELEVATION = 3.0/8.l FT , a e NORMAL WATER SURFACE ELEV = 3,0/7.0 FT NORMAL WATER SURFACE ELEV = 3,0/2.2 FT 4 � � 4 I `� � ° = f DATE OF SURVEY = l2/20/20/6 DATE OF SURVEY = l2/20/20/6 ; �, , , , Pl l4 77a00 � � � EL = 3,024e30' � � , � , � ; � � ° ° ' VC = l00' ; o ,, � � , , o � , K = 68 � e a � � � ' ' — — V = 40MPH ' � ` ` � — Pl = 16+35000 ,� , i � I � , ii , _ I I EL = 3 0/9e42' — + � . — _ _ — - — � 9 � L _ _—i . 0 5 ; Q � � a f,,,,,,_ VC = l70' . , l , e 9 �_ e ,� � _ � � K = 76 � � � Pl = l8 +50000 , � _ , � __�__ ; _ , _, _ RocK '-- _ V = 40MPH . ; � • , ., w ' --,—__ . � _ EL = 3,0/7,57' � � 302 .3 LT/R � 4 _ ` S � .. . � � . � — ____ - -- _ _. VC = l40' ; � (- 5e/724' — , 3 23.g' LT/ r ° a ''-- _ _ —L STAo / + a _ _ ° K = 57 _ . _ � . I � ' ��it� _ '-- � . _ — ; � EL — 30/5 00` V 35 MPH , � —� �_ i � _ _ W. R CK �= � � � � � � � CULVERT HYDRAULIC DATA Roc � , .. a -- � o SrR *940046 Sto./3+04.4 -L- � fll�' . �7� � _----- _ - 3 17.8' L T )�o -- 600% — ' _ ' ��� ' — _—_ _ _ _ — — °o ; � _ DESIGN FREQUENCY = 25 YRS ``_� C, OCK I )I 'Jr7 ; � DESIGN DISCHARGE = 750 CFS 30� 5 4 R T - ° i � DESI�N HW ELEVATION = 3,028.4 FT 3016. ' RT . -------------- e ___._._.-- 0 2. � i o - l00 YEAR FREQUENCY = l00 Y RS �""---- I. R CK _ � 301.9' T - ; � l00 YEAR DISCHARGE _ l,100 CFS . �_; 3 j R � _ _ ._ — ; W � l00 YEAR HW ELEVATION = 3.029.2 FT ' PLA11tS PREPARED BY : � � - OVERTOPPING FREQUENCY = l00 + YRS � � � - OVERTOPPING DISCHARGE _ 1,200 CFS —L S Aa 5+25aO —L — Ae / e 0� T T � � EL = 30/ 50' EL = 30/700 ' - � � O V E R T O P P/ N G E L E V A T I O N = 3, 0 3/. 0 F T ° � � NORMAL WAiER SURFACE ELEV = 3,024.6 FT - - a - � ; � DATE OF SURVEY = l2/20/20/6 ^ ° RUMMEL, KLEPPER & KAHL, LLP � u� - _ . . I �� 900 RIDGEFIELD DRIVE SUITE 350 ' �' RALEIGH, NORTH CAROLINA 27609-3960 I � , , , , , , , I o�� NC LICENSE NO. F-0112 •(919) 878-9560 � N� � � N=� 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 3 i \� i i i i i i � � WETLAND AND SURFACE WATER IMPACTS PERMIT � � Impervious SITE 1 Temporary Surface ���-- Permanent Surface Water Impacts Tempora Water t Surface mpacts ermanent Surface Water Impacts Temporary Surface Water Impacts SITE 3 Impervio Dike Special Stilling Basin Impery � Dik� � �a � � � � � � � � � 0 � 0 � � � � 3 i � L Q � � � C9 � � � � � � � � � � � 3 � L � / � � � C Q� � � 0 � � � � w � � � � w � , � � � �, � o� �� �� �_ ��- �� SITE 4 Temporary Surface Water Impacts Impervious Dike Permanent Surface Water Impacts Temporary Surface Water Impacts I M PACTS SU RFACE TE IN IN WAT E R PORARY I SU RFACE MPACTS WATE R Impervious Di ke (2)-24 INCH TEMPORARY PIPES 9400460940047 & 940048 Permanent Surface Water Impacts Special Stilling Basin PROJECT REFERENCE NO. l7BPelleRel73 fLW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 