Loading...
HomeMy WebLinkAbout20181718 Ver 1_Additional Info Received_20190109Moore, Andrew W From: Joel Lenk <jlenk@quible.com> Sent: Wednesday, January 09, 2019 6:56 PM To: Moore, Andrew W Cc: 'David.W.Brown@usace.army.mil'; Leslie, Andrea J; Manderson@aceasheville.com; Mike Lovoy Subject: RE: [External] RE: Request for Additional Information, The Cottages at Cypress Run, Henderson County (DWR Project #20181718) External email. Do not click links or open attachments unless you verified. Send all suspicious email as an attachment to report.spam@nc.gov Andrew, Sorry for the delayed response on this. Per the requested items in your email, please see my responses below: I did confirm with Mike Anderson of Advantage Civil Engineering that the temporary crossing will be a culvert type crossing and not a ford type crossing. I also asked Mike Anderson of Advantage Civil Engineering that he ask the contractor to carefully read the PCN, this email and the 404/401 permit when it is received. As stated in the PCN, flow in the tributary will be pumped around the work area during installation of the sewer line and culvert type temporary crossing. Flow will be returned to the streambed after the sewer line is installed and the temporary culvert is in place. During removal of the culvert type temporary crossing and installation of the permanent arched culvert, stream flow will again be pumped around the work area. At completion of the permanent crossing care will be taken to maintain and mimic natural channel geometry above and below the crossing. Floodplain benches will be installed and graded to blend into existing benches if they exist in undisturbed areas above and below the work area. Disturbed streambank slopes will be graded to a maximum slope of 3H:1V and blend to natural slopes above and below the work area. Disturbed areas of the streambank will be seeded with a Mountain Riparian Seed Mix similar to Ernst NC Mountains Riparian Mix (ERNMX-304) and an annual grain appropriate for the season (oats, rye or millet) per manufactures specification. All disturbed areas of the streambank within the trout buffer shown on the plans will be fertilized using care to keep fertilizer out of the water/stream and mulched with wheat straw. Areas of the streambank below the ordinary high water mark or bankfull elevation will be reinforced with minimum 400 gram/square meter weight Coir slope matting and be installed per the manufactures specification for streambank applications. During periods of dry weather, streambanks will be watered until a six inch stand of grassy vegetation is established. Thank you again for your email and please let me know if any additional information is required. Regards, Joel D. Lenk, P.G. WNC Office Manager Quible & Associates, P.C. 90 Church Street, Suite B Black Mountain, NC 28711 828.280.8375 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Friday, January 4, 2019 11:44 AM To: Joel Lenk <jlenk@quible.com> Cc: 'David.W.Brown@usace.army.mil' <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: RE: [External] RE: Request for Additional Information, The Cottages at Cypress Run, Henderson County (DWR Project #20181718) Joel, An email works for me. Thanks, Andrew From: Joel Lenk <llenk@quible.com> Sent: Friday, January 04, 2019 11:42 AM To: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Cc: 'David.W.Brown@usace.army.mil' <David.W.Brown@usace.army.miI>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: [External] RE: Request for Additional Information, The Cottages at Cypress Run, Henderson County (DWR Project #20181718) External email. Do not click links or open attachments unless you verified. Send all suspicious email as an attachment to report.spam@nc.gov Hey Andrew, Happy New Year, I hope you are well, and thank you for your email. In what form would you prefer that I submit the required information (email, letter, revised application)? Thank you, Joel D. Lenk, P.G. WNC Office Manager Quible & Associates, P.C. 90 Church Street, Suite B Black Mountain, NC 28711 828.280.8375 www.auible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Friday, January 4, 2019 11:22 AM To: Joel Lenk <Ilenk@quible.com> Cc: 'David.W.Brown@usace.army.mil' <David.W.Brown@usace.army.miI>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: Request for Additional Information, The Cottages at Cypress Run, Henderson County (DWR Project #20181718) Joel, On December 17, 2018, the Division of Water Resources (Division) received your application dated December 14, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until the following items are addressed: The Temporary Stream Crossing Detail on Sheet D3.2 of the Pre -Construction Notification (PCN) depicts both ford and culvert type crossings. Please confirm the temporary crossing will be a culvert type crossing or clearly explain why the culvert type crossing is infeasible. [15A NCAC 02B .0200] 2. Please explain how streambanks will be stabilized following sewer line installation and/or provide a construction sequence for the sewer line stream crossing, temporary stream crossing, and arch culvert that details how sedimentation to the stream channel from disturbance along the streambanks will be prevented. If applicable, a streambank stabilization detail may be advantageous. [15A NCAC 02B .0200] Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received, the Division will be unable to approve the application and it will be returned. Feel free to contact me if you have any questions or would like to discuss further. Andrew W. Moore, P.G. Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.