Loading...
HomeMy WebLinkAbout20190140 Ver 1_CI Channel MP2 2019 PDF_20190107252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Channel (NLW or NWL) Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater Other (excluding shoreline stabilization) Length 1230 800 Width 250 400 Avg. Existing Depth 7.5 8 NA NA Final Project Depth 12 12 NA NA 1. EXCAVATION This section not applicable a. Amount of material to be excavated from below NHW or NWL in cubic yards. 22,450 b. Type of material to be excavated. Sand c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. CW SAV SB WL None (ii) Describe the purpose of the excavation in these areas: The purpose of excavation in this area is to remove material that has caused a shoal in the previously unpermitted ferry channel d. High-ground excavation in cubic yards. 0 2. DISPOSAL OF EXCAVATED MATERIAL This section not applicable a. Location of disposal area. Leased disposal area from nearby landowner b. Dimensions of disposal area. 3.96 Acres or 172,585 square feet c. (i) Do you claim title to disposal area? Yes No NA (ii) If no, attach a letter granting permission from the owner. d. (i) Will a disposal area be available for future maintenance? Yes No NA (ii) If yes, where? Lease will allow for future maintenance activities e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. CW SAV SB WL None (ii) Describe the purpose of disposal in these areas: Dredged material will be pumped to this location via pipeline from the Dredge Manteo. NCDOT does not have a designated upland spoil site on the property.Neighbor propery has entered f. (i) Does the disposal include any area in the water? Yes No NA (ii) If yes, how much water area is affected? Form DCM MP-2 (Excavation and Fill, Page 2 of 3) 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 into a leasre agreement to allow for disposal to be placed on property. 3. SHORELINE STABILIZATION This section not applicable (If development is a wood groin, use MP-4 – Structures) a. Type of shoreline stabilization: Bulkhead Riprap Breakwater/Sill Other: b. Length: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 months? Yes No NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other h. Type of fill material. i. Source of fill material. 4. OTHER FILL ACTIVITIES This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? Yes No NA If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. CW SAV SB WL None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Spoil site construction will take place involving creating berms to keep material in the leased and permitted area. b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Hydraulic dredge, tugs, barges, excavator, c. (i) Will navigational aids be required as a result of the project? Yes No NA (ii) If yes, explain what type and how they will be implemented. d. (i) Will wetlands be crossed in transporting equipment to project site? Yes No NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. January 7, 2019 Date Cedar Island Dredging 2019 Project Name