HomeMy WebLinkAbout20190141 Ver 1_400235_Permit Drawings_20181127_20190130(Version 2.08; Released April 2018)17BP.7.R.107TIP No.:SF-400235County(ies):Guilford Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future:Year:2025Existing:Year:Aquatic T&E Species?NoComments:YesNoNoN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.Alamance Chruch Road (SR 1005): 2 paved lanes (total 22' wide), 2' shoulder on each side.3800kyle.stoffer@hdrinc.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Water Supply IV (WS-IV)NCDWR Surface Water Classification for Water BodyJordan LakeBuffer Rules in Effect:None1900Alamance Chruch Road (SR 1005): 2 paved lanes (total 22' wide), 6' shoulder on each side (9' with guardrail).Waterbody Information2011NCDWR Stream Index No.:17BP.7.R.107Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The North Carolina Department of Transportation (NCDOT) has proposed to replace Guilford County Bridge #235 on Alamance Church Road (SR 1005) over Big Alamance Creek. The existing structure is a four span bridge (1@40.5’, 2@40’, 1@39.5’) steel plank deck on I-Beams. The end bent 1 is reinforced concrete spill thru and end bent 2 is vertical rock masonry. All Interior bents are reinforced concrete piles with steel caps. The proposed structure is a three span (1@60', 1@80’, 1@50’), 33" box beam with 4' deep caps. This structure has been designed to have as little environmental and surface water impacts as possible. 2:1 roadway fill slope will be used to minimize impacts. Deck drains are not required for the proposed bridge. There is no direct discharge of bridge storm water into the receiving water. Storm water impacts to the stream have been minimized by utilizing grated inlets and pipes to collect bridge storm water and use rip rap outlet protection at 14+75 LT to dissipate energy to provide a diffuse flow (non-erosive sheet flow) in a wooded area. This diffused flow will run for a distance of 25’+/- before entering buffer zone 2. In the northwest quadrant there is no existing roadside ditch. In the southwest quadrant PSRM toe protection is utilized on an existing roadside ditch that flows off the project area at 13+00 RT. Also in the southwest quadrant there is a stable ditch line that will outfall at 16+50 RT onto the proposed bank stabilization and become non-erosive sheet flow before entering the stream. In the northeast quadrant an existing roadside ditch will be lined with PSRM to provide toe protection. The ditch will outlet into a grated inlet at 17+85 LT and outlet at 17+55 LT onto Class B Rip Rap outlet protection and where flow becomes non-erosive sheet flow and will run 5’+/- before entering buffer zone 2. In the southeast quadrant a lateral V ditch will outlet at 18+55 RT onto Class B Rip Rap and become non-erosive sheet flow that will run 5’+/- before entering buffer zone 2. Bank stabilization will be installed along the west bank to re-establish the channel bank line and provided protection to the proposed bridge bent. Impervious dikes will be utilized to install the bank stabilization in the dry. Due to the nature of low impact bridge replacement, the increases in stormwater discharges (post vs pre condition) are insignificant and the existing ditches do not need to be modified. Therefore, additional stormwater measures are not required.HDR Engineering, Inc. of the CarolinasNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:NCDOT Hydraulics UnitAddress:General Project InformationSF-400235WBS Element:Bridge ReplacementWBS Element:Kyle StofferNCDOT Contact:(919) 707-6711555 Fayetteville Street, Suite 900Raleigh, NC 27601Contractor / Designer:(919) 900-1632gcail@ncdot.govRaleigh, NC 27560Address:11/27/2018GuilfordPleasant GardenGalen Cail, PE1590 Mail Services UnitRiver Basin(s): City/Town:0.4Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoLow Residential, WoodedBig Alamance Creek16-19-(1)0.30.106 milesProject DescriptionProposed ProjectCape FearNoneSupplemental Classification: Nutrient Sensitive Waters (NSW)Wetlands within Project Limits?
3083
3084
3085
3086
3087
3381
3388
3389
3334
3491
3458
3086
1005
3616
3336
3665
3664
3337
1005
3126
3093
3094
3092
3088
3735
3111
3093
3616
3334
3336
ENGLISHSHEET 1 OF 6
PERMIT DRAWING
WETLAND AND SURFACE WATER IMPACTS PERMIT
11/27/2018HDR ENGINEERING, INC.J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_wet_tsh.dgn
STATE STATE PROJECT REFERENCE NO.
F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
DESIGN DATA PROJECT LENGTH
LETTING DATE:
STATE PROJECT NO.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
1
VICINITY MAP
(NOT TO SCALE)
NCDOT CONTACT:$$$$USERNAME$$$$DIVISION 7
OFF-SITE DETOUR
DEPART
ME
NT
OF TRANSPORTATIONSTATE OF NORT
H CAR
O
L
I
NATYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE
SIGNATURE:
P.E.
