HomeMy WebLinkAbout20190080 Ver 1_Shoreline Stabilization_20190115ROWBOAT
Dock & Dredge
858 Williamson Road
Mooresville, NC 28117
(704) 663-3478 (704) 663-5298 (FAX)
www.therowboatcompany.com
PAID
January 9 2019, �` 51
N.C. Department of Environment Quality
1
Division of Water Resources, 401 & Buffering Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
201 90 080
REF: Lake Norman— Douglas Weishaar
Dear Alan Johnson,
Our firm is processing this application on behalf of the attached applicant, to remove
approximately 80 cubic yards of material from Lake Norman, Mecklenburg County, North
Carolina (22511 Torrence Chapel Rd, Cornelius NC 28031).
A copy of the Duke Energy Company application, pertinent drawings and a location map are
enclosed for your use.
We look forward to hearing from you at the earliest time possible.
Sincerely,
Brandon Parsons
Project Manager
State of North Carolina
Department of Environment Quality
DWR Division of Water Resources
Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
Shoreline Stabilization Application Form
Three copies of the application (including attachments) and the application fee should be sent
to:
Division of Water Resources
401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
I. Applicant Information [15A NCAC 02H .0502(a)]
1. Owner Information
Name: -DOV t ICA,S
Mailing Address: 11 `I orrcnc4- C6%peA Rd
Corne.l,"vs ML ao603(
Telephone Number: 701 - A06- 6(%01 Fax Number:
E-mail Address: .S %we,; skmar @ be,11 Sov+k • Ae+
2. Agent/ Contact Person Information
A signed and dated copy of the Agent Authorization letter (a form can be downloaded here:
htti)://www.saw.usace.armv.mil/Portals/59/docs/reRulatory/re2docs/Permits/SAMPLE AGENT AUTH
ORIZATION FORM.pdf) must be attached if the Agent has signed this application form.
Name: 'Grrn.AJQA _1 arSOII s
Company Affiliation: 120`v60C4} DOCA, d' D re d�
Mailing Address: $ 5 '� Wi Il,a�nsoit Rck
/VlooreS016 , /VG a%117
Telephone Number: 7o`/- 663- 3g7t� Fax Number: 7o`/- 663- 6999
E-mail Address: U p0%t-5011 5 W Af, (_c►\-f60C4tC0MDCA Ati • C0
Person to receive the Certification Approval: 1�)r/)Jai ottSoA S
II. Project Information [15A NCAC 02H .0502(a) & (b)]
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces,
FORM: SSGP 10-2013 Page 1 of 3
etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations,
and construction access corridors. You may use the diagram provided at the end of this
application form.
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale
of some sort- a yard stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
County: Nlec,J(,1eA bvrSN Nearest Town: Gorn epi VS
Subdivision name or site address (include phase/lot number):
aa -51! TormnLe. c6pel Rdk Gornel;Vs �� a5f031
Directions to site - please include road names and numbers, landmarks, etc.:
I - 77 ko is x i k 24. Keep%trc,ht +P mt!er e pn+o W C c_ }taw6 ,4Je.
�k C)—Corr-e,1cf_ Gkl4oel Rdk.
Latitude (in decimal degrees) _;6. 5 017 00
Longitude (decimal degrees) - 10.yw),(0 0
5. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): F.eS,JeA*1cn,1
6. Property size (acres): I . 311 uc,Ces
7. Lake/ river/ ocean adjacent to property: Nor yickn
8. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary): 91ZA
9. Will work be conducted from land? From water? ❑
10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.)
below the normal pool lake level/ Normal Water Level in square feet or acres:
9.01
11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining
walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in
square feet or acres: O
12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and
50 feet landward to be impacted (number of trees, for instance): !ln d rs}vrbcance
above. nQrn) a l poa I n or in SO dwa rcA.
Owner/Agent's Signature Printed Name Date
[15A NCAC 02H .0502(f)l
'Agent's signature is valid only if an authorization letter from the owner is provided.
FORM: SSGP 10-2013 Page 2 of 3
Full Pond/
Normal Water Level
SI
La ke
(At Full Pond/ Normal Water Level)
2GS2 Se.p-' a}-�cAc.k-ed c4cnw1,1 .
Please approximately sketch the following information on this plan (provide dimensions for each
item, such as 10 ftx 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: ��5
Tacrence G�•e�ae� '�ZZcA. Cacneltu�ounty: /yieik�enilwrA
Owner.
Contract
Print �lgnature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A
NCAC 02H.0506 and 15A NCAC 026 .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be
removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)]
Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically
approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B.0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non-erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
I, J)ov Vel „'r , hereby state that I have been informed of the Catawba
Riparian Fuffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other s pporting
materials.
