Loading...
HomeMy WebLinkAbout20190120 Ver 1_01_TIP_R5779_Madison_Cover Letter_20190128 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION THIRTEEN POST OFFICE BOX 3279 ASHEVILLE, NC 28802-3279 Telephone: (828) 251-6171 Fax: (828) 251-6394 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 55 ORANGE STREET ASHEVILLE, NC 28801-2340 January 28, 2019 Ms. Lori Beckwith US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Subject: Nationwide Permit #23 Extension of SR 1631 (Crossroads Parkway) to SR 1549 (Calvin Edney Road) State Project No. R-5779 WBS Element 44834.1.1 Mars Hill, Madison County, NC Dear Ms. Beckwith: I have enclosed a set of plans, a PCN application for NWP #23, a figure set, permit drawings, and a preliminary jurisdictional determination request relative to the proposed extension of SR 1631 (Crossroads Parkway) to SR 1549 (Calvin Edney Road) in Mars Hill, Madison County, NC (TIP# R-5779). We propose to extend Crossroads Parkway from the existing terminus for approximately 0.3 mile south to Calvin Edney Road. The proposed 2-lane road extension will include 11’ travel lanes and 6’ grass shoulders. The roadway extension will result in permanent impacts to 180 linear feet (LF) of Stream SB (UT to Big Branch) with an additional 81 LF of bank stabilization and outlet protection at four sites. Temporary impacts to 60 LF of Big Branch and stream SB are necessary for temporary construction access. Big Branch is approximately 12’ wide and 1’ deep with a predominantly gravel and cobble substrate. Stream SB is approximately 8-9’ wide and 6” deep with a predominately sand and cobble substrate. Both streams are classified as WS-II; High Quality Waters. Existing channel morphology will be maintained at the bank stabilization sites and upstream and downstream of the culvert. Riparian vegetation will be reestablished along disturbed areas associated with the project. This project will not affect the northern long-eared bat (Myotis septentrionalis) (NLEB) or the gray bat (Myotis grisescens). Marella Buncick confirmed that the proposed project is not located within a county or watershed known to contain NLEB hibernation or maternity roosting sites and therefore has met the criteria required for the USFWS 4(d) rule and any associated take is exempt. Additionally, Marella Buncick confirmed that habitat for gray bat is not present within the study area. Lori Beckwith Page –2 TIP # R-5779, Madison County January 28, 2019 Kristi Lynn Carpenter, NC Division of Water Resources, Transportation Permitting Unit and Kevin Barnett, NC DWR Asheville Regional Office will review the project through the electronic form (https://edocs.deq.nc.gov/Forms/Pre-Construction_Notification_Form). Please charge the application fee of $570.00 to WBS element # 44834.1.1. Please forward comments directly to the Corps with copy to Division 13 Environmental Officer . Your earliest consideration for this request would be greatly appreciated. If you have any questions or information needs, please contact me at (828) 251-6171. Sincerely, Roger D. Bryan Division 13 Environmental Officer Enclosures cc: Mark T. Gibbs, PE Steve Cannon, PE