4 HYDRAULICS ENGINEER PERMIT DRAWING SHEET 8 OF 15 ')-24 INCH PORARY PI PES nanent Surface ater Impacts �ary Surface r Impacts �0' 0' �0' 60' 90' GRAPHC SCA�E I I I I I � � l 9400469 940047 & 940048 PROJECT REFERENCE NO. SHEET NO. ; � STANDARD 'V' DITCH � � � S E E D ETAI L C, S H T. 2 D-1 D E L. � A C o l7BPelleRel73 4 � � — — PT St +87a03 " i �0 1'= i,; � �,/q SO�ID � AND JOHNNIE De SMITH RrW SHEET NO. � � �� C 0 P P E R ROADWAY DESIGN HYDRAULICS � DB 638 PG 49 �1 � � —L— PCC Staa 11+23084 � 1` �''� ���� ��TOE PROTECTION -L- PR�C1�toe 14+53v07 BEGIN CULVERT ENGINEER ENGINEER � � , � � M A R C A o � � E E D ETAI L A S HT. 2 D- -L - Stoe l5 +25e77 � ~ , - , & CAROL Lo , , � o � �" 46-3 3 � �- Y 0 R K S 0 N �' `� EGIN CULV ERT \ o - P E RM I T D RAW I N G � , � T� D B 474 P G 2 2 0 �� � c,. � z ;� � ��' P R O T E C T I O N ! �� - E 4 6 — 2 � 1'� L— S tae l 2 + 9/a 3 7 — w 2 S F D � �- r u E '' o� � x X A I L A S H T. �- S H E E T 9 O F 1 5 � �— _ 'M T'�� °° � � IMPERVIOUS -i�- SITE 1 � T� � � � T� CTION � N 68° 29� OSoB� `'� FFE= GARDEN � _ � DIKE � ; SEE DE AIL`�;' � �; � 302 � X — — PRC S �o � �� � � �� � � ; c� �, � `, �, c� ,v WOODS SITE 3 S ! TZ R� \� SHT. 2D-1 �,�� ,�; � \\ �� �� s E I L � 2�� P�S ME IMPERVIOUS , S I T E 4 � � � , ----- F, I � � c� i � \ i � ��/ %� �` BA NG W� POST DIKE C Sf , 16+28e35 30 i / �; , _ W � � � ,�m ��I E W se2 'W � � ' c � � rn , ' W � \�� � ,,��- �5� " —L — C tao l3 f27o60 �V e P ��� o B � — ' � o u i s E c e H o q Sg � � , — � � � � m ; 20� `. - - e (2)-24 INCH � �� � 3015 13 ; DB 358 � ; __ �� \ "`,F'�!O� TEMPORARY / � � N GRASSY CREEK T I ,' � 12 30 i ' - - \ \ �\\ \ \� � PIPES - . Q � / TB TB m TB Tg e PT i �� F ��� � ���� , . . ti -� ��- � ; � ✓ -- � __ \ `� � �o —� � � ,,,m IMPERVIOUS � � � - -s� � \ %� �\ w 5„ CP-►v G'/� � _ D I KE � � � BEGll1� - - _ q �r — _, , s �- _— -- ----_ ---- . _ _ -- • q g w �m`� � � `� ��`- --- .�- --- ------- �� � � �� � � 3 � - � —L — STAe // +0 a � 4� � „ _ ---- � ;, �_\\ � � o� _ ' _ _ - - _ • o ' � '` _-- � —L— PRC Staa llf o � SITE 2��.�� e I RE� ` PAVED , o , N \\� o � � o � 'oo ; ROGER De AND �� , � � ' a„ R l 5/ CASTLE ORD RDa '' � o 0 0 ,���- ' LORI Pe COOK Xl lN A S — PAV D - — - � 3�z ' 3016 — �2�—Z4 INCH � i DB 669 PG 810 BRIDGE \ � - T ' __ _ _ ________ __ �5� -- � � � �' -- TEMPORARY � 3 s . � IMPE VIOUS �'� - � �REMOVE 01 i CHANNEL RELOCATION p� m �--�' --- �, � PIPES 3m��� �� ; 46-5 SEE DETAIL B, SHT. 2D-1 � � �' ---� `� --- --- � �- - - i e�' - ,, � � 3m13�/ � . � � ` , 84" P MESI� W/ ,, �' . N � J ; E I L e e� �� a � m� �� �e�, — ; STI NG 1 a PERVIOUS / �mti %�� ,,,� �`� D CUL �fi _ � m�, e � BASI � E � N DIKE _ � �mtih � , ;i / \�' PE I L - - - � _ , —L — Stao 042 � � ; � � (2 -24 INCH STILLING � i � � �` � 1-24 INCH 1 ND C VERT '�, TEMPORARY wcb � V� T A N BA I I DE S� , �� � IMPERVIOUS m ND G S j TEMPORARY �'' O�, 4.3 0 C H A R D DI KE PI PES ; 46�-3 36 . � __ � � woo�s PIPE N� �L— Sta l3+17e ,,, ,,,, ,,;,, �� o + IIOE � �, - I X X � �" i /m / /i� � �� W PERVIOUS � — � e ; � r� � �,, mw �, @"'� D E L L A C a S� � � �0£ � � ; �� N X @ / �� �� 0 CHA A AND JOHNNIE De SMITH SEE Te i e e m. � � � � � D B 6 3 8 P G 4 9 . 8`0� 6�0� 0Z0E � M � �� • 9I0 �0£ � LE E D � X / �� " 0 5z0s ; G N � . � ZZm .• 8Z0£� 9���£ bZe£�za�ze� i � � 6Z0� � DENOTES IMPACTS IN m° � sfl`�' - - 0£ � SURFACE WATER � � �'� re �ti�� � �!� ; , \ / e20 � � � / ; ` � �e. ~� / ; DENOTES TEMPORARY ra � ,0�,0� ' IMPACTS IN SURFACE WATER �. ��re n�� �° , � � ��Te ��°o .�tg� �0� WETLAN D AN D SU RFACE WATER IMPACTS PERMIT � � � — , ; . . . � Pl = ll +60°00 � CULV ERT HYDRAULIC DAT A CULV ERT HYDRAULIC DAT A � EL = 3,�4/e73� ' I STR *940047 Sto.l5+4/.2 —L— STR #940048 Sta.18+00.9 —L— i �` VC = SO� � � I DESIGN FREQUENCY = 5 YRS DESIGN FREQUENCY = 25 YRS ; ` K= 67 DESIGN DISCHARGE = 440 CFS DESIGN DISCHARGE = 850 CFS ' Pl = l2 +57v00 � �� V= 4OMPH � DESIGN HW ELEVATION = 3,0/9.9 FT DESIGN HW ELEVATION = 3.0/6.9 FT ; `���.� I EL = 3,0.34032� l00 YEAR FREQUENCY = l00 YRS l00 YEAR FREDUENCY = l00 YRS � V C = IOO� l00 YEAR DISCHARGE _ 1,200 CFS l00 YEAR DISCHARGE _ 1,200 CFS ; l00 YEAR HW ELEVATION = 3,023.5 FT l00 YEAR HW ELEVATION = 3.0/8.7 FT ; , K=32 � ' V= 27MPH � � OVERTOPPING FREQUENCY = l0 + YRS OVERTOPP/NG FREQUENCY = 50 + YRS � OVERTOPPING DISCHARGE = 600 CFS OVERTOPP/NG DISCHAR�E _ 1,000 CFS ; � � � OVERTOPPING ELEVATION = 3,02/2 FT OVERTOPPING ELEVATION = 3.0/8.l FT , a e � 4 I �� = o NORMAL WATER SURFACE ELEV = 3,0/7.0 FT NORMAL WATER SURFACE ELEV = 3,0/2.2 FT 4 � � = f DATE OF SURVEY = l2/20/20/6 DATE OF SURVEY = l2/20/20/6 ; , , , Pl l4 77a00 � � � EL = 3,024e30' � , �, , � ; � � � ° ' VC = l00' ; o o ,, � � , , o � , K = 68 � e a � � � ' ' � — ��� � — V = 40MPH � ' � ` ` � � � — Pl = 16+35000 ,� , i � I � , ii , _ I I EL = 3 0/9e42' — + � . - _ _ - - - � 9 � L _ _—i . 0 5 ; Q � � a f,,,,,,_ VC = l70' . , l , e 9 �_ e ,� � _ � � K = 76 � � � Pl = l8 +50000 , � _ , � __�__ ; _ , _, _ RocK '-- _ V = 40MPH . ; � • , ., w ' --,—__ . � _ EL = 3,0/7,57' � � 302 .3 LT/R � 4 _ ` S � .. . � � . � — ____ - -- _ _. VC = l40' ; � (- 5e/724' — , 3 23.g' LT/ r ° a ''-- _ _ —L STAo / + a _ _ ° K = 57 _ . _ � . I 6- ' ��it� _ ' - — � . _ — ; � EL — 30/5 00` V 35 MPH , � —� �_ i � _ _ W. R CK �= � � � � � � � CULVERT HYDRAULIC DATA Roc � , .. a -- � o SrR *940046 Sto./3+04.4 -L- � fll�' . �7� � _----- _ - 3 17.8' L T )�o -- 600% — ' _ ' ��� ' — _—_ _ _ _ — — °o ; � _ DESIGN FREQUENCY = 25 YRS ``_� C, OCK I )I 'Jr7 ; � DESIGN DISCHARGE = 750 CFS 30� 5 4 R T - ° i � DESI�N HW ELEVATION = 3,028.4 FT 3016. ' RT . -------------- e ___._._.