SIGNATURE:
P.E.CONTRACT: TIM JORDAN, PE
PROJECT ENGINEER
HYDRAULICS ENGINEER
PROGRAM MANAGER
DIVISION BRIDGE
TIM POWERS, PE
HYDRAULICS ENGINEER
ROADWAY DESIGN ENGINEER PLANS PREPARED BY:TIP PROJECT: 17BP.7.R.10717BP.7.R.107
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DAVID FUH, PE
LICENSE NO. F-0669
www.mottmac.com/americas
(919) 552-2254 (Fax)
(919) 552-2253
Fuquay-Varina, NC 27526
PO Box 700
GUILFORD COUNTY
LOCATION: BRIDGE NO. 235 OVER BIG ALAMANCE CREEK ON SR 1005 (ALAMANCE CHURCH ROAD)
V = 55 MPH
ADT 2025 = 3800
ADT 2011 = 1900
MAJOR COLLECTOR
SUB REGIONAL TIER
TOTAL LENGTH TIP PROJECT = 0.142 MILES
LENGTH STRUCTURE TIP PROJECT = 0.037 MILES
LENGTH ROADWAY TIP PROJECT = 0.105 MILES
2018 STANDARD SPECIFICATIONS
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
HDR Engineering, Inc. of the Carolinas
Prepared in the Office of Mott MacDonald for
-L- Sta. 15+84.56
BEGIN BRIDGE
LIMITS
PROJECT
17BP.7.R.107
-L- POT Sta. 13+00.00
BEGIN PROJECT 17BP.7.R.107
-L- POC Sta. 20+50.00
END PROJECT 17BP.7.R.107
-L- Sta. 15+73.86
BEGIN APPROACH SLAB
-L- Sta. 17+77.44
END BRIDGE
I-85
TO
JULIANTO
-L-
SR 1005 CRE
E
KBI
G AL
AMANC
E
N
A
D 83/ N
A 2011
VERTICAL SSD
*DESIGN EXCEPTION:
SAG VERTICAL CURVE K
-L- Sta. 17+88.14
END APPROACH SLAB
RUI
NSBRI
DGETT
T
RUINS
BRIDGE
48" WW & 3SBW
48" WW & 3SBW
72" C
HL
& 3S
B
W72" CHL
& 3SB
WWOODS
WOODS8'GR 10'G
R11'GR10'GRMTL
MTLMTL
MTL
22' BST
VAR. GR
VAR
. GR
48" WW36" WW18" RCPVAR. GR
DILAPIDATED SBW
ROCK OUTCROPPINGSAPPROX. LOCATION OF
30.00'30.00'17.50'7.50'
24" P
V
C60.00'60.00'EXISTING R/W
CULVERT
48
"x48
" MTL
12
" D
I (PER
PLAN
S
)WOODS
WOODS
WOODS
WOODS
WOODS
WD POST
WOODS
WOODS
WOODS
WOODS
WELL
GATE
CHL WOODS
WOODS
WOODSGATE
MTL
WOODS
PUMP
BYPASS
WELL
WET
WOODS
REF. DB 4183 PG 36
UTILITY EASEMENT
25' PERMANENT
RICKEY ARNOLD PIPE
WD POST
5SBW
18" CPP
BRENDA LEE SIMPSON
JOSEPH SIMPSON, JR.
JACQUELYN D. NOLES
JAMES V. NOLES
JACQUELYN D. NOLES
JAMES V. NOLES
RACHEL O. VAN ALST
& WW
MTL HW
& WW
MTL HW
RAP
RIP
RAP
RIP
72" CMP
6' OF
ELLA MARGARET BLUNT
48" CMP
9.8' OF
EXISTING R/W
I-85
TO
(PER PLANS)
ENCASEMENT PIPE
31 L.F. OF 18" STEEL
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
WW
CONC
WW
CONC
POSTS
SIGN
POST
SIGN
(PER PLANS)
12" DI
CITY OF GREENSBORO
VAULT
VALVE
CHECK
VAULT
VALVE
SURGE
GATE
CHL
WW
STONE
WW
STONE
WOODS
JULIANTO
WOODS
OUTCROPPINGS
ROCK
EXISTING R/W
EXISTING R/W
ALAMANCE
CHURCH
RD
SR
1005
VAN ALST
RACHEL O.
C
R
E
E
KAL
AMANC
E
BI
G15+0020+00-L- PC Sta. 10+00.00
-L- PT Sta. 11+00.00
-L- PC Sta. 13+20.48
-L- PT Sta. 15+72.68
-L- PC Sta. 18+27.06
-L- PT Sta. 21+50.00
-L- POT Sta. 13+00.00
BEGIN PROJECT 17BP.7.R.107
-L- POC Sta. 20+50.00
END PROJECT 17BP.7.R.107
N
A
D 83/ N
A 2011
1
1
2
2
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$USERNAME$$$$PROJECT REFERENCE
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com/americas
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
4
DITCH
EXISTING
DITCH
EXISTING
EXISTING DITCH
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
E4XISTING DITCH
OUTLET-50% SILTED
EXISTING 18" RCP-GOOD
EXISTING CHANNEL
EXISTING CHANNEL
4
0
100
50
100
SCALE: 1"= 100' HORIZ.
IMPACTS IN SURFACE WATER
DENOTES PERMANENTSS
LEGEND
SITE 1
PLAN VIEW
J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_wet_psh04.dgnHDR ENGINEERING, INC.11/27/2018NEXT SHEET
AREA ON
SEE ENLARGED
ENGLISHSHEET 2 OF 6
PERMIT DRAWING
WETLAND AND SURFACE WATER IMPACTS PERMIT
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
F
F
F
F
F
F
F
F
2GI
TB
2GI
+12RETAINRETAIN2GI
TB 15" RCP-IV +78+58+84LATERAL 'V' DITCH
( Not to Scale)
D2:
1 2:1
b
1"/Ft.
-L- STA. 18+55 TO 18+95 RT
b= 2 Ft.
Min. D= 1 Ft.
DETAIL C
Ground
Natural
Slope
Fill
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
-L- STA. 18+12 TO 18+50 RT
DETAIL D
Type of Liner= CLASS B Rip-Rap
d= 1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
EST. 78 SY PSRM
SEE DETAIL A
TOE PROTECTION
EST. 112 SY PSRM
SEE DETAIL A
TOE PROTECTION
+70 LT
END SBG
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 19 SY GEOTEXTILE
EST. 9 TONS RIP RAP
SEE DETAIL D
TOE PROTECTION
EST. 11 CY DDE
SEE DETAIL C
LATERAL V DITCH
DETAIL B
Type of Liner= CLASS II RIP RAP
GEOTEXTILE
T
EXCAVATION
-L- STA. 16+50
(BANK RE-ESTABLISHMENT)
BANK STABILIZATION
( Not to Scale)
NWS
CLASS II RIP RAP FILL
T=Varies 2'-10'
EST. 300 SY GEOTEXTILE
EST. 285 TONS RIP RAP
SEE DETAIL B
BANK STABLIZATION
(STRUCTURE PAY ITEM)
UP TO ELEV. 611.0' (TYP.)
CLASS II RIP RAP
LIMITS
EXCAVATION
W/ELBOWS
15" CSP
W/ELBOWS
15" CSP
OF BANK
PROPOSED TOP
EXIST FOOTER (TYP.)
BENT (CONC.) AT
CUT OFF EXIST
( Not to Scale)
TOE PROTECTION
d
-L- STA. 17+85 TO 20+10 LT
-L- STA. 13+20 TO 14+77 RT
Fill Slope2:1 or Flatter
d= 1 Ft.
Type of Liner= PSRM
DETAIL A
Ground
Natural
PSRM
-L-
(STRUCTURE PAY ITEM)
EXCAVATION = 635 CY
10 11 12 13 14 15 16 17 18 19 20 21
580
590
600
610
620
630
640
650
PI = 18+80.00
EL = 621.67'
(+)1.1983%
(+)5.2500%
VC = 200'
K = 49
580
590
600
610
620
630
640
650
(+)1.1983%
BEGIN GRADE
BEGIN PROJECT
STA. 13+00.00
EL = 614.72'
END GRADE
STA. 20+00.00
EL = 627.97'
STA. 20+50.00
END PROJECT
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
YRS
CFS
FT
CFS
YRS
FT
CFS
YRS
FT
= 100
= 50
(TYP.)
3.5' KEY DEPTH
= 4700
= 609.5
= 5300
= 610.2
= 14000
= 500+
= 618.0
= 11-10-2017
= 594.2
(+)4.5000%
L
GP ELEV. = 619.28'
W/4' DEEP CAPS
3 SPAN: 1@60', 1@80', 1@50' SKEW 60
33" BOX BEAM
BRIDGE C STA. 16+81.0 -L-ELEV. = 620.20'-L- STA. 18+55BEGIN SP DITCH RTELEV. = 622.00'-L- STA. 18+95END SP DITCH RT(SLOPE 1.5:1)
W/CLASS II RIP RAP
BANK STABILIZATION
DATE: 10-11-2017
ELEV.=594.2'
NORMAL WS
(STRUCTURE PAY ITEM)
(NORMAL TO CAP) (TYP.)
SLOPE 1.5:1 (2 FT. THICK)
CLASS II RIP RAP
BRIDGE
EXISTING
REMOVE
ELEV=601.2'
EXCAVATE TO
EXIST
TO
MILL
TS
TS
595
5
9
5
595595595595600600600 600600600600600600600600
6
0
0
600
600600600
600605605605605605605605605605605605
6056056056056056056106106106106106106106106106106106
1
0
610610610610
610
610610610610
610615615615
6156156156156156156156156 1 5
615615615
615615615615615615
615
615620620
620620620 620 6206206206206206206206206206206206206206256256256256256256
2
5
6
2
5
625
625625
625 625625625
625
630630630630630630630
630
630630
6306306306306306356356356
3
5
635
635
635
635
635635 635635
640640640
640
640640
640645645645
645
645 650650
650
650650 6556
5
5
655
655
655
655660
660
660
6606
6
5
6
6
5
RUI
NSBRI
DGETT
T
RUINS
BRIDGE
48" WW & 3SBW
48" WW & 3SBW
72" C
HL
& 3S
B
W72" CHL
& 3SB
WWOODS
WOODS8'GR 10'G
R11'GR10'GRMTL
MTLMTL
MTL
22' BST
VAR. GR
VAR
. GR
48" WW36" WW18" RCPVAR. GR
DILAPIDATED SBW
ROCK OUTCROPPINGSAPPROX. LOCATION OF
30.00'30.00'17.50'7.50'
24" P
V
C60.00'60.00'EXISTING R/W
CULVERT
48
"x48
" MTL
12
" D
I (PER
PLAN
S
)WOODS
WOODS
WOODS
WOODS
WOODS
WD POST
WOODS
WOODS
WOODS
WOODS
WELL
GATE
CHL WOODS
WOODS
WOODSGATE
MTL
WOODS
PUMP
BYPASS
WELL
WET
WOODS
REF. DB 4183 PG 36
UTILITY EASEMENT
25' PERMANENT
RICKEY ARNOLD PIPE
WD POST
5SBW
18" CPP
BRENDA LEE SIMPSON
JOSEPH SIMPSON, JR.
JACQUELYN D. NOLES
JAMES V. NOLES
JACQUELYN D. NOLES
JAMES V. NOLES
RACHEL O. VAN ALST
& WW
MTL HW
& WW
MTL HW
RAP
RIP
RAP
RIP
72" CMP
6' OF
ELLA MARGARET BLUNT
48" CMP
9.8' OF
EXISTING R/W
I-85
TO
(PER PLANS)
ENCASEMENT PIPE
31 L.F. OF 18" STEEL
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
WW
CONC
WW
CONC
POSTS
SIGN
POST
SIGN
(PER PLANS)
12" DI
CITY OF GREENSBORO
VAULT
VALVE
CHECK
VAULT
VALVE
SURGE
GATE
CHL
WW
STONE
WW
STONE
WOODS
JULIANTO
WOODS
OUTCROPPINGS
ROCK
EXISTING R/W
EXISTING R/W
ALAMANCE
CHURCH
RD
SR
1005
VAN ALST
RACHEL O.
C
R
E
E
KAL
AMANC
E
BI
GSHEET 3 OF 6
PERMIT DRAWING
15+0020+00-L- PC Sta. 10+00.00
-L- PT Sta. 11+00.00
-L- PC Sta. 13+20.48
-L- PT Sta. 15+72.68
-L- PC Sta. 18+27.06
-L- PT Sta. 21+50.00
-L- POT Sta. 13+00.00
BEGIN PROJECT 17BP.7.R.107
-L- POC Sta. 20+50.00
END PROJECT 17BP.7.R.107
N
A
D 83/ N
A 2011
1
1
2
2
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$USERNAME$$$$PROJECT REFERENCE
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com/americas
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
4
VERTICAL SSD
SAG VERTICAL CURVE K
*DESIGN EXCEPTION: 4
DITCH
EXISTING
DITCH
EXISTING
EXISTING DITCH
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
E4XISTING DITCH
OUTLET-50% SILTED
EXISTING 18" RCP-GOOD
EXISTING CHANNEL
EXISTING CHANNEL
4
0
100
50
100
SCALE: 1"= 100' HORIZ.
IMPACTS IN SURFACE WATER
DENOTES PERMANENTSS
LEGEND
SITE 1
PLAN VIEW
J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_wet_psh04_con.dgnHDR ENGINEERING, INC.11/27/2018NEXT SHEET
AREA ON
SEE ENLARGED
ENGLISHSHEET 2 OF 6
PERMIT DRAWING
WETLAND AND SURFACE WATER IMPACTS PERMIT
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
F
F
F
F
F
F
F
F
2GI
TB
2GI
+12RETAINRETAIN2GI
TB 15" RCP-IV +78+58+84LATERAL 'V' DITCH
( Not to Scale)
D2:
1 2:1
b
1"/Ft.
-L- STA. 18+55 TO 18+95 RT
b= 2 Ft.
Min. D= 1 Ft.
DETAIL C
Ground
Natural
Slope
Fill
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
-L- STA. 18+12 TO 18+50 RT
DETAIL D
Type of Liner= CLASS B Rip-Rap
d= 1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
EST. 78 SY PSRM
SEE DETAIL A
TOE PROTECTION
EST. 112 SY PSRM
SEE DETAIL A
TOE PROTECTION
+70 LT
END SBG
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 19 SY GEOTEXTILE
EST. 9 TONS RIP RAP
SEE DETAIL D
TOE PROTECTION
EST. 11 CY DDE
SEE DETAIL C
LATERAL V DITCH
DETAIL B
Type of Liner= CLASS II RIP RAP
GEOTEXTILE
T
EXCAVATION
-L- STA. 16+50
(BANK RE-ESTABLISHMENT)
BANK STABILIZATION
( Not to Scale)
NWS
CLASS II RIP RAP FILL
T=Varies 2'-10'
EST. 300 SY GEOTEXTILE
EST. 285 TONS RIP RAP
SEE DETAIL B
BANK STABLIZATION
(STRUCTURE PAY ITEM)
UP TO ELEV. 611.0' (TYP.)
CLASS II RIP RAP
LIMITS
EXCAVATION
W/ELBOWS
15" CSP
W/ELBOWS
15" CSP
OF BANK
PROPOSED TOP
EXIST FOOTER (TYP.)
BENT (CONC.) AT
CUT OFF EXIST
( Not to Scale)
TOE PROTECTION
d
-L- STA. 17+85 TO 20+10 LT
-L- STA. 13+20 TO 14+77 RT
Fill Slope2:1 or Flatter
d= 1 Ft.
Type of Liner= PSRM
DETAIL A
Ground
Natural
PSRM
-L-
(STRUCTURE PAY ITEM)
EXCAVATION = 635 CY
10 11 12 13 14 15 16 17 18 19 20 21
580
590
600
610
620
630
640
650
PI = 18+80.00
EL = 621.67'
(+)1.1983%
(+)5.2500%
VC = 200'
K = 49
580
590
600
610
620
630
640
650
(+)1.1983%
BEGIN GRADE
BEGIN PROJECT
STA. 13+00.00
EL = 614.72'
END GRADE
STA. 20+00.00
EL = 627.97'
STA. 20+50.00
END PROJECT
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
YRS
CFS
FT
CFS
YRS
FT
CFS
YRS
FT
= 100
= 50
(TYP.)
3.5' KEY DEPTH
= 4700
= 609.5
= 5300
= 610.2
= 14000
= 500+
= 618.0
= 11-10-2017
= 594.2
(+)4.5000%
L
GP ELEV. = 619.28'
W/4' DEEP CAPS
3 SPAN: 1@60', 1@80', 1@50' SKEW 60
33" BOX BEAM
BRIDGE C STA. 16+81.0 -L-ELEV. = 620.20'-L- STA. 18+55BEGIN SP DITCH RTELEV. = 622.00'-L- STA. 18+95END SP DITCH RT(SLOPE 1.5:1)
W/CLASS II RIP RAP
BANK STABILIZATION
DATE: 10-11-2017
ELEV.=594.2'
NORMAL WS
(STRUCTURE PAY ITEM)
(NORMAL TO CAP) (TYP.)
SLOPE 1.5:1 (2 FT. THICK)
CLASS II RIP RAP
BRIDGE
EXISTING
REMOVE
ELEV=601.2'
EXCAVATE TO
EXIST
TO
MILL
TS
TS
TT
WOODS
8'GR 10'
G
R
MTL
MTLMTL
MTL
VAR. GR
30.00'30.00'WOODS
WOODS
WOODS
WOODS
WOODS
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
WW
CONC
WW
CONC
WW
STONE
WW
STONE
WOODS
C
R
E
E
KAL
AMANC
E
BI
GSHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE
Office of:
Prepared in the
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
WETLAND AND SURFACE WATER IMPACTS PERMIT
ENGLISH
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENTSS 0
4020
40
SCALE: 1"= 40' HORIZ.
SITE 1
DETAIL SHEET FOR
J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_wet_psh04a.dgnHDR ENGINEERING, INC.11/27/2018SHEET 4 OF 6
PERMIT DRAWING
C
R
E
E
KAL
AMANC
E
BI
G17+0015+00OUTFALL STABLE
EXISTING DITCH
DITCH
EXISTING
DITCH
EXISTING
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY TS TS
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
F
F
F
F
2GI
TB
2GI
2GI
TB 15" RCP-IV
TS
TS
595595
5955956006006006
0
0
600605
605605605
6056056106106106106
1
0
615615615615615620
6206206206206256
2
5
625
630630
630
630630635 640645650
TT
WOODS
8'GR 10'
G
R
MTL
MTLMTL
MTL
VAR. GR
30.00'30.00'WOODS
WOODS
WOODS
WOODS
WOODS
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
WW
CONC
WW
CONC
WW
STONE
WW
STONE
WOODS
C
R
E
E
KAL
AMANC
E
BI
GSHEET 5 OF 6
PERMIT DRAWING
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE
Office of:
Prepared in the
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
WETLAND AND SURFACE WATER IMPACTS PERMIT
ENGLISH
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENTSS 0
4020
40
SCALE: 1"= 40' HORIZ.
SITE 1
DETAIL SHEET FOR
J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_wet_psh04a_con.dgnHDR ENGINEERING, INC.11/27/2018SHEET 4 OF 6
PERMIT DRAWING
C
R
E
E
KAL
AMANC
E
BI
G17+0015+00OUTFALL STABLE
EXISTING DITCH
DITCH
EXISTING
DITCH
EXISTING
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY TS TS
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
F
F
F
F
2GI
TB
2GI
2GI
TB 15" RCP-IV
TS
TS
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- 16+55 to 16+70 BANK STABILIZATION 0.02 < 0.01 93 10 TOTALS*: 0.02 < 0.01 93 10*Rounded totals are sum of actual impactsNOTES: Temp. SW Impacts = 0.003 acRevised September 2014 SHEET 6OF 6 WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSGUILFORD COUNTYBRIDGE #23517BP.7.R.107NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSAUG. 23, 2018
3083
3084
3085
3086
3087
3381
3388
3389
3334
3491
3458
3086
1005
3616
3336
3665
3664
3337
1005
3126
3093
3094
3092
3088
3735
3111
3093
3616
3334
3336
ENGLISHSHEET 1 OF 6
BUFFER DRAWING
11/27/2018HDR ENGINEERING, INC.J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_buf_tsh.dgnBUFFER IMPACTS PERMIT
STATE STATE PROJECT REFERENCE NO.
F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
DESIGN DATA PROJECT LENGTH
LETTING DATE:
STATE PROJECT NO.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
1
VICINITY MAP
(NOT TO SCALE)
NCDOT CONTACT:$$$$USERNAME$$$$DIVISION 7
OFF-SITE DETOUR
DEPART
ME
NT
OF TRANSPORTATIONSTATE OF NORT
H CAR
O
L
I
NATYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE
SIGNATURE:
P.E.
SIGNATURE:
P.E.CONTRACT: TIM JORDAN, PE
PROJECT ENGINEER
HYDRAULICS ENGINEER
PROGRAM MANAGER
DIVISION BRIDGE
TIM POWERS, PE
HYDRAULICS ENGINEER
ROADWAY DESIGN ENGINEER PLANS PREPARED BY:TIP PROJECT: 17BP.7.R.10717BP.7.R.107
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DAVID FUH, PE
LICENSE NO. F-0669
www.mottmac.com/americas
(919) 552-2254 (Fax)
(919) 552-2253
Fuquay-Varina, NC 27526
PO Box 700
GUILFORD COUNTY
LOCATION: BRIDGE NO. 235 OVER BIG ALAMANCE CREEK ON SR 1005 (ALAMANCE CHURCH ROAD)
V = 55 MPH
ADT 2025 = 3800
ADT 2011 = 1900
MAJOR COLLECTOR
SUB REGIONAL TIER
TOTAL LENGTH TIP PROJECT = 0.142 MILES
LENGTH STRUCTURE TIP PROJECT = 0.037 MILES
LENGTH ROADWAY TIP PROJECT = 0.105 MILES
2018 STANDARD SPECIFICATIONS
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
HDR Engineering, Inc. of the Carolinas
Prepared in the Office of Mott MacDonald for
-L- Sta. 15+84.56
BEGIN BRIDGE
LIMITS
PROJECT
17BP.7.R.107
-L- POT Sta. 13+00.00
BEGIN PROJECT 17BP.7.R.107
-L- POC Sta. 20+50.00
END PROJECT 17BP.7.R.107
-L- Sta. 15+73.86
BEGIN APPROACH SLAB
-L- Sta. 17+77.44
END BRIDGE
I-85
TO
JULIANTO
-L-
SR 1005 CRE
E
KBI
G AL
AMANC
E
N
A
D 83/ N
A 2011
VERTICAL SSD
*DESIGN EXCEPTION:
SAG VERTICAL CURVE K
-L- Sta. 17+88.14
END APPROACH SLAB
RUI
NSBRI
DGETT
T
CONTROLS
PUMP STATION
BLK
RUINS
BRIDGE
48" WW & 3SBW
48" WW & 3SBW
72" C
HL
& 3S
B
W72" CHL
& 3SB
WWOODS
WOODS8'GR 10'G
R11'GR10'GRMTL
MTLMTL
MTL
22' BST
VAR. GR
VAR
. GR
48" WW36" WW18" RCPVAR. GR
INV=631.16'
INV=633.22'
BST OVERLAY
MTL DECK W/
#235
BRIDGE
DILAPIDATED SBW
ROCK OUTCROPPINGSAPPROX. LOCATION OF
30.00'30.00'17.50'7.50'
TOP=616.60'
INV=602.35'
TOP=614.63'
INV=602.03'
24" P
V
C60.00'60.00'EXISTING R/W
12
" D
I (PER
PLAN
S
)WOODS
WOODS
WOODS
WOODS
WOODS
EIP
WD POST
WOODS
WOODS
WOODS
WOODS
WELL
GATE
CHL WOODS
WOODS
WOODSGATE
MTL
EIP
WOODS
EIP
PUMP
BYPASS
WELL
WET
WOODS
REF. DB 4183 PG 36
UTILITY EASEMENT
25' PERMANENT
RICKEY ARNOLD PIPE
WD POST
5SBW
18" CPP
BRENDA LEE SIMPSON
JOSEPH SIMPSON, JR.
JACQUELYN D. NOLES
JAMES V. NOLES
JACQUELYN D. NOLES
JAMES V. NOLES
RACHEL O. VAN ALST
RAP
RIP
RAP
RIP
ELLA MARGARET BLUNT
EXISTING R/W
I-85
TO
(PER PLANS)
ENCASEMENT PIPE
31 L.F. OF 18" STEEL
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
WW
CONC
WW
CONC
POSTS
SIGN
POST
SIGN
(PER PLANS)
12" DI
W/LT
POLE
SERVICE
CITY OF GREENSBORO
VAULT
VALVE
CHECK
VAULT
VALVE
SURGE
GATE
CHL
WW
STONE
WW
STONE
WOODS
JULIANTO
WOODS
OUTCROPPINGS
ROCK
EXISTING R/W
EXISTING R/W
ALAMANCE
CHURCH
RD
SR
1005
VAN ALST
RACHEL O.
C
R
E
E
KAL
AMANC
E
BI
G4
DITCH
EXISTING
DITCH
EXISTING
EXISTING DITCH
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
E4XISTING DITCH
OUTLET-50% SILTED
EXISTING 18" RCP-GOOD
EXISTING CHANNEL
EXISTING CHANNEL
BUFFER IMPACTS PERMIT SHEET 2 OF 6
BUFFER DRAWING
ENGLISH
NEXT SHEET
AREA ON
SEE ENLARGED
SITE 1
PLAN VIEW
0
100
100
SCALE: 1"= 100' HORIZ.
LEGEND
ZONE 1 (30')
RIPARIAN BUFFER
ZONE 2 (20')
RIPARIAN BUFFER
J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_buf_psh04.dgnHDR ENGINEERING, INC.11/27/2018N
A
D 83/ N
A 2011 N
A
D 83/ N
A 2011
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
2GI
TB
2GI
+12RETAINRETAIN2GI
TB 15" RCP-IV +78+58+84LATERAL 'V' DITCH
( Not to Scale)
D2:
1 2:1
b
1"/Ft.
-L- STA. 18+55 TO 18+95 RT
b= 2 Ft.
Min. D= 1 Ft.
DETAIL C
Ground
Natural
Slope
Fill
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
-L- STA. 18+12 TO 18+50 RT
DETAIL D
Type of Liner= CLASS B Rip-Rap
d= 1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
EST. 78 SY PSRM
SEE DETAIL A
TOE PROTECTION
EST. 112 SY PSRM
SEE DETAIL A
TOE PROTECTION
+70 LT
END SBG
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 19 SY GEOTEXTILE
EST. 9 TONS RIP RAP
SEE DETAIL D
TOE PROTECTION
EST. 11 CY DDE
SEE DETAIL C
LATERAL V DITCH
DETAIL B
Type of Liner= CLASS II RIP RAP
GEOTEXTILE
T
EXCAVATION
-L- STA. 16+50
(BANK RE-ESTABLISHMENT)
BANK STABILIZATION
( Not to Scale)
NWS
CLASS II RIP RAP FILL
T=Varies 2'-10'
EST. 300 SY GEOTEXTILE
EST. 285 TONS RIP RAP
SEE DETAIL B
BANK STABLIZATION
(STRUCTURE PAY ITEM)
UP TO ELEV. 611.0' (TYP.)
CLASS II RIP RAP
LIMITS
EXCAVATION
W/ELBOWS
15" CSP
W/ELBOWS
15" CSP
OF BANK
PROPOSED TOP
EXIST FOOTER (TYP.)
BENT (CONC.) AT
CUT OFF EXIST
( Not to Scale)
TOE PROTECTION
d
-L- STA. 17+85 TO 20+10 LT
-L- STA. 13+20 TO 14+77 RT
Fill Slope2:1 or Flatter
d= 1 Ft.
Type of Liner= PSRM
DETAIL A
Ground
Natural
PSRM15+0020+00-L- PC Sta. 10+00.00
-L- PT Sta. 11+00.00
-L- PC Sta. 13+20.48
-L- PT Sta. 15+72.68
-L- PC Sta. 18+27.06
-L- PT Sta. 21+50.00
-L- POT Sta. 13+00.00
BEGIN PROJECT 17BP.7.R.107
-L- POC Sta. 20+50.00
END PROJECT 17BP.7.R.107
N
A
D 83/ N
A 2011
4
VERTICAL SSD
SAG VERTICAL CURVE K
*DESIGN EXCEPTION:
1
1
2
2
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com/americas
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
-L-
(STRUCTURE PAY ITEM)
EXCAVATION = 635 CY
10 11 12 13 14 15 16 17 18 19 20 21
580
590
600
610
620
630
640
650
PI = 18+80.00
EL = 621.67'
(+)1.1983%
(+)5.2500%
VC = 200'
K = 49
580
590
600
610
620
630
640
650
(+)1.1983%
BEGIN GRADE
BEGIN PROJECT
STA. 13+00.00
EL = 614.72'
END GRADE
STA. 20+00.00
EL = 627.97'
STA. 20+50.00
END PROJECT
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
YRS
CFS
FT
CFS
YRS
FT
CFS
YRS
FT
= 100
= 50
(TYP.)
3.5' KEY DEPTH
= 4700
= 609.5
= 5300
= 610.2
= 14000
= 500+
= 618.0
= 11-10-2017
= 594.2
(+)4.5000%
L
GP ELEV. = 619.28'
W/4' DEEP CAPS
3 SPAN: 1@60', 1@80', 1@50' SKEW 60
33" BOX BEAM
BRIDGE C STA. 16+81.0 -L-ELEV. = 620.20'-L- STA. 18+55BEGIN SP DITCH RTELEV. = 622.00'-L- STA. 18+95END SP DITCH RT(SLOPE 1.5:1)
W/CLASS II RIP RAP
BANK STABILIZATION
DATE: 10-11-2017
ELEV.=594.2'
NORMAL WS
(STRUCTURE PAY ITEM)
(NORMAL TO CAP) (TYP.)
SLOPE 1.5:1 (2 FT. THICK)
CLASS II RIP RAP
BRIDGE
EXISTING
REMOVE
ELEV=601.2'
EXCAVATE TO
EXIST
TO
MILL
F
F
F
F
F
F
F
F
595
5
9
5
595595595595600600600 600600600600600600600600
6
0
0
600
600600600
600605605605605605605605605605605605
6056056056056056056106106106106106106106106106106106
1
0
610610610610
610
610610610610
610615615615
6156156156156156156156156 1 5
615615615
615615615615615615
615
615620620
620620620 620 6206206206206206206206206206206206206206256256256256256256
2
5
6
2
5
625
625625
625 625625625
625
630630630630630630630
630
630630
6306306306306306356356
3
5
635
635
635
635
635635 635635
640640640
640
640640
640645645645
645
645 650650
650
650650 6556
5
5
655
655
655
655660
660
660
6606
6
5
6
6
5
RUI
NSBRI
DGETT
T
CONTROLS
PUMP STATION
BLK
RUINS
BRIDGE
48" WW & 3SBW
48" WW & 3SBW
72" C
HL
& 3S
B
W72" CHL
& 3SB
WWOODS
WOODS8'GR 10'G
R11'GR10'GRMTL
MTLMTL
MTL
22' BST
VAR. GR
VAR
. GR
48" WW36" WW18" RCPVAR. GR
INV=631.16'
INV=633.22'
DILAPIDATED SBW
ROCK OUTCROPPINGSAPPROX. LOCATION OF
30.00'30.00'17.50'7.50'
TOP=616.60'
INV=602.35'
TOP=614.63'
INV=602.03'
24" P
V
C60.00'60.00'EXISTING R/W
12
" D
I (PER
PLAN
S
)WOODS
WOODS
WOODS
WOODS
WOODS
EIP
WD POST
WOODS
WOODS
WOODS
WOODS
WELL
GATE
CHL WOODS
WOODS
WOODSGATE
MTL
EIP
WOODS
EIP
PUMP
BYPASS
WELL
WET
WOODS
REF. DB 4183 PG 36
UTILITY EASEMENT
25' PERMANENT
RICKEY ARNOLD PIPE
WD POST
5SBW
18" CPP
BRENDA LEE SIMPSON
JOSEPH SIMPSON, JR.
JACQUELYN D. NOLES
JAMES V. NOLES
JACQUELYN D. NOLES
JAMES V. NOLES
RACHEL O. VAN ALST
RAP
RIP
RAP
RIP
ELLA MARGARET BLUNT
EXISTING R/W
I-85
TO
(PER PLANS)
ENCASEMENT PIPE
31 L.F. OF 18" STEEL
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
POSTS
SIGN
POST
SIGN
(PER PLANS)
12" DI
W/LT
POLE
SERVICE
CITY OF GREENSBORO
VAULT
VALVE
CHECK
VAULT
VALVE
SURGE
GATE
CHL
WOODS
JULIANTO
WOODS
OUTCROPPINGS
ROCK
EXISTING R/W
EXISTING R/W
ALAMANCE
CHURCH
RD
SR
1005
VAN ALST
RACHEL O.
C
R
E
E
KAL
AMANC
E
BI
G4
DITCH
EXISTING
DITCH
EXISTING
EXISTING DITCH
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
EXISTING DITCH
OUTFALL STABLE
E4XISTING DITCH
OUTLET-50% SILTED
EXISTING 18" RCP-GOOD
EXISTING CHANNEL
EXISTING CHANNEL
SHEET 3 OF 6
BUFFER DRAWING
BUFFER IMPACTS PERMIT SHEET 2 OF 6
BUFFER DRAWING
ENGLISH
NEXT SHEET
AREA ON
SEE ENLARGED
SITE 1
PLAN VIEW
0
100
100
SCALE: 1"= 100' HORIZ.
LEGEND
ZONE 1 (30')
RIPARIAN BUFFER
ZONE 2 (20')
RIPARIAN BUFFER
J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_buf_psh04_con.dgnHDR ENGINEERING, INC.11/27/2018N
A
D 83/ N
A 2011 N
A
D 83/ N
A 2011
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
2GI
TB
2GI
+12RETAINRETAIN2GI
TB 15" RCP-IV +78+58+84LATERAL 'V' DITCH
( Not to Scale)
D2:
1 2:1
b
1"/Ft.
-L- STA. 18+55 TO 18+95 RT
b= 2 Ft.
Min. D= 1 Ft.
DETAIL C
Ground
Natural
Slope
Fill
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
-L- STA. 18+12 TO 18+50 RT
DETAIL D
Type of Liner= CLASS B Rip-Rap
d= 1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
EST. 78 SY PSRM
SEE DETAIL A
TOE PROTECTION
EST. 112 SY PSRM
SEE DETAIL A
TOE PROTECTION
+70 LT
END SBG
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 19 SY GEOTEXTILE
EST. 9 TONS RIP RAP
SEE DETAIL D
TOE PROTECTION
EST. 11 CY DDE
SEE DETAIL C
LATERAL V DITCH
DETAIL B
Type of Liner= CLASS II RIP RAP
GEOTEXTILE
T
EXCAVATION
-L- STA. 16+50
(BANK RE-ESTABLISHMENT)
BANK STABILIZATION
( Not to Scale)
NWS
CLASS II RIP RAP FILL
T=Varies 2'-10'
EST. 300 SY GEOTEXTILE
EST. 285 TONS RIP RAP
SEE DETAIL B
BANK STABLIZATION
(STRUCTURE PAY ITEM)
UP TO ELEV. 611.0' (TYP.)
CLASS II RIP RAP
LIMITS
EXCAVATION
W/ELBOWS
15" CSP
W/ELBOWS
15" CSP
OF BANK
PROPOSED TOP
EXIST FOOTER (TYP.)
BENT (CONC.) AT
CUT OFF EXIST
( Not to Scale)
TOE PROTECTION
d
-L- STA. 17+85 TO 20+10 LT
-L- STA. 13+20 TO 14+77 RT
Fill Slope2:1 or Flatter
d= 1 Ft.
Type of Liner= PSRM
DETAIL A
Ground
Natural
PSRM15+0020+00-L- PC Sta. 10+00.00
-L- PT Sta. 11+00.00
-L- PC Sta. 13+20.48
-L- PT Sta. 15+72.68
-L- PC Sta. 18+27.06
-L- PT Sta. 21+50.00
-L- POT Sta. 13+00.00
BEGIN PROJECT 17BP.7.R.107
-L- POC Sta. 20+50.00
END PROJECT 17BP.7.R.107
N
A
D 83/ N
A 2011
4
VERTICAL SSD
SAG VERTICAL CURVE K
*DESIGN EXCEPTION:
1
1
2
2
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com/americas
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
-L-
(STRUCTURE PAY ITEM)
EXCAVATION = 635 CY
10 11 12 13 14 15 16 17 18 19 20 21
580
590
600
610
620
630
640
650
PI = 18+80.00
EL = 621.67'
(+)1.1983%
(+)5.2500%
VC = 200'
K = 49
580
590
600
610
620
630
640
650
(+)1.1983%
BEGIN GRADE
BEGIN PROJECT
STA. 13+00.00
EL = 614.72'
END GRADE
STA. 20+00.00
EL = 627.97'
STA. 20+50.00
END PROJECT
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
YRS
CFS
FT
CFS
YRS
FT
CFS
YRS
FT
= 100
= 50
(TYP.)
3.5' KEY DEPTH
= 4700
= 609.5
= 5300
= 610.2
= 14000
= 500+
= 618.0
= 11-10-2017
= 594.2
(+)4.5000%
L
GP ELEV. = 619.28'
W/4' DEEP CAPS
3 SPAN: 1@60', 1@80', 1@50' SKEW 60
33" BOX BEAM
BRIDGE C STA. 16+81.0 -L-ELEV. = 620.20'-L- STA. 18+55BEGIN SP DITCH RTELEV. = 622.00'-L- STA. 18+95END SP DITCH RT(SLOPE 1.5:1)
W/CLASS II RIP RAP
BANK STABILIZATION
DATE: 10-11-2017
ELEV.=594.2'
NORMAL WS
(STRUCTURE PAY ITEM)
(NORMAL TO CAP) (TYP.)
SLOPE 1.5:1 (2 FT. THICK)
CLASS II RIP RAP
BRIDGE
EXISTING
REMOVE
ELEV=601.2'
EXCAVATE TO
EXIST
TO
MILL
F
F
F
F
F
F
F
F
TT
WOODS
8'GR 10'
G
R
MTL
MTLMTL
MTL
VAR. GR
30.00'30.00'WOODS
WOODS
WOODS
WOODS
WOODS
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
WW
CONC
WW
CONC
WW
STONE
WW
STONE
WOODS
C
R
E
E
KAL
AMANC
E
BI
GSHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE
Office of:
Prepared in the
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
ENGLISH
0
4020
40
SCALE: 1"= 40' HORIZ.
SITE 1
DETAIL SHEET FOR
J:\Hydro\DDC\Guilford_235\6.0_CAD_BIM\6.2_Work_In_Progress\Hydraulics\PERMITS_Environmental\Drawings\400235_hyd_prm_buf_psh04a.dgnHDR ENGINEERING, INC.11/27/2018C
R
E
E
KAL
AMANC
E
BI
G17+0015+00 LEGEND
ZONE 1 (30')
RIPARIAN BUFFER
ZONE 2 (20')
RIPARIAN BUFFER
SHEET 4 OF 6
BUFFER DRAWING
BUFFER IMPACTS PERMIT
BRIDGING IMPACTS
-L-
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
OUTFALL STABLE
EXISTING DITCH
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
DITCH
EXISTING
DITCH
EXISTING
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
OUTFALL STABLE
EXISTING DITCH
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
OUTFALL STABLE
EXISTING DITCH
F
F
F
F
2GI
TB
2GI
2GI
TB 15" RCP-IV
595595
5955956006006006
0
0
60
0605
6056056
0
5
6056056106106106106
10
61561561561561562
0
62062062062062562
5
625
630630
63
0
63063063
5 64
06456
5
0
TT
WOODS
8'GR 10'
G
R
MTL
MTLMTL
MTL
VAR. GR
30.00'30.00'WOODS
WOODS
WOODS
WOODS
WOODS
REF. DB 4183 PG 39
INGRESS-EGRESS AND FORCE MAIN
30' PERMANENT EASEMENT FOR
WOODS
C
R
E
E
KAL
AMANC
E
BI
GSHEET 5 OF 6
BUFFER DRAWING
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
PROJECT REFERENCE
Office of:
Prepared in the
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
17BP.7.R.107 - GUILFORD 235
HDR Engineering, Inc. of the Carolinas
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
LICENSE NO. F-0116
HDR ENGINEERING
ENGLISH
0
4020
40
SCALE: 1"= 40' HORIZ.
SITE 1
DETAIL SHEET FOR
$FILEL$$(USERNAME)$$DATE$C
R
E
E
KAL
AMANC
E
BI
G17+0015+00 LEGEND
ZONE 1 (30')
RIPARIAN BUFFER
ZONE 2 (20')
RIPARIAN BUFFER
SHEET 4 OF 6
BUFFER DRAWING
BUFFER IMPACTS PERMIT
BRIDGING IMPACTS
-L-
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
(NON-EROSIVE)
V10= 1.9 fps
Q10= 1.1 cfs
OUTFALL STABLE
EXISTING DITCH
(NON-EROSIVE)
V10= 2.0 fps
Q10= 3.6 cfs
DITCH
EXISTING
DITCH
EXISTING
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
OUTFALL STABLE
EXISTING DITCH
(NON-EROSIVE)
V10= 1.4 fps
Q10= 0.5 cfs
OUTFALL STABLE
EXISTING DITCH
F
F
F
F
2GI
TB
2GI
2GI
TB 15" RCP-IV
ROAD CROSSING BRIDGE UTILITIESZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)13 SPAN 1@60',1@80,1@50'; 33" BOX BEAM-L- FROM STA. 14+90 TO 18+70 X 7595 1906 9501X 1104 1788 2892TOTAL:8699 3694 12393IMPACTBUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPE STATION (FROM/TO)ALLOWABLE MITIGABLEBUFFER REPLACEMENTSHEET 6 OF 6PROJECT: 17BP.7.R107BRIDGE NO. 235 11/26/2018N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS GUILFORD COUNTYRev. May 2006