Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutWQ0014550_Pump & Haul Permit WQ0040588 for Camp Don Lee, Arapahoe WWTF_20190125ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Dail Ballard, Executive Director
Don Lee Camp and Retreat Center
700 Waterfield Ridge Place
Garner, NC 27529
NORTH CAROLINA
Environmental Quality
January 25, 2019
Subject: Permit No. WQ0040588
Camp Don Lee
Domestic Wastewater Pump & Haul Permit
Pamlico County
Dear Ms. Ballard:
In accordance with your application received January 14, 2019 we are forwarding herewith Permit No.
WQ0040588, dated January 25, 2019 to Don Lee Camp and Retreat Center for the time -limited operation
of a domestic wastewater pump and haul operation. This permit shall be effective from the date of
issuance, January 25, 2019, and will expire on September 1, 2020, and shall be subject to the conditions
and limitations as specified therein. This cover letter and supplement shall be considered a part of this
permit and are therefore incorporated therein by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition 1.1: The Permittee or its representative shall inspect the permitted pump and haul
facilities at least daily to prevent malfunctions and deterioration, operator errors, and
discharges that may cause or lead to the release of wastes to the environment, a threat
to human health, or a nuisance condition.
Condition 11.1: An accurate record of the pump and haul activities must be maintained by the
Permittee, indicating; Date and time wastewater is removed from the facility; Name
of contract hauler; Name of facility receiving wastewater; & Volume of wastewater
removed.
Condition 11.14: This permit shall expire September 1, 2020. Should the pump and haul activities stop
prior to the date of expiration send written notification to the Washington Regional
Office, Water Quality Section, notifying them that the permit is no longer required and
detailing the final disposal solution.
North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
Noana GwauNn �
252.946.6481
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within 30 days following receipt of
this permit. This request must be in the form of a written petition, conforming to Chapter 150B of
North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail
Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final
and binding.
If you need additional information concerning this matter, please contact Scott Vinson at (252) 948-3844
or via e-mail at Scott.Vinson@ncdenr.gov .
Sincerely,
vm-a "
for Linda Culpepper
Director, Division of Water Resources
by David May, Regional Supervisor
Water Quality Regional Operations Section
Washington Regional Office
Division of Water Resources, NCDEQ
cc: Gary MacConnell, PE (email)
Tony Hawkins, ORC, City of New Bern WWTP (email)
Jordan Hughes, PE, City Engineer, City of New Bern (email)
Washington Regional Office Files
Water Resources Central Files: Attention Diane Rodman
Water R esources
ENVIRONMENTAL QUALITY
DOMESTIC WASTEWATER PUMP & HAUL PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
Don Lee Camp and Retreat Center
for the construction and operation of a domestic wastewater pump and haul operation to serve Camp
Don Lee. The facility from which pumping will occur shall be the on -site high rate infiltration basin. The
anticipated flow for this pump and haul operation is expected to be no greater than 15,000 gallons per
day of domestic wastewater, pursuant to the application received on January 14, 2019 and in conformity
with 15A NCAC 02T and other supporting data subsequently filed and approved by the Department of
Environmental Quality and considered a part of this permit.
This permit shall be effective from January 25, 2019, and will expire on September 1, 2020, and shall be
subject to the conditions and limitations as specified therein.
VMa "
for Linda Culpepper
Director, Division of Water Resources
By Authority of The Environmental Management Commission
Permit Number: WQ0040588
Permit Issued: January 25, 2019
Don Lee Camp and Retreat Center is hereby authorized to:
Construct and operate the aforementioned domestic wastewater pump and haul operation. The
wastewater collected by this system shall be pumped and hauled to the City of New Bern Wastewater
Treatment Facility (Permit No. NC0025348) for final treatment and disposal.
It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement facilities,
and/or referral of the North Carolina -licensed Professional Engineer to the licensing board.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
1. The Permittee or its representative shall inspect the permitted pump and haul facilities at least
daily to prevent malfunctions and deterioration, operator errors, and discharges that may cause
or lead to the release of wastes to the environment, a threat to human health, or a nuisance
condition. The Permittee shall maintain an inspection log or summary including at least:
a. Date and time of inspection;
b. Observations made;
c. Any maintenance, repairs, or corrective actions taken by the Permittee.
The Permittee shall maintain this log of inspections for as long as the pump and haul activities
are being conducted and shall be made available to the Division or other permitting authority,
upon request. Records shall be submitted quarterly to the Supervisor of the Water Quality
Regional Operations of the Washington Regional Office. The records must be submitted within
30 days of the end of each quarter (quarters end on the last day of March, June, September, and
December). [15A NCAC 02T .0204(d)]
The Washington Regional Office, must be notified at least 48 hours prior to the commencement of
the pump and haul activities so that a site inspection maybe performed. [15A NCAC 02T .0110]
This permit shall become voidable unless the agreement between Camp Don Lee, Craven Ag
Services, Inc., and the City of New Bern WWTP for the collection, transportation, and final
treatment of wastewater is in full force and effect. [15A NCAC 02T.0204(b)]
II. STANDARD CONDITIONS
1. An accurate record of the pump and haul activities must be maintained by the Permittee,
indicating:
a. Date and time wastewater is removed from the facility;
b. Name of contract hauler;
c. Name of facility receiving wastewater;
d. Volume of wastewater removed.
The Permittee shall maintain this log for as long as the pump and haul activities are being
conducted and shall be made available to the Division or other permitting authority, upon
request. Records shall be submitted quarterly to the Supervisor of the Water Quality Regional
Operations of the REGION Regional Office. The records must be submitted within 30 days of the
end of each quarter (quarters end on the last day of March, June, September, and December).
[15A NCAC 02T .0108]
2. This permit shall not be transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a formal permit request shall be submitted
to the Division accompanied by an application fee, documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be
considered on its merits and may or may not be approved. [15A NCAC 02T .0104; G.S. 143-
215.1(d3)]
3. The Permittee shall provide for the installation and maintenance of an audible and visual high-
water alarm on all storage and pumping facilities associated with this pump and haul operation.
[15A NCAC 02T .0204(c)]
4. This permit shall become voidable unless the subject pump and haul activities are carried out in
accordance with the conditions of this permit; 15A NCAC 2T; and other supporting materials
unless specifically mentioned herein. [15A NCAC 02T.0110]
5. This permit shall be effective only with respect to the nature and volume of wastes described in
the application and other supporting data. No type, kind or quantity of wastewater other than
the pumped and hauled wastewater from the facility shall be included in these pump and haul
activities. [15A NCAC 02T .0110]
6. The wastewater collection facilities shall be properly maintained and operated at all times.
Adequate inspection, maintenance, and cleaning shall be provided by the permittee to insure
proper operation of the subject facilities. [15A NCAC 02T .0403]
7. The Permittee shall report by telephone to a Water Resources staff member at the Washington
Water Quality Regional Operations Section, telephone number (252) 946-6481, as soon as
possible, but in no case more than 24 hour, following the occurrence or first knowledge of the
occurrence of either of the following:
a. If the flow volume estimated above is exceeded by any amount on any day; or
b. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable of adequate wastewater storage, such as failures of tanks, piping, pumps,
aerators, compressors etc.; or
c. Any failure of a pumping station, sewer line, etc., resulting in a spill or by-pass directly to
receiving waters without treatment of all or any portion of the influent to such station or
facility; or
d. Any SSO and/or spill over 1,000 gallons; or
e. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the
initial verbal report. Overflows and spills occurring outside normal business hours may also be
reported to the Division of Emergency Management at telephone number (800) 858-0368 or
(919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by
completing and submitting Part I of Form CS-SSO (or the most current Division approved form)
within five days following first knowledge of the occurrence. This report must outline the actions
taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO
(or the most current Division approved form) can also be completed to show that the SSO was
beyond control. [G.S. 143-215.1C(a1)]
8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 02T; and
other supporting materials may subject the Permittee to an enforcement action by the Division,
in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C,
construction of additional or replacement wastewater collection facilities, and/or referral of the
North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A
NCAC 02T .0108(b-c)]
9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall cease operation of all pump and haul
activities and shall take immediate corrective action, including those as may be required by this
Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110;
15A NCAC 02T .0108(b)]
10. Any duly authorized officer, employee, or representative of the Division of Water Resources may,
upon presentation of credentials, enter and inspect any property, premises, or place on or related
to the pump and haul collection facilities at any reasonable time for the purpose of determining
compliance with the Division's approval; may inspect or copy any records that must be
maintained under the terms and conditions of this permit; and may obtain samples. [15A NCAC
02T .0110]
11. The issuance of this permit shall not exempt the Permittee from complying with any and all
statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal,
State, or Local government agencies which have jurisdiction or obtaining other permits which
maybe required by the Division or any other Federal, State, of Local government agencies. [G.S.
143-215.1(b)]
12. Operation of this permit is based on acceptance of the certification attached to this permit,
completed by the Permittee and a North Carolina licensed Professional Engineer. Note that a
completed certification is only required for activities that met the definition of the Practice of
Engineering in accordance with G.S. 89C-3. In some instances this certification may not be
required.
13. A copy this permit, and approved plans and specifications (if applicable) shall be maintained on
file by the Permittee for the life of the project. [15A NCAC 02T .0104]
14. This permit shall expire September 1, 2020. Should the pump and haul activities stop prior to
the date of expiration send written notification to the Washington Regional Office, Water Quality
Regional Operations Section notifying them that the permit is no longer required and detailing
the final disposal solution. [15A NCAC 02T .0105(j), 15A NCAC 02T.0204(a)]
DOMESTIC WASTEWATER PUMP & HAUL ENGINEERING CERTIFICATION
This certification shall be completed and submitted to the appropriate regional office for
activities that result in the Practice of Engineering in accordance with G.S. 89C-3. In some
instances this certification may not be required.
PERMITTEE: Don Lee Camp and Retreat Center
PERMIT #: WQ0040588
PROJECT: Camp Don Lee Pump and Haul
ISSUE DATE: January 25, 2019
This project shall not be considered complete nor allowed to operate until the Division has received
this Certification. It should be submitted in a manner that documents the Division's receipt. Send
the required documentation to the Regional Supervisor, Water Quality Regional Operations Section
at the address at the bottom.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed
pursuant to the applicable standards & requirements, the Professional Engineer below has provided
applicable design/construction information to the Permittee, and the Permittee is prepared to
operate & maintain the pump and haul system permitted herein or portions thereof.
Printed Name, Title Signature Date
ENGINEERS CERTIFICATION
I, as a duly re istered Professional Engineer in the State of North Carolina,
having been authorized to observe (] periodically, ❑ weekly, ❑ full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best
of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T and
other supporting materials.
.................................................
North Carolina Professional Engineer's Seal w/signature & date:
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):