-- 0 2. � i o - l00 YEAR FREQUENCY = l00 Y RS �""---- I. R CK _ � 301.9' T - ; � l00 YEAR DISCHARGE _ l,100 CFS . �_; 3 j R � _ _ ._ — ; W � l00 YEAR HW ELEVATION = 3.029.2 FT ' PLA11tS PREPARED BY : � � - OVERTOPPING FREQUENCY = l00 + YRS � � � - OVERTOPPING DISCHARGE _ 1,200 CFS —L S Aa 5+25aO —L — Ae / e 0� T T � � EL = 30/ 50' EL = 30/700 ' - � � O V E R T O P P/ N G E L E V A T I O N = 3, 0 3/. 0 F T ° � � NORMAL WAiER SURFACE ELEV = 3,024.6 FT - - a - � ; � DATE OF SURVEY = l2/20/20/6 ^ ° RUMMEL, KLEPPER & KAHL, LLP � u� - _ . . I �� 900 RIDGEFIELD DRIVE SUITE 350 ' �' RALEIGH, NORTH CAROLINA 27609-3960 I � , , , , , , , I o�� NC LICENSE NO. F-0112 •(919) 878-9560 � N� � � N=� 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 3 i \� i i i i i i � � WETLAND AND SURFACE WATER IMPACTS PERMIT � � Impervious SITE 1 Temporary Surface ���-- Permanent Surface Water Impacts Tempora Water t Surface mpacts ermanent Surface Water Impacts Temporary Surface Water Impacts SITE 3 Impervio Dike Special Stilling Basin Impery � Dik� SITE 4 PROJECT REFERENCE NO. l7BPelleRel73 fLW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 4 HYDRAULICS ENGINEER PERMIT DRAWING SHEET 10 OF 15 ')-24 INCH PORARY PI PES nanent Surface ater Impacts �ary Surface r Impacts � � � � � � � � � � 0 � � � � 3 � � � Q � �, � � � � � � � � � � � � 3 � L � / � � � C Q� � � 0 � � � � w � � � � w � , � � � �, � o� �� �� �_ ��- �� Temporary Surface Water Impacts Impervious Dike Permanent Surface Water Impacts Temporary Surface Water Impacts I M PACTS SU RFACE TE IN IN WAT E R PORARY I SU RFACE MPACTS WATE R Impervious Di ke (2)-24 INCH TEMPORARY PIPES 9400460940047 & 940048 Permanent Surface Water Impacts Special Stilling Basin �0' 0' �0' 60' 90' GRAPHC SCA�E m 0 N— �_ �— c�- �� CULVERT CONSTRUCTION SEQUENCE STA. 13 � 04.4 -L- PHASE 1 1. INSTALL SPECIAL STILLING BASIN AT DOWNSTREAM END OF THE WORK AREA AS SHOWN I N PLAN VI EW. 2. INSTALL (2)-24" TEMPORARY PIPES (APPROX. 115 LF EACH) THROUGH EXISTING CHANNEL AND PROPOSED CULVERT AS SHOWN IN PLAN VIEW. 3. INSTALL (1)-24" TEMPORARY PIPE (APPROX. 70 LF) THROUGH EXISTING JS IN SOUTHWEST QUADRANT OF BRIDGE AS SHOWN IN PLAN VIEW. 4. CONSTRUCT IMPERVIOUS DIKES UPSTREAM OF THE WORK AREA TO DIVERT FLOW THROUGH THE 3 TEMPORARY PIPES. ANCHOR AND SEAL TEMPORARY PIPES SECURELY AT INLET. 5. CONSTRUCT AN IMPERVIOUS DIKE AT THE DOWNSTREAM SIDE OF THE (3)-24" TEMPORARY PIPES TO ISOLATE WORK AREA. ANCHOR AND SEAL TEMPORARY PIPES SECURELY AT OUTLET. 6. CONSTRUCT 4' BASE DITCH TO REALIGN JS IN SOUTHWEST QUADRANT OF BRIDGE. INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. CULVERT CONSTRUCTION SEQUENCE STA. 13 + 04 .4 -L- P HAS E 2 l. RELOCATE (1)-24" TEMPORARY PIPE TO NEWLY CONSTRUCTED 4' BASE DITCH AS SHOWN IN PLAN VIEW. 2. REMOVE EXISTING BRIDGE AND END BENTS. 3. CONSTRUCT CONCRETE FOOTINGS, INSTALL PROPOSED BOTTOMLESS (3-SIDED) CULVERT AND CONSTRUCT ASSOCIATED CHANNEL IMPROVEMENTS. 4. UPON COMPLETION OF CULVERT CONSTRUCTION, REMOVE IMPERVIOUS DIKES AND TEMPORARY PIPES TO DIVERT FLOW THROUGH NEWLY CONSTRUCTED CULVERT AND BASE DITCH. 5. REMOVE STILLING BASIN. 6. COMPLETE -L- ROADWAY AND EMBANKMENT CONSTRUCTION. 7. ESTABLISH VEGETATION ON FILL SECTIONS AND ALL OTHER BARE AREAS. INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. CULVERT CONSTRUCTION SEQUENCE STA. 15 � 41.2 -L- 1. INSTALL SPECIAL STILLING BASIN AT DOWNSTREAM END OF THE WORK AREA AS SHOWN I N PLAN VI EW. 2. INSTALL (2)-24" TEMPORARY PIPES (APPROX. 115 LF EACH) THROUGH EXISTING CHANNEL AND PROPOSED CULVERT AS SHOWN IN PLAN VIEW. 3. CONSTRUCT IMPERVIOUS DIKE UPSTREAM OF THE WORK AREA TO DIVERT FLOW THROUGH THE TEMPORARY PIPES. ANCHOR AND SEAL TEMPORARY PIPES SECURELY AT INLET. 4. CONSTRUCT AN IMPERVIOUS DIKE AT THE DOWNSTREAM SIDE OF THE (2)-24" TEMPORARY PIPES TO ISOLATE WORK AREA. ANCHOR AND SEAL TEMPORARY PIPES SECURELY AT OUTLET. 5. REMOVE EXISTING BRIDGE AND END BENTS. 6. CONSTRUCT CONCRETE FOOTINGS, INSTALL PROPOSED BOTTOMLESS �3-SIDED) CULVERT AND CONSTRUCT ASSOCIATED CHANNEL IMPROVEMENTS. 7. UPON COMPLETION OF CULVERT CONSTRUCTION, REMOVE IMPERVIOUS DIKES AND TEMPORARY PIPES TO DIVERT FLOW THROUGH NEWLY CONSTRUCTED CULVERT. 8. REMOVE STILLING BASIN. 9. COMPLETE -L- ROADWAY AND EMBANKMENT CONSTRUCTION. 10. ESTABLISH VEGETATION ON FILL SECTIONS AND ALL OTHER BARE AREAS. INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. CULVERT CONSTRUCTION SEQUENCE STA. 18 + 00.9 -L- 1. INSTALL SPECIAL STILLING BASIN AT DOWNSTREAM END OF THE WORK AREA AS SHOWN I N PLAN VI EW. 2. INSTALL (2)-24" TEMPORARY PIPES (APPROX. 115 LF EACH) THROUGH EXISTING CHANNEL AND PROPOSED CULVERT AS SHOWN IN PLAN VIEW. 3. CONSTRUCT IMPERVIOUS DIKE UPSTREAM OF THE WORK AREA TO DIVERT FLOW THROUGH THE TEMPORARY PIPES. ANCHOR AND SEAL TEMPORARY PIPES SECURELY AT INLET. 4. CONSTRUCT AN IMPERVIOUS DIKE AT THE DOWNSTREAM SIDE OF THE (2)-24" TEMPORARY PIPES TO ISOLATE WORK AREA. ANCHOR AND SEAL TEMPORARY PIPES SECURELY AT OUTLET. 5. REMOVE EXISTING BRIDGE AND END BENTS. 6. CONSTRUCT CONCRETE FOOTINGS, INSTALL PROPOSED BOTTOMLESS �3-SIDED) CULVERT AND CONSTRUCT ASSOCIATED CHANNEL IMPROVEMENTS. 7. UPON COMPLETION OF CULVERT CONSTRUCTION, REMOVE IMPERVIOUS DIKES AND TEMPORARY PIPES TO DIVERT FLOW THROUGH NEWLY CONSTRUCTED CULVERT. 8. REMOVE STILLING BASIN. 9. COMPLETE -L- ROADWAY AND EMBANKMENT CONSTRUCTION. 10. ESTABLISH VEGETATION ON FILL SECTIONS AND ALL OTHER BARE AREAS. INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL.