Loading...
HomeMy WebLinkAbout20181041 Ver 2_Inspection Report_20190128Wetland Inspection Report Project Num: 20181041 Project Name: Cambridge Park (Turner Road) County: Alamance Location: Cambridge Park (Turner Road) Latitude: +36° 02' SW Plan Location Site Owner Name Desco Mebane Partners Inspection Date: 1/28/2019 Reason for Inspection Follow-up Inspection Type: Site Inspection (non -DOT) Version: 2 Status: Issued Project Type: Residential Subdivision Region: Winston-Salem Longitude: -79° 15'57" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Sue L Homewood Secondary Inspector(s): Facility Compliance Status: ❑ Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: 0 Permit (401 WQC) Inspection Summary: 0 Not Compliant Phone: 336-776-9694 page: 1 Site Number: 20181041 Owner: Dischinger, Eric Inspection Date: 1/28/2019 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Follow-up Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ ❑ ❑ Comment: Permittee had notified agencies that they had repaired the riprap at the culvert inlet. Inspection conducted to confirm status. Riprap had been modified however there is still a section of stream above the culvert that is not providing aquatic passage due to riprap installation above grade. page: 2 � 0 '•2 8 2019 max. •ry.- �� .nom `i_—s �':1 t� - ,�► ails �_ yApr } 4 F 'R. _ .$awl -=*.ems- _. _. A IL • It "� ` � � �'aY►.! .: � moi• _� -� � ' ;5t - _ � ,tea ; _ "► � •r� •,-� a -a4 ~-`��°- erica`]"-'.. .♦ �•"- `-vii*. if, 3 .�x Y� ,y L _ t, Nf ;r 0128 2. a , f Peya�• �i �f� "��al "I �i �'. .i i-17 t R_.,t# 44. e la t" I 4`. lk ot �, P; w � y r r p i k ����'' I ' �� •i[It n r A r ^^a� t' 01_., 2'8. 2010 9 6 �4