HomeMy WebLinkAboutWQ0040583_Application_20190129 (2)Central Files: APS _ SWP _
1 /29/2019
Permit Number WQ0040583
Program Category
Non -discharge
Permit Type
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions
Primary Reviewer
ori.tuvia
Coastal SWRuIe
Permitted Flow
24,120
Facility
Facility Name
Caldwell Townhomes
Location Address
Owner
Owner Name
Town of Harrisburg
Dates/Events
Permit Tracking Slip
Status
Project Type
Active
New Project
Version
Permit Classification
1.00
Individual
Permit Contact Affiliation
Major/Minor Region
Minor Mooresville
County
Cabarrus
Facility Contact Affiliation
Owner Type
Government - Municipal
Owner Affiliation
Carl Palmer
Administrator Town
Scheduled
Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration
1 /29/2019 1 /18/2019 1 /29/2019 1 /29/2019
Regulated Activities Requested /Received Events
Condominium Additional information requested 1/24/19
Wastewater collection Additional information received 1/28/19
Outfall
Waterbody Name Streamindex Number Current Class Subbasin
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources ETA 04-16 & SUPPORTING DOCUMENTATION
Application Number:IA/1�a�6e completed by DWR)
All items must be completed or the application will be returned
1. APPLICANT INFORMATION:
I. Applicant's name: Town of Harrisbure (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: Rob Donham per 15A NCAC 02T .0106(b)
Title: Town Engineer
4. Applicant's mailing address: P.O. Box 100
City: Harrisbure State: North Carolina Zip: 28075-
5. Applicant's contact information:
Phone number: (704) 455-0728 Email Address: rdonham@harrisburgnc.org
11. PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
1. Project name: Caldwell Townhomes
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W000 and issued date:
If new construction but pan of a master plan, provide the existing permit number: W000_
3. County where project is located: Cabatrus
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.2966' Longitude:-80.6751°
5. Parcel ID (if applicable): 55060731520000
(or Parcel ID to closest downstream sewer)
111. CONSULTANT INFORMATION:
I. Professional Engineer: Vincent G. Keene, P.E. License Number: 17637
Firm: Yarbrough -Williams & Houle, Inc.
Mailing address: P.O. Box 1198
City: Pineville State: NC Zip: 28134-
Phone number: (704) 556-1990 Email Address: march@v-wh.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
t. Facility Name: Rocky River Regional Wasterwater Treatment Plant Permit Number:
Owner Name: Water Sewer Authority of Cabarrus County
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
I. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 8 inch
System Wide Collection System Permit Number(s) (if applicable): WQCS_
Owner Name(s): Town of Harrisburg
FORM: FTA 04-16 Page 1 of 5
Vt. GENERAL REQUIREMENTS
RECEIVED/NCDENR/DWR
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Conveniejy "ro BeQ"y been attached?
❑ Yes [:]No ®N/A
WOROS
2. If the Applicant is a Developer of lots to be sold, has a Dcvelgper's OperatiopWra4axanznantTJRlMattached?
❑ Yes ❑No MN/A
3. if the Applicant is a dome/Property Owners' Association has an Operational Agreement (FORM: I IOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Nome ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 0?.T .0103 20 )
Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Has a flow reduction been approved under (SA NCAC 02T .QMd t�? ❑ Yes ® No
➢ if Yes, provide a cony of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 021.01140
Daily Design Flow 's
No, of Units
Flow
Dwelling Units (3 Bedrooms @ 120 GPD)
360 gal/l day
67
24,120 GPD
gal/
_
GPD
�... _._..
._ gal/
GPD
gal/ �--
-
---GPD
gal/
GPD
gal/
GPD
Total
24,120 GPD
a See 15A NCAC: 02T .0114(b). (d). (e)ju and (0)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or cast of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42�A-4).
b Per 15A NCAC 02T ,0114(c), design flow rates for establishments not identified [in table 15A.NCAC 02T.0I 141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 24120 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted now is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16
R�OE1V 6D INODENRID`t`1R
JAN 2 a �,019
NO'OS P'J_ F 2 of 5
000\1nLs VkSG
VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 0211 .0305 & VIDC (Gravity Sewers):
I. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8"
845
PVC
8"
626
DIP
➢ Section If & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VI11. PUMP STATION DESIGN CRITERIA (If Applicable) —02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
I. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -
3. Design (low of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDI-1)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02'1' .0305(h)( I ):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily Flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T.0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations, storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(0):
I. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) N Yes ❑ No
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be nrovided for sewer systems-
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-1 waters of Class 1 or
Class ❑ impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HOW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboage
➢ If noncompliance with 02T.0305(t) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) N Yes ❑ No ❑ N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? N Yes ❑ No ❑ N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes N No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with I5A NCAC 02T.0105(c)(6) (additional permits/certifications)? N Yes ❑ No
Per 15A NCAC 02T.0105fc)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes N No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location)
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with I5A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version) and the Gravity Sewer Minimun Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents
2. Professional
(Professional Engineer's name
Item Ill.1.)
