RE: RESUBMITTAL - PRE -CONSTRUCTION NOTIFICATION PACKAGE
DWR# 20181393
PIEDMONT NATURAL GAS, LINE 446 BELEWS CREEK GAS LINE PROJECT
GUILFORD, ROCKINGHAM, AND STOKES COUNTIES, NORTH CAROLINA
Dear Ms. Homewood:
Enclosed please find the revised stream drawings and impact spreadsheet based on previous
emails with comments on the September 28, 2018 Pre -Construction Notification (PCN) package
requesting a 401 Water Quality Certification and Buffer Authorization for the Line 446 Belews
Creek Gas Line Project in Guilford, Rockingham, and Stokes Counties, North Carolina. I have
addressed your questions and comments below.
• As we have previously discussed, the crossing of stream 1 has been removed. The
proposed project will have some impact to a zone 2 buffer at that location, but no zone 1
impact.
• The permanent maintenance corridor across streams 2/29, 3, 6, and 7/8 has been reduced
to 30 feet in width.
Please let me know if you have any questions or comments on the enclosed revisions. Again,
thank you for your consideration of this application. If you have questions or need additional
information please contact me at (615) 383-6300 or by email at suzanne.herron@eli-llc.com.
Sincerely,
ENERGY LAND & INFRASTRUCTURE, PLLC
Suzan i Herron, P.E., CPESC
PE 040556
Enclosures
cc: Ms. Alicia DePalma, Environmental Siting and Licensing, Piedmont Natural Gas
Mr. David Bailey, PWS, Regulatory Project Manager, U.S. Army Corps of Engineers (SAW -
2018 -00885)
1420 Donelson Pike, Suite A-12, Nashville, Tennessee 37217 www.eli-lic.com GIS.383.G300
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
Stream
Stream 1
Stream 2/29
Stream 3
Stream 6
Stream 7/8
Sheet
Number
84
82
81
81
80
Impact Area: Permanent
Zone 1 (SF)
Zone 2 (SF)
Total
Wetland
Total
Wetland
0.0
0.0
542.7
0.0
2120.7
587.1
1281.3
335.9
NA
NA
NA
NA
2882.3
0.0
1549.1
0.0
2406.4
118.1
4001.9
1236.5
Piedmont Natural Gas Line 446 Belews Creek Gas Line
Buffer Impacts Table
Impact Area: Temporary
Zone 1 (SF)
Zone 2 (SF)
Total
Wetland
Total
Wetland
0.0
0.0
0.0
0.0
2944.1
624.1
2241.0
421.4
NA
NA
NA
NA
3118.2
0.0
3871.5
0.0
9019.9
630.3
8445.7
612.3
Perpendicular or
Total Buffer
Permanent
Buffer Mitigation Area
Is Mitigation
Non-
Impact Area
Maintenance
Zone 1
Zone 2
Required?
Perpendicular
(SF)
Corridor Width
(SF)
(SF)
no crossing
542.7
60'
Yes
0
814
perp
8,587.1
30'
Yes
11,561
4,148
perp
NA
30'
No
0
0
perp
11,421.1
30
Yes
18,002
8,131
perp
23,873.9
30
Yes
32,034
15,898
Zone 1 Mitigation Multiplier = 3 Total: 61,596 28,991
Zone 2 Mitigation Multiplier= 1.5
Wetland areas are removed from buffer mitigation calculations.
Buffer Mitigation Areas include permanent and temporary impact areas.
Notes
Adjacent wetlands
Adjacent wetlands to east
Crossing by HDD
No adjacent wetlands
Adjacent wetlands
WETLAND 12B PERMANENT
EASEMENT PERMANENT
IMPACT: ROW CONVERSION
OF WETLAND FROM FORESTED
TO NON -FORESTED.
WETLAND '14
NO IMPACT
WETLAND WZ z
NO IMP
/1.
WETLAND CT
NO
WETLAND 10/11
PERMANENT EASEMENT
PERMANENT IMPACT: ROW
CONVERSION OF WETLAND FROM
FORESTED TO NON -FORESTED.
WETLAND 12A PERMANENT
EASEMENT TEMPORARY
IMPACT: OPEN CUT FOR GAS
LINE, DEWATERING
STRUCTURE, EQUIPMENT
CROSSING/MAT PLACEMENT.
LINE 446 BELEWS CREEK PIPELINE
STREAM BUFFER MAP
DATE 1/24/2019 SEE TABLE FOR BUFFER AREAS
REVISED TO REDUCE PERM. WIDTH
SHEET 1 OF 4 CORRESPONDS TO SHEET 80
--------------
WETLAND 9A PERMANENT STREAM SHOWN IN
SOIL SURVEY -
EASEMENT TEMPORARY
IMPACT: OPEN CUT FOR GAS NO FEATURE
PRESENT
LINE, DEWATERING
STRUCTURE, EQUIPMENT 40' TEMP
CROSSING/MAT PLACEMENT. EASEMENT `
WETLAND 9B PERMANENT `
EASEMENT PERMANENT
IMPACT: ROW CONVERSION OF
WETLAND FROM FORESTED TO 7NON-FORESTED. l
Q
1
�TTI
SF �'
FT SF S��SFt&�
Y: 1F g� SFSF s SDS S F
W ZONE
ZpNE 2
RT
/8
• •WET • • • WEi • +— • • WET�—
STREAM 7/� •• ••••VJEP-�'-WE,•• •••,WET•..
OPEN CUT FOR GAS LINE,
IMPACT SITE 15: DEWATERING STRUCTURE,
EQUIPMENT CROSSING/MAT WETLAND 8/13
STREAM 7/S
STREAM
PLACEMENT. STREAM BUFFERS NO IMPACT
WETWETLAND 9B TO BE PROVIDED PER JORDON
WETLAND 10/11 LAKE BUFFER RULE (SEE
WETLAND 12A DETAIL 9, SHEET 87)
WETLAND 12B 30' PERMANENT
MAINTENANCE
CORRIDOR WIDTH
LEGEND: STREAM BUFFERS
4•i i•G•i•G•
••y_•_•y_•s
ZONE 1: PERM. IMPACT
ZONE 2: PERM. IMPACT
ZONE 2: TEMP. IMPACT
C6�Piedmont
Natural Gas
GRAPHIC SCALE (IN FEET)
100 0 50 100 200
1 inch= 100 ft.
PREPARED BY:
ENERGY LAND & INFRASTRUCTURE, PLLC
1015 PASSPORT WAY- NORTH CAROLINA 27513
919-234-1974 • WWW.ELI-LLC.COM•LICENSE # P-1289
14F ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
LEGEND: STREAM BUFFERS
MZONE 1: PERM. IMPACT
Fw ZONE 2: PERM. IMPACT
ZONE 1: TEMP. IMPACT
ZONE 2: TEMP. IMPACT
GRAPHIC SCALE (IN FEET)
100 0 50 100 200
1 inch= 100 ft.
STREAM 6O
(PERENNIAL) O
OPEN CUT FOR GAS LINE, STREAM SHOWN IN
DEWATERING STRUCTURE, SOIL SURVEY -
65' TEMP EQUIPMENT CROSSING/MAT NO FEATURE ` I
EASEMENT PLACEMENT PRESENT
40' TEMP
EASEMENT `
TA SB
mN m
SF =E-0-0_
� SF &S4
30'PERMANENT
MAINTENANCE
CORRIDOR WIDTH
IMPACT SITE 16:
STREAM 6
LINE 446 BELEWS CREEK PIPELINE
STREAM BUFFER MAP
DATE 1/24/19 SEE TABLE FOR BUFFER AREAS
REVISED TO REDUCE PERM. WIDTH
SHEET 2 OF 4 CORRESPONDS TO SHEET 81
sb-
STREAM BUFFERS TO BE
PROVIDED PER JORDON
LAKE BUFFER RULE (SEE
DETAIL 9, SHEET 87)
Piedmont PREPARED BY
ENERGY LAND & INFRASTRUCTURE, PLLC
Natural Gas 1015 PASSPORT WAY- NORTH CAROLINA # P-1
919-234-1974 WWW.ELI-LLC.COM•LICENSE # P-1289
r6l�s ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
40' TEMP -
EASEMENT
SFCD
STREAM BUFFERS TO
BE PROVIDED PER
JORDON LAKE
BUFFER RULE (SEE
DETAIL 9, SHEET 87
LEGEND: STREAM BUFFERS
ZONE 1: PERM. IMPACT
ZONE 2: PERM. IMPACT
ZONE 1: TEMP. IMPACT
ZONE 2: TEMP. IMPACT
GRAPHIC0
100 0 50 100 204
1
CWD
••ialutN•
oe••
CWD ulv
- CWD= CW��
cWL�� LEY
STREAM 29
LINE 446 BELEWS CREEK PIPELINE
WETLAND 5A PERMANENT
STREAM BUFFER MAP
c
p
PREPARED BY:
EASEMENT TEMPORARY
IMPACT: OPEN CUT FOR GAS
DW
ENERGY LAND & INFRASTRUCTURE, PLLC
1015 PASSPORT WAY- NORTH CAROLINA # P-1
919-234-1974 WWW.ELI-LLC.COM•LICENSE # P-1289
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
DATE 1/24/2019
SEE TABLE FOR BUFFER AREAS
REVISED TO REDUCE PERM. WIDTH
CORRESPONDS TO SHEET 82
SHEET 3 OF 4
LINE, DEWATERING
W
w Uj Z
p O
STRUCTURE, EQUIPMENT
CROSSING/MAT PLACEMENT.
�/
CX
N
30' PERMANENT
WETLAND 5B PERMANENT
MAINTENANCE
EASEMENT PERMANENT
STREAM 2/29
CORRIDOR WIDTH
IMPACT: ROW CONVERSION OF
(INTERMITTENT)
WETLAND FROM FORESTED TO
OPEN CUT FOR GAS
NON -FORESTED.
IMPACT SITE 18.
LINE, DEWATERING
STRUCTURE,
STREAM 2/29
EQUIPMENT
CROSSING/MAT
EXISTING
WETLAND 5A
PLACEMENT
CULVERT
WETLAND 5B
STREAM 29
LINE 446 BELEWS CREEK PIPELINE
STREAM BUFFER MAP
Piedmont
PREPARED BY:
Natural Gas
ENERGY LAND & INFRASTRUCTURE, PLLC
1015 PASSPORT WAY- NORTH CAROLINA # P-1
919-234-1974 WWW.ELI-LLC.COM•LICENSE # P-1289
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
DATE 1/24/2019
SEE TABLE FOR BUFFER AREAS
REVISED TO REDUCE PERM. WIDTH
CORRESPONDS TO SHEET 82
SHEET 3 OF 4
GRAPHIC SCALE (IN FEET)
100 0 50 100 200
1 inch = 100 ft.
NOTE: ALIGNMENT REVISION
IN JAN. 2019 TO AVOID
IMPACTS TO STREAM AND
WETLANDS. THE NEW
ALIGNMENT HAS A SMALL
AREA OF PERMANENT
IMPACT IN ZONE 2. THIS
DRAWING SHOWS THE
PREVIOUS LAYOUT AND THE
PROPOSED NEW ALIGNMENT.
LEGEND: STREAM BUFFERS
ZONE 1: PERM. IMPACT
ZONE 2: PERM. IMPACT
ZONE 1: TEMP. IMPACT
ZONE 2: TEMP. IMPACT
REVISED GAS
PIPELINE
Al 1/�AIRAC77AIT
TEMP.EASEMENT
PMM. EASE ENT
STREAM BUFFERS TO
BE PROVIDED PER
JORDON LAKE
BUFFER RULE (SEE
DETAIL 9, SHEET 87)
S_
�F
WETLAND WXA: _ / ZONE Z
NO I M PACT
ZONE 1
WETLAND WXB:
NO IMPACT
STREAM 1
(PERENNIAL) O
NO IMPACT
- WETLAND 1A:
/ NO IMPACT
WETLAND 1:
NOIMPACT
Al �1 �rSr� I 'IMPACT
• iAL wo -.
-EXISTING
7 CULVERT
SF
IMPACT SITE 19:
REVISED FOR NO IMPACTS
[EXCEPT STREAM BUFFER
ZONE 2]
LINE 446 BELEWS CREEK PIPELINE
STREAM BUFFER MAP
Piedmont
PREPARED BY:
r6l�s Natural Gas
ENERGY LAND & INFRASTRUCTURE, PLLC
1015 PASSPORT WAY- NORTH CAROLINA 27513
919-234-1974 • WWW.ELI-LLC.COM•LICENSE # P-1289
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
DATE 1/24/2019
SEE TABLE FOR BUFFER AREAS
REVISED TO AVOID STREAM
CORRESPONDS TO SHEET 84
SHEET 4 OF 4