Signature (own Date:
State of North Carolina I Environmental Quality I water Resources
512 N. Salisbury Street 11611 Mail Service Center i Raleigh. NC27699-1611
1)19.707.9000
Duke Energy Excavation Permit Application Form
FOR DUKE ENERGY USE ONLY
Duke File No.
Application Fee S Security Deposit $ Check # Date Recv'd Initials
Date of Duke Energy Lake Services, applicant and/or contractor on-site inspections Date ) ` p�jt
pe ! U , �nitiais l IG-s
Date Final Protection/Avoidance Area Markings Field - Verified
Approved to Start Work By * :
Date Completion Required
Date Passed Closeout Inspection*
(Print)
Date of Any Approved Extension
Initials
Initials
Date
(Sign)
Initials
Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ❑No (/f Yes, explain in PART V)
Date Deposit Refunded Initials Date Permit Database Updated Initials
* Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant
with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work
Part I. Applicant Information (Please Print)
Name Do%jalws %Ate', Sl1r;ka,r Telephone 70� x-010- gs60�
Email address: �✓ei s�+war a b e ll sot, 4\ , h of
Lake Address Mailing Address (if dierent)
la nl Torrence G6pe.l Rd
Cornelius NG 2- 8031
Contractor Company
Row6oa+
Dock a-
Dc,eJc,e.
�.,
Contractor Contact Person
1 f) (" A
%-J50115-
Telephone
Contractor Email Address: 13pe-.rsons u@ ♦He, ra\ADooc "' t;0,n pVkny, GO'
LAKE LOT INFORMATION
Lake gOrmm County klenbvt City Corn-ellv5 State ISL Tax Map No. 0011013`►
Subdivision
Lot / Section No. L XO SA Lot Size I'31 Acres
Duke Energy Page 4 of 14 rev 6/20/17
Excavation Program.
Duke Eneray Excavation Permit Application Form
Are there any Co -Applicants*? (check one) OYes ONo (If Yes, include names, street
addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V —
Additional Information)
* Co -Applicants exist when the proposed work is being done under a single application, will be
performed by a single contractor as one continuous project, and is done to benefit multiple
owners / lease holders of Project -front properties within a single development. There can be no
more than 4 co -applicants in addition to the lead applicant on any application.
Do not continue the application until an on-site inspection has been conducted between a
Duke Energy Lake Representative and the applicant and/or the excavation contractor.
NOTE: Initialling this portion of the application by a Lake Representative in no way
constitutes approval or eminent approval of the excavation or any other lake use permitting
activity.
Date of on-site inspection 0 C 1
Initials (Duke Energy) , �?_i! d.1
(applicant/contractor)
Duke Energy Page 5 of 14 rev 6/20/17
Excavation Program.
Duke Energy Excavation Permit Application Form
Part II. Description of Project
A. Basic Info
1. Type of excavation: (check one) ❑ New excavation Maintenance excavation
2. Purpose of excavation: (check one) Boat Access Channel
❑ Water Intake Channel ❑ Wastewater Discharge Channel
❑ Other (specify):
3. Lake user category: (check one) li(Private ❑Residential Marina
❑Commercial Marina ❑Public
❑Other (spec):
4. Max. Excavation Area Dimensions (ft): Length Width I °t
Depth 2.6
(Note: include additional area dimensions if necessary so response to #5 below equals max. area
dimensions in #4)
5. Volume of Excavated Material (TOTAL for the project): 10 Cubic yards
6. Type of material removed (applicant determines by field sample ifpractical):
s; I+ / sCXAa
7. Excavation Site area: 0.0 1 Acre (s) Disposal Site area: 0.01 Acre
(s)
8. Total Disturbed Area (including equipment staging area): 0.0a`` Acre (s)
9. Does tl a project meet the requirements of the applicable General Permit? (check one)
es ONO
10. Do you claim title to the disposal area? (check one) IA/Yes ONO
11. Do you claim title to the equipment staging area? (check one) dyes ONO
12. Are there any water-treatme facilities within 50 feet of the proposed excavation area?
(check one) ❑Yes Oo
(If Yes, specify):
13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached
erosion control plan and disposal area design): See. a'4c4td ®%sran.
6.1
Duke Energy Page 6 of 14 rev 6/20/17
Excavation Program.
Duke Energy Excavation Permit Application Form
14. Type(s) of excavation equipment to be used: L. a,1rn C -,M c h 2x c.c,,,va� a r
5 - s t'ezr
15. Will waters or wetlands be c ssed in transporting equipment to or from the site?
(check one) ❑Yes I�Co
(If yes, explain)
16. Will return water re-enter the reservoir? (Check one) ❑Yes QNo ❑N/A
(If Yes, sped points) of re-entry and show on Excavation Area Drawing)
17. is there an exing facility (e.g. pier) that access is being maintained to by conducting the
excavation? mYes ❑No
(If Yes, speck the existing permit number. If No, include a scaled drawing of the proposed
facility). Permit # Fj 010%
18. Total planned duration of the work (Include first equipment mobilization, excavation
through final mitigation measures complete):
START Off- / I (� FINISH 0 Ck / _ 10_
(Month) (Year) (Month) (Year)
Duke Energy Page 7 of 14 rev 6/20/17
Excavation Program.
Duke Energy Excavation Permit Annlication Form
Part U. (Continued)
B. Protection / Avoidance Area Description
Complete the following table including all land areas within and immediately adjoining the disturbed area:
Protection/Avoidance Areas
(check all that apply)
a. Marshland, swam ,
p ponds, beneficial
aquatic vegetation or other potential wetlands
(circle all that apply)
Aonrox
Identillcation
Field 1D
Method
Avoid fAl or Mitigate fMl
Acre
Work Area Dw , ID
b. Buffer Zones (specify width & source
of requirement)
a Environmental Areas as identified by
Duke Energy
A. Natural Areas as identified by Duke
Energy
e Historic properties (specify)
f. Rare or threatened species (sped)
Duke Energy Page 8 of 14
Excavation Program rev 2/6/17
Duke Energy Excavation Permit Application Form
Protecdon/Avoidance Areas
(check all that apply)
Approx
Identification
Method *
Avoid (A) or Mitieate (M)
Acre
Held ID
Work Area Dwe. ID
¢. Buried gas, water, sewer,
communications or electric lines (circle)
h. Impact Minimization Zones as
identified by Duke Energy
4 Other areas requiring specific
avoidance, protection or mitigation (spec)
* For "Field BY column, specify entity or person that performed the identification and how it was physically marked (e.g. Duke
Energy (John DoeyPink and purple -dotted tape, Corps of Eng. (John Smithy yellow flagging). For "Work Area Dwg ID" column,
show the symbol that is used on the drawings to identify the protection/avoidance area.
** List and attach mitigation plans
Duke Energy Page 9 of 14 rev 2/6/17
Excavation Program
Duke Energy Excavation Permit Application Form
C. Applicant's Signatures
Comments:
Applicant Name (print14 On LA -% A, V cr t S 14A A �
Applicant Signatu
Co -Applicant Name (print)
Co -Applicant Signature*
Date
Co -Applicant Name (print)
Co -Applicant Signature* Date
Co -Applicant Name (print)
Co -Applicant Signature* Date
Co -Applicant Name (print)
Co -Applicant Signature* Date
*Per my signature, the information provided in this application is correct to the best of my
knowledge.
Duke Energy Page 10 of 14 rev 2/6/17
Excavation Program
DREDGE SPOIL DISPOSAL FORM
Project Name/address: DOU SJ NdQ sk cc k - County: At Gk kA lovd )
Location Address: a-Jrl Qrre�l�� flu il r _ Co rn-li vs C ,2 -031\J
Parcel OpI/.�/3H
Parcel/lot size_... 1. '316 A C
Disposal area required (sq ft and/or acreage)
Acknowledgement of Notification
1, Douwe si ayr am aware that the site must adhere to all state regulations
and rules regarding sediment and erosion control and water quality. And give permission for
Name of Individual and Company
to dispose of their dredge material at the above stated location
Owner: L)O JAL L-7 > W t;
P nt
Date:
Along with form, please provide:
Aerial of parcel/lot (County GIS)
Photo of proposed spoil site
Identified proposed spoil site
Signature
'i Legend
Map Created: i• 22511 Torrence
Lat. 35.501700 Lon. -80.89 1260
low
2251 I' Torrence Chapel Rd
- tm
Ox
Google Earth
jSilt Fence
�Spoll Location (40'x25')
Wsl�
1; 11-1 tL
syy
Description of Dredge Cut Profile
The scope of this dredging event is to remove sediment that has accumulated under the dock structure
to provide boating access to Lake Norman. Work will be performed from land using a long reach
mechanical bucket dredge that will excavate the spoils and place them directly in the designated spoil
location (Bold Blue). Rowboat will install silt fencing (Bold Yellow) around the perimeter of the
designated spoil location to control sedimentation. The material will be dewatered on-site in the spoil
location. At an appropriate time, the spoils will be rough graded on-site, outside of the riparian buffer,
as directed by the home owner. No spoil materials will be transported off-site.
Shown in Green/Red Weishaar personal dock (maintenance of existing). Works involve the mechanical
removal of approximately 80 cubic yards of sediment from underneath the floating dock. Floating dock
will be removed by homeowner prior to work commencement.
Green Depth of cut is 8.5 feet when measured at full pond.
Red Depth of cut is 10 feet when measured at full pond. Impacted area is 0.01 acres.