Loading...
HomeMy WebLinkAboutCorning CEPI - 190118 Corning CEPI - NCDEQ Plan setKnow what's R C:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\C0-1COVER.dwgTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY BANKS ENGINEERING, PLLC. SHALL BE WITHOUT LIABILITY TO BANKS ENGINEERING, PLLC.December17,2018-1:55amBy:Ba1919 SOUTH BOULEVARD SUITE 200 CHARLOTTE, NC 28203 T: 704.780.4972 NC License #P-1370 © 2018 ENGINEERINGVICINITY MAP 1" = 2000'PROJECT:01045001CONCORDEMPLOYEEPARKINGIMPROVEMENTSREV.DATE REVISION DESCRIPTION SHEETS -11.19.18 1st submittal to Cabarrus Planning ALL -12.06.18 1st submittal to NCDENR ALL -12.18.18 1st submittal to NCDOT. 2nd submittal to NCDENR ALLOWNER: CORNING - CONCORD PLANT 14556 US-601 MIDLAND, NC 28107 704.569.6728 CONTACT: AL MABROUK, PE ENGINEER: BANKS ENGINEERING, PLLC. 1919 SOUTH BOULEVARD, SUITE 200 CHARLOTTE, NC 28203 704.780.4972 CONTACT: JAY D. BANKS, PE SURVEYOR (AERIAL): AVIOIMAGE MAPPING SERVICES, INC. 4600 LEBANON RD. - SUITE E CHARLOTTE, NC 28227 704.573.7080 CONTACT: ROBERT F. AKERS, PLS SITE C0-1 SURVEYOR (GROUND): McKIM & CREEK 8020 TOWER POINT DR. CHARLOTTE, NC 28227 704.841.2588 CONTACT: w. ANDREW EADES, PLS WHITLEY RD.KISERRD.D R A K E R D . WALLACE RD. BETHELAVE.US-601NORTH 14556 US-601. MIDLAND, NC 28107 CONCORD EMPLOYEE PARKING IMPROVEMENTS SHEET INDEX Sheet No:Sheet title C0-1 COVER SHEET C0-2 GENERAL NOTES C0-3.0 EXISTING CONDITIONS - AVIOIMAGE C0-4.0 EXISTING CONDITIONS - McKIM & CREED C0-4.1 EXISTING CONDITIONS - McKIM & CREED C0-4.2 EXISTING CONDITIONS - McKIM & CREED C0-4.3 EXISTING CONDITIONS - McKIM & CREED C0-5 BORE/SOFT-DIG C0-6 SAFETY NOTES C0-7 ORIGINAL PLANT SWPP SITE PLAN C1-0 SITE - OVERALL C1-1 SITE - SHEET 1 OF 3 C1-2 SITE - SHEET 2 OF 3 C1-3 SITE - SHEET 3 OF 3 C2-0 DEMOLITION - OVERALL C2-1 DEMOLITION - SHEET 1 OF 3 C2-2 DEMOLITION - SHEET 2 OF 3 C2-3 DEMOLITION - SHEET 3 OF 3 C3-0 EROSION CONTROL PH1 - OVERALL C3-1 EROSION CONTROL PH1 - SHEET 1 OF 3 C3-2 EROSION CONTROL PH1 - SHEET 2 OF 3 C3-3 EROSION CONTROL PH1 - SHEET 3 OF 3 C3-4 EROSION CONTROL PH2 - SHEET 1 OF 3 C3-5 EROSION CONTROL PH2 - SHEET 2 OF 3 C3-6 EROSION CONTROL PH2 - SHEET 3 OF 3 C4-0 GRADING AND DRAINAGE - OVERALL C4-1 GRADING - SHEET 1 OF 3 C4-2 GRADING - SHEET 2 OF 3 C4-3 GRADING - SHEET 3 OF 3 C4-4 PROFILE - FOC NORTH C4-5 PROFILE - FOC SOUTH C5-0 SECURITY LAYOUT C6-0 LANDSCAPING - OVERALL C6-1 LANDSCAPING - SHEET 1 OF 3 C6-2 LANDSCAPING - SHEET 2 OF 3 C6-3 LANDSCAPING - SHEET 3 OF 3 C7-0 SITE DETAILS - 1 C7-1 SITE DETAILS - 2 C7-2 EROSION CONTROL DETAILS - 1 C7-3 EROSION CONTROL DETAILS - 2 C7-4 STORM DETAILS - 1 C7-5 STORM DETAILS - 2 C7-6 PLANTING DETAILS C7-7 SPECIFICATIONS C8-0 DRAINAGE AREA MAP C8-1 IMPERVIOUS INVENTORY RD1-0 ROAD IMPROVEMENTS RD1-1 TYPICAL SECTION & PAVEMENT MARKINGS RD1-2 TRAFFIC CONTROL RD1-3 TRAFFIC CONTROL DETAILS RD2-0~RD2-11 ROADWAY CROSS-SECTIONS MOTORCYCLEPARKINGONLY75' FRONT SETBACK75' FRONT SETBACK 15' THOROUGHFARE LANDSCAPE YARD 15' THOROUGHFARE LANDSCAPE YARD15' THOROUGHFARE LANDSCAPE YARD US-601 (NCDOT MAINTAINED-100' R.O.W.)US-601 (NCDOT MAINTAINED-100' R.O.W.)KISERRD.WHITLEYRD.US-601 (NCDOT MAINTAINED- 100' R.O.W.)30'SETBACKPHASE2-EX.LOTPHASE1-NEWLOTEX. LOT #2 LOT #4 FUTURE LOT #4 Know what's R C:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\C1-0TOC1-3SITE.dwgTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY BANKS ENGINEERING, PLLC. SHALL BE WITHOUT LIABILITY TO BANKS ENGINEERING, PLLC.December17,2018-2:12amBy:BaOWNER:1919 SOUTH BOULEVARD SUITE 200 CHARLOTTE, NC 28203 T: 704.780.4972 NC License #P-1370 © 2018 ENGINEERINGDESIGNED: DRAWN: CHECKED: PROJECT: DATE: JDB 01045001 11.19.18PROJECT:SHEET:---REV.12.18.1812.06.1811.19.18DATE1stsubmittaltoNCDOT.2ndsubmittaltoNCDENR1stsubmittaltoNCDENR1stsubmittaltoCabarrusPlanningDESCRIPTIONNORTH14556US-601MIDLAND,NC28107CONCORDEMPLOYEESPARKINGIMPROVEMENTS14556US-601MIDLAND,NC28107CLIENT:0 SCALE: 8040 160 1"= 80'C1-0SITEOVERALLSITE LEGEND PROPOSED SIGNAGE PROPOSED CURB (BOC, FOC, EOP) PROPOSED SITE NOTE PROPOSED PARKING SPACES20 PROPOSED SIDEWALK HATCH PROPOSED STD. DUTY ASPH. PAVMT PROPOSED HEAVY DUTY ASPHALT PROPOSED LIGHTING SYMBOLOGY PROPOSED HANDRAILOOOOOOOOOO A PROPOSED SITE FENCEOOOOOOOO PARKING STOP BLOCK PARKING SUMMARY PARKING REQUIREMENT (CABARRUS TABLE 10-6): MINIMUM: 1 SPACE PER EMPLOYEE AT PEAK SHIFT PLUS 1 FOR EVERY COMPANY VEHICLE STORED ON SITE. MAXIMUM: 1.5 PER EMPLOYEE AT PEAK SHIFT PLUS 1 FOR EVERY COMPANY VEHICLE STORED ON SITE. STANDARD PARKING PARKING EXISTING: 738 SPACES COMPACT ALLOWED (25%):N/A SPACES PARKING REMOVED: 163 SPACES COMPACT PROVIDED:N/A SPACES PROPOSED NEW:607 SPACES PROPOSED TOTAL: 1182 SPACES**COMPACT PROVIDED:N/A SPACES ** PARKING COUNT INCLUDES ADA SPACES ACCESSIBLE PARKING ACCESSIBLE SPACES REQUIRED: 22 SPACE SPACES PROVIDED: 28 SPACES VAN ACCESSIBLE SPACES REQ'D: 5 SPACE SPACES PROVIDED: 9 SPACES ZONING CODE SUMMARY PROJECT NAME:CONCORD EMPLOYEE PARKING IMPROVEMENTS OWNER:CORNING PHONE:704.569.6728 PLANS PREPARED BY: BANKS ENGINEERING, PLLC. PHONE:704.780.4972 TAX PARCEL ID:55435780680000 STREET ADDRESS:14556 US-601 MIDLAND, NC 28107 ZONING:GI - GENERAL INDUSTRIAL PROPOSED USE:SURFACE PARKING BUILDING HEIGHT:N/A STORIES BUILDING COVERAGE: N/A SF GROSS FLOOR AREA: N/A SF LOT SIZE:± 155 AC JURISDICTION:CABARRUS COUNTY YARD REQUIREMENTS: SETBACK (FRONT-EAST):75'SIDE YARD (NORTH): 30' REAR YARD (WEST):30'SIDE YARD (SOUTH): 30' REQUIRED BUFFERS: SETBACK (FRONT):N/A SIDE YARD (NORTH): N/A REAR YARD (WEST):N/A SIDE YARD (SOUTH): N/A C C C C C C C CCC C C C CCCCCCC C CCCC C CCCCC C C C SF S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF CB-66 RIM: 529.30 MOTORCYCLEPARKINGONLY75' FRONT SETBACK75' FRONT SETBACK 15' THOROUGHFARE LANDSCAPE YARD 15' THOROUGHFARE LANDSCAPE YARD15' THOROUGHFARE LANDSCAPE YARD US-601 (NCDOT MAINTAINED-100' R.O.W.)US-601 (NCDOT MAINTAINED-100' R.O.W.)KISERRD.WHITLEYRD.US-601 (NCDOT MAINTAINED- 100' R.O.W.)30'SETBACKUEUEUEUEPHASE2-EX.LOTPHASE1-NEWLOT2:1(MAX. ) STRUCTURAL FILL STOCKPILE FOR PHASE 2 SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFS FSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS F SFSFSFS F S F SFSFSFSFSFSFS F SF SF S F SFSFEX. LOT #2 LOT #4 FUTURE LOT #4523524525526527528529530531 5325335345355365375385365355345315285 2 2 52252752853052953153253453353552653753625.5527527 526 525 52952652753053153253453453334.534.529.553529.55305335325275285345255265295245245245 2 0 52052152252352452552652752852953153253353453653452852752953052429.552952852752552352652453052552952752652853253152524.524.552552454053552752753221.5 53052552321.5 21.522.2521.2552222.552323.552452552322.552252423.552221.522.522.55295245385395405415 4 1539 542531530532533534535536537538539540542543544546546545543544541545CB-63 RIM: 522.65 CB-08 RIM: 523.00 DI-67 RIM: 532.00 CB-09 RIM: 524.90 CB-12 RIM: 529.00 DCB-10 RIM: 523.75 CB-11 RIM: 528.80 CB-15 RIM: 526.65 CB-13 RIM: 533.80 CB-14 RIM: 534.00 CB-07 RIM: 523.00 CB-06 RIM: 523.00 CB-19 RIM: 531.20 CB-16 RIM: 527.90 CB-17 RIM: 529.00 CB-18 RIM: 529.95 CB-20 RIM: 532.35 CB-21 RIM: 519.50 EXMH-50 RIM: 521.40 INV: 514.76 CB-51 RIM: 521.00 STMH-52 RIM: 523.40 INV: 519.90 CDI-53 RIM: 521.00 INV: 515.07 CDI-54 RIM: 521.00 INV: 515.29 CDI-55 RIM: 521.00 INV: 515.44 CDI-56 RIM: 521.00 INV: 515.72 CDI-57 RIM: 521.00 INV: 516.53 CB-58 RIM: 521.20 CB-59 RIM: 522.65 CB-61 RIM: 522.65 CB-60 RIM: 521.30CB-62 RIM: 521.30 EXDI-64 RIM: 522.44 INV: 517.80 CB-65 RIM: 526.65 CB-05 RIM: 521.50 FES-01 INV: 515.00 STMH-04 RIM: 523.00 STMH-03 RIM: 523.00 STMH-02 RIM: 520.75 FES-22 INV: 517.10 DRY DETENTION FACILITY 15" RCP CULVERT SEE ROADWAY SHEETS RD2-X FOR GRADING DETAILS 15+850+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 Know what's R C:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\C4-0TOC4-3GRADING.dwgTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY BANKS ENGINEERING, PLLC. SHALL BE WITHOUT LIABILITY TO BANKS ENGINEERING, PLLC.December17,2018-2:37amBy:BaOWNER:1919 SOUTH BOULEVARD SUITE 200 CHARLOTTE, NC 28203 T: 704.780.4972 NC License #P-1370 © 2018 ENGINEERINGDESIGNED: DRAWN: CHECKED: PROJECT: DATE: JDB 01045001 11.19.18PROJECT:SHEET:---REV.12.18.1812.06.1811.19.18DATE1stsubmittaltoNCDOT.2ndsubmittaltoNCDENR1stsubmittaltoNCDENR1stsubmittaltoCabarrusPlanningDESCRIPTIONNORTH14556US-601MIDLAND,NC28107CONCORDEMPLOYEESPARKINGIMPROVEMENTS14556US-601MIDLAND,NC28107CLIENT:0 SCALE: 8040 160 1"= 80'C4-0GRADINGOVERALLPROPOSED CONSTRUCTION LIMITS PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED SPOT PROPOSED GRADING ARROW GRADING LEGEND PROPOSED WALL SPOTS PROPOSED INTER. CONTOUR 799 TC: 100.00BC: 100.00597.00 TW: 100.00BW: 100.00 25.5 PROPOSED IRRIGATION SLEEVE PROPOSED STORMSTMH-1 STUB TC: 100.00BC: 100.00597.00 TW: 100.00BW: 100.00 TC: 100.00BC: 100.00597.00 TW: 100.00BW: 100.00 2 - 2" PVCGRADING NOTES 1. SEE GENERAL NOTES SHEET C0-2 FOR GRADING NOTES. 2. CONTRACTOR SHALL REVIEW, UNDERSTAND AND IMPLEMENT ALL REQUIRED EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO ANY DISTURBANCE. 3. SEE THE EROSION CONTROL PLANS AND DETAILS FOR THE LOCATION AND SIZING OF ALL RIP-RAP APRONS AND SLOPE AND CHANNEL LININGS. 4. ON ALL SLOPES STEEPER THAN 3:1, CONTRACTOR SHALL INSTALL NORTH AMERICAN GREEN PRODUCT SC150 EROSION CONTROL MATTING. REFER TO NAG FOR INSTALLATION GUILDELINES. 5. ALL SPOT ELEVATIONS ALONG CURB AND GUTTER LINE REPRESENT FLOW LINE ELEVATIONS UNLESS OTHERWISE NOTED. 6. CONTRACTOR AND/OR CONSTRUCTION SURVEYOR TO VERIFY THAT CONSTRUCTION STAKING BASED ON CONTOURS AND SPOT ELEVATIONS DOES NOT CONFLICT WITH SLOPE CALL-OUTS OR ADA REQUIREMENTS. NOTIFY SITE ENGINEER OF ANY DISCREPANCIES AND AWAIT FURTHER INSTRUCTION. 7. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY THE ACCURACY OF ALL STORM/UTILITY TIE-IN INVERTS SHOWN AND NOTIFY THE SITE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY 8. AFTER VERIFICATION, ALL GRAVITY PIPE INSTALLATION(S) SHALL BEGIN AT THE LOWEST ELEVATION OUTFALL AND/OR TIE-IN POINT(S) INDICATED AND PROCEED UPSTREAM UNLESS OTHERWISE INDICATED ON THE PLANS. INSTALLATION(S) NOT FOLLOWING THIS SEQUENCE WILL BE CONSIDERED A CONTRACTOR "MEANS AND METHODS" AND WILL SUBSEQUENTLY ASSUME ALL RISKS ASSOCIATED WITH MEETING INDICATED TIE-OUT ELEVATION, NECESSARY PIPE ADJUSTMENTS DUE TO CONFLICTS AND PIPE SLOPES AS INDICATED. ALL ADDITIONAL COSTS (INCLUDING ENGINEERING) ASSOCIATED WITH RE-WORKING PIPE SYSTEM TO FUNCTION PROPERLY WILL BE AT THE CONTRACTORS EXPENSE. NOTE TO CONTRACTOR - AS-BUILT FOR DETENTION SYSTEM: CONTRACTOR SHALL ENGAGE NC LICENSED SURVEYOR TO PROVIDE AS-BUILT SURVEY OF STORM COLLECTION SYSTEM AS WELL AS UNDERGROUND UTILITIES. SURVEY SHALL BE IN NC STATE PLANE COORDINATE SYSTEM USING SAME SURVEY CONTROL AS ORIGINAL DESIGN SURVEY. UTILITY SERVICES (I.E. POWER, GAS, WATER, FOC, ETC. TO INCLUDE LINES SIZES AND DEPTH INFORMATION. AS-BUILT SURVEY INFORMATION WILL BE COMPARED WITH DESIGN DRAWINGS FOR VERIFICATION THAT PIPE INVERTS, PIPE LENGTHS AND OTHER SYSTEM PARAMETERS MATCH THE DESIGN DRAWINGS. VARIATIONS FROM THE DESIGN DRAWINGS MAY REQUIRE REMOVAL/REPLACEMENT AT THE CONTRACTORS EXPENSE. DIP = DUCTILE IRON PIPE - PC 350 W/ TYPE 5 BEDDING. USE 16" DIA. PIPE IF TABLE ABOVE INDICATES 15" **ALL PIPE MATERIALS AND STRUCTURES TO BE INSTALLED PER MANUFACTURES SPECIFICATIONS, GEOTECHNICAL ENGINEER AND/OR LOCAL REGULATIONS, WHICHEVER IS MORE STRINGENT. *** PERIMETER PIPING AROUND BUILDING TO PICK UP ROOF LEADERS OR SMALL AREA DRAINS SHALL NOT COMMENCE UNTIL AFTER BUILDING FOOTINGS HAVE BEEN INSTALLED. ADJUSTMENT TO THESE LINES MAY BE NECESSARY DUE TO FOOTINGS. RCP = REINFORCED CONCRETE PIPE-CLASS III IF NOT SPECIFIED. JOINT TO CONFORM WITH AASHTO M198 PVC = POLYVINYL CHLORIDE PIPE - SCHEDULE 40 DI = DROP INLET (WITH FRAME AND GRATE) PER NCDOT STD 840.15/16 SDMH = MANHOLE JUNCTION (WITH SOLID LID) PER NCDOT STD 840.31/54 JB = ROOF LEADER/SMALL DIA. DRAIN STRUCTURE - SEE NYOPLAST 15" CAST IRON H-20 GRATE AND DRAIN BASIN DETAILS YI = YARD INLET - SEE NYOPLAST 15" CAST IRON H-20 GRATE AND DRAIN BASIN DETAILS AD = AREA DRAIN - SEE NYOPLAST 15" CAST IRON H-20 GRATE AND DRAIN BASIN DETAILS O-RING - WATER TIGHT GASKETED RCP/HDPE RL = ROOF LEADER COLLECTION MANIFOLD - HDPE SMOOTH WALL (TYPE S) HDPE = HIGH DENSITY POLYETYLENE - CORRUGATED EXTERIOR/SMOOTH INTERIOR (TYPE S). AASHTO M294 CMP = CORRUGATED METAL PIPE - ALUMINIZED TYPE II, 14 GAUGE, HEL-COR W/ HUGGER JOINTS OR EQUAL. DCB = DOUBLE CATCH BASIN (WITH FRAME, GRATE, AND HOOD) PER NCDOT STD 840.01/02 CDI & CCB = CONVERT EX STRUCTURE TO DROP INLET OR CATCH BASIS. SEE CB & DI FOR STANDARDS STCB = SLAB TOP CATCH BASIN PER NCDOT 840.04 EW = PRECAST CONCRETE ENDWALL PER NCDOT STD 838.80 FES = FLARED END SECTION - CONCRETE WITH ADAPTER IF NECESSARY FOR CONNECTION TO HDPE STORM PIPE-NO HDPE OR CMP. CO - PVC CLEAN-OUT WITH TRAFFIC RATED BRASS CAP JCT - PRECAST CONCRETE JUNCTION BOX - NO "KNOCK-OUT" TYPE BOXES ARE PERMITTED CB = CATCH BASIN (WITH FRAME, GRATE, AND HOOD) PER NCDOT STD 840.01/02 NOTE TO CONTRACTOR: GEOTECHNICAL REPORT INDICATES SHALLOW WEATHERED ROCK WITH BPF > 50. OVERALL MASS GRADING DOES NOT APPEAR TO ENCROACH UPON THESE REGIONS BUT IT MAY BE ENCOUNTERED DURING STORM DRAINAGE INSTALLATION. AN ALLOWANCE SHALL BE INCLUDED WITH BASE BID TO ACCOUNT FOR THIS CONDITION. SEE GEOTECHNICAL ENGINEERING REPORT DATED 