that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation,
North Carolina Professional Engineer's seal, signature, and date:
R
3, Applicant's Certification per 15A NCAC 02T .0106(b):
a -A. I, .( (,> vS rJ `Z k` nr-r� attest that this application for
(Signature Authority's names from Application Item l..)
has been reviewed by the and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: <,2-- Q v <�), t • Date: \%- I S/ / ( 4
FORM: FTA 04-16 Page 5 of 5
WILL14
AVEN� WELL
Z
�
Z
r
BEDFORD
rn
-700,
.ry
z
r
WSACC
IS014001:2011 ♦ NOStir MICSo • OHSAM01:1001
January 8, 2019
Mr. Haynes Brigman
Town Manager
Town of Harrisburg
P.O. Box 100
Harrisburg, NC 28075
Subject: Flow Acceptance Request - Town of Harrisburg
Caldwell Townhomes
Dear Mr. Brigman:
WATER & SEWER AUTHORITY
OF CABARRUS COUNTY
232 Davidson Hwy,
Concord, NC 28027
704.786.1783 ♦ 704.795.1564 Fax
www.wsacc.org
This is a notice of capacity for the flow acceptance request received by the Water and Sewer Authority of Cabarrus
County (WSACC) from the Town of Harrisburg on December 27, 2018 through January 3, 2019. WSACC has or
will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to
transport and treat the domestic wastewater from the proposed project named Caldwell Townhomes, located off
Farmington Ridge Parkway. The referenced project will serve 67 single-family townhomes, with a projected
wastewater flow of 24,120 gallons per day (gpd). The wastewater generated by this project will be conveyed
through a proposed gravity system and then enter WSACC's system at the existing 18-inch Fuda Creek Interceptor.
WSACC acknowledges it has or will have capacity for wastewater from the proposed development based on
information provided by Town of Harrisburg using North Carolina Department of Environmental Quality (NCDEQ)
wastewater flow guidelines.
The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006,
funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future.
Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies,
regulatory approval, and funding availability. The list and schedule of CIP projects are tentative and are revised
periodically to reflect changing conditions and needs.
If construction of this project does not commence within two (2) years of the date of this notice, the notice is
rescinded and a second request and notice will be required before flow capacity is accepted. Please notify WSACC,
in writing, when construction of this project is initiated. This sewer capacity allocation may also be cancelled
pursuant to the conditions set forth in the WSACC Sewer Allocation and Commitment Policy.
Please note that the final commitment to service to provide wastewater treatment services shall occur upon
application for a building permit for the project and when system development fees are paid pursuant to N.C.G.S
§162A, Article 8.
If you have any questions, please call me at (704) 788-4164, extension 104.
Sincerely,
J.
Thomas Hahn, PE
Utility Systems Engineer
cc: Tom Polito/Harrisburg
Michael Wilson/WSACC
Tim Kiser, PE/WSACC
Chad VonCannon, PE/WSACC
Mark Lomax/WSACC
RECEIVED/NCDENRIDWR
JAN 2 8 2019
State of North Carolina
DWRWQRos Department of Environmental Quality
MOORESVILLE REGIONAL OFFICE Division of Water Resources
Plow Tracking/Acceptance for Sewer Extension Applications
Division of Water Resources (FTSE-04/16)
(WSACC USE ONLY) Caldwell Townhomes
Section I. Name of wastewater treatment facility (W WTF) receiving wastewater:
® Rocky River Wastewater Treatment Facility - Permit #NC0036269
❑ Muddy Creek Wastewater Treatment Facility - Permit #NC0081621
W WTP facility's permitted flow, MOD 26.500
Estimated obligated flow not yet tributary to the W WTP, MGD 1.792
-._....-............ ........
W WTP facility's actual avg. daily flow, MGD 20.07 (75.74% of permit)
Total flow for this specific request, MGD 0.024
Total actual and obligated flows to the facility, MGD 21,886
Percent of permitted flow used 82.59%
Section II. Pump stations along the route from the Jurisdiction's connection point to the W WTP.
(A)
(B)
(C)
(D)=(atC:)
(L)—(A•D)
Pump Station
Firm Capacity"
Design Average Daily Flow ""
Approx. Current
Obligated, Not Yet
Total Cistern Flow
Available
(Name or Number)
MGD
(Firm/pr)
Average Daily Flow
Tributary Daily Plow
Plus Obligated Flow
Capacity"""
MGD
MGD
MGD
MGD
MGD
Lower Rocky River PS
37.000
14.800
10.541
1.338
11,879
2.921
The Firm Capacity of any pump station Is donned as lire maximum pumped Dow that can be achieved with the largest pump taken out of serviru.
""Design Average Daily Flow is the firm capacity of the pump station divided by a penking factor not less than 2.5,
""A Planning Assessment Addendum shall ba attached for each pump station located between the project connection point and the W WrP where Available Capacity is <n.
Section III. WSACC Certification Statement:
1, J. Thomas Hahn. PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted
in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary
sewer overflows or overburden any downstream pump station on route to the receiving treatment plant under normal
circumstances, given the implementation of the planned improvements identified in the planning assessment where
applicable. This analysis has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Section I and Section 11 plus all attached planning
assessment addendums for which I am the responsible party. Signature of this form indicates W SACC's guarantee of
capacity for this wastewater flow. Notwithstanding the guarantee of capacity, WSACC does not make a commitment to
service this wastewater flow until a building permit is requested through the Cabarrus County Building Inspections
Department and WSACC receives payment of the System Development Fee.
's Signing Official Signature
State of North Carolina
, P,X&-o Department of Environmental Quality
Division of Water Resources Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE—01/14)
(JURISDICTION USE ONLY)
Jurisdiction Requesting Flow Acceptance for Collection System:
❑City of Concord ❑City of Kannapolis [0 Town of Harrisburg ❑Town of Mt. Pleasant
❑Charlotte Mecklenburg Utilities
Project Title, Description, and Number of Lots/Unit:
Project Title: Caldwell Townhomes
Description: Approx. 1,471 LF of proposed 8" gravity sewer including 10 manholes to serve 67 single-familv
Townhome lots The proposed sanitary sewer will tie into the existing 18" Fuda Creek Interceptor between existing
manholes 012772 and 012770.
What is the quantity of flow that will be discharged? 24,120 GPD
Flow type:
N Domestic 100 % ❑ Commercial % ❑ Industrial %
Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC
Interceptor connection point.
Pump Station
(Name or Number)
Firm Capacity "
MGD
(A)
Design Average Daily Flow ""
(Fitm/pf)
MGD
(B)
Approx. Current
Average Daily Flow
MGD
(C)
Obligated, Not Yet
Tributary Daily Flow
NIGD
(D)-(B+C)
Total Current Flow
Plus Obligated Flaw
MGD
(E)-(A-D)
Available
Capacity.^^
MGD
"The Firm Capacity of any pump station is defined as the maximum pumped flow that can he achieved with the largest pump taken out ofservice.
*"Design Average Daily Flaw is the firm capacity of the pump station divided by a peaking factor not has than 2.5.
"""A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the W WTP where Available Capacity is <0.
Section II. Jurisdiction's Certification Statement:
1 Rob Donham , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in
this project has been evaluated along the route to the receiving WSACC interceptor; and the flow from this project is not
anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to
the receiving WSACC interceptor normal circumstances, given the implementation of the planned improvements identified in
the planning assessment where applicable. This analysis has been performed in accordance with local established policies and
procedures using the best available data. This certification applies to those items listed above in Section I plus all attached
planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer
capacity. Signature of this form indicates acceptance of this wastewater flow.
Jurisdiction's Signing Official Signature
Date
cll�
Revision Date: 08Y09113
WASTEWATER FLOW ACCEPTANCE FORM
FOR THE
WATER AND SEWER AUTHORITY OF CABARRUS COUNTY
Jurisdiction Requesting Flow Acceptance: Date:
❑City of Concord ❑City of Kannapolis QTown of Harrisburg ❑Town of Mt. Pleasant
❑Charlotte Mecklenburg Utilities
Project Title, Description, and Number of Lots/Unit:
Project Title: Caldwell Townhomes
Description: Approximately 1,471 L.F. of proposed 8" gravity sanitary sewer including 10 manholes to serve 67 single-
family townhonte lots The proposed sanitary sewer will tie into the existing 18" Fuda Creek Interceptor between existing
manholes 0 12772 & 012770.
*Number of Lots: 67 OR *Number of Units: *Must be included in request.
Where will the new line be connected:
® Directly into a WSACC Interceptor
❑ Into the Jurisdiction's existing collection system
❑ Into a private line
Describe the location of the tie-in line to which the new sewer line will connect: The proposed 8" sanitary
sewer will connect to the existing 18" Fuda Creek Interceptor between existing manholes 012772 & 012770
via a 5' doghouse manhole with water -tight lid 2' above existing grade.
Which WSACC Interceptor will the Dow ultimately be discharged into: Fuda Creek Interceptor
What is the WSACC manhole number that the Dow will be discharged into? 012770
What is the quantity of Dow that will be discharged? 24,120 GPD
Flow type:
® Domestic 100 % ❑ Commercial % ❑ Industrial %
Name of wastewater treatment facility (WWTF) receiving wastewater:
® Rocky River Wastewater Treatment Facility— Permit #NC0036269
❑ Muddy Creek Wastewater Treatment Facility — Permit #NC0081621
Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted
as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure.
If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will
be required before Dow acceptance will be provided.
Mark Lomax at 704-786-1783, ext. 231, nowt be notified 48 hours in advance of a connection into a WSACC interceptor.
WSACC will inspect connection before, during, and after completion.
If construction is not started within two (2) year from the Ante of approval of the flow acceptance for this project, the
approval is rescinded and a second request and approval will be required for the project.
WSACC USE ONLY:
DATE:
Current sewer model shows an Interceptor as being surcharged south of the manhole in question.
Approved ❑ Not Approved
Current Sewer Model shows: