Loading...
HomeMy WebLinkAbout20181634 Ver 1_More Info Received_20181221Strickland, Bev From: Mark Ritter <markdritter@hotmail.com> Sent: Friday, December 21, 2018 2:57 PM To: Annino, Amy M Subject: [External] Re: Shoreline Stabilization Application DWR 18-1634 - Additional Information required External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Amy After our conversation I made contact with Jason Floyd of Bennick Grading. He will be doing our shore stabilization. He did not think we would need to eliminate as many trees as I had in my count. I counted all the trees that were on the very edge of the shoreline but he did not think any more than 5 or 6 trees over 3 inches would need to taken down. Any trees that are removed will be replaced inch for inch with a replant in the 50' protected area. We will likely be planting more hardwoods regardless. We have a lot of pines on our property and we would like more hardwoods. Regarding the the errors on the page 3 drawing, I just reversed my numbers by mistake. Page 3 on the drawing are reversed - it should have been - 3 x 100 = 300 sf above normal water level and 2 x 100 = 200 sf below normal water level I appreciate your help with my application. Thanks! Mark Ritter 984-269-2163 From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Thursday, December 20, 2018 11:43 AM To: markdritter@hotmail.com Subject: Shoreline Stabilization Application DWR 18-1634 - Additional Information required Mr. Ritter, On November 26, 2018, the Division of Water Resources (Division) received your application dated November 26, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until all of the following items are addressed: 1 • The application is not clear regarding the proposed impacts. Please respond with the correct impact in writing. o On page 2, the impacts are listed as being 300 sf above normal water level and 200 sf below normal water level. o On page 3, the impacts are shown to be 200 sf above normal water level and 300 sf below normal water level. • Please clarify whether you are proposing to remove trees from the Catawba buffer and describe what the purpose and need to do so is. If you are proposing to remove trees greater than 3" DBH, replanting with native hardwood tree species is required. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide a response by January 20, 2019. If you have any questions or concerns, do not hesitate to contact me. Regards, Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office amy.annino(cancdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 L AL Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties