Loading...
HomeMy WebLinkAbout20190101 Ver 1_401 Application_20190118T.E. ALLEN ENGINEERING, PC Terry E. Allen, PE, MSE Post Office Box 103 Rosman, North Carolina 28772 Phone (828)877-4883 Mobile (828)553-3004 Email: teallenengkcomporium.net Firm: C-1997 January 7, 2019 SUBJECT: Pre -Construction Notification (PCN) Application Form for 401/404 Permits to New Boathouse Foundation at Richard & Louise Tranquilli Residence, 2646 West Club Blvd., Lake Toxaway, Transylvania County, North Carolina, PIN 8.1h12- 5�04 0 NC DWQ, 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Dear DWQ: 4190101 Enclosed, please find five (5) copies of the 401/404 application (PCN form). A check for the application review fee is also enclosed. This PCN to address the construction of a new 20'x34' Boathouse Foundation at 2646 West Club Blvd., Lake Toxaway, Transylvania County, North Carolina. This work is for a new structure. The work shall be in accordance with attached Sheet C-1. Lake Toxaway has a water quality classification of B; Tr. NOTE- At the time this PCN Application was prepared, Mr. & Mrs. Tranquilli were in the process of closing on the purchase of the subject parcel. The Transylvania County Record -of -Deeds may not yet reflect this new change of Ownership. All disturbed areas not to be filled or flooded will be vegetated pursuant to the seeding schedule in the Erosion and Sediment Control Planning and Design Manual. If you have any questions or require any additional information, please do not hesitate to contact me at (828) 877-4883 or email tealleneng@comporium.net. Sincerely, [1@9 DWI Terry E. Allen, P.E. JAN 1 22019 Consulting Engineer p Enclosures 5 copies of 401/404 PCN Application Form Check for application review fee Copy Furnish w/ attachment: 401 PERMITTING Kevin Mitchell NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, NC 28711 828-296-4500 NC FISH & WILDLIFE PERMITTING Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Bldg B Marion, NC 28752 828-400-4223 andrea.leslie@ncwildlife.org USACE 404 PERMITTING Mr. David Brown, PG Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Ave, Room 208 Asheville, NC 28801-5006 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18 - New Boathouse or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: NEW BOATHOUSE at TRANQUILLI RESIDENCE 2b. County: Transylvania 2c. Nearest municipality / town: Brevard 2d. Subdivision name: Lake Toxaway 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Tranquilli, Richard J & Tranquilli, Louise 3b. Deed Book and Page No. T.B.D. (Purchase in Progress) 3c. Responsible Party (for LLC if applicable): 3d. Street address: B B L119 WESTSHORE DR (2646 West Club Blvd) 3e. City, state, zip: Lake Toxaway, NC 28747 3f. Telephone no.: 828-553-1702, Jonathan Dodson - Appalachian Construction 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Terry Allen, PE 5b. Business name (if applicable): T.E. ALLEN ENGINEERING, PC 5c. Street address: P.O. Box 103 5d. City, state, zip: Rosman, NC 28772 5e. Telephone no.: 828-877-4883 5f. Fax no.: 5g. Email address: tealleneng@comporium.net Page 2 of 12 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 8512-85-5904 1 b. Site coordinates (in decimal degrees): Latitude: 35.13086 Longitude: - 82.95289 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 1.00 LT (from Transylvania County GIS) acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Toxaway 2b. Water Quality Classification of nearest receiving water: B, Trout 2c. River basin: Savannah Page 3 of 12 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This home site located in Toxaway Estates, a private residential development in western Transylvania County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential. 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: Construct new 20'x34' Boathouse Foundation & Retaining Wall Structure meeting side yard setback rules. All work to be in accordance with the engineered plans. The boathouse foundation work will be performed "IN THE DRY" using a coffer dam to create a dry work area. Minimual disturbance within existing Vegetated Trout Buffer. See attached drawings. 3e. Describe the overall project in detail, including the type of equipment to be used: BOATHOUSE FOUNDATION. The boathouse foundation work shall be performed "IN THE DRY" using a coffer dam to create a dry work area. To comply with Water Quality requirements, the will be performed in the dry. Where a coffer dam is used, the work area will be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ's Turbidity Standards (15A NCAC 02B.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF -400 from Rain -for -Rent with a 100 to 1 micron nominal rating (P.O.C. at Rain -for -Rent is Jeremy at 704-393- 3345). The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the dredging areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. TURBIDITY CURTAINS. In addition to the Coffer Dam, a minimum of two (2) rows of Turbidity Curtains shall be installed and maintained around the work area. Uncured concrete shall not be allowed to come into direct contact with surface waters. This will be accomplished by establishing a "dry work area" as described above. "High Early" cementious material shall be in the stone work to minimize curing time. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Furnish and install multiple layers of turbidity curtains as necessary to insure regulatory compliance. Minimal disturbance within existing Vegetated Trout Buffer. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Page 4 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: El Yes ®No El Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary [:1 Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 5 of 12 PCN Form —Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P ❑ T ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ ❑ Yes ❑ Corps W6 ❑ P ❑ T ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) ❑ PER ❑ Corps S1 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S2 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT FI DWQ ❑ PER ❑ Corps S6 [-]P ❑ T El INT ❑DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 6 of 12 PCN Form —Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. ' 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T Temporary Coffer Dam for 01 ❑ P ®T Lake Toxaway Boathouse Foundation 75 Linear Lake 0.04 Acres Ft (+/-) 02 ❑ P ®T Lake Toxaway Temporary Turbidity Curtain to Repair Seawall, 75 Linear Ft Lake 0.04 Acres Permanent Boathouse 03 ®P ❑ T Lake Toxaway Foundation (88 Linear Ft x 3 Ft Lake 0.02 Acres horizontal projection) 04 ❑P❑T 4E Total open water impacts 0.10 Acres 4g. Comments: The work will be performed while the lake is at normal pool elevation. 1.0 NEW BOATHOUSE FOUNDATION. New presast concrete block foundation to support new boathouse structure. 2.0 Boathouse foundation work will be accomplished "in the dry" by installing a temporary coffer dam around the proposed work area. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. Two (2) rows of Turbidity Curtains will also be used. 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5L Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 7 of 12 PCN Form —Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required. 131 ®P❑T El Yes ❑ No B2 ❑P❑T El Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The work will be performed while the lake is at normal pool elevation. 1.0 Boathouse foundation work will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. 2.0 Turbidity Curtains will also be used to isolate the work area from Lake waters. Turbidity curtains to remain in place untll work is complete and the turbidity in the work area is less than 10 NTUs above background. Turbidity curtains shall be used outboard of the coffer dam to isolate the work area. Turbidity curtains to remain in place until work is complete and the turbidity in the work area is less than 10 NTUs above background. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment practicable. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this ❑Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 6. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Should project exceed 10% or 1 00'in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land Resources Page 9 of 12 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N.A. Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act El Yes No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Rick Tranquilli f Applicant/Agenfs Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 12 of 12 PCN Form — Version 1.3 December 10, 2008 Version BOATHOUSE FOUNDATION. The boathouse foundation work shall be performed "IN THE DRY" using a coffer dam to create a dry work area. To comply with Water Quality requirements, the will be performed in the dry. Where a coffer dam is used, the work area will be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ's Turbidity Standards (15A NCAC 028.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF -400 from Rain—for—Rent with a 100 to 1 micron nominal rating. The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the work areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. TURBIDITY CURTAINS. In addition to the Coffer Dam, a minimum of two (2) rows of Turbidity Curtains shall be installed and maintained around the work area. Uncured concrete shall not be allowed to come into direct contact with surface waters. This will be accomplished by establishing a "dry work area" as described above. High Early" cementious material shall be in the stone work to minimize curing time. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Furnish and install multiple layers of turbidity curtains as necessary to insure regulatory compliance. PRELIMINARY - NOT FOR CONSTRUCTION © Copyright 2018 T.E. ALLEN ENGINEERING PC. All Rights Reserved Worldwide. DO NOT SCALE DRAWINGS GRA VEL DRIVE SHED GARAGE APARTMENT I P� 0 1 - S TORY DECK EXISTING HOUSE LOT# COVERED B 9 DECK DEC 0 eoAr_ e } HOUSE � � 30,6 a / 30" CONSTRUCT NEW 20'X34' BOATHOUSE FOUNDATION & RETAINING WALL STRUCTURE ALL WORK TO BE IN ACCORDANCE WITH THE ENGINEERED PLAN SHEETS S-1, S-2 & S-3. Limitation of Liability. By accepting this engineering document, the Owner, Contractor and any others to whom it is distributed, agree to a strict limitation of liability for Terry E. Allen PE, T.E. ALLEN ENGINEERING, P.C., and its employees to an amount not to exceed $25,000.00 or one-half the total amount of paid invoices, whichever is less. BOATHOUSE SITE PLAN for TRANQUILLI RESIDENCE Not to Scale All Base Layer Features, including all topographic and boundary information was provided by E. Roger Raxter Land Surveyor. Do no rely on this drawing 12-13-2018 for land survey information. BOATHOUSE PLANPrepared Rick Tranquilli Residence T.E. ALLEN ENGINEERING, PC for: Rick Tranquilli (Prospective Buyer) FlRM / C-1997 Y 2646 West Club Blvd Roses 1r�ioRn+� 2646 West Club Blvd Lake Toxaway, NC 2874 Lake Toxaway, Transylvania County, NC (828) 877-4883 843-540-1478 PIN 8512-85-5904-000 MOBILE (828) 553-3004 ricktranquilli@hotmail.com email : tealleneng0comporium.net