11.06.18 DEVELOPED BY STEWART ENGINEERING PRIOR TO BIDDDING. STRUCTURE RIM ELEV (ft) INVERT IN (1) (ft) INVERT IN (2) (ft) INVERT IN (3) (ft) INVERT OUT (ft) STMH-52 523.40 (N/A)(N/A)(N/A)519.90 STMH-04 523.00 516.32 (N/A)(N/A)516.32 STMH-03 523.00 515.64 (N/A)(N/A)515.64 STMH-02 520.75 515.12 (N/A)(N/A)515.12 FES-22 519.75 (N/A)(N/A)(N/A)517.10 DI-67 532.00 (N/A)(N/A)(N/A)528.16 DCB-10 523.75 (N/A)(N/A)(N/A)520.50 CB-66 529.30 526.05 (N/A)(N/A)526.05 CB-65 526.65 523.40 (N/A)(N/A)520.73 CB-63 522.65 (N/A)(N/A)(N/A)519.40 CB-62 521.30 518.05 (N/A)(N/A)518.05 CB-61 522.65 (N/A)(N/A)(N/A)519.40 CB-60 521.30 518.05 (N/A)(N/A)518.05 CB-59 522.65 (N/A)(N/A)(N/A)519.40 CB-58 521.20 517.95 (N/A)(N/A)517.95 CB-51 521.00 516.75 (N/A)(N/A)516.50 CB-21 519.50 516.85 (N/A)(N/A)516.85 CB-20 532.35 (N/A)(N/A)(N/A)529.10 CB-19 531.20 527.95 (N/A)(N/A)527.95 CB-18 529.95 526.70 (N/A)(N/A)525.27 CB-17 529.00 (N/A)(N/A)(N/A)525.75 CB-16 527.90 524.65 (N/A)(N/A)524.65 CB-15 526.65 523.40 522.40 (N/A)522.40 CB-14 534.00 (N/A)(N/A)(N/A)530.75 CB-13 533.80 530.18 (N/A)(N/A)527.83 CB-12 529.00 (N/A)(N/A)(N/A)525.75 CB-11 528.80 524.55 525.18 (N/A)522.39 CB-09 524.90 520.65 520.06 (N/A)520.06 CB-08 523.00 519.00 (N/A)(N/A)519.00 CB-07 523.00 518.52 (N/A)(N/A)518.52 CB-06 523.00 517.91 (N/A)(N/A)517.91 CB-05 521.50 517.42 518.25 516.66 516.66 FES-01 520.00 515.05 (N/A)(N/A)515.00 EXMH-50 521.40 516.34 (N/A)(N/A)514.76 EXDI-64 522.44 518.19 (N/A)(N/A)517.80 CDI-56 521.00 517.67 (N/A)(N/A)515.72 CDI-55 521.00 517.75 (N/A)(N/A)515.44 CDI-53 521.00 517.75 (N/A)(N/A)515.29 STORM STRUCTURE TABLE START NODE STOP NODE US INVERT (ft) DS INVERT (ft) DIAMETER (in) MATERIAL LENGTH (ft) SLOPE (ft/ft) CB-14 CB-13 530.75 530.18 15 HDPE O-RING 113.4 0.005 CB-13 CB-11 527.83 524.55 15 HDPE O-RING 82 0.040 CB-11 CB-09 522.39 520.65 15 HDPE O-RING 86.9 0.020 CB-09 CB-08 520.06 519.00 24 HDPE O-RING 154.2 0.007 CB-08 CB-07 519.00 518.52 24 HDPE O-RING 95.2 0.005 CB-07 CB-06 518.52 517.91 24 HDPE O-RING 122.3 0.005 CB-06 CB-05 517.91 517.42 24 HDPE O-RING 99.2 0.005 CB-05 STMH-04 516.66 516.32 30 HDPE O-RING 67.9 0.005 STMH-04 STMH-03 516.32 515.64 30 HDPE O-RING 136.1 0.005 STMH-03 STMH-02 515.64 515.12 30 HDPE O-RING 104.7 0.005 STMH-02 FES-01 515.12 515.05 30 HDPE O-RING 14.1 0.005 CB-12 CB-11 525.75 525.18 15 HDPE O-RING 113.4 0.005 DCB-10 CB-09 520.50 520.06 15 HDPE O-RING 88.8 0.005 CB-17 CB-16 525.75 524.65 15 HDPE O-RING 170 0.006 CB-16 CB-15 524.65 523.40 15 HDPE O-RING 127.1 0.010 CB-15 CB-05 522.40 518.25 15 HDPE O-RING 98.4 0.042 CB-20 CB-19 529.10 527.95 15 HDPE O-RING 117.9 0.010 CB-19 CB-18 527.95 526.70 15 HDPE O-RING 127 0.010 CB-18 CB-15 525.27 522.40 15 HDPE O-RING 82 0.035 DI-67 CB-66 528.16 526.05 15 HDPE O-RING 21.1 0.100 CB-66 CB-65 526.05 523.40 15 HDPE O-RING 77.9 0.034 CB-65 EXDI-64 520.73 518.19 15 HDPE O-RING 50.9 0.050 CB-59 CB-58 519.40 517.95 15 HDPE O-RING 93.2 0.016 CB-58 CDI-56 517.95 517.67 15 HDPE O-RING 56.3 0.005 CB-61 CB-60 519.40 518.05 15 HDPE O-RING 90.3 0.015 CB-60 CDI-55 518.05 517.75 15 HDPE O-RING 33.6 0.009 CB-63 CB-62 519.40 518.05 15 HDPE O-RING 58.5 0.023 CB-62 CDI-53 518.05 517.75 15 HDPE O-RING 42.8 0.007 STMH-52 CB-51 519.90 516.75 18 HDPE O-RING 42.1 0.075 CB-51 EXMH-50 516.50 516.34 18 HDPE O-RING 15.9 0.010 FES-22 CB-21 517.10 516.85 15 DIP 47.5 0.005 CB-21 CB-05 516.85 516.66 15 HDPE O-RING 37.3 0.005 STORM PIPE TABLE C C C CCCC C C C C C C C C C C C CCCCCCCCCCC C C C C C CCCCCCC CCCCCCC C SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF S F S F SFSFSFSFSFEX. DRY DETENTION FACILITY-4 5235245255265275285295245205215225235245255265275285295285275295245 2 0 527.80 525.45 525.00 524.90 HP EX. 520.00EX. 520.16 EX. 519.89 526.55 526.70 526.55 526.70 526.65 529.80 523.00 527.90 523.50 TC:524.00 BC:523.50 523.50 524.14 523.60 529.82 526.67 526.78 527.13527.15 527.02 529.90 529.25 528.10 528.45 528.65 527.20 525.00 524.40 HP524.05 524.05HP 524.10 HP HP CB-15 RIM: 526.65 CB-06 RIM: 523.00 CB-16 RIM: 527.90 CB-21 RIM: 519.50 CB-05 RIM: 521.50 FES-01 INV: 515.00 STMH-04 RIM: 523.00 STMH-03 RIM: 523.00 STMH-02 RIM: 520.75 FES-22 INV: 517.10 8%10%1.5%(TYP)1.5%(TYP)6' CURB TAPER (TYP BOTH SIDES) 6' CURB TAPER (TYP BOTH SIDES) USE BRICK/MORTAR TO FILL OLD PIPE 10" DIP CONNECTION OPENING 7.5'Wx16.5'Wx14'L RIP RAP APRON 6' CURB TAPER 2' CURB TAPER 520.00520.50 HP 1.5%Know what's R C:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\C4-0TOC4-3GRADING.dwgTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY BANKS ENGINEERING, PLLC. SHALL BE WITHOUT LIABILITY TO BANKS ENGINEERING, PLLC.January18,2019-11:50amBy:BaOWNER:1919 SOUTH BOULEVARD SUITE 200 CHARLOTTE, NC 28203 T: 704.780.4972 NC License #P-1370 © 2018 ENGINEERINGDESIGNED: DRAWN: CHECKED: PROJECT: DATE: JDB 01045001 11.19.18PROJECT:SHEET:---REV.12.18.1812.06.1811.19.18DATE1stsubmittaltoNCDOT.2ndsubmittaltoNCDENR1stsubmittaltoNCDENR1stsubmittaltoCabarrusPlanningDESCRIPTIONNORTH14556US-601MIDLAND,NC28107CONCORDEMPLOYEESPARKINGIMPROVEMENTS14556US-601MIDLAND,NC28107CLIENT:C4-4EXISTINGDETENTIONAREA0 SCALE: 3015 60 1"= 30'MATCHLINEC4-2PROPOSED CONSTRUCTION LIMITS PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED SPOT PROPOSED GRADING ARROW GRADING LEGEND PROPOSED WALL SPOTS PROPOSED INTER. CONTOUR 799 25.5 PROPOSED IRRIGATION SLEEVE PROPOSED STORM 2 - 2" PVC