Loading...
HomeMy WebLinkAbout20190080 Ver 1_Shoreline Stabilization_20190115ROWBOAT Dock & Dredge 858 Williamson Road Mooresville, NC 28117 (704) 663-3478 (704) 663-5298 (FAX) www.therowboatcompany.com PAID January 9 2019, �` 51 N.C. Department of Environment Quality 1 Division of Water Resources, 401 & Buffering Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 201 90 080 REF: Lake Norman— Douglas Weishaar Dear Alan Johnson, Our firm is processing this application on behalf of the attached applicant, to remove approximately 80 cubic yards of material from Lake Norman, Mecklenburg County, North Carolina (22511 Torrence Chapel Rd, Cornelius NC 28031). A copy of the Duke Energy Company application, pertinent drawings and a location map are enclosed for your use. We look forward to hearing from you at the earliest time possible. Sincerely, Brandon Parsons Project Manager State of North Carolina Department of Environment Quality DWR Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: -DOV t ICA,S Mailing Address: 11 `I orrcnc4- C6%peA Rd Corne.l,"vs ML ao603( Telephone Number: 701 - A06- 6(%01 Fax Number: E-mail Address: .S %we,; skmar @ be,11 Sov+k • Ae+ 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: htti)://www.saw.usace.armv.mil/Portals/59/docs/reRulatory/re2docs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: 'Grrn.AJQA _1 arSOII s Company Affiliation: 120`v60C4} DOCA, d' D re d� Mailing Address: $ 5 '� Wi Il,a�nsoit Rck /VlooreS016 , /VG a%117 Telephone Number: 7o`/- 663- 3g7t� Fax Number: 7o`/- 663- 6999 E-mail Address: U p0%t-5011 5 W Af, (_c►\-f60C4tC0MDCA Ati • C0 Person to receive the Certification Approval: 1�)r/)Jai ottSoA S II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Nlec,J(,1eA bvrSN Nearest Town: Gorn epi VS Subdivision name or site address (include phase/lot number): aa -51! TormnLe. c6pel Rdk Gornel;Vs �� a5f031 Directions to site - please include road names and numbers, landmarks, etc.: I - 77 ko is x i k 24. Keep%trc,ht +P mt!er e pn+o W C c_ }taw6 ,4Je. �k C)—Corr-e,1cf_ Gkl4oel Rdk. Latitude (in decimal degrees) _;6. 5 017 00 Longitude (decimal degrees) - 10.yw),(0 0 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): F.eS,JeA*1cn,1 6. Property size (acres): I . 311 uc,Ces 7. Lake/ river/ ocean adjacent to property: Nor yickn 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 91ZA 9. Will work be conducted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 9.01 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: O 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): !ln d rs}vrbcance above. nQrn) a l poa I n or in SO dwa rcA. Owner/Agent's Signature Printed Name Date [15A NCAC 02H .0502(f)l 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Full Pond/ Normal Water Level SI La ke (At Full Pond/ Normal Water Level) 2GS2 Se.p-' a}-�cAc.k-ed c4cnw1,1 . Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ftx 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: ��5 Tacrence G�•e�ae� '�ZZcA. Cacneltu�ounty: /yieik�enilwrA Owner. Contract Print �lgnature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H.0506 and 15A NCAC 026 .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B.0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, J)ov Vel „'r , hereby state that I have been informed of the Catawba Riparian Fuffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other s pporting materials. Signature (own Date: State of North Carolina I Environmental Quality I water Resources 512 N. Salisbury Street 11611 Mail Service Center i Raleigh. NC27699-1611 1)19.707.9000 Duke Energy Excavation Permit Application Form FOR DUKE ENERGY USE ONLY Duke File No. Application Fee S Security Deposit $ Check # Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on-site inspections Date ) ` p�jt pe ! U , �nitiais l IG-s Date Final Protection/Avoidance Area Markings Field - Verified Approved to Start Work By * : Date Completion Required Date Passed Closeout Inspection* (Print) Date of Any Approved Extension Initials Initials Date (Sign) Initials Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ❑No (/f Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Part I. Applicant Information (Please Print) Name Do%jalws %Ate', Sl1r;ka,r Telephone 70� x-010- gs60� Email address: �✓ei s�+war a b e ll sot, 4\ , h of Lake Address Mailing Address (if dierent) la nl Torrence G6pe.l Rd Cornelius NG 2- 8031 Contractor Company Row6oa+ Dock a- Dc,eJc,e. �., Contractor Contact Person 1 f) (" A %-J50115- Telephone Contractor Email Address: 13pe-.rsons u@ ♦He, ra\ADooc "' t;0,n pVkny, GO' LAKE LOT INFORMATION Lake gOrmm County klenbvt City Corn-ellv5 State ISL Tax Map No. 0011013`► Subdivision Lot / Section No. L XO SA Lot Size I'31 Acres Duke Energy Page 4 of 14 rev 6/20/17 Excavation Program. Duke Eneray Excavation Permit Application Form Are there any Co -Applicants*? (check one) OYes ONo (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional Information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on-site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on-site inspection 0 C 1 Initials (Duke Energy) , �?_i! d.1 (applicant/contractor) Duke Energy Page 5 of 14 rev 6/20/17 Excavation Program. Duke Energy Excavation Permit Application Form Part II. Description of Project A. Basic Info 1. Type of excavation: (check one) ❑ New excavation Maintenance excavation 2. Purpose of excavation: (check one) Boat Access Channel ❑ Water Intake Channel ❑ Wastewater Discharge Channel ❑ Other (specify): 3. Lake user category: (check one) li(Private ❑Residential Marina ❑Commercial Marina ❑Public ❑Other (spec): 4. Max. Excavation Area Dimensions (ft): Length Width I °t Depth 2.6 (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): 10 Cubic yards 6. Type of material removed (applicant determines by field sample ifpractical): s; I+ / sCXAa 7. Excavation Site area: 0.0 1 Acre (s) Disposal Site area: 0.01 Acre (s) 8. Total Disturbed Area (including equipment staging area): 0.0a`` Acre (s) 9. Does tl a project meet the requirements of the applicable General Permit? (check one) es ONO 10. Do you claim title to the disposal area? (check one) IA/Yes ONO 11. Do you claim title to the equipment staging area? (check one) dyes ONO 12. Are there any water-treatme facilities within 50 feet of the proposed excavation area? (check one) ❑Yes Oo (If Yes, specify): 13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion control plan and disposal area design): See. a'4c4td ®%sran. 6.1 Duke Energy Page 6 of 14 rev 6/20/17 Excavation Program. Duke Energy Excavation Permit Application Form 14. Type(s) of excavation equipment to be used: L. a,1rn C -,M c h 2x c.c,,,va� a r 5 - s t'ezr 15. Will waters or wetlands be c ssed in transporting equipment to or from the site? (check one) ❑Yes I�Co (If yes, explain) 16. Will return water re-enter the reservoir? (Check one) ❑Yes QNo ❑N/A (If Yes, sped points) of re-entry and show on Excavation Area Drawing) 17. is there an exing facility (e.g. pier) that access is being maintained to by conducting the excavation? mYes ❑No (If Yes, speck the existing permit number. If No, include a scaled drawing of the proposed facility). Permit # Fj 010% 18. Total planned duration of the work (Include first equipment mobilization, excavation through final mitigation measures complete): START Off- / I (� FINISH 0 Ck / _ 10_ (Month) (Year) (Month) (Year) Duke Energy Page 7 of 14 rev 6/20/17 Excavation Program. Duke Energy Excavation Permit Annlication Form Part U. (Continued) B. Protection / Avoidance Area Description Complete the following table including all land areas within and immediately adjoining the disturbed area: Protection/Avoidance Areas (check all that apply) a. Marshland, swam , p ponds, beneficial aquatic vegetation or other potential wetlands (circle all that apply) Aonrox Identillcation Field 1D Method Avoid fAl or Mitigate fMl Acre Work Area Dw , ID b. Buffer Zones (specify width & source of requirement) a Environmental Areas as identified by Duke Energy A. Natural Areas as identified by Duke Energy e Historic properties (specify) f. Rare or threatened species (sped) Duke Energy Page 8 of 14 Excavation Program rev 2/6/17 Duke Energy Excavation Permit Application Form Protecdon/Avoidance Areas (check all that apply) Approx Identification Method * Avoid (A) or Mitieate (M) Acre Held ID Work Area Dwe. ID ¢. Buried gas, water, sewer, communications or electric lines (circle) h. Impact Minimization Zones as identified by Duke Energy 4 Other areas requiring specific avoidance, protection or mitigation (spec) * For "Field BY column, specify entity or person that performed the identification and how it was physically marked (e.g. Duke Energy (John DoeyPink and purple -dotted tape, Corps of Eng. (John Smithy yellow flagging). For "Work Area Dwg ID" column, show the symbol that is used on the drawings to identify the protection/avoidance area. ** List and attach mitigation plans Duke Energy Page 9 of 14 rev 2/6/17 Excavation Program Duke Energy Excavation Permit Application Form C. Applicant's Signatures Comments: Applicant Name (print14 On LA -% A, V cr t S 14A A � Applicant Signatu Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 14 rev 2/6/17 Excavation Program DREDGE SPOIL DISPOSAL FORM Project Name/address: DOU SJ NdQ sk cc k - County: At Gk kA lovd ) Location Address: a-Jrl Qrre�l�� flu il r _ Co rn-li vs C ,2 -031\J Parcel OpI/.�/3H Parcel/lot size_... 1. '316 A C Disposal area required (sq ft and/or acreage) Acknowledgement of Notification 1, Douwe si ayr am aware that the site must adhere to all state regulations and rules regarding sediment and erosion control and water quality. And give permission for Name of Individual and Company to dispose of their dredge material at the above stated location Owner: L)O JAL L-7 > W t; P nt Date: Along with form, please provide: Aerial of parcel/lot (County GIS) Photo of proposed spoil site Identified proposed spoil site Signature 'i Legend Map Created: i• 22511 Torrence Lat. 35.501700 Lon. -80.89 1260 low 2251 I' Torrence Chapel Rd - tm Ox Google Earth jSilt Fence �Spoll Location (40'x25') Wsl� 1; 11-1 tL syy Description of Dredge Cut Profile The scope of this dredging event is to remove sediment that has accumulated under the dock structure to provide boating access to Lake Norman. Work will be performed from land using a long reach mechanical bucket dredge that will excavate the spoils and place them directly in the designated spoil location (Bold Blue). Rowboat will install silt fencing (Bold Yellow) around the perimeter of the designated spoil location to control sedimentation. The material will be dewatered on-site in the spoil location. At an appropriate time, the spoils will be rough graded on-site, outside of the riparian buffer, as directed by the home owner. No spoil materials will be transported off-site. Shown in Green/Red Weishaar personal dock (maintenance of existing). Works involve the mechanical removal of approximately 80 cubic yards of sediment from underneath the floating dock. Floating dock will be removed by homeowner prior to work commencement. Green Depth of cut is 8.5 feet when measured at full pond. Red Depth of cut is 10 feet when measured at full pond. Impacted area is 0.01 acres.