HomeMy WebLinkAbout20190088 Ver 1_Pipe 202 Wetland_Impact_Summary_Form_Revised_20190130Carpenter,Kristi
From: Price, Gregory W
Sent: Wednesday, January 30, 2019 8:59 AM
To: Steenhuis, Joanne
Cc: Rerko, James J; Sarah.E.Hair@usace.army.mi)
Subject: RE: Emergency permit pipe # 202 replacement Bladen
County
Attachments: Pipe 202
Wetland_Impact_Summary_Form_Revised.xlsx
Joanne,
The culvert and bank stabilization acreage was inadvertently left out. Attached is
revised summary sheet depicting that. Sorry for inconvenience.
Gregory W. Price, PWS
Division 6 Environmental Specialist
North Carolina Department of Transportation
910 364 0835 office
919 914 1200 mobile
qwprice2(a�ncdot.qov
500 Transportation Drive
Fayetteville, NC 28302
� ��� �
n�� ��,,
��� �� � � ..
�. �..
� _�
i � .� -�.u�' ` x
� � y � ,
� ��v �,� ��,�,.
� �'�+�. �:.:x,; #�' x"%�i.�:.,.
x
x.. �p � � .�:�.: � ,:
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
From: Price, Gregory W
Sent: Wednesday, January 30, 2019 8:39 AM
To: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Cc: Rerko, James J<jjrerko@ncdot.gov>; Sarah.E.Hair@usace.army.mil
Subject: RE: Emergency permit pipe # 202 replacement Bladen County
Joanne,
Please find attached the updated wetland impact summary sheet.
85 feet of permanent impacts are due to bank stabilization whereas only 10 feet is due
to culvert fill. The "surface water" impacts shown in drawings refers to stream impacts
and no other type of surface water impacts. Consultant was only matching the Surface
Water label listed on wetland impact summary sheet. Let me know if you need anything
else. Thanks, Joanne.
Gregory W. Price, PWS
Division 6 Environmental Specialist
North Carolina Department of Transportation
910 364 0835 office
919 914 1200 mobile
qwprice2(a�ncdot.qov
500 Transportation Drive
Fayetteville, NC 28302
�:
x�;
ra,: �
m��
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
From: Steenhuis, Joanne <jcranne.steenhuis('�ncdenr.�crv>
Sent: Tuesday, January 29, 2019 1:24 PM
To: Price, Gregory W <�w.pri�e�(�_n�d_crt:.�crv>
Cc: Rerko, James J <illrerkcr(c�ncdcrt.�crv>; �a_ra_h.:_�.:II:.�_a.i_r(e�_usa�e.:_a_r_rn�.y.:_rn�_i.l.
Subject: Emergency permit pipe # 202 replacement Bladen County
G reg/J i m,
In reviewing the application, I have a couple of questions.
1.-The Wetland Permit impact summary sheet indicates 95' of permanent impacts to
streams.
The drawings only show about 10 If of additional pipe. If there is this many LF
of permanent stream impacts, you need to send us $$.
2. There are two other impacts noted on the drawings...the `Temp impacts in surface
waters' and the `Impacts in surface waters'
If the impacts are in a stream, they should be denoted as `Temp impacts in
stream' and Impacts in Stream'
Surface waters would be considered ditches, ponds, etc..
3. I do not understand the "impacts in surface waters (i.e. stream)'. What are these
impacts? Is this additional riprap? If it is, shouldn't that be considered stream
stabilization (as long as it's not in the Thalweg)? Please explain what these impacts in
the stream are for.
Please revise the drawings (as necessary) and the Wetland permit impact summary
sheet and resubmit.
If I am not reading this correctly, please let me know. If you have any questions, please
don't hesitate to call me.
Thanks!
Joanne
J�a � �t�� uis
Environmental Senior Specialist
Transportation Permitting Branch
Department of Environmental Quality
(910) 796�7306 (office)
(910) 30��4021 (rnobile)
jr��u�u��.�t��u�Ihui�C�u��d�u�ir.qr�u
• �• +�
�
� � � 4� �!
x�
x�:
.......a. 3s�.k. ..... .'.+ ... x.t t �,,: .. „ ..
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,
WETLAND AND SURFACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 Sta 14+03 to Sta 14+95 Culvert <0.01 10
Bank Stabilization 0.020 0.010 85 60
TOTALS*: 0.00 0.00 0.00 0.00 0.00 0.02 0.01 95 60 0
*Rounded totals are sum of actual impacts
NOTES:
NO WETLAND OR BUFFERS ON PROJECT
Temporary Fill is within linear limits of Permanent Fill limits.
I Revised 2018 Feb