Loading...
HomeMy WebLinkAbout20190078 Ver 1_Riparian Buffer Authorization_20190114LETTER OF TRANSMITTAL W,�Wi< WDICKSOL4 community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 919.782.0495 tel. TO: NCDEO 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 ATTENTION: Karen Higgins 2 0 1 90 0 78 DATE: January 14, 2019 RE: Elliott Storage Design PCN and Buffer Authorization Submittal We are sending via: ❑ Overnight ❑ Regular Mail ❑ Pick-up ® Hand Delivered The following items: ❑ Correspondence ❑ Plans ❑ Specifications ® Other as listed below: COPIES DATE NO. DESCRIPTION 2 12/20/2018 1 PCN Package 2 12/20/2018 2 Elliott Storage Design Preliminary Plans 1 12/20/2018 3 Buffer Authorization Package RR (a 5 n M�=g Enn =Luftah THESE ARE TRANSMITTED as checked below: ® For Approval ❑ As Requested ❑ Approved as Submitted ❑ Returned for Corrections ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ Forward to Subcontractor REMARKS: COPY TO: SIGNED: M r _AD WWK WIDICKSOn community infrastructure consultants January 14, 2019 Samantha Dailey US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Dear Ms. Dailey, WK Dickson is pleased to submit a Nationwide Permit 27 Pre -Construction Notification (PCN) for Elliot Storage Design project. The PCN being submitted is notification on behalf of the Town of Chapel Hill Public Works Department. The purposed of the project is to create and preserve a natural green area in a largely urbanized area of Chapel Hill that will reestablish floodplain connectivity with the stream during smaller more frequent rain events and increase the floodplain storage during larger events. Additional goals include reduction of streambank erosion, removal of invasive species, and creation of passive recreational opportunities. The proposed project is along the banks of Booker Creek and a small tributary between Eastgate Shopping Center and South Elliott Road. Both channels enter the site from culverts systems. The upstream reach of Booker Creek is piped beneath the Eastgate Shopping Center from north of Franklin Street. Approximately 2.1 acres of the floodplain adjacent to Booker Creek will be excavated 2 to 8 feet to provide additional flood storage and reestablish connectivity between the stream and floodplain. All excavation will occur above the ordinary high water mark for the stream. Stream banks will be stabilized with livestakes and the riparian buffer and floodplain will be planted with native trees and plants and a natural riparian seed mix. Invasive species will be removed throughout the project area. Approximately 1,500 feet of concrete greenway trail will be constructed in the project area to provide additional pedestrian connectivity in the Ephesus Fordham district. Three pedestrian bridges will be constructed across the streams which may All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 {Sediment and Pollution Control Act of 1973}. The attached PCN package includes PCN Form, supporting figures, and design plans. Total existing stream is 1,485 LF. Total wetland impacts resulting from the proposed project are 0.08 acres 720 Corporate Center Drive Raleigh, NC 27607 Tel. 919.782.0495 www.wkdickson.com Aviation • Water Resources • Urban Development 9 Geomatics 1.r Samantha Dailey US Army Corps of Engineers January 14, 2019 Page 2 due to fill and excavation. The project meets all conditions of the NWP 27. Authorization for buffer impacts are being sought from the North Carolina Department of Environmental Quality. Thank you for your prompt attention to this important project and please let me know if you have any questions or require any additional information. Sincerely, W.K. Dickson & Co., Inc. Tom Murray, PE Project Manager cc: George Lankford, WK Dickson, Project Scientist Chris Roberts, PE., Town of Chapel Hill, Town Engineer WDIICKSON Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form —Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification —Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Elliott Storage Design 2b. County: Orange 2c. Nearest municipality / town: Chapel Hill 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: NA 3. Owner Information 3a. Name(s) on Recorded Deed: See attachment - Supplemental Information 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form —Version 1.4 January 2009 4.. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: Chris Roberts 4c. Business name (if applicable): Town of Chapel Hill 4d. Street address: 6850 Millhouse Road 4e. City, state, zip: Chapel Hill, NC 27516 4f. Telephone no.: 919-969-5091 4g. Fax no.: 919-932-2954 4h. Email address: croberts@townofchapelhill.org S. Agent/Consultant Information (if applicable) 5a. Name: Tom Murray, PE 5b. Business name (if applicable): W.K. Dickson & Co., Inc. 5c. Street address: 720 Corporate Center Drive 5d. City, state, zip: Raleigh, NC 27607 5e. Telephone no.: 919-782-0495 5f. Fax no.: 919-782-9672 5g. Email address: tmurray@wkdickson.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): see attached - supplemental information 1 b. Site coordinates (in decimal degrees): I Latitude: 35.9346 Longitude: -79.0255 1c. Property size: 35 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Booker Creek 2b. Water Quality Classification of nearest receiving water: WS-V;NSW 2c. River basin: Cape Fear (HUC 8 03030002) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: See attachment - Supplemental Information 3b. List the total estimated acreage of all existing wetlands on the property: 0.23 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,485 3d. Explain the purpose of the proposed project: See supplemental information attached. 3e. Describe the overall project in detail, including the type of equipment to be used: See attachment - Supplemental Information 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / roject includin all rior hases in the ast? ® Yes ❑ No ❑ Unknown Comments: gee attachment -supplemental Information 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): George Lankford Agency/Consultant Company: vac Dickson Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Pending 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes © No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands Q Streams — tributaries Q Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary W1 P Fill Bottomland Hardwood Forest Yes Corps 0.01 W2 P Choose one Bottomland Hardwood Forest Yes Corps 0 W3 P Excavation Bottomland Hardwood Forest Yes Corps 0.03 W4 P Excavation Bottomland Hardwood Forest Yes Corps 0.01 W5 P Excavation Bottomland Hardwood Forest Yes Corps 0.03 W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.08 2h. Comments: Wetland impacts to W3, W4, W5 include excavation and lowering of the grade. Due to the nature of the impact, wetlands are expected to reestablish after the project is constructed. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 T Temp Stream Crossing Booker Creek PER Corps 25 9 S2 T Temp Stream Crossing UT Trib 1 PER Corps 10 18 S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - Sg - Choose one - - 3h. Total stream and tributary impacts 27 3i. Comments: Impacts are for temporary stream crossings and installation of permanent bridge footers for greerrway crossings. All excavation for the floodplain reconnection is occurring above the ordinary high water mark. Page 4 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: n/a 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑X Other:jordan 6b. Buffer Impact number — Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 T Floodplain grading Booker Creek Yes 48,519 30,180 B2 - Yes/No B3 _ Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 48,519 30,180 6i. Comments: Buffers vA I be re -vegetated with native vegetation. See Supplemental fora itiona comments. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. See Supplemental 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Tree protection areas will be clearly marked and construction equipment will be kept out of these areas as well as all streams and wetlands to the extent possible. Equipment will be staged outside of the buffers to the extent possible. Heavy equipment will only be in the buffers as necessary to install the bridges and retaining walls and complete grading operations. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes Q No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires 0 Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Flood storage grading 48,519 3 (2 for Catawba) 145,557 Zone 2 Flood storage grading 30,180 1.5 45,270 6f. Total buffer mitigation required: 190,827 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). Buffer mitigation will be provided by onsite riparian buffer restoration. The existing buffer contains significant invasive species and limited woody vegetation. Invasive species will be removed and natural vegetation will be planted in the riparian buffer and along the streambank to reduce potential for instream erosion. There will be no permanent loss of buffer. 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. No new stormwater outfalls will be installed as part of this project. New impervious surfaces will only is in diffuse ❑ Yes ® No include greenway trails where runoff conveyed a manner. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 5.6% 2b. Does this project require a Stormwater Management Plan? ❑ Yes 0 No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: New impervious surfaces are only associated with the greenway trails. Runoff from impervious areas will be disconnected and not concentrated. The majority of the greenway drains to vegetated areas in excess of 40 feet in length, which would result in 40% (D soils) of the runoff from impervious areas being treated through evapotranspiration and infiltration per the DEQ Stormwater Control Measure Credit Document. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Chapel Hill 0 Phase 11 ❑ NSW 3b. Which of the following locally-implemented stormwater management programs ❑ USMP0 apply (check all that apply): Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Pro ram Review E]Coastal counties ❑HQW 4a. Which of the following state-implemented stormwater management programs apply ❑ORW (check all that apply): E] Session Law 2006-246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? 0 Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? © Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes Q No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes © No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The surrounding watershed is largely developed. Any redevelopment that occurs is required to have its own stonnwater treatment for additional impervious areas. The Town will maintain the property as a Town green space. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Does not generate wastewater and therefore will not affect sewage disposal treatment methods or disposition. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑R No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish and Wildlife website, NC Natural Heritage Program database search (county and topo map searchs). See attachment - Supplemental Informal 6. Essential Fish Habitat (Corps Requirement) __T_ 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Essential Fish Habitat Mapper v3.0 (http://www.habitat.noaa.gov/protection/efh/habitatmapper.html) (accessed May 17, 2016) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Office HPOWEB GIS Service (http://www.hpo.ncdcr.gov/) (accessed May 17, 2016) 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The proposed project does not result in increases to the 100 -year base flood elevation or the 100 -year floodway elevations or widths. A no -rise submittal will be provided to the Town of Chapel Hill. 8c. What source(s) did you use to make the floodplain determination? Source is digital geodatabase of effective floodplain maps from the State of North Carolina's Flood Risk Information System Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 Supplemental Information - Elliott Storage PCN Chapel Hill, NC A. Applicant Information (page 1) 3. Owner Information 3a. Name(s) on Recorded 3b. Deed Book 3d -e Street address: PIN No. Deed and Page No. City, state, zip: 3f. Telephone no.: RRPIV Village Plaza Chapel 6162/154 4801 PGA Blvd 9799-24-2361 Hill LLC Palm Beach Gardens, FL 33418 Little & Cloninger Partnership 1665/399 11503 McLean 9799-25-0069 Chapel Hill NC 27517 Federal Realty Investment 621/127 PO Box 92129 9799-25-5527 Southlake Texas, 76092 M&H Hospitality LLC 2440/179 1312 N. Fordham Blvd 9799-24-5697 Chapel Hill, NC 27514 Mariakakis Enterprises 355/274 1322 Fordham Blvd 9799-24-6919 Chapel Hill, NC 27514 3h. Email address RRPIV Village Plaza Chapel Hill LLC - dklepser@ramrealestate.com Little & Cloninger Partnership - crowlittle@aol.com Federal Realty Investment - Djohnson@federalrealty.com M&H Hospitality LLC - dklepser@ramrealestate.com Mariakakis Enterprises - B. Project Information and Prior Project History (page 3) 1a. Property Owner tax PIN: 9799-24-2361 9799-25-0069 9799-25-5527 9799-24-5697 9799-24-6919 1Y Supplemental Information — Elliott Storage PCN Chapel Hill, NC 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project is located within the Town of Chapel Hill in a developed landscape. The site is along the banks of Booker Creek and a small tributary between Eastgate Shopping Center and South Elliott Road. Both channels enter the site from culverts systems. The upstream reach of Booker Creek is piped beneath the Eastgate Shopping Center from north of Franklin Street. The origin of the small tributary was not evaluated. The project is within the Booker Creek Urban areas, such as the project site is located, follow the Census Bureau urban -area definition and includes residential areas and concentrations of nonresidential urban areas, such as commercial, industrial, and institutional land; office areas; urban streets and roads; major airports; urban parks and recreational areas, and other land within urban -defined areas (USDA 2017). Two existing perennial streams are located on the property. Booker Creek itself is approximately 20 to 25 feet wide with moderately incised banks and a disturbed buffer. An unnamed tributary to Booker Creek has been straightened and dredged immediately downstream of a 48" pipe outfall. Invasive plant species including Chinese privet and Japanese honeysuckle are located adjacent to the streams. 3d. Explain the purpose of the proposed project: The purpose of the project is to create and preserve a natural green area in a largely urbanized area of Chapel Hill that will reestablish floodplain connectivity with the stream during smaller more frequent rain events and increase the floodplain storage during larger events. Additional goals include reduction of streambank erosion, removal of invasive species, and creation of passive recreational opportunities. 3e. Describe the overall project in detail, including the type of equipment to be used: Approximately 2.1 acres of the floodplain adjacent to Booker Creek will be excavated 2 to 8 feet to provide additional flood storage and reestablish connectivity between the stream and floodplain. All excavation will occur above the ordinary high water mark for the stream. Stream banks will be stabilized with livestakes and the riparian buffer and floodplain will be planted with native trees and plants and a natural riparian seed mix. Invasive species will be removed throughout the project area. Approximately 1,500 feet of concrete greenway trail will be constructed in the project area to provide additional pedestrian connectivity in the Ephesus Fordham district. Three pedestrian bridges will be constructed across the streams which may result in temporary stream impacts. Required footings will be installed outside of the stream banks. 2 Supplemental Information — Elliott Storage PCN Chapel Hill, NC Standard equipment will be used including but not limited to track hoe, back hoes, excavators, and dump trucks. Tree protection areas will be designated and fenced off to prevent large equipment from accessing these areas. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past? There is an overlapping area containing wetlands on the northeastern part of the property boundary that directly abuts the new RAM Realty residential building. The three (3) separate wetland areas identified as W3, W4, and W5 in Figure 5 were previously identified as part of the RAM Realty project. WK Dickson met with staff from the Army Corps of Engineers and DEQ on April 5, 2018 to make a preliminary site evaluation and review wetland flags for W1 and W2 as well as the ordinary high water mark for S1 and S2 4c. W3, W4, and W5 delineated by Pilot Environmental, Inc. W1 and W2 delineated by WK Dickson. C. Proposed Impacts Inventory 6. Buffer Impacts 6i. Comments Buffer impacts include regrading the floodplain adjacent to the stream to lower the floodplain and make it more accessible during the more frequent stream events. Increasing the access to the floodplain during storm flows will reduce the shear stress on the incised stream bank. After grading is complete the buffer will be replanted with native vegetation. During the grading operation invasive species including Chinese privet and Japanese honeysuckle will be removed. The post -construction buffer will have greater nutrient removal due to more frequent periods of inundation and localized wetlands will likely be created by lowering the elevation of the floodplain. Wetland impacts are minimized to less than 0.1 acres to only include grading for greenway trail. All floodplain grading will occur above the ordinary high water mark and bridge crossings are designed to have no footings within the stream bed to avoid permanent stream impacts and minimize temporary impacts. Floodplain grading is focused only in those areas that provide significant flood storage benefits for upstream properties. In areas where floodplain grading does not provide significant benefits, tree protection areas are designated and no grading will occur. 01 Supplemental Information - Elliott Storage PCN Chapel Hill, NC Wetland creation is expected to occur as a result of lowering the floodplain and reconnecting the stream to the floodplain, although the specific acreage of wetland creation is unknown at this time. D. Impact Justification and Mitigation The proposed project was regraded to eliminate impacts for W2 and to minimize impacts for the remaining wetlands. Permanent stream impacts are avoided. Pedestrian bridges are designed to only result in temporary impacts. All floodplain grading will occur above the ordinary high water mark. Grading will result in lower shear forces for the existing stream. Lower shear forces as well as planting of live stakes along the bank will stabilize the stream bank and reduce downstream sediment. Floodplain grading is focused only in those areas that provide significant flood storage benefits for upstream properties. The Town surveyed trees within the project area to identify areas with significant hardwood stands that could be saved. In areas where floodplain grading does not provide significant benefits, tree protection areas are designated and no grading will occur. The disturbed area will be re -planted with native vegetation. The buffer impact associated with the greenway trail is approximately 4,250 square feet. E. Stormwater Management and Diffuse Flow Plan No new stormwater outfalls will be installed as part of this project. New impervious surfaces will only include greenway trails where runoff is conveyed in a diffuse manner. Runoff from impervious areas will be disconnected and not concentrated. The majority of the greenway drains to vegetated areas in excess of 40 feet in length, which would results in 40% (D soils) of the runoff from impervious areas being treated through evapotranspiration and infiltration per the DEQ Stormwater Control Measure Credit Document. Supplemental Information — Elliott Storage PCN Chapel Hill, NC F. Supplementary Information 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Table - Protected Species - US Fish & Wildlife Service Orange County, North Carolina Common Name Scientific name Federal Status Record Status Habitat Present Vertebrate: American eel Anguilla rostrata FSC Current No Bald eaele Haliaeetus leucocephalus BGPA Current No Carolina darter Etheostoma collis lepidinion FSC Current No Roanoke bass Ambloplites cavifrons FSC Current No Invertebrate: Atlantic pigtoe Fusconaia masoni FSC Current No Brook floater Alasmidonta varicosa FSC Current No Dwarf wed emussel Alasmidonta heterodon E Current No Green floater Lasmigona subviridis FSC Current No Savannah lilliput Toxolasma pullus FSC Current No Yellow lampmussel Lampsilis cariosa FSC Current No Vascular Plant: Butternut Juglans cinerea FSC Historic No Creamy tick -trefoil Desmodium ochroleucum FSC Historic No Michaux's sumac Rhus michauxii E Historic No Smooth coneflower Echinacea laevigata E Historic No Sweet pinesap I Monotropsis odorata FSC I Current I No Torrey's Mountain -mint I Pycnanthemum torrei FSC I Current INo Updated: 6-8-2015 http://www.fws.gov/raleigh/species/cntylist/orange.html Key E = Endangered. T = Threatened. C = Candidate. BGPA = Bald and Golden Eagle Protection Act FSC=Federal Species of Concern (FSC is an informal term). T(SIA) = Threatened due to similarihj of appearance EXP = Experimental population P = Proposed 751 70 Duke Forest Korstian Division i 1 J 501 1 HUC 030004150061 L �' =Durham Elliott Floodplain Storage ,..-Horace VL'dliams .. Chapel -Hill l 54 v F _} ♦ �� Legend 1 { Project Area _ 14 Digit HUC . Highway' Major Road 15 l Local Road 1 .; =` "N" 0 0.5 1 Figure 1. Elliott Floodplain Storage WWI< Miles N ICKSON 1 inch = 1 miles WE *community Introstructure conW!anrs 5 Vicinity Map 0 250 500 N Figure 3. Elliott Floodplain Feet ,3' E Storage 5 1 inch = 500 feet Soils Map WDIICKSON communllV Infrastructure consllltanls 250 500 N W E Feet S 1 inch = 500 feet Figure 4. Elliott Floodplain Storage NWI and FEMA Map WDIICKSON community introstructure consultants 1" wit e � •tib' � i : o-. � • .'� +�,� �`.. �_. '� �. � -• � - 'r. +., it wn 1 I-,` 'so rMt M a- My % v ; x-. T soft fk K s . S1 - Booker Creek � � • � • b 'w' IL s *► " -+w,4'Ty W3 - Wetland' , S2 - UT to Impact: 0.03 ac Booker Creek .rte- �� W2 Wetland W4 - Wetland t; k "a! No Impact Impact: 0.01 ac W5 -Wetland <_ Impact: 0.03 ac W1 - Wetland ti;A�`T\P Impact: 0.01 ac I�•n-\;: •.x,x es+0000�, a t } v F * Q 000 n r Legend Existing Stream Centerline Project Limits 7 }� a � - Wetland Impacts Wetlands ` 0 100 200 N Feet Figure 5. Booker Creek Road MWK W E Culvert Improvements ��DlCc<SON 1 inch = 200 feet p S Stream & Wetland Locations Permission Form Date: November , 2018 Tax Map No.: 9799-25-0069 Site Address: 1700 E Franklin Street Property Owner: Little & Cloniger LLP Mailing Address: 11503 McLean Chapel Hill, NC 27517 Contact Name: C. Crowell Little, Jr. Contact Email Address: crowlittle@aol.com KNOWN ALL MEN BY THESE PRESENTS, that Little & Cloniger LLP hereinafter called "GRANTOR" (whether one or more) does hereby grant unto the Town of Chapel Hill Public Works Department hereinafter called "GRANTEE", its successors and assigns, authorization to act on my behalf and take all actions necessary for the processing, issuance, and acceptance of the permit requirements for stream, wetland, and buffer impacts associated with the Elliott Storage project described on the Elliott Storage Conceptual Trail and Easement Layout attached hereto as Exhibit A, and the Pre -Construction Notification Form attached hereto as Exhibit B. TO HAVE AND TO HOLD the land herein before described unto the Grantee, its successors and assigns, for the aforesaid uses and purposes and none other. For as long as the Grantor owns the premises, this permission form shall remain in effect and valid. Therefore, the Grantee shall have a temporary non- exclusive license to access the rear portion of Gateway Commons Shopping Center in Chapel Hill, NC (hereinafter "premises") to carry out inspections related to the above-described activities on an as -needed basis in the future as long as the premises remains under ownership of the Grantor. By entering the premises, Grantee agrees that any damage which may occur to the premises resulting from the Grantee's exercise of its right to ingress, egress and regress shall be repaired by the Grantee. WHEREOF, the Grantor has hereunto set his/her hand, this day of bQ.4ej� 2018. LITTLE & CLONIGER LLP, a North Carolina limited liability partnership By: Crowell Little Family LLLP, a North Carolina limited liability limited partnership, Partner By: _ c, _. " \� (L& C. Crowell Little, Jr., General artner ,. , .& DocuSign Envelope ID: B6D0809E-9CAA-4F3E-858C-C1B2A5AOB9FE Limited Permission Form Date: August 16, 2018 Tax Map No.: 9799-25-5527 Site Address: 1330 Fordham Blvd Property Owner: Federal Realty Investment Trust Mailing Address: 1626 East Jefferson Street, Rockville, Maryland 20852, Attn: Legal Department Contact Name: Deirdre Johnson, Vice President -Asset Management (djohnson@federalrealty.com) KNOWN ALL MEN BY THESE PRESENTS, that Federal Realty Investment Trust, a Maryland real estate investment trust, hereinafter called "GRANTOR" (whether one or more) does hereby grant unto the Town of Chapel Hill Public Works Department, authorization to act on its behalf and take all actions necessary for the processing, issuance, and acceptance of the permit requirements for stream, wetland, and buffer impacts associated with the Elliott Storage project as depicted on the plans attached hereto as Exhibit A. The duration of this Limited Permission Form is expressly tied to the permits required for the completion of the work shown on Exhibit A. Any deviation from the plans set forth as Exhibit A shall result in automatic revocation of this Limited Permission Form. The work required to implement the improvements shown on Exhibit A shall be the subject of a separate agreement between Federal Realty Investment Trust and the Town of Chapel Hill. If a separate agreement is not reached between the parties by April 30, 2019, this Limited Permission Form shall be void ab initio. WHEREOF, the Grantor has hereunto set his/her hand, this 16th day of August 2018. FEDERAL REALTY INVESTMENT TRUST, a Maryland real estate investment trust &. buiv By: Name: Dawn M. Becker Title: Executive Vice President - Corporate Storm -005 (Rev. 01/11/06) Permission Form Date: February 9, 2018 Tax Map No.: 9799-24-6919 Site Address: 1322 Fordham Blvd Chapel Hill, NC Property Owner: Mariakakis Enterprises Mailing Address: #1 Mariakakis Plaza 1322 Fordham Blvd Chapel Hill NC 27514 Contact Name: Contact Email Address: KNOWN ALL MEN BY THESE PRESENTS, that RRPIV Village Plaza Chapel Hill LLC hereinafter called "GRANTOR" (whether one or more), for consideration, does hereby grant unto the Town of Chapel Hill Public Works Department, its successors and assigns, hereinafter called "GRANTEE", the right, privilege and permission to go in and upon a portion of that property conveyed to GRANTOR (hereinafter "premises") by instrument of this permission form, for: ❑ Wetland and Waters of the US Determination And over and across said premises within an access area consisting of and immediately adjacent to the storm drainage system on the premises for the purpose of determining the jurisdictional wetlands and/or Waters of the U.S. as regulated by the Army Corps of Engineers including and adjacent to Booker Creek. It is understood and agreed by and between the parties hereto that the Grantee shall have the right of ingress, egress and regress over and upon any lands of the Grantor adjacent to or in the vicinity of the premises as may be essential to the use thereof for the aforesaid purposes, and no entry for such purposes shall be deemed a trespass. [Any damage which may occur outside the access area to fences, buildings, or other structures resulting from the Grantee's exercise of its right to ingress, egress and regress shall be repaired by the Grantee.] The undersigned, registered property owners of the above noted property do hereby authorize the Town of Chapel Hill Public Works Department to act on my behalf and take all actions necessary for the processing, issuance, and acceptance of the permit requirements for stream, wetland, and buffer impacts associated with the Elliott Storage project. TO HAVE AND TO HOLD the land herein before described unto the Grantee, its successors and assigns, for the aforesaid uses and purposes and none other. For as long as the Grantor owns the Storm -005 (Rev. 01/1 t/06) premises, premises, this permission form shall remain in effect and valid. Therefore, the Grantee may access the premises to carry out the above-described activities on an as -needed basis in the future as long as the premises remains under ownership of the Grantor: WHEREOF, the Grantor has hereunto set his/her hand, this day of !:; : -' 2018. Storm -005 (Rev. 01/11/06) w 1 J Permission Form Date: February 20, 2018 Tax Map No.: 9799-24-5697 Site Address: 1312 Fordham Blvd Chapel Hill, NC Property Owner: RRPIV Fordham Chapel Hill LP Mailing Address: 4801 PGA Blvd Palm Beach Gardens, FL 33418 Contact Name: Karen Geller & David Klepser Contact Email Address: kgellera..ramrealestate.com / dklepser _,ramrealestate.com KNOWN ALL MEN BY THESE PRESENTS, that RRPIV Village Plaza Chapel Hill LLC hereinafter called "GRANTOR" (whether one or more), for consideration, does hereby grant unto the Town of Chapel Hill Public Works Department, its successors and assigns, hereinafter called "GRANTEE", the right, privilege and permission to go in and upon a portion of that property conveyed to GRANTOR (hereinafter "premises") by instrument of this permission form, for: ❑ Wetland and Waters of the US Determination And over and across said premises within an access area consisting of and immediately adjacent to the storm drainage system on the premises for the purpose of determining the jurisdictional wetlands and/or Waters of the U.S. as regulated by the Army Corps of Engineers including and adjacent to Booker Creek. It is understood and agreed by and between the parties hereto that the Grantee shall have the right of ingress, egress and regress over and upon any lands of the Grantor adjacent to or in the vicinity of the premises as may be essential to the use thereof for the aforesaid purposes, and no entry for such purposes shall be deemed a trespass. [Any damage which may occur outside the access area to fences, buildings, or other structures resulting from the Grantee's exercise of its right to ingress, egress and regress shall be repaired by the Grantee.] The undersigned, registered property owners of the above noted property do hereby authorize the Town of Chapel Hill Public Works Department to act on my behalf and take all actions necessary for the processing, issuance, and acceptance of the permit requirements for stream, wetland, and buffer impacts associated with the Elliott Storage project. TO HAVE AND TO HOLD the land herein before described unto the Grantee, its successors and assigns, for the aforesaid uses and purposes and none other. For as long as the Grantor owns the Storm -005 (Rev. 01/11/06) 4 1 1 premises, this permission form shall remain in effect and valid. Therefore, the Grantee may access the premises to carry out the above-described activities on an as -needed basis in the future as long as the premises remains under ownership of the Grantor: WHEREOF, the Grantor has hereunto set his/her hand, this 191 day of February, 2018. RRPIV Fordham Chapel Hill LP By: RRPIV Fordham Chapel Hill GP, LLC, its General Partner By: Ram Realty Associates W LLC, its Manager By: Aw - Name:>��� Title: V • P► LIM Name: Title: Storm -005 (Rev. 01/11/06) .s 1 J Permission Form Date: January 31, 2018 Tax Map No.: 9799-24-2361 Site Address: S. Elliott Road Chapel Hill, NC Property Owner. RRPIV Village Plaza Chapel Hill LP Mailing Address: 4801 PGA Blvd Palm Beach Gardens, FL 33418 Contact Name: Karen Geller & David Klepser Contact Email Address: kaell ramrealestate.com / dkiepser0ramrealestate.com KNOWN ALL MEN BY THESE PRESENTS, that RRPIV Village Plaza Chapel Hill LP hereinafter called "GRANTOR" (whether one or mored for consideration, does hereby grant unto the Town of Chapel Hill Public Works Department, its successors and assigns, hereinafter called "GRANTEE", the right, privilege and permission to go in and upon a portion of that property conveyed to GRANTOR (hereinafter "premises") by instrument of this permission form, for: ffWetland Determination And over and across said premises within an access area consisting of and immediately adjacent to the storm drainage system on the premises for the purpose of determining the jurisdictional wetlands and/or Waters of the U.S. as regulated by the Army Corps of Engineers including and adjacent to Booker Creek. It is understood and agreed by and between the parties hereto that the Grantee shall have the right of ingress, egress and regress over and upon any lands of the Grantor adjacent to or in the vicinity of the premises as may be essential to the use thereof for the aforesaid purposes, and no entry for such purposes shall be deemed a trespass. [Any damage which may occur outside the access area to fences, buildings, or other structures resulting from the Grantee's exercise of its right to ingress, egress and regress shall be repaired by the Grantee.] The undersigned, registered property owners of the above noted property do hereby authorize the Town of Chapel Hill Public Works Department to act on my behalf and take all actions necessary for the processing, issuance, and acceptance of the permit requirements for stream, wetland, and buffer impacts associated with the Elliott Storage project. TO HAVE AND TO HOLD the land herein before described unto the Grantee, its successors and assigns, for the aforesaid uses and purposes and none other. For as long as the Grantor owns the premises, this permission form shall remain in effect and valid. Therefore, the Grantee may access the promises to carry out the above-described activities on an as -needed basis in the future as long as the premises remains under ownership of the Grantor: Storm -003 (Rev. 01/11/06) • i , O WHEREOF, the Grantor has hereunto set his/her hand, this E1day of February, 2018. RRPIV Village Plaza Chapel Hill LP BY: RRPIV Village Plaza Chapel Hill GP LLC, its General Partner BY: Ram Realty Associates IV LLC, its Manager By: Karen D. Geller, Vice Preside • Cl t-�— By:_ Vice President (Property Owner) stomm ca r. oui 1/m 0 r 1 f f t`r United States Department of the Interior ,x V FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 8564520 Fax: (919) 856-4556 In Reply Refer To: September 20, 2018 Consultation Code: 04EN2000-2018-SLI-0336 Event Code: 04EN2000-2018-E-02719 Project Name: Elliott Storage Subject: Updated list of threatened and endangered species that may occur in your proposed project location, and/or may be affected by your proposed project To Whom It May Concern: The species list generated pursuant to the information you provided identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. Section 7 of the Act requires that all federal agencies (or their designated non-federal representative), in consultation with the Service, insure that any action federally authorized, funded, or carried out by such agencies is not likely to jeopardize the continued existence of any federally -listed endangered or threatened species. A biological assessment or evaluation may be prepared to fulfill that requirement and in determining whether additional consultation with the Service is necessary. In addition to the federally -protected species list, information on the species' life histories and habitats and information on completing a biological assessment or - I A 0 09/20/2018 Event Code: 04EN2000-2018-E-02719 evaluation and can be found on our web page at http://www.fws.gov/raleigh. Please check the web site often for updated information or changes If your project contains suitable habitat for any of the federally -listed species known to be present within the county where your project occurs, the proposed action has the potential to adversely affect those species. As such, we recommend that surveys be conducted to determine the species' presence or absence within the project area. The use of North Carolina Natural Heritage program data should not be substituted for actual field surveys. If you determine that the proposed action may affect (i.e., likely to adversely affect or not likely to adversely affect) a federally -protected species, you should notify this office with your determination, the results of your surveys, survey methodologies, and an analysis of the effects of the action on listed species, including consideration of direct, indirect, and cumulative effects, before conducting any activities that might affect the species. If you determine that the proposed action will have no effect (i.e., no beneficial or adverse, direct or indirect effect) on federally listed species, then you are not required to contact our office for concurrence (unless an Environmental Impact Statement is prepared). However, you should maintain a complete record of the assessment, including steps leading to your determination of effect, the qualified personnel conducting the assessment, habitat conditions, site photographs, and any other related articles. Please be aware that bald and golden eagles are protected under the Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.), and projects affecting these species may require development of an eagle conservation plan (http://www.fws.gov/windenergy/ eagle_guidance.html). Additionally, wind energy projects should follow the wind energy guidelines (http://www.fws.gov/windenergy/) for minimizing impacts to migratory birds and bats. Guidance for minimizing impacts to migratory birds for projects including communications towers (e.g., cellular, digital television, radio, and emergency broadcast) can be found at: http:// www.fws.gov/migratorybirds/CurrentBirdlssues/Hazards/towers/towers.htm; http:// www.towerkill.com; and http://www.fws. og_v/migratoiybirds/CurrentBirdlssues/Hazards/towers/ comtow.html. Not all Threatened and Endangered Species that occur in North Carolina are subject to section 7 consultation with the U.S Fish and Wildlife Service. Atlantic and shortnose sturgeon, sea turtles,when in the water, and certain marine mammals are under purview of the National Marine Fisheries Service. If your project occurs in marine, estuarine, or coastal river systems you should also contact the National Marine Fisheries Service, http://www.mnfs.noaa.gov/ We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Tracking Number in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. If you have any questions or comments, please contact John Ellis of this office at john_ellis@fws.gov. . 0 t r 09/20/2018 Event Code: 04EN2000-2018-E-02719 Attachment(s): • Official Species List a I f r 09/20/2018 Event Code: 04EN2000-2018-E-02719 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 09/20/2018 Event Code: 04EN2000-2018-E-02719 Project Summary Consultation Code: 04EN2000-2018-SLI-0336 Event Code: 04EN2000-2018-E-02719 Project Name: Elliott Storage Project Type: LAND - FLOODING Project Description: Located within a an urban landscape along Booker Creek. Creation of flood and storm water storage above Ordinary High Water Mark to store peak flows and reduce downstream flooding. Project Location: Approximate location of the project can be viewed in Google Maps: https: www.google.com/maps/place/35.933803915N79.02580403423343W Eqotw* h1aIE 11 S r if w!PZa: yff 1 xr Counties: Orange, NC 2 a _ ) v 09/20/2018 Event Code: 04EN2000-2018-E-02719 Endangered Species Act Species There is a total of 2 threatened, endangered, or candidate species on this species list. 3 Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesl, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Flowering Plants NAME STATUS Michaux's Sumac Rhus michauxii Endangered No critical habitat has been designated for this species. Species profile: https://ecos.fws.ggv/ec}L/species/5217 Smooth Coneflower Echinacea laevigata Endangered No critical habitat has been designated for this species. Species profile: htt2s://ecos.fws.gov/ecp/species/3473 Critical habitats THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. 004 --. North Carolina Department of Natural and Cultural Resources Natural Heritage Program Governor Roy Cooper October 23, 2017 George Lankford WK Dickson 720 Corporate Center Drive Raleigh, NC 27607 RE: Chapel Hill -Elliott Storage Dear George Lankford: Secretary Susi H. Hamilton NCNHDE-4545 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. A query of the NCNHP database, based on the project area mapped with your request, indicates that there are no records for rare species, important natural communities, natural areas, or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence; the area may not have been surveyed. The results of this query should not be substituted for field surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached 'Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists and is included for reference. Tables of natural areas and conservation/managed area within a one -mile radius of the project area, if any, are also included in this report. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve (DNP), Registered Heritage Area (RHA), Clean Water Management Trust Fund (CWMTF) easement, or Federally -listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rodney.butler mcdcr.gov or 919.707.8603. Sincerely, NC Natural Heritage Program MAILING ADDRESS: Telephone_ (919) 707-8107 LOCATION_ 1651 Mal Service Center www.ncnhp.org 121 West Jones Street Raleigh, NC 27699.1651 Raleigh, NC 27603 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area Chapel Hill -Elliott Storage October 23, 2017 NCNHDE-4545 Element Occurrences Documented Within a One -mile Radius of the Project Area Taxonomic EO ID Scientific Name Common Name Last Element Group Rank 5 -Very --- Significantly Observation Occurrence Low Rare Date Rank Butterfly 34564 Erynnis martialis Mottled Duskywing 1952-07-01 H Dragonfly or 33764 Somatochlora georgiana Coppery Emerald 2004 -Pre H? Damselfly 4 -Low --- Significantly GNR S1 Vascular Plant 34235 Crataegus succulenta Fleshy Hawthorn 1932 -Pre H Vascular Plant 8524 Dichanthelium annulum Ringed Witch Grass 1902 -Pre H Vascular Plant 3598 Echinacea laevigata Smooth Coneflower 1922-05-27 X Vascular Plant 3221 Liatris squarrulosa Earle's Blazing -star 1944-10-07 H Vascular Plant 36779 Orbexilum pedunculatum Sampson's Snakeroot 1898-07 H Vascular Plant 5981 Parthenium auriculatum Glade Wild Quinine 1949-05-08 X? Vascular Plant 22304 Tridens chapmanii Chapman's Redtop 1894-08-21 H No Natural Areas are Documented Within a One -mile Radius of the Project Area Accuracy Federal State Global State Status Status Rank Rank 5 -Very --- Significantly G3 S2 Low Rare 5 -Very --- Significantly G3G4 S2? Low Rare 5 -Very --- Significantly G5 S1S2 Low Rare Peripheral 4 -Low --- Significantly GNR S1 Rare Peripheral 3 -Medium Endangered Endangered G2G3 S1S2 4 -Low --- Significantly G4G5 S2 Rare Peripheral 5 -Very --- Significantly G5 S1 Low Rare Peripheral 4 -Low --- Significantly G3G4 S3 Rare Throughout 5 -Very --- Threatened G5T3 S1 S2 Low Managed Areas Documented Within a One -mile Radius of the Project Area Managed Area Name Owner Owner Type Orange County Open Space Orange County: multiple local government Local Government Town of Chapel Hill Easement Town of Chapel Hill Local Government Definitions and an explanation of status designations and codes can be found at fps;Hncnhde natureserve.ora/content/help. Data query generated on October 23, 2017; source: NCNHP, 03 July 2017. Please resubmit your Page 2 of 4 information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 3 of 4 NCNHDE-4545: Chapel Hill -Elliott Storage Too Rd Yb� tit W, Enke FI� IIN It S Gd, i7 V W Briarcliff Tenney Circle W+E Davie Circle October 23, 2017 1:1 Project Boundary El Buffered Project Boundary 0 Managed Area (MAREA) Page 4 of 4 1:21,924 0 0.175 0.35 0.7 mi 0 0.3 0.6 1.2 km Sources: Esn, HERE, DeLi-ne. Int—p, increment P Corp., GEBCO, USGS, FAO NPS, NRCAN, G-8—, IGN, Kd-ter NL, Ordnancen S—.y, E,Japan, METi. Esn China (Hong Kong). svestitopo, Map"India, 0 Open ftetiwap contributors, and the GIS User Community f ELLIOTT STORAGE DESIGN s8 Mi1�8i 1ji TOWN OF CHAPEL Hlu ILLm FLOODPLAIN STORAGE CONSTRUCTION PLANS L WK DICKSON PROJECT NO. 20170225.00.RA e f 6 s e N m e � � W. 'o m m . a o 0 a;� O O J m A = y��Ls LU o Q 0 tiG ir cy�o O� 0 CD W 0 0 J J LU U O a e0Ok ELLIOTT RD RFFk R s s IZ VICINITY MAP LLJ NOTICE TO CONTRACTOR Z > N.T. S 1) THE CONTRACTOR SHALL FIELD VERIFY THE ONSITE T.B.M. wl EXISTING ELEVATIONS. THE LD O 6 TOWN OF CHAPEL HILL CONTRACTOR SHALL IMMEDIATELY CONTACT W.K. DICKSON & CO., INC. Q 919.782.D495 IF ANY I ORANGE COUNTY N C DISCREPANCIES ARE FOUND IN DIGGING, O ONS SHOWN. U U BENCHMARKSA. 2) PRIORTOCONSTRUCTION,RO DIGGING, IE EXCAVATION THE CONTRACTOR IS RESPONSIBLE FOR , LOCATING ALL UNDERGROUND UTILITIES (PVBUC OR PRIVATE) THAT MAY EXIST AND CROSS g THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. CALL I� '811'A MINIMUM OF 72 HOURS PRIOR TO DIGGING OR EXCAVATING. REPAIRS TO ANY UTIUTY Un t DAMAGED RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBIUTY OF THE Z a CONTRACTOR. O i1 a ��� O �� F- 3 �Know whars below. O Call before you dig Z 1 REV RECORD: REV RECORD: ISSUED RECORD: cswcce (n c7 BY DATE DESCRIPTION BY DATE DESCRIPTION BY DATE DESCRIPnON Z a o WVD CKSON Q w I c un'tY'nfrastructure wnsuMants Z HORIZONTAL DATUM =NAD 83 (2011) 11 1 PROFEa9pN4 SM ? T dl VERTICAL DATUM = NAVD 88 Ld Z < € cc o WKD PROJ. NO_' 2Dn022s DD.RA GPS Sheet List Table Sheet Number Sheet Title 1 COVER 2 GENERAL NOTES 3 EXISTING CONDITIONS 4 PLAN &PROFILE 5 PLAN &PROFILE 6 PLAN &PROFILE 7 PARK PLAN 8 PARK PLAN 9 PLANTING PLAN 10 PLANTING PLAN 11 PLANTING PLAN Di DETAILS D2 DETAILS D3 DETAILS D4 PARK PLAN DETAILS XS1 CROSS-SECTIONS XS2 CROSS-SECTIONS XS3 CROSS-SECTIONS XS4 CROSS-SECTIONS XS5 CROSS-SECTIONS XS6 CROSS-SECTIONS XS7 CROSS-SECTIONS XS8 CROSS-SECTIONS EC1 EROSION CONTOL NOTES EC2 EROSION CONTROL EC3 EROSION CONTROL EC4 EROSION CONTROL EC5 EROSION CONTROL DETAILS EC6 EROSION CONTROL DETAILS S1 STRUCTURAL GENERAL NOTES S2 FRAMING PLAN S3 TYPICAL SECTIONS &DETAILS PT01 PERMATRAK GENERAL NOTES PT02 PERMATRAK DETAILS PT03 PERMATRAK DETAILS PT04 PERMATRAK DETAILS PT05 PERMATRAK INSTALLATION DIAGRAMS GPS NORTHING FASTING ELEVATION DESCRIPTION 1 794535.8754 1992609.7299 262.03 SURVEY NAIL 2 794372.8125 1992657.4366 263.32 PK NAIL 794339.4867 1992496.8080 264.51 SURVEY NAIL 4 794645.2432 1992410.2266 265.44 PK NAIL 5 794856.891 1992117.9770 281.09 SURVEY NAIL 6 795091.457 1992151.459 277.83 PK NAIL 7 795158.746 1992189.06 263.20 SURVEY NAIL DRAINAGE STRUCTURES: .GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. WEEP HOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES, WEEP HOLES SHOULD BE ON 4' CENTER WITH A MINIMUM OF 1 WEEP HOLE PER WALL WEEP HOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC FILLED WITH j78 STONE THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK. STATION, OFFSETS AND ELEVA71ONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION BOXES, AND THE MIDPOINT OF THE GRATE FOR CATCH BASINS UPON APPROVAL BY THE ENGINEER, CONTRACTOR MAY SUBSTITUTE BRICK STRUCTURES WITH PRECAST STRUCTURES TREES, SHRUBS, AND HEDGES: THE CONTRACTOR SHALL NOT REMOVE ANY TREES PRIOR TO ONE MONTH BEFORE CONSTRUCTION PER SUB -LOCATION. EXCEPTIONS TO THIS WALL BE TREE REMOVAL NECESSARY FOR OVERHEAD AND UNDERGROUND UTUTY (TELEPHONE AND ELECTRIC) WORK. THE CONTRACTOR SHALL SAVE ALL TREES AND SHRUBS WHERE TREE PROTECTION IS NOTED ON THE PLANS. THE CONTRACTOR SHALL SAVE LL OTHER TREES AND SHRUBS WITHIN THE LIMITS OF DISTURBANCE LINES UNLESS OTHERWISE DIRECTED BY THE ENGINEER. TREE PROTECTION BARRICADE SHALL E HIGH DENSITY POLYETHYLENE FABRIC. ORANGE. FOUR FEET IN HEIGHT. INSTALL PER MANUFACTURERS SPECIFICATIONS WHERE SHOWN ON THE PLANS TREE PROTECTION BARRICADE SHALL BE INSTALLED BEFORE ANY DEMOLITION OR CONSTRUCTION BEGINS IN THE AREA AND SHALL NOT E REMOVED UNTIL CONSTRUCTION IS COMPLETED AND AS DIRECTED BY THE OWNER. MAINTAIN TREE PROTECTION BARRICADES THROUGHOUT CONSTRUCTION. SIDE SLOPES: LIMITS OF PROPOSED SLOPES ARE INDICATED IN THE PLANS, DETAILS AND STANDARD DRAWINGS. THE MAXIMUM FILL SLOPE SHALL NOT EXCEED A 3:1 fHORIZONTAL TOVERTICAL UNLESS DESIGNATED BY THE ENGINEER. CUT SLOPES GREATER THAN 2.1 WILL BE USED ONLY AS DIRECTED 8 THE ENGINEER AND AT THE SPECIFIC LOCATIONS SHOWN ON THE PLANS EXISTING SANITARY SEWER AND WATER LINE: FOR WATER AND SEWER LOCATES THE CONTRACTOR SHALL CLL 811. DONNIE NOLF (919-537-4271) OR NICK PARKER (919-537-4201) FROM OWASA SHALL BE NOTIFIED BY THE CONTRACTOR 48 HOURS PRIOR TO THE BEGINNING OF WATER AND/OR SANITARY SEWER WORK. WHERE SANITARY SEWER AND WATER LINES ARE ENCOUNTERED, THE CONTRACTOR SHALL USE CARE IN WORKING AROUND OR NEAR THEM. IF AN EXISTING SEWER OR WATER LINE IS DAMAGED, THE CONTRACTOR SHALLIMMEDIATELY REPLACE THE SEWER OR WATER LINE AT HIS EXPENSE. ALL WATER VALVES k BOXES, WATER METER BOXES WATER VAULTS SANITARY SEWER MANHOLES, AND CLEANOUTS IN THE CONSTRUCTION AREA ARE TO BE ADJUSTED TO THE FINISHED GRADE BY THE CONTRACTOR. IF THE WATER METERS ARE TO BE RELOCATED HORIZONTALLY. THEY SHALL BE MOVED TO AN AREA BEHIND THE PROPOSED CURB. IF RELOCATED METER IS IN DRIVE OR SIDEWALK, CONTRACTOR WILL PROVIDE AND INSTALL CONCRETE METER BOXES. WATER AND SEWER LINES ARE TO REMAIN ACTIVE AT ALL TIMES DURING CONSTRUCTION. IF THIS IS NOT POSSIBLE, THEN CONTRACTOR SHALL FOLLOW OWASA POLICIES PROCEDURES STANDARDS AND SPECIFICATION MANUAL SEWER LATERALS ARE TO E RECONNECTED PER OWASA SPECIFICATIONS CONSTRUCTION EQUIPMENT WEIGHT SHALL NOT EXCEED 16,000 LBS. INSIDE OF EXISTING SANITARY SEWER EASEMENT. STOCKPILE STAGING AREAS ARE NOT TO BE LOCATED WITHIN THE EXISTING SANITARY SEWER EASEMENT. NO EQUIP ENT OR CONSTRUCTION MATERIALS SHALL BE LEFT WITHIN THE EXISTING SANITARY SEWER EASEMENT AT THE END OF THE DAY. CLEARING LIMITS: CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK LIMITS BELOW ORDINARY HIGH WATER MARK UNLESS OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED ON PLANS AS TOP OF BANK ELEVATION. CONTRACTOR SHALL INSTALL TREE PROTECTION FENCING ALONG LIMITS OF DISTURBANCE THROUGHOUT THE PROJECT AREA. ALL VEGETATION INSIDE LIMITS OF DISTURBANCE SHALL BE CLEARED AND REMOVED UNLESS OTHERWISE NOTED. WETLAND IMPACTS: TEMPORARY DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS AND WATERS OF THE UNITED STATES WILL BE FOR THE ABSOLUTE MINIMUM PERIOD OF TIME NECESSARY TO ACCOMPUSH THE WORK. TEMPORARY DISCHARGES WILL BE FULLY CONTAINED WITH APPROPRIATE EROSION CONTROL OR CONTAINMENT METHODS OR OTHERWISE SUCH FILLS WILL CONSIST OF NON—ERODIBLE MATERIALS. THE AREA OF WATERS OF THE UNITED STATES TO BE DISTURBED WILL BE LIMITED TO THE MINIMUM NECESSARY TO CONSTRUCT THE PROJECT. THE WORK AREA AUTHORIZED BY THE PERMIT, INCLUDING PERMANENT FILLS, WALL BE MINIMIZED TO THE GREATEST EXTENT PRACTICABLE. NO WASTE, SPOIL, SOUDS OR FILL OF ANY KIND SHALL OCCUR IN WETLANDS, WATERS OR RIPARIAN AREAS BEYOND THE FOOTPRINT OF THE IMPACTS AUTHORIZED IN USACE 404 PERMIT, INCLUDING INCIDENTAL IMPACTS. LL CONSTRUCTION ACTIVITIES INCLUDING THE DESIGN, INSTALLATION, OPERATION, AND MAINTENANCE OF SEDIMENT AND EROSION CONTROL BEST MANAGEMENT PRACTCES, SHALLBE PERFORMED SO THAT NO VIOLATIONS OF STATE WATER QUALITY STANDARDS STATUTES OR RULES OCCUR. SEDIMENT AND EROSION CONTROL MEASURES SHOULD NOT BE PLACED IN WETLANDS OR WATERS OUTSIDE OF THE PERMITTED IMPACT AREAS WITHOUT PRIOR APPROVAL FROM THE DIVISION OF LAND RESOURCES IF PLACEMENT OF SEDIMENT AND EROSION CONTROL DEVICES IN WETLANDS AND WATERS IS UNAVOIDABLE, THEN THE DESIGN AND PLACEMENT OF TEMPORARY EROSION CONTROL MEASURES SHALL NOT BE CONDUCTED IN A MANNER THAT MAY RESULT IN DIS—EQUILIBRIUM OF WETLANDS OR STREAM BEDS OR BANKS ADJACENT TO OR UPSTREAM AND DOWN STREAM OF THE ABOVE STRUCTURES. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE REMOVED AND NATURAL GRADE RESTORED WITHIN TWO (2) MONTHS OF THE DATE THAT THE DIVISION OF LAND RESOURCES OR LDCLLY DELEGATED PROGRAM HAS RELEASED THE PROJECT. TOTAL WETLAND IMPACTS G0.01 ACRES TOTAL STREAM IMPACTS 0 LINEAR FEET SURVEY NOTES: 1. SURVEY PERFORMED BY: STEWART ENGINEERING INC. (N.C. FIRM LICENSE f C-1051), 919-380-8750 (OFFICE) 421 FAYETTEVILLE STREET, RALEIGH, NORTH CAROLINA 27601 GENERAL UTILITIES NOTES: I. CONSTRUCTION METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH OWASA UTIU71ES STANDARDS AND SPECIFICATIONS, UNLESS OTHERWISE NOTED. 2 LL CONTRACTORS WORKING ON TOWN OF CHAPEL HILL PROJECTS ARE REWIRED TO OWN A COPY OF THE DESIGN MANUAL AND SHALL KEEP A COPY ON THE JOB SITE AT ALL TIMES 3. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTES AND ASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CLL NC ONE. AT 811 FOR UTIUTY LOCATING SERVICES 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 4. IF THE PROPOSED WATER AND/OR SANITARY SEWER MAIN IS INSTALLED WITHIN 12' IN ANY DIRECTION (VERTICALLY OR HORIZONTLLY) FROM GAS MAINS, THE CONTRACTOR SHLL CONTACT PSNC ENERGY AND INFORM THEM. 5. EXISTING SANITARY SEWER LATERAL k WATER SERVICE LOCATIONS ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED PRIOR TO CONSTRUCTION. CONTRACTOR SHALL RELOCATE ANY SEWER LATERALS h WATER SERVICES AS NEEDED PRIOR TO STORM PIPE CONSTRUCTION. UTILITY COORDINATION: CONTRACTOR SHALL CONTACT NC ONE -CLL AT 811 FOR UTILITY LOCATIONS PRIOR TO CONSTRUCTION. ORGANIZATIONS THAT MAY OWN FACILITIES THROUGHOUT THIS PROJECT ARE BELL SOUTH ORANGE WATER AND SEWER AUTHORITY (OWASA) DUKE ENERGY PSNC ENERGY CENTURYUNK QUEST TIME WARNER CABLE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS ARE FOR THE USE OF THE CONTRACTOR IN PROVIDING PRTECTIONS FOR THE UTILITIES DURING CONSTRUCTION OPERATION. THE TOWN, DESIGN CONSULTANT, AND/OR AGENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OR LOCATION, SIZE. DEPTH OR COMPLETENESS OF E INFORMATION. BEFORE BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL CONTACT EACH OF THE UTILITY OWNERS IN THE AREA OF CONSTRUCTION RELATIVE TO THEIR UTILITY LOCATIONS THE CONTRACTOR SHALL PROTECT LL UTILITIES FROM DAMAGE CAUSED BY CONSTRUCTION OPERATIONS AND OR RELATED WORK OF THE CONTRACTOR OR HIS AGENTS. THE CONTRACTOR SHALL HOLD THE TOWN HARMLESS FOR Y INCONVENIENCE OR DELAY CAUSED BY THE OPERATIONS OF OTHERS CONTRACT ITEMS. H WILL BNG THE E PERFORMEOVE D BYTHE UTILITY SERMCE PROVIDER. THE CONTRY ADJUSTMENT OR RELOCATION OF ACTOR SHALL CSTING EOORDINATE HISEXCEPT S WORK WITH OTHERS IN ORDER TO PROVIDE SATISFACTORY PROGRESS OF THE PROJECT. PSNC ENERGY REPRESENTATIVE MUST BE PRESENT PRIOR TO AND DURING ANY CONSTRUCTION "THIN THE AREA OF EXISTING GAS MANS. THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OR RELOCATION OF GAS MAINS WITH PSNC ENERGY. PSNC MUST BE NOTIFIED TWO WEEKS IN ADVANCE OF CONSTRUCTION. ALL ADJUSTMENTS AND RELOCATIONS WILL BE PERFORMED BY PSNC. A BELL SOUTH REPRESENTATIVE MUST BE PRESENT PRIOR TO AND DURING ANY CONSTRUCTION WITHIN THE AREA OF EXISTING BELL SOUTH CABLES. THE CONTRACTOR SHALL SUPPORT AND PROTECT ANY EXISTING UNDERGROUND UTILITIES ENCOUNTERED DURING TRENCH EXCAVATION AND/OR PIPE INSTALLATION. CONTRACTOR TO USE EXTREME CAUTION WHEN WORKING IN AREAS NEAR POWER TRANSMISSION LINES THE CONTRACTOR SHALL COORDINATE WORKING IN THE AREA OF THE PROGRESS ENERGY TRANSMISSION LINES WITH DUKE ENERGY. EROSION CONTROL: SEE SHEETS EC1 h ECB FOR EROSION CONTROL NOTES. PLANS, AND DETAILS TOTAL DISTURBED AREA 7.0 ACRES MINIMUM EROSION CONTROL MEASURES SHALLBE CONSTRUCTED AND PERMITTED REQUIREMENTS (WHERE NECESSARY) SHALL BE IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL U.S. DEPT. OF AGRICULTURE, NATURAL RESOURCES SOIL CONSERVATION SERVICE CONTRACTOR SHALL NOT DISTURB ANY AREAS OUTSIDE OF THE DESIGNATED EASEMENT AREAS OR LIMITS OF DISTURBANCE. STORM DRAINAGE PIPE & GRADING NOTES: PIPE INVERT ELEVATIONS HAVE PRECEDENCE OVER SLOPES. HOWEVER, SLOPES SHALL NOT BE DECREASED FROM THOSE SHOWN ON PLAN WITHOUT PRIOR APPROVAL FROM THE ENGINEER. ALL STORM DRAINAGE PIPE TO BE CLASS 3 REINFORCED CONCRETE UNLESS OTHERWISE NOTED. PIPE LENGTHS INDICATED ON PLAN ARE APPROXIMATE ONLY. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, TRENCHING, OR OTHER LAND DISTURBING ACTVITY SHALL BE PERMITTED BEYOND LIMITS OF GRADING WITHOUT PRIOR APPROVAL FROM THE OWNER AND TOWN ENGINEERING DEPT. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE TOWN OF CHAPEL HILL ANY DISCREPANCIES FOUND BETWEEN ACTUAL CONDITION AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTION FROM THE TOWN INSPECTOR PRIOR TO PROCEEDING. MANHOLE RIM ELEVATIONS SHOWN ON THE PLANS ARE APPROXIMATE. NEW MANHOLE RING AND COVERS SHALL BE INSTALLED FLUSH WITH THE SURROUNDING GRADE SO AS TO AVOID DAMAGE TO MOTOR VEHICLES DURING CONSTRUCTION. THEY ARE TO BE ADJUSTED TO MATCH THE SURROUNDING PROPOSED GRADE PRIOR TO PLACING THE NEW SURFACE COURSE. BOTH AERIAL AND GROUND -CONTROLLED EXISTING CONTOURS ARE SHOWN ON THE PLAN AT 1' INTERVALS PROPOSED CONTOURS SHOWN ARE AT 1' INTERVALS THE CONTRACTOR SHALL BACKFILL OPEN EXCAVATIONS AT THE END OF EACH WORKING DAY. AT DRAINAGE STRUCTURE LOCATIONS, THE EXCAVATION SHALL BE COVERED NTH METAL PLATES WHEN PRACTICAL OR COMPLETELY ENCLOSED WITH SAFETY NETTING. CONTRACTOR SHALL PERFORM LL WORK IN ACCORDANCE TO CURRENT OCCUPATIONAL SAFETY HEALTH ADMINISTRATION REGULATIONS. ALL PROPOSED GRADES ARE FINISH GRADES WHERE STRUCTURES THAT ARE BEING REMOVED AND REPLACED WITH NEW STRUCTURES THE REMOVAL WILL BE INCIDENTAL TO THE INSTALLATION OF THE NEW STRUCTURE. PIPES THAT ARE EXISTING AND ARE TO CONNECT TO A NEW STRUCTURE WILL E INCIDENTAL TO THE INSTALLATION OF THE NEW STRUCTURE FOR AREAS OUTSIDE OF THE ROADWAY THAT ARE DISTURBED DURING CONSTRUCTION USE SOD TO MATCH EXISTING GRASS TYPE FOR PERMANENT GROUND COVER AFTER CONSTRUCTION. STOCKPILING NOTE: ANY ONSITE STOCKPILING IS TO BE COORDINATED AND APPROVED BY A TOWN INSPECTOR. THE STOCKPILE WILL BE PROVIDED WITH GROUND COVER WATIIN 15 WORKING DAYS UPON COMPLETION OF ANY PHASE OF WORK. MULCH WILL BE TACKED WITH EMULSIFIED ASPHALT. ABBREVIATIONS A....................................NUMBER MMOUTHIC A&W D............................ABANDONED PER HOUR A\C................................AIR CONDIRONER AD............. _.................. ALGEBRAIC DIFFERENCE ASPM....___._._....._...ASPHALT APPROX. ........................ APPROXIMATELY BIL ................................... BOT70M OF BANK 9/c. ................................ BA= OF CURB SIT ........... _..................... ANTUM NOIIS BM_ ... ...... ................... BENCH MARK BOG ....... _ .......................BOTTOM OF CHANNEL BRM................................BEARING PC. ...... _ .........................PRESSURE CB.._ .......... _....... .._..._CATCH BASIN ClG...._..._...._......... _CURB AND OUTIEN CE. ............ ...................CCIgTRVATION EASEMENT CL................... __........... CLEARANCE CIL .................... _... _..... CENTER LANE CMP ........... _ ....................CORRUGATED METAL PIPE CMP ........ ....................CORNIIGATED METAL PIPE MCH C.O. ...............................CLEW COAG—__._.__.__CONCRETE OUT CONST _...... .... ..............CONSTRUCTION CPR ........... _.._ ................CORRUGATED PLASTIC PPE D.TREE ..... ............... __DEIL000S TREE (HARDWOOD) DCB.................................DOUBLE CATCH BASIN DB ...................... _........... DEED BOON DEL .......... _... _ ...............DOUBLE REO'D ........ ......................REOUNED ___........ _..DROP INLET DIA ..... _._._ ...................DIAMETER OF WAY DW...................................DRIVEWAY DM..................................DIMENSKIN E .................... _............... EAST/EASING EA ........ — .... _..........._..EACH DRAINAGE EASEMENT ELEY...... ...... _................ ELEVATION ELL RCP.........................ELLIPTICAL REINFORCED CONCRETE RPE ECP .... ........................ _EDGE OF PAVEMENT ENT. .............................. EASEMENT ETCB...............................ELONGATED THROAT CATCH BASIN ERCP..............................EL PIKAL REINFORCED CONCRETE RPE EXIST—_— . ........... EISTNG F/G._._... ....................FACE OF CURB FES..................................FLARED END SECTION FFE................. ..... ...... .RNISHED FLOOR ELEVATION FH...................................FIRE HYDRANT F/L........... _ ...................FLAW LINE FOC......_.._ .............. .FEW OPTIC CABLE GY..... ... ___................ GAS VALVE HOW .............................HORIZONTAL INT.... ..... _ ..... _... _.......... INTERSECTION INV .. ............. _................. INVERT IP ................................. _..IRON PN SET JL................ _................. JUNCTION BOX L....................................J.MGiH W/............. _................... LF....................................LINER FOOTAGE LOD..................................LIMITS OF DISTURBANCE LE.... ............ _................. LEFT I0.......... _.__............ _P W ND LP. ......... _._ ....................AMY POLE W ................................ _..LANE MAX................................MAAMUM BOP..................................SOOT MH...................................MANHOLE ' .......................................FOOT MIN . ............ ..... ............. MINIMUM MONO .............. _.............. MMOUTHIC .PH................................MLA PER HOUR MTL....... ....... ............... META N. ........... .... ................... NORTH/NORTHNc HAD BE_..__ .... ........... NORTH AMERICAN DATUM 1983 NTS .... _... _ ......................NOT TO SCALE OM .................................OVER WAD OC. .... .... ____.............. ON CENTER ORN_... _ .... ..... _........... ORNAMENTAL PAVT................................PAVEMENT PB_...__..._.....__PUT BOC( PC. ...... _ .........................PRESSURE CUSS PERM...............................PERMANENT � PG.._._.__._...............PAGE PL....................................POINT OF INTERSECTION PIC ........... .....................PN NAL SET PP__.____..._..POWER PROP POLE ...............................PROPOSED PT....................................POINT OF TMOENCY PVL................ _................ POINT OF VERTICAL INTERSECTION I .... _.... ___..... _..... RADIUS ROM ....... ... _ ................REINFORCED CONCRETE BOX CULVERT RCP.................................REINFORCED CONCRETE PPE RD...................................ROAD RELOC..............................RELOCATE REO'D ........ ......................REOUNED R/W \ ROW.i.................RIiHT OF WAY S. .......... _.._ ...................SOUTH SAN .... _..... _....................SANITRY SD ... _..... _...... _ ...............STORM GRAN SDE ........ __._ ..............STOW DRAINAGE EASEMENT SF. ..... _.... _..... _...............SWME FOOT S/R FENCE_ ..... .......... SPLIT RAIL FENCE SS..................................SANITARY SEWER $TA................................STATION SID ............ _ ...................STANDARD SUE................................SEWER UTIUTY EASEMENT SW..................................SIDEWALK SY................... _.............. SQUARE YARD TM .............................. _.TANGENT TB...................................TOP OF BAN( TGE................................TEMP CONSTRUCTION EASEMENT TEMP__ ................ _......... TEMPORARY TP. ...... _................... TRAVERSE PONT TM .............. __............... TEST VINE TYR...... _ .........................TYPICAL U/G............ ...... _............ UNDER GROUND VG ..... _.... _ ....................VERTICAL CURVE VERT................................VERTICAL VCP........—_.___._YTiRIFID CLAY PPE W_ ................. _................ WEST W/............. _................... GTN WB...................................BOTTOM WIDTH WBKF......... _........... _..... BANOULL WIDTH WIG...................................WATER METER W VAULT__._.......__WA1ER VAULT WV.............. .................WATER VALVE YL....................................YARD INLET BOP..................................SOOT PENNY NAIL SET ' .......................................FOOT ................. _..................... INCH WDI KSON Ery infrastructure consultants Transportation + Water Resources Urban Development metics 720 Corporate Drive Raleigh, NC 2 i 607 (v) 91 9.782 0495 (f) 919.762.0672 w .wkd,ckson.ccm 2' —FULL SCALE 1' =HALF SCALE vl'ccZ cc Q Z 0 aU 2 LU Q to LU Z LU C J Z 02 ~ J Q O GO LU UU x LU C7 �U J LL w0 w Z LLL Z F U ~ 2 w o a Q Q D. o PROJ. DATE: �JAN120�8 O.C.: TMO.C. DATE: JAN 208 DRAWING NUMBER: 2 PROJ. NO.: 20170225.00.RA a m O � I— n O a m Z O Cr Or) O o Z � ff m Z 5 N o¢ LL Q W J I CrEE--r�I INV=254.P1' • EXISTING CONTOUR MAJLEOORRLND 1 -- 5Q 6EMINOR BOUNDAY I(N)2?1 � 2277, UNE NIY)2 BOUNDARY LINE )-271 �YS71 ..• EXISTING TOP OF BANK - - - - - TS _ JUT=271 22 -1 L \ EXISTING BOTTOM OF BANK - - -- - - - [? --- J EXISTING TREELINE 100 -YR FEMA - - - l OCYR-- p FEMA�FOLOODWAY J) �\ EXISTING SANITARY SEWER UNE SS SS WP 6 9 PK5 p N:79509 46' E 1992 151,49'/ EXISTING WETLAND EL 27].83' J'n RIM 2 825 N 270.15' � / CUT -270.20' a/(I N al \ FEC . R 7 N n1' PG. 127 PE90, 0 P_. e / 1 P 9.. ,_.,> 27 ` 1 k RIM 28C Eft' y N 79465C 89 OUT=268.69' (E199211]98' EL 28t.C9 tvA J I ` ) \\ TOC 28151 \ \\ \ INV 2]3.4,' \\ Rim - IM 27828 \ /( IN=T6838' OUT=25 25 \t^ IN -26] 92' \\ cur 2 6782'---� TCC 275 75' \ N=271.40' OUT_ 26410 \ N7F II I h r, R 4 1Y '1 NG \ K.ABL k:G1H B. 21 P 127 i o E S MEN1 -- 9-92t5527 55^_7 y { \ 48RCP RIM -259'0' "RIM 61.50' N(8'PVC)=25510' } 'N=252.35' IN(8"DIP) 15.520 OUT. -252.30' IN(24-)®25195' I 1 RIM 259. 52' OUT= 51 90 CU r=257.27' �: 1 r L ss -__24 GIP .k, IN 256.04 'v) h A4O'1 ,.11 , OLT ^5%ISR P hW 1M1S :.X 0 WP -226 -NL t \I ('':. 4 W 16• .Z35 6501• _N 2 . i 1 c: 19523$7 24 II(1 EL: 2f 2.°3' -LXIS ING 'IAN NI( "y OPA 9D6F;. R 'o �II,. v. F,I;1zA�.1JE-l. MV 1p' ? 8 9n. 13 i It 1` ;\ +I FTN 99 5 7 -�w%GBL 11 IN -(24 )=251 43, e 11 I OUT "=251.1w.- is 57 1w..p'Cn �arwls H! ..( 'I '94915 , v 1 V �Dq g � 1 I g ti P 2250 A L:254.61' 'C\i\ C IA Z3' u R7 44UP% tF z% LI W.L, IH P, E +. E .q rF7NEE14 HW 23 A, \ , \ m if'4, .����� v � v• �' 4 � of t FIN% 2027� \ MI IB t `\" Q• tW..�WEET M" }ta;:�." \�. V \`• e�"5 aY--_mJRW 1 `1d .3' o ^ !' OD RIM 26454` Z� O.B. 671 PC 127 P.E iv F . 28 < p'IH ?79925,527 1 � 'l •"] IN (n 261.70' f \ 0 162.37• -o I r B 0 n W 12' / ,L \ G9A 1,6 55, t 5 EPG. W\ A ( F,13 33. n. 13 PIN - )vi t6 X19 78' I \I I RIM= 259 9 IN 254.39 u 12' y/ ,x\ IN(6) 294 59' \ OUT 253.79' f 0 !Y 14 W .. ; >♦W i3 eeM 15" a i - Hw•M yaw- ' 252.7 \ ,M.B- -' 4- i '�' 34•, 4 1 -- � l i yI - ra B. ci�w 14 e:�YIW 13 \Y TRPL, 1?� 252.7 '4 - / \ \ 15. 31" \ -DEED DSE',iAP-- j o 3 1 1z C\P I \ 1 J FPb1 '.NV=2 686 1 --� /! i.,. �\. (. \t. ��44''7T�� �\ i •J/ ! PROPERTY LIVE j PEP / !I t' 12' - \ PROPER TY LINE PER 'b D E 2440, PG. 179 0.8. 61E2, P.G . PROPERTY L'..NE I 154 VI 11, e '�12 - - \\ - } ' PER PE 90. PG. 28- J 1 RRIl VIL-G7'l 1 p PI' '] YG �1 I N F ''PPIV • E I p�Pf� � lr � �� �Y• PLAZAN P HILI 4 11 p256.41 `\ \\\\ ,D,"G 12, / Q s.86162P !,.724..3914 12 ",`• , IN 12• I ? Al\^ \.\� INV- �/ 1 ! ,... m RIM -264.'[ 8 \� K 4 r' .h i % 'I' `2p, �e I47RC y 2 A94 ]ON] 258 8 G." \�� \ ( \ IRP I\51 '26340.'94 2 jl \ \ \ � � � \ �/-rte ' I� i`` f � fly � • ..4_ __ __-._ ` r - `y� OUT -1.6 N794339.49' / A / �IO RAD � � 4\ . 794-j39.49 \ IE 199249681 EL 264.51' CiJ� p �J GG X50 0 ^/e WVDI KSON tatltY fnlraelructure canarilarhs Tre portation + Water Rewvoea urban Development Geom - 720 Corpomte Drive Raleigh, NC 27607 (v) 919.782.0485 (1) 919.782.9872 www.wkdickeon.com FULL SCALE: 1'=5D' 0 50 00 FULL SCALE 1' = HALF SCALE�f' Q Z F Z w CC O Q ZU In _ (j)) p Z ¢ O W Z Q J Z OS W Z a W0= J U LL O W Z W z o w ~ z a o PROD. DATE: JAN 2018 0 G.. TM O.O. DATE: JAN 2018 DRAWING NUMBER: 3 PROJ. NO.: 20170225.00.RA m O J m a 0 U 7 Q z Q O H ? z I o ¢ LL O ¢ LL Q a a 270 i {{ �a 267 - �o °za oy88� 264 \ 261 258 PROPOSED PIPE COLLAR -� SEE SHEET D3 255--- 4 55 -4 LF OF PROP. 3C RCP @ 1.60% 252 I 24 LF OF PROP. N j \ \ ry i / \. \'\\\\\ PINE 14 i a N , \\\ � _ Y' \ Y\ \ 1 PROPOSED !i \ RETAINING WALL EA.• I q -y�� V i BY OTHERS i----� \ \�\ { ,j // I SS PROPOSIf ED 4,i /- /- RETAINING WALL , :p NRRIPYY .� e -e' �� NAL I i yr C B 62, PO 154 I P 57, "C 43 PIN 9799242361 _ r r / PROPOSED CONTOUR MAJOR G PROPOSED CONTOUR MINOR lIk\ \ PROPOSED � \\ \\ jot\ RETAININGWALL \�� \ PROPOSED A` . TEMPORARY CONSTRUCTION EASEMENT SPLASH PAD \\ \ PERMANENT DRAINAGE EASEMENT I \ \ \ \' SEE SHEET D2 \. TREE PROTECTION AREA l + PROP.4 --\- 0 a m6 LF OF U REMOVE AND REPLACE 25SY N/t fiFl I I AGE OF SIDEWALK AS NEEDED. SEE SHEET D3 3 TOC -2 .61' J6� F-L9Z-P..-C.11arLL. H:,.� D e 6162, ?C. 154 ! I II ! \ OUT=2 6.a1' " PB. 57, PO 43 PIN 0779242367 264 o�sZ� , PROP. PIPE COLLAR I L: \a SEE SHEET D3 �\✓ U MS \� REMOVE 23 LF �l% OF 15" RCP ( ( PROP. 15 LF OF I ^\ \ 1 N�15•RCP@0.32% H °, _ \\ RIM -$E / Y ! ° \ W-25 P o // i a i REMOVE AND REPLACE 25SY OUT -25 SIDEWALK AS NEEDED. \\ II 258---ff'............ SEE SHEET D3 / ! u 258 PROP. PIPE COLLAR o SEE SHEET D3 PROPOSED !i \ RETAINING WALL EA.• I q -y�� V i BY OTHERS i----� \ \�\ { ,j // I SS PROPOSIf ED 4,i /- /- RETAINING WALL , :p NRRIPYY .� e -e' �� NAL I i yr C B 62, PO 154 I P 57, "C 43 PIN 9799242361 _ r \\ �` PROP. 4 LF OF L�\' ...`1i/36"RCP@1.60%'_.♦ ILr 270 267 264 -� 261 _O d sa 258 REMOVE EXISTING T36" RCP t— 255 rr - - EXISTING r,.. GROUND _,?- 252 VKUYUbtU GRADE PROPOSED RETAINING WALL 249 249 0+00 0+5157 SCALE: HOR 1"=30'; VERT 1"=3' 0401 TO 0402 ooDi June .- REMOVE 17 LF OF 36 RCP 12*CMP _ \ a# ° 157, 1�' 13� � �' f' • '• 61 I i • F alt' PROP. 24 LF OF, 36" RCP @ 0.19% \ \ TOG�2 ata• ` EIOT \ R \� 60�1M0TH R/WAD � O \ LEGEND r / PROPOSED CONTOUR MAJOR GA PROPOSED CONTOUR MINOR TEMPORARY CONSTRUCTION EASEMENT TICE PERMANENT DRAINAGE EASEMENT ,C vi1 TREE PROTECTION AREA TP 0 a m6 U s� ^V ,..\ }, I fit \�. k13' ` J' 0\•'. F¢ - z 264 o�sZ� , 264 I \\ �` PROP. 4 LF OF L�\' ...`1i/36"RCP@1.60%'_.♦ ILr 270 267 264 -� 261 _O d sa 258 REMOVE EXISTING T36" RCP t— 255 rr - - EXISTING r,.. GROUND _,?- 252 VKUYUbtU GRADE PROPOSED RETAINING WALL 249 249 0+00 0+5157 SCALE: HOR 1"=30'; VERT 1"=3' 0401 TO 0402 ooDi June .- REMOVE 17 LF OF 36 RCP 12*CMP _ \ a# ° 157, 1�' 13� � �' f' • '• 61 I i • F alt' PROP. 24 LF OF, 36" RCP @ 0.19% \ \ TOG�2 ata• ` EIOT \ R \� 60�1M0TH R/WAD � O \ LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR TEMPORARY CONSTRUCTION EASEMENT TICE PERMANENT DRAINAGE EASEMENT PDE TREE PROTECTION AREA TP CONSTRUCTION AT STREAM BANK NOTE: E STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLESS OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. 249 - -' -- 249 1SLFOFPROP iS RCP PROPOSED RETAINING WALL 246 O+DO 246 0+50 0+ 7 SCALE: HOR 1"=30'; VERT 1"=3' 0403 TO 0404 WD CKSON community infrastructure consultants TrensportaYon + Water Resources Urban Development + Geomencs 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1919.782.9672 —.Wkdickson.com FULL SCALE: 1-30- 0 •=30'O 30 60 2• - FULL SCALE 1' = HALF SCAL� z Z O M Z < CD CT _ 0 LLI O -W1 �z O M J a U, _j ati �w z a 0= EL MV W LL w Z til Z Q F -- L) Z w O 4 a o PROJ. DATE: JAN 2018 O.C. 1M O.C. DATE: JAN 2018 DRAWING NUMBER: 4 PROJ. NO.: 20170225.00. RA E; yq \Soot 267 z -267 O J a7 a Z O 0 a m6 U s� ^V F¢ - z 264 o�sZ� , 264 I U Q O H °, 261-1j I I o -261 II 258---ff'............ a. ! 258 1(` o ¢ o � LL Q ° O 'r a EXIS' J W GROI 255 `o�g> 255 zm�z PROPOSED�+- PIPE COLLAR -" SEE SHEET D3 - PRI 4 LF OF PROP. 15" RCP @20.5% AGR 252 ... 252 REMOVE 24LF EXISTING 15 RCP 249 - -' -- 249 1SLFOFPROP iS RCP PROPOSED RETAINING WALL 246 O+DO 246 0+50 0+ 7 SCALE: HOR 1"=30'; VERT 1"=3' 0403 TO 0404 WD CKSON community infrastructure consultants TrensportaYon + Water Resources Urban Development + Geomencs 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1919.782.9672 —.Wkdickson.com FULL SCALE: 1-30- 0 •=30'O 30 60 2• - FULL SCALE 1' = HALF SCAL� z Z O M Z < CD CT _ 0 LLI O -W1 �z O M J a U, _j ati �w z a 0= EL MV W LL w Z til Z Q F -- L) Z w O 4 a o PROJ. DATE: JAN 2018 O.C. 1M O.C. DATE: JAN 2018 DRAWING NUMBER: 4 PROJ. NO.: 20170225.00. RA E; O J a7 a Z O U F¢ - z O U Q O H °, o a ff Z a I o ¢ o � LL Q O m g J W - RIM=25 .17' Ih iP") 25 C5' OUT -25r, Hw N 619E 12 AL I _ c R."T EN TRUST 3 21 P:.. 127 P E 9C.Ps. 28 PIN 9799255527 RIM -280.68• I WT= 6868` A: V -�° l Ijl rill I1r1 �G PROP. PIPE COLLAR ' l HW 2' \ 1ri e / SEE SHEET D3 J/ \ t PROP. 14 LF OF REMOVE 4LFto OF 15" RCP 15" RCP Q 0.609 /I \ I h/F I D Ov6/ v. FEDERAL REALI"f ( \ \ I ?aSG. o PC 28 ( f \ \\ PROP. PIPE COLLAR \ N TU11 \\ SEE SHEET D3. \\ M Gf;J P 9/�)SS5Z4' 1 I g A PROPOSED SPLASH PAD I� \\ .\ / � IN, RIM 2; 7.42' �.. IN -267 92' Dur=267 a2' •\ / TOC -276.75• IN=271.40' \ OUT=264.to— \ EXISTING vy /,/-GRO,ND 276 276 a 27; 27C 261 264 26 4 LF 25E 25E 252 SCALE: HOR 1"=30'; VERT 1"=3' 0501 TO 0502 273 270 267 264 261 258 255 252 At" \ ) G' tir QS PINE 27',- \ \ HW 20' }� REMOVE 24 LF \ `� Hw t4•`'"• a xw t rt OF 15" RCP PROP. 30 LF OF ' 15"RCP(10.5". .... ..... /_ lP ... SII - �� \\\\\ \ PROPOSED \\ J PINE SPLASH PAD \ / ' PROP. 4 LFOF 4- OF \ \\ \ SEE SHEET D2 •( T% = PRO \ \ \ Hw \ \ \ y ZT =11 4FM't6 \ N t o R - MATCH LINE 7+40 " SEE SHEET # 6 _ REMOVE AERIAL i �� � � '\ SS L SSWRCROSSING -I,,25 - 1 {44.39' IN } OZ•1T®2b3.79• MV 13' IHw' 12} II 3 vu r o P+NC 18" L 14. HW 28• 7d'l %NEfLE ,I Zl`IM 13" f0 HW 15 - INE 1.I j,. HWM 252.7 p B--- c N IF 1 IA&H H1 ITA o ' '1 I \ \\ \Py \ \\ PROPOSED CONTOUR MINOR kt2• HW 2' \ 1ri e / PERMANENT DRAINAGE EASEMENT a xw t8" PROP. 14 LF OF TP 15" RCP Q 0.609 /I r I I h/F I D Ov6/ !' I FEDERAL REALI"f ( \ \ I ?aSG. o PC 28 ( f \ �Y�t6" I // / I I \ M Gf;J P 9/�)SS5Z4' 1 I g N PROPOSED SPLASH PAD I� \\ I / � IN, / SEE SHEET D2 \I \\ XIS'NG YAR(AB W'IDT1iI STORM DFtAI`JP Sys / \ !n In ( \ EASE NT 'P B 9N bC 28) \ At" \ ) G' tir QS PINE 27',- \ \ HW 20' }� REMOVE 24 LF \ `� Hw t4•`'"• a xw t rt OF 15" RCP PROP. 30 LF OF ' 15"RCP(10.5". .... ..... /_ lP ... SII - �� \\\\\ \ PROPOSED \\ J PINE SPLASH PAD \ / ' PROP. 4 LFOF 4- OF \ \\ \ SEE SHEET D2 •( T% = PRO \ \ \ Hw \ \ \ y ZT =11 4FM't6 \ N t o R - MATCH LINE 7+40 " SEE SHEET # 6 _ REMOVE AERIAL i �� � � '\ SS L SSWRCROSSING -I,,25 - 1 {44.39' IN } OZ•1T®2b3.79• MV 13' IHw' 12} II 3 vu r o P+NC 18" L 14. HW 28• 7d'l %NEfLE ,I Zl`IM 13" f0 HW 15 - INE 1.I j,. HWM 252.7 p B--- c N IF 1 IA&H H1 ITA o / PINH 919 PROPOSED CONTOUR MAJOR .75697 3' PROPOSED CONTOUR MINOR HW 2' \ 1ri e / PERMANENT DRAINAGE EASEMENT a xw t8" TREE PROTECTION AREA TP a PINE 21,HW \ I \ D ✓�,� \\ 4 HW 15 m • I HW i�m 20• Its `a`C��i£. �� i I r` HW 12 io Nf711 rlj tW Is' 3S \ 11 HW N I I,S'� HWW 14' _ m- 1\ 1i l c HW 13' l �. N tr I I / N y xHW 14' 12- , i rNr25e. i V i2'V I • I \' CP o I\ ' 13- HW rkPl lz' Et3 NVl I�, LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR TEMPORARY CONSTRUCTION EASEMENT —TCE PERMANENT DRAINAGE EASEMENT PDE TREE PROTECTION AREA TP H31m m _ I m { , Ge f 1 II PROPOSED \jl ' :I I ( \ \ / I - SS I I I RETAINING WALL \ \ \ t — — i I \ HW �y iyy t� A" • } x \ 270-----270 _/—GRO,UND. ---------- CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLESS OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. '1i', GRADE 258 wV 258 PROPOSED PIPECOLLAR J I SEE SHEET D3 14LFOFPROPIS"RCP ...... DSD% 255 255 252252 0+00 0+500+62 SCALE: HOR 1"=30'; VERT 1"=3' 0503 TO 0504 WWK DICKSON community Infrastructure consuaants Transportation + Water Resources U rbw Development + Geometics 720 Corporate Drwe Raleigh. NC 27607 (Y) 919.782.0495 (1) 919.782.9872 www.wkdlckson com FULL SCALE: 1'=30' 0 30 Bo FULLSCALE 1' =HALF SCALE jEr Q Z 0 Q Z U C7 2 w 0 —W1 0Z O Q J Q J d 02 U W Z d 0= a � U J LL w0 w Z w a z O L) ~ Z O a v PRO:. DATE. JAN 2018 O.C.: TM O.C. DATE: JAN 2018 DRAWING NUMBER: 5 PROJ. NO.: 20170225.00.RA o m {- N a Z 0 U F- U) U 0 o F ? Z � g io } �¢ o Q N/F FEDERAL REAL':"' I INVESTMENT TRUST D.R. 6.21, Pr,. '27 P.3. 90, PG. 25 s PIN 975525552' I II I i7 + ' o' RIM -261.50' RIM -259.70' IN=252.35" IIJ(B'PVC)-255.10' /, •� C '' G— OUT=252.30 IN(8'DIP)=253.20' RIM=276.57'X AN \ \'' S IN(24")=251.95' , INV=271.67' 1 1 I' 11 1 f OUT -251.90' 1 I , I RIM 259 87 IIIIIIIIII \\ ouT-257.271 � RI ' M=277.27 1 1\ I\(\\\(\� \ \ \ SS �• N IN(N)=271. 27In SS 55 IN(SW)=z71.2r . Dur=271.22' 1 '\ir\ \' o Ir 'o ``.air 1`r\ \\\co• � _ __ '_�--, s's \\.\\I\\ PROPOSEDGRADINGWILL / \\ 4a• SS SS \ \� ` \ \ \'� \ BE REVISED FOR FEDERAL 0'1 \\ \ \ Ri =259.89' REALTY BMP UPON RECEIPT _ IN=256.9418'RCP \ 11\1 OF DESIGN FROM THE TOWN. Ot7T-255.94' y5 v IV, it � 11!I ,IF V lHW 16 —_-- N W � c \ II EXISTING VARIABLE WIDTHS \ RIM ®278.25' \ , ) \\ \\\ \� 1 1 STORM DRAINAGE S \ j I \ \ \ ` \ EASEMENT IN=270.25' \ i N,%F 1 J :PDFRAL REALTY 10 I 1 O ' 1 1 1 •1 \ \ \\ \ ` \ INS T TRUST N/F ca ! ( \ 1 �\ \ \ \\ \ \ \ D.B. 2:. RG. -27 / FEDERAL REALTY N I f I I I !\f \ \\ 1 \ \ \ \ \\ \ \ PU 90, PG. 6' INVESTMENT TP.U6T I I (� \ `FW 993255527 D.B. 621, PC. 127 1� I ,� I 1 1 1' \.• \ \— -- P.B. 90. PG. 28 ~ \ PIN 9799255527 / III 1 , ` \\ \ \ \ \ \\\� \ '�., NG �I . y LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR TEMPORARY CONSTRUCTION EASEMENT EXISTtlG VARIABLE WIDTH '\ \ \\ STORM DRAT EASEMENT \\SS (P. E. 90. PG. 28) RIM= 266'\ 1 INV -254.8 \ \ \ \ \ 48' RCP N/F FEDERAL REAL':"' I INVESTMENT TRUST D.R. 6.21, Pr,. '27 P.3. 90, PG. 25 s PIN 975525552' I II I i7 + ' o' RIM -261.50' RIM -259.70' IN=252.35" IIJ(B'PVC)-255.10' /, •� C '' G— OUT=252.30 IN(8'DIP)=253.20' RIM=276.57'X AN \ \'' S IN(24")=251.95' , INV=271.67' 1 1 I' 11 1 f OUT -251.90' 1 I , I RIM 259 87 IIIIIIIIII \\ ouT-257.271 � RI ' M=277.27 1 1\ I\(\\\(\� \ \ \ SS �• N IN(N)=271. 27In SS 55 IN(SW)=z71.2r . Dur=271.22' 1 '\ir\ \' o Ir 'o ``.air 1`r\ \\\co• � _ __ '_�--, s's \\.\\I\\ PROPOSEDGRADINGWILL / \\ 4a• SS SS \ \� ` \ \ \'� \ BE REVISED FOR FEDERAL 0'1 \\ \ \ Ri =259.89' REALTY BMP UPON RECEIPT _ IN=256.9418'RCP \ 11\1 OF DESIGN FROM THE TOWN. Ot7T-255.94' y5 v IV, it � 11!I ,IF V lHW 16 —_-- N W � c \ II EXISTING VARIABLE WIDTHS \ RIM ®278.25' \ , ) \\ \\\ \� 1 1 STORM DRAINAGE S \ j I \ \ \ ` \ EASEMENT IN=270.25' \ i N,%F 1 J :PDFRAL REALTY 10 I 1 O ' 1 1 1 •1 \ \ \\ \ ` \ INS T TRUST N/F ca ! ( \ 1 �\ \ \ \\ \ \ \ D.B. 2:. RG. -27 / FEDERAL REALTY N I f I I I !\f \ \\ 1 \ \ \ \ \\ \ \ PU 90, PG. 6' INVESTMENT TP.U6T I I (� \ `FW 993255527 D.B. 621, PC. 127 1� I ,� I 1 1 1' \.• \ \— -- P.B. 90. PG. 28 ~ \ PIN 9799255527 / III 1 , ` \\ \ \ \ \ \\\� \ '�., NG �I . y LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR TEMPORARY CONSTRUCTION EASEMENT TCE PERMANENT DRAINAGE EASEMENT PDE TREE PROTECTION AREA TP N/F R IN 7" iLyyf $,.yEL.iENT TR' S- y D.B. 621, PG 28 P.B.a o, PG._8 I PIN _7992555_7 a U ! 4'UIP OUT=26d. r\ \1 CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLESS OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. �D CKSON commurAy infrastructure consukanls Transportation + Water Resources Urban Development + GeomaTics 720 Corporate Drive Raleigh, NC 27807 (v) 919.782.0495 (1) 919.782.9872 —vil,dlckson.com Nc uc� w FULL SCALE: 1'=30' 0 30 00 FULL SCALE HALF SCALE' zz z Z O z V C7 Ju x LU UJI LU Q J CD z UL UL Q J CC J d Ox 06 y W z oz (L ziO J W WO tii Z ii z O U ~ 2 W a a o PROJ. DATE: �11� AN2018 O.C:MOC.DATE: N 2018 DRAWING NUMBER: 6 PROJ. NO.: 20170225.00.RA o � N o I Z O U 7 2 11 to z 0 ,Hw 113" to 12 12 0 N/F �. - MARIAI:A-IS RPFISFS D.E. 355, PO 274 F- P.B. 33, PG. 13 N m \ \6• \\ ,J p0 FIN 9755246919 o a I to w II 11111 as o QLL i I ;I i 1 1 11.1 I I Rw 1s' \ ! `. ! 117 1 (!I HW QX EWORK SSWR LATERIAL TO THE 30" SSWR MAIN ON SERVICE ROAD Itm1�� ¢ a \ rrhN�10 '� ory; 7E' DBi 18"152 --• MATCH LINE 7+40 SEE SHEET #5 CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLESS OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. �D CKSON commurAy infrastructure consukanls Transportation + Water Resources Urban Development + GeomaTics 720 Corporate Drive Raleigh, NC 27807 (v) 919.782.0495 (1) 919.782.9872 —vil,dlckson.com Nc uc� w FULL SCALE: 1'=30' 0 30 00 FULL SCALE HALF SCALE' zz z Z O z V C7 Ju x LU UJI LU Q J CD z UL UL Q J CC J d Ox 06 y W z oz (L ziO J W WO tii Z ii z O U ~ 2 W a a o PROJ. DATE: �11� AN2018 O.C:MOC.DATE: N 2018 DRAWING NUMBER: 6 PROJ. NO.: 20170225.00.RA o � N o I Z O U 7 2 to z 0 0 Z Z to as o QLL o Y IN � � J i � � ¢ a EXISTING RET/ WALL EXISTING SANITARY SEWER STRUCTURE (TYPJ PROP. CAST4N-PLACE CONC. RETAINING WALL (SEE SHEET t FOR ENLARGED VIEW) PROP. CONC. STAIRS WITH HANDRAIL (SEE SHEET 8 FOR ENLARGED VIEW) L EXISTING 8' DIP SANITARY SEWER \ 1 EXISTING SANITARY SEWER STRUCTURE -\ \ PROPOSEDB' CONCRETE TRAIL DTL. 5 SHT. D4 l\\ EXISTING CONCRETE TRAIL(TYP.) GENERAL NOTES: 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN COMPLIANCE WITH NCDEO, AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL GUIDELINES. ALL UTILITY CONSTRUCTION SHALL COMPLY WITH APPLICABLE LOCAL JURISDICTIONAL STANDARDS AND SPECIFICATIONS. 2. EXISTING SURVEY INFORMATION INCLUDING TOPOGRAPHIC INFORMATION PROVIDED BY STEWART, UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK THE CONTRACTOR SMALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFUCTS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING, COORDINATING AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES INCLUDING INDEPENDENT LOCATING SERVICES. THE CONTRACTOR SHALL PROVIDE NOTICE OF EXCAVATION TO NOTIFICATION CENTER AND FACILITY OWNERS (PER NC STATUTE) NO LESS THAN 3 BUSINESS DAYS AND NO MORE THAN 12 WORKING DAYS PRIOR TO BEGINNING DEMOLITION, EXCAVATION OR ANY OTHER FORM OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. NO EXCAVATION OR DEMOLITION SHALL BE STARTED WITHOUT ALL UTILITIES BEING LOCATED. 4. ALL SUBSURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND/OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. 6. THE CONTRACTOR SMALL BE RESPONSIBLE FOR OBTAINING AND COORDINATING PERMITS, INSPECTIONS, CERTIFICATIONS AND OTHER REOUIREMENTS WHICH MUST BE MET UNDER THIS CONTRACT. 7. THE CONTRACTOR SHALL MAINTAIN -AS-BUILT- DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT, VA LVE AND MANHOLE CHANGES, AND HARDSCAPE OR LANDSCAPE CHANGES. DRAWINGS SHALL BE PROVIDED TO THE OWNERS REPRESENTATIVE AT REGULAR INTERVALS, OR AS REQUESTED THROUGHOUT THE PROJECT FOR RECORD KEEPING. S. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE OWNER'S REPRESENTATIVE. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY EXISTING UTILITY LINES REQUIRED TO COMPLETE ANY PORTION OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE COORDINATION AND COSTS OF THE RELOCATION AND ASSOCIATED WORK. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND RUBBISH CAUSED BY THE CONTRACTOR ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS. 11. THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS, 12. ROADWAYS (TEMPORARY OR PERMANENT) MUST BE CAPABLE OF SUPPORTING FIREFIGHTING APPARATUS (85,000 LBS) DURING ALL PHASES OF CONSTRUCTION ONCE VERTICAL CONSTRUCTION HAS BEGUN. SITE NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF THE CONSTRUCTION LAYDOWN AREA, PERIMETER FENCE, AND ASSOCIATED GATES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE REMOVAL OF THE CONSTRUCTION LAYDOWN AREA PERIMETER FENCE AND ASSOCIATED GATES AT THE COMPLETION OF THE PROJECT. 2. THE CONTRACTOR SHALL REFERENCE THE DESIGN PLANS FOR DIMENSIONS, JOINT LOCATIONS, AND INLAY SPECIFICATIONS NEAR BUILDINGS AND IN COURTYARDS. CONTRACTOR SHALL PROVIDE JOINTS IN WALKWAYS AND HARDSCAPE PER DETAILS OR AS INDICATED ON LANDSCAPEIHARDSCAPE PLAN SHEETS. 3.ALL CONSTRUCTION TRAFFIC SHALL ENTER SITE FROM UNLESS OTHERWISE APPROVED IN WRITING FROM THE OWNER'S REPRESENTATIVE FOR AN ALTERNATE POINT OF ACCESS. 4. REFER TO ARCHITECTURAL PLANS FOR BUILDING INFORMATION. 5. ALL DIMENSIONS ARE IN DECIMAL FEET TO OUTSIDE FACE OF BUILDINGS, TO CENTERLINES, AND/OR FACE OF CURB UNLESS OTHERWISE NOTED. 6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES AND REPORT ANY DISCREPANCIES TO THE OWNER'S REPRESENTATIVE PRIOR TO ANY CONSTRUCTION. 7. ALL WRITTEN DIMENSIONS SHALL PREVAIL. DO NOT SCALE FROM DRAWINGS. B. ALL UTILITIES WITH SURFACE ACCESS SHALL BE LOCATED WITHIN THE PAVING PATTERN AND SHALL BE COORDINATED WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. REFER TO LAYOUT DRAWINGS. 9. ALL ANGLES ARE 90 DEGREES UNLESS OTHERWISE NOTED 10. ALIGN ALL JOINTS, CORNERS, AND EDGES AS SHOWN 11. CONTRACTOR SHALL REFER TO AND COORDINATE WITH ARCHITECTURAL, STRUCTURAL, AND MEP DRAWINGS AT ALL TIMES PRIOR TO AND DURING CONSTRUCTION. 12. ALL CURB TAPERS ARE SIX IS) FEET LONG UNLESS OTHERWISE SHOWN ON PLAN 13. WHERE NEW SIDEWALK ADJOINS EXISTING WALK, PROVIDE EXPANSION JOINT BY DRILLING INTO THE FACE OF THE EXISTING WALK FOR PLACEMENT OF DOWELS. TIE NEW SIDEWALKS INTO NEAREST EXISTING PAVEMENT JOINT; MATCH WIDTH OF EXISTING WALKWAY. 14, WHERE SIDEWALK OR WALKWAYS ARE ADJACENT TO PARKING SPACES THE WALKWAY SHALL BE A MINIMUM 65' WIDE AS MEASURED FROM THE FACE OF CURB. 15. MAXIMUM RUNNING SLOPE FOR WALKING SURFACES CANNOT BE GREATER THAN 1:20 AND CROSS SLOPES CANNOT BE GREATER THAN 1:48. HANDICAP SPACES SURFACE SLOPES SHALL NOT EXCEED 1.481N ALL DIRECTIONS. 16. SIGHT TRIANGLES - NOTHING OVER 30' HIGH SHALL BE ALLOWED WITHIN THE SIGHT DISTANCE TRIANGLES. 17. THE SITE SHALL BE FULLY STABILIZED (90% COVERAGE) PRIOR TO ISSUANCE OF A BUILDING CERTIFICATE OF OCCUPANCY OR PROJECT APPROVAL 18. HANDICAP RAMPS SHALL BE INSTALLED PER LATEST EDITION OF THE NC BUILDING CODE AND ANSI 111.11 WITH DETECTABLE WARNING DOMES WITH A COLOR CONTRAST OF 7W. MINIMUM. SEE DETAILS AND GRADING SPOT ELEVATIONS, IF THE EXISTING CONDITIONS PRECLUDE THE ABILITY TO PROVIDE A MAXIMUM SLOPE 1112 FOR &FEET OR A MAXIMUM CROSS SLOPE OF 1:48 AND A 36' MINIMUM LANDING, THE CONTRACTOR SHALL NOTIFY ENGINEER OR OWNER REPRESENTATIVE PRIOR TO INSTALLATION. OR HANDICAP RAMPS SHALL BE INSTALLED PER THE PLANS AND SPECIFICATIONS AND THE NC BUILDING CODE. A MAXIMUM SLOPE OF 1112 FOR 6-FEETE ANDA MAXIMUM CROSS SLOPE OF 1:48 SHALL BE PROVIDED. IF EXISTING CONDITIONS PRECLUDE THIS REQUIREMENT, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION POTENTIAL ART INSTALLATION (TYP.) � o X", � a , PROPOSED A_ HANDRAIL (TYPO EXIsnNccoNCREre� TRAIL (TVP.) SITE LEGEND \ PROPOSED CONCRETE SIDEWALK v. EXISTING RETAINING WALL(TVP.) `•\ \ PROPOSED GRAVEL U PROPOSED SIGN - I' ,�MMMMM PROPOSED UNIT RETAINING WALL PROPOSED GRAVEL TRAIL PROPOSED ASPHALT TRAIL H O PROPOSED TREELINE y _ MJ 3 PROPOSED BIKE RACK o N PROPOSED BENCH Ai % • PROPOSED BOLLARD _ y vVv VA v -- l• M LIMITS OF DISTURBANCE 7L7 (I 0 20 40 80 NORTH SCALE: 1"=40' OWvw DICICSON cc nun8y inbastrucerm coneullerHs Tra spoReBon + Water Resources Urban DevelopmeM + Geomatka 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.7829672 www.Wkdicksm.Com Nt. LX:E115E NO WA STEWARTm cc a Z J O LL Z V C7 (n = Lu F- 0 (9 Z Z Q J 2 Ox Y rQ EL 02 _V wLL ui Z ui z 0 U F- Z a cc PROJ. DATE: SPRING 2018 O.C.: MDS O.C. DATE: JAN 2018 DRAWING NUMBER: 7 PROJ. NO.: 20170225.00.RA � o � a H O c a U I' U Q H O Z y _ MJ 3 o N ¢ a O LL Q O O O y¢ VJ J f a W1ME: SITE LEGEND PROPOSED CONCRETE SIDEWALK PROPOSED GRAVEL -� PROPOSED SIGN MOMM PROPOSED UNIT RETAINING WALL PROPOSED GRAVEL TRAIL - PROPOSED ASPHALT TRAIL PROPOSED TREELINE PROPOSED BIKE RACK PROPOSED BENCH • PROPOSED BOLLARD 1111111 111111 LIMITS OF DISTURBANCE FL.7 (ID 0 2.5 5 10 NORTH SCALE: 1"=5' DMKSON commaNry InhaetrucWre coraWlanb Transportation + Water Resources Urban Development + Geommbm 720 Corporate Drive Raleigh, NC 27807 (v) 919.782.0995 (t) 919.782.9872 W W W.Wkdickson.com ac. ucsase ao. wnv WA STEWARTEr Z J O cc Z U 0 Fn = w� 0LU 0 Z Zg �_� a O 2 Y Wir Q �a a 0 2 i IL LL O Z w z 0 h U H Z w 3 'o a� a o PROJ. DATE: SPRING 2018 0. C.: MDS O.C. DATE: JAN 2018 DRAWING NUMBER: 8 PROJ. NO.: 20170225.00.RA wm Q N f Or O� J O a Z O U Q h Z O U O LL O O Z F U)g O H O ¢LL f/J y c" � J f ¢ ¢ a •d °oo°o ; \\ 79 � a••r _ o 00000000o0o0 Ii :. .. a \ - - � ' • - •�• I/ I � �1 �I It I\ p 17 / 4 D \ / \ I i ss ss I °od�?t�er o od�o ° } \ \ •Lrss ! ` s� 1'.�x I'• oo`I !'1 I I / _ I f `"'bra PoO .. + \� \\ I •.tl'I I ! i I I 'Ili I—J l o A Qo0� ° \ o°o O I,.1 I !y� ,L ! I It rl momma \ \ ti•.. I { ; I /! em• . \\ R \ �\ � � t z 1. •: 1 PLANTING ZONE A - DETAIL 4+00 SEED 8 PLANTINGS) (MATTING, WETLAND SEEDING 5413' -$• ; MPfG}{l1EET# 0 SH b o°0°0' ora a 61FEE• � i. vo SEE 0o�0000, } ,U. PLANTING ZONE D- DETAIL 1/D1 + } } k•f' i � t I z O o o ol PLANTING ZONE E- DETAIL 1/D1 \ \ \ \ \ \ \ \ \ \ \ UPLAND SEED MIX ONLY O0: ? PLANTING ZONE F LAWN SEEDING TO MATCH EXISTING 12.CMP z g � •d °oo°o ; \\ 79 � a••r _ o 00000000o0o0 Ii :. .. a \ - - � ' • - •�• I/ I � �1 �I It I\ p 17 / 4 D \ / \ I i ss ss I °od�?t�er o od�o ° } \ \ •Lrss ! ` s� 1'.�x I'• oo`I !'1 I I / _ I f `"'bra PoO .. + \� \\ I •.tl'I I ! i I I 'Ili I—J l o A Qo0� ° \ o°o O I,.1 I !y� ,L ! I It rl momma \ \ ti•.. I { ; I /! em• . \\ R \ �\ � � t z 1. •: 1 PLANTING LEGEND PLANTING ZONE A - DETAIL SEED 8 PLANTINGS) (MATTING, WETLAND SEEDING 5413' -$• ; 57.76' (WETLAND SEEDING B PLANTINGS) ora a 61FEE• � i. vo (WETLAND SEEDING ONLY ALONG SEWER MAIM } ,U. PLANTING ZONE D- DETAIL 1/D1 + } } (UPLAND SEEDING 8 PLANTINGS) A. PLANTING LEGEND ` EcsIOT R ` %AD \� o�mD1R P Ic R/w CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES; OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON SHEET 4 - 6. SEE DETAIL X / XX FOR BANK STABILIZATION PLANTINGS ABOVE HIGH WATER MARK. �pyyhL DV CKSON community Inhastn lure consultants Trensporlenon + Water Resources Urban Development + Geoma6cs 720 Corporate Drive Raleigh NC 27507 (v) 919.762.0495 (1) 919.762.9672 www.wkdickson.com uc. uce«se -- FULL SCALE: 1-30' 0 30 60 2• —FULL SCALE 1 • =HALF SCALE �I'co Q z CC m EL J O it Z U O � LLI F 0o z �z a Ox Z NW z a 0= a 3U W 0 u Z w z ?i z O � U ~ Z w O 6 a o PROJ. DATE: JAN 2018 O.C.: IN O.C. DATE: JAN 2018 DRAWING NUMBER: 9 PROJ. ND.: 20170225.00.RA PLANTING ZONE A - DETAIL SEED 8 PLANTINGS) (MATTING, WETLAND SEEDING 0°0°0°0°000°00 PLANTING ZONE B- DETAIL I/D1 00000000000000 (WETLAND SEEDING B PLANTINGS) ora a PLANTING ZONE C- DETAIL 1/D1 (WETLAND SEEDING ONLY ALONG SEWER MAIM } ,U. PLANTING ZONE D- DETAIL 1/D1 + } } (UPLAND SEEDING 8 PLANTINGS) A. z O \ \ \ \ \ \ \ \ \ \ PLANTING ZONE E- DETAIL 1/D1 \ \ \ \ \ \ \ \ \ \ \ UPLAND SEED MIX ONLY o ? PLANTING ZONE F LAWN SEEDING TO MATCH EXISTING ` EcsIOT R ` %AD \� o�mD1R P Ic R/w CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES; OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON SHEET 4 - 6. SEE DETAIL X / XX FOR BANK STABILIZATION PLANTINGS ABOVE HIGH WATER MARK. �pyyhL DV CKSON community Inhastn lure consultants Trensporlenon + Water Resources Urban Development + Geoma6cs 720 Corporate Drive Raleigh NC 27507 (v) 919.762.0495 (1) 919.762.9672 www.wkdickson.com uc. uce«se -- FULL SCALE: 1-30' 0 30 60 2• —FULL SCALE 1 • =HALF SCALE �I'co Q z CC m EL J O it Z U O � LLI F 0o z �z a Ox Z NW z a 0= a 3U W 0 u Z w z ?i z O � U ~ Z w O 6 a o PROJ. DATE: JAN 2018 O.C.: IN O.C. DATE: JAN 2018 DRAWING NUMBER: 9 PROJ. ND.: 20170225.00.RA slum - J ora a z O U 6T z O O o ? 12.CMP z g � o ¢ n. O ¢ \Got,o- LL Q (] To3.14' OuT.251.89' ` EcsIOT R ` %AD \� o�mD1R P Ic R/w CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES; OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON SHEET 4 - 6. SEE DETAIL X / XX FOR BANK STABILIZATION PLANTINGS ABOVE HIGH WATER MARK. �pyyhL DV CKSON community Inhastn lure consultants Trensporlenon + Water Resources Urban Development + Geoma6cs 720 Corporate Drive Raleigh NC 27507 (v) 919.762.0495 (1) 919.762.9672 www.wkdickson.com uc. uce«se -- FULL SCALE: 1-30' 0 30 60 2• —FULL SCALE 1 • =HALF SCALE �I'co Q z CC m EL J O it Z U O � LLI F 0o z �z a Ox Z NW z a 0= a 3U W 0 u Z w z ?i z O � U ~ Z w O 6 a o PROJ. DATE: JAN 2018 O.C.: IN O.C. DATE: JAN 2018 DRAWING NUMBER: 9 PROJ. ND.: 20170225.00.RA 0 0 ora a z O U z O O o ? � z g � o ¢ n. O ¢ W N LL Q (] o y f W ¢ + 000 � Z 0.0o� m0 uzm s Z m0 } Z Z �'� AO Inz 8T n 000 674 vm 0- 00 Zn Om 2 m Zm 9 M Z 0 0 + m OOK 000 m � v z N + o 0 000 000 A- ��� + 0004 O Oo + 000 ==. + 000 + 000 Z= m� ZO 0m GA s nczi H 3m � Z 0.0o� m0 uzm s Z m0 o� m0 �"m Z Z �'� AO Inz 8T n Xm ZM o 674 vm 0- 00 Zn Om 2 m Zm 9 M Z 0 0 ZD 06 ,M Z �o a' T 5 m z�z m � v z N O o 0 3 toO O m z x ;u y M �A DmO 0 X ypA jO Ozm z 00 0 zm, y Noz z mj0 A 7 ymm 0 Azm �mo Z A3O D y O oy m z ap D ;R y x� y G) = N D >40 O Z xT m� 2 m = xZ m 7 m m Dms z0 m mo 0 A 0= 4 m T � iy mp z o z m v; r z O T r m m v z --I z r m G) m z v PROJECT NAME: ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: PLANTING PLAN --k— O O 9 ppo -o o Z Z E X REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION anznoia m � m z�z O � v O o 0 v z --I z r m G) m z v PROJECT NAME: ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: PLANTING PLAN --k— mx Nr _..-.�_ m m m g�3V ��m a ,. 5 sgm-n S 9021 � u o T $oV�;; ` 3 6 9Z J MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION anznoia mx Nr _..-.�_ m m m g�3V ��m a ,. 5 sgm-n S 9021 � u o T $oV�;; ` 3 6 9Z J a \ \ Vp. \\ \ RiM=256. INv=zsa.a' \0 \ \ 48" RCP INY=271.67"—�j/ 1 1 ��Itllll�il��h IN(N)=271.27N IN(W)=271,27" ', \ IN(SW)=271.27' OUT=271.22' 3U" ' \� \'\•~ SS SS \ \\ \\ 1 \ 10 1p \ \ I\c \ M\ RIM=278.25' \ N=27025 � I ❑ I � I \ I II Slp RIM m 261.50' IN=25235" OUT=252.30' RIM=259.70' IN(8'PYC)=255.10' IN(8"DIP)=253.20" IN(24')=257.95 OUTm251.90: RIM -259.82" OUT=257,27 i SS ----- SS SS 4TCH LINE 7+40 SEE SHEET #10 r I I I I 00 00 N-- 00 *\ mo_ \3------ PLANTING LEGEND CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES: OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON SHEET 4 - 6. SEE DETAIL X I XX FOR BANK STABILIZATION PLANTINGS ABOVE HIGH WATER MARK. Wvw DICKSON commur111y infrastructure c-sukents Transportation + Water Resources Urt—r Development + Gaomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (Q 919.782.9872 W Ww.W kdlckson.com nc ucase sc FULL SCALE: 1'=30' 0 3D 50 2" —FULL SCALE 1' = HALF SCALE �'co Q Z 0 cc ZU O 0 a Z wZ g J Z Os �W g EL a p= �U W LL U Ji Z w z U U ~ Z W a a a ❑ PROJ. DATE: JAN 2018 O.C,: TM O.C. DATE: JAN 2018 DRAWING NUMBER: 11 PROJ. NO.: 20170225.00.RA O N O m a Z O U Z O O ¢ C� Z R I o do } O Q I � O y � 05 Z5 PLANTING ZONE A -DETAIL (MATTING, WETLAND SEEDING8 PLANTINGS) SEED 0o0900000000°o 0000000 PLANTING ZONE B -DETAIL I/DI 00000000000000 (WETLAND SEEDING 8 PLANTINGS) PLANTING ZONE C- DETAIL lfDl (WETLAND SEEDING ONLY ALONG SEWER MAIN) } PLANTING ZONE D- DETAIL IIDI (UPLAND SEEDING 8 PLANTINGS) \\ \ \ \ \ \ \ \ \ PLANTING ZONE E -DETAIL 1/D1 \ \ \ \ \ \ \ \ \ \ \ UPLAND SEED MIX ONLY PLANTING ZONE F LAWN SEEDING TO MATCH EXISTING CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES: OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON SHEET 4 - 6. SEE DETAIL X I XX FOR BANK STABILIZATION PLANTINGS ABOVE HIGH WATER MARK. Wvw DICKSON commur111y infrastructure c-sukents Transportation + Water Resources Urt—r Development + Gaomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (Q 919.782.9872 W Ww.W kdlckson.com nc ucase sc FULL SCALE: 1'=30' 0 3D 50 2" —FULL SCALE 1' = HALF SCALE �'co Q Z 0 cc ZU O 0 a Z wZ g J Z Os �W g EL a p= �U W LL U Ji Z w z U U ~ Z W a a a ❑ PROJ. DATE: JAN 2018 O.C,: TM O.C. DATE: JAN 2018 DRAWING NUMBER: 11 PROJ. NO.: 20170225.00.RA O N O m a Z O U Z O O ¢ C� Z R I o do } O Q I � O y � 05 Z5 w I ¢ ¢ a SILT LOCA FLOW STABILIZED OUTFALL CLASS A STOW T I.`iNG ,r I,ND 15' TO 20' L FILTER FABRIC B" OF CLASS A STONE SIT BAS O PROFILE EXISTING CHANNEL AROUND NOT TO SCALE cr. NOTES OSE NOTES: 1. EXCAVAITON SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS NO GREATER THAN 2:1) OF CHANNEL E KEPT 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM A FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED _- IN ONE WORKING DAY. 4. THE PUMP -AROUND PUMP SHALL BE ADEQUATE TO KEEP WORKING AREA DRY Slopes 4:1 at Flatter WHILE STREAM IMPROVEMENTS ARE BEING COMPLETED. 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS 14 Days SANDBAGS SEQUENCE OF CONSTRUCTION FDR TYPICAL PUMP AROUND I.INSTALL STIWNG BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABIUZED OUTFALL 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR ROOT BALL STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPING APPARATUS IF NEEDED TO BEWARE THE ENTRAPPED AREA, THE PUMP AND I 1-::::::l FLd I I HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE ' WORK AREA THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABUZED I I I WITH CLASS A RIP RAP. 5. THE CONTRACTOR WILL PERFORM WORK IN ACCORDANCE WITH THE PLAN AND II=III III=1 �i%i� FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER -III III -III III- I I -III -I I. BEFORE REMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA ALL III -_III -_III III III III -I DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS I-III=I I -III-III I I -III- I. DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE -III-III-III 111-11 11 11 1 I DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. B ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE. POLYETHYLENE MEMBRANE ON FACE 2D MIL THICK ' I /-LE- WITH TOP OF BANK OR j�--� AS NECESSARY SANDBAGS, CLASS 1 RIP RAP OR 01HER NON -ERODIBLE MATERIAL SYNTHEOC FILTER FABRIC CREEK CROSSING - COFFER DAM 2 PLANTING PLAN NOTES D1 NOT TO SCALE NOTES 1. EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED -PERMANENT VEGETATION IS ESTABLISHED. THE CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. 2. EROSION CONTROL LINER SHALL NOT BE UT WITH PLANTING IMPLEMENTS. THE SMALLEST OPENING NECESSARY TO ACCOMMODATE EACH PLANT SHALL BE CUT INTO THE LINER USING A SHARP KNIFE OR SHEARS. AFTER PLANTING IS COMPLETE USE 2.3 PINS TO SECURE LINER WHERE CUT WAS MADE. ALL AREAS TO BE PLANTED SHALL BE PREPARED PRIOR TO PLANTING BY DISC OR SPRING -TOOTH CHISEL PLOW TO NMINIVIUM DEPTH OF 12 INCHES, TAKING CARE TO AVOID EXISTING TREES CALLED OUT TO BE PROTECTED. MULTIPLE PASSES SHALL BE MADE ACROSS PLANTING AREAS WITH THE IMPLEMENT AND THE FINAL PASS SHALL FOLLOW TOPOGRAPHIC CONTOURS. 3. PLANTS SHALL BE INSTALLED IN STAGGERED ROWS. PLANE SPACING SHALL BE APPROXIMATELY EIGHT FEET (S.0') BETWEEN PLANTS IN THE SAME ROW. ROWS SHALL BE STAGGERED SUCH THAT PLANTS ARE APPROXIMATELY FIV E FEET (5.0) APART. AT LEAST 50o OF TREE SPECIES AND 5W. OF SHRUB SPECIES SHALL BE FROM ONE GALLON OR LARGER CONTAINERS AT LEAST 4W. OF ALL PLANTS SHALL BE A SHRUB SPECIES. 4, ASPHALTIC TACKIFIER SHALL NOT BE USED. 5. ONCE PERMANENT VEGETATION AND EROSION CONTROL MEASURES ARE ESTABLISHED, THE CONTRACTOR SHALL SCHEDULE A FINAL INSPECTION IN ORDER TO OBTAIN A CERTIFICATE OF COMPLETION. AFTER APPROVAL, ALL REMAINING TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED. 6. THE RIPARIAN BUFFER IS DEFINED AS THE AREA BETWEEN THE TOP OF BANK AND THE WIDTH NEEDED TO EXTEND 1.5- ABOVE BANKFULL. THE REMAINING FLOODPLAIN IT AREA TO BE PLANTED EXTENDS TO THE LIMS OF DISTURBANCE. SEE PLANTING PLAN SHEETS 11, 12 & 13 FOR FULL EXTENT OF PLANTINGS. MAINTENANCE NOTES TEMPORARY SEEDING 1. RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR OR WHERE EROSION OCCURS. AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. PERMANENT SEEDING 1. RESEED AREAS WHERE VEGETATIVE COVER IS BELOW 70 PERCENT, OR WHERE EROSION OCCURS. AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. _. IF GERMINATION OR FROSION CONTINUES TO BE PROBLEMATIC THE FOLLOWING MEASURES WILL BE PERFORMED AS NEEDED: SOIL FERTILITY TESTING, SOIL AMENDMENTS, PLACEMENT OF TOPSOIL, EROSION CONTROL MATTING. VARIES EXISTINZONE ONE I B/C• 2D�- G GROUND J EV E EY 2521'3 - 25ZY3 PROP FLOOD PLAIN PROP FLOOD PLAIN BENOR BENCH SEE SHEETS SEE SHEETS CSI-CS6 CSI -CSB KEY IN EROSION CONTROL MATTING 0.8' BEYOND TOP OF KEY IN EROSION CONTROLBANK MATING O.B' BEYOND TOP OF CHANNEL BED BANK -NOTE (UNDISTURBED) NO WOODY VEGETATION SHALL BE PLANTED WITHIN SEWER EASEMENT - ZONE C PLANTING ZONE DETAIL CLASS 1 RIP RAP, NJ BARRIER DR OTHER NOTES: APPROVED MATERIAL (IF USING RIP RAP DOWNSTREAM, SLOPEAS I. PLN15. ARE ROOT SHRUBS SIAND TINES TO THE WIDTH BE THE UMIm.a DISTURBANCE AS SHOWN ON THE NO GREATER THAN 2:1) Z DO NOT COMPACT SOIL AROUND PLANTINGS 'I i o'harnc Esceptions 3. PLANT IN HOLES MADE BY A MATTOCK, DIBBLE, PLANTING BAR, OR OTHER APPROVED MEANS. MOM BANKFULL ELEVATION 4. PLANT IN HOLES DEEP AND WIDE ENOUGH TO ALLOW THE ROOTS TO SPREAD BUT AND DOWN WITHOUT fillirl High Quality Water (HOW) Zones J -ROOTING. _- 5. KEEP ROOTS MOIST WHILE DISTRIBUTING OR WAITING TO PLANT BY MEANS OF WET CANVAS, BURLAP, OR 7 Days STRAW. Slopes 4:1 at Flatter 6. HEEL -IN PLANTS INMOIST SGL OR SAWDUST IF NOT PROMPTLY PLANTED UPON ARRIVAL TO PROJECT SITE 7days forslopes greater than 50' in length ALL PLANTS MUST BE INSTALLED WITHIN 48 HOURS OF ARRIVING ONS17L 14 Days II_ I I 7. BARE ROOT SEEIIW UNGS MUST BE FULLY DORMANT WHEN PLANTED. CHANNEL BANK STABILIZATION DETAIL D1 NOT TO SCALE EROSION CONTROL LINER 5' o c C) 3' O O C 0 C LIVE STAKE SPACING LIVE STAKE 24"-36" J MIN.LENGTH (TYP.3 1 (�- VARIES HIGH WATER 2 BED Design\GADO\Plan SegElliott BHT DETAILS.dWg -June 12 2D1 B -Ban Cenoll CROSS SECTION VIEW OF BARE ROOT PLANTING BARE ROOT PLANT INSTALLATION D1 NOT TO SCALE TEMPORA RI SI I -DING THROUGH EROSION 112m 1. UNE DISTURBED CHANNEL BANKS WITH EROSION CONTROL UNER AND SILKY DOGWOOD, BLACK WILLOW, AND SILKY WILLOW UVE STAKING AT STATIONS AS FOLLOWS: WEST BANK 9+50 TO 18+25 EAST BANK 7+75 TO 19+75 2. GEOTEXTILE MATING SHOULD BEGIN INSIDE THE CHANNEL AT THE NORMAL WATER SURFACE ELEVATOR AND EXTEND PAST NEWLY GRADED TOP OF BANK A MINIMUM OF 24. 3. PLACE LIVE STAKES IN MATING MATERIAL. STARTING AT NORMAL WATER SURFACE ELEVATION AND EXTENDING 15 FEET INTO THE RODDPWN. 4. PLACE UVE STAKES WITH A 5 FT STAGGBTED SPACING EVERY 3 R. SEE SPACING DIAGRAM BELOW. Corwuaamaw 1 AI Mo J! IM I Raak P I ooe 1- ,N a Uae Stakes slpaeeJ sin rows with 3naSSered-3Terdapart ror01o6feoframbanA Sa/un( Sao BWCW'i1Mw GET Sn6rnenrla Silky Willow OBL PI III IVG LIS] CONTAINERIZED PLANT INSTALLATION GROUNDSTADILIZATION TIAIEFRA'aIES ®-IMM Stabilization 'I i o'harnc Esceptions Perimeter dikes, a.]. and slopes MOM None High Quality Water (HOW) Zones IM _- Slopes Steeper than 3:1 7 Days ®®®® Slopes 4:1 at Flatter 14 Days 7days forslopes greater than 50' in length AB a - areae with slopes Danerthao 4:1 14 Days None, except for perimeters and HQW ZaRes 2. REMOVE THE PLANT FROM THE POT. LAY FIRE PLANT ON ITS SNE IF NECESSARY TO REMOVE THE POT. ONE 3. FOR ALL CONTAINERIZED PLANTS, MAKE VERTICAL CUTS IN FOOTBALL KNIFE JUST DEEP ENOUGH TO WT THE NET OF ROOTS ALSO MAKE A ROOT BALL CRISS-CROSS WT ACROSS THE BOTIDM OF THE FOOTBALL . I 1-::::::l FLd I I 5. FILL HALF OF THE HOLE WITH SOL (SAME SOL REMOVED FOR BACKFILL). ' E®IME ® I I I ��®mall POCKETS. NOT II=III III=1 �i%i� 7. BUILD A FOUR-INOi HIGH BEEN AROUND THE EDGE OF THE NOT BALL USING SOL REMOVED FROM THE HOE TO FORM A BASIN FOR HOLDING III=III-III �\j/, �TS��i 1 WATER. THE BOTTOM OF THE BASIN SHALL BE AT SIIRROUNONG KNISH -III III -III III- I I -III -I I. GRADE III -_III -_III III III III -I e. CONTAINER PLANTS INSTALLED WITHIN LIMITS OF DISTURBANCE DO NO I-III=I I -III-III I I -III- I. REWIRE A LAYER OF MULCH. -III-III-III 111-11 11 11 1 I VARIES MIMI ®®®® CONTAINERIZED PLANT INSTALLATION GROUNDSTADILIZATION TIAIEFRA'aIES Site Area Description Stabilization 'I i o'harnc Esceptions Perimeter dikes, a.]. and slopes 7 Days None High Quality Water (HOW) Zones 7Days None Slopes Steeper than 3:1 7 Days If slopes are 10' or less in length and are not steeper than 2:1,14 days are allmved Slopes 4:1 at Flatter 14 Days 7days forslopes greater than 50' in length AB a - areae with slopes Danerthao 4:1 14 Days None, except for perimeters and HQW ZaRes CONTAINERIZED PLANT INSTALLATION I l'L:Y's'D SEED II (ZONE B & E) LTi Timm, e... nipro.ennoi ny.vr 1. pp r.�. pouv egr.enl Hubarmos 1'eaelatiun Seed �1i� Ifor ull d'omrbed oamml nrcvx) CoR,mon \ame Sons Te I- P" Paoods 2. DIA. OF NOTES FOR CONTAINER PLANTING WI, CONTAINER 1. WHEN PREPARING THE HOLE FOR A POTTED PLANT OR SHRUB DIG THE TYPICAL oma HOLE B-12 INCHES LARGER THAN THE DIAMETER OF THE POT D THE CONTAINER SAME DEPTH AS THE POT. SCARIFY SIDES AND BOTTOM OF THE HOLE GROWN TREE ORSHRUB 2. REMOVE THE PLANT FROM THE POT. LAY FIRE PLANT ON ITS SNE IF NECESSARY TO REMOVE THE POT. 3. FOR ALL CONTAINERIZED PLANTS, MAKE VERTICAL CUTS IN FOOTBALL KNIFE JUST DEEP ENOUGH TO WT THE NET OF ROOTS ALSO MAKE A ROOT BALL CRISS-CROSS WT ACROSS THE BOTIDM OF THE FOOTBALL 4. PLACE THE PLANT IN THE HOLE I 1-::::::l FLd I I 5. FILL HALF OF THE HOLE WITH SOL (SAME SOL REMOVED FOR BACKFILL). G LL PLANTING I I I ��®mall POCKETS. NOT II=III III=1 �i%i� 7. BUILD A FOUR-INOi HIGH BEEN AROUND THE EDGE OF THE NOT BALL USING SOL REMOVED FROM THE HOE TO FORM A BASIN FOR HOLDING III=III-III �\j/, �TS��i 1 WATER. THE BOTTOM OF THE BASIN SHALL BE AT SIIRROUNONG KNISH -III III -III III- I I -III -I I. GRADE III -_III -_III III III III -I I l'L:Y's'D SEED II (ZONE B & E) LTi Timm, e... nipro.ennoi ny.vr 1. pp r.�. pouv egr.enl Hubarmos 1'eaelatiun Seed �1i� Ifor ull d'omrbed oamml nrcvx) CoR,mon \ame Sons Te I- P" Paoods LIST D1 NOT TO SCALE 2. DIA. OF NOTES FOR CONTAINER PLANTING CONTAINER 1. WHEN PREPARING THE HOLE FOR A POTTED PLANT OR SHRUB DIG THE TYPICAL oma HOLE B-12 INCHES LARGER THAN THE DIAMETER OF THE POT D THE CONTAINER SAME DEPTH AS THE POT. SCARIFY SIDES AND BOTTOM OF THE HOLE GROWN TREE ORSHRUB LIST D1 NOT TO SCALE 2. DIA. OF NOTES FOR CONTAINER PLANTING CONTAINER 1. WHEN PREPARING THE HOLE FOR A POTTED PLANT OR SHRUB DIG THE TYPICAL HOLE B-12 INCHES LARGER THAN THE DIAMETER OF THE POT D THE CONTAINER SAME DEPTH AS THE POT. SCARIFY SIDES AND BOTTOM OF THE HOLE GROWN TREE ORSHRUB 2. REMOVE THE PLANT FROM THE POT. LAY FIRE PLANT ON ITS SNE IF NECESSARY TO REMOVE THE POT. 3. FOR ALL CONTAINERIZED PLANTS, MAKE VERTICAL CUTS IN FOOTBALL KNIFE JUST DEEP ENOUGH TO WT THE NET OF ROOTS ALSO MAKE A ROOT BALL CRISS-CROSS WT ACROSS THE BOTIDM OF THE FOOTBALL 4. PLACE THE PLANT IN THE HOLE I 1-::::::l FLd I I 5. FILL HALF OF THE HOLE WITH SOL (SAME SOL REMOVED FOR BACKFILL). G LL PLANTING I I I MEDIUM D WATER THOROUGHLY. BACKFILL REST OF HOLE WITM ACCEPTABLE PLANTINGMEDIUM. FIRM DOWN, ELIMINATING ALL AIR POCKETS. NOT II=III III=1 �i%i� 7. BUILD A FOUR-INOi HIGH BEEN AROUND THE EDGE OF THE NOT BALL USING SOL REMOVED FROM THE HOE TO FORM A BASIN FOR HOLDING III=III-III �\j/, �TS��i 1 WATER. THE BOTTOM OF THE BASIN SHALL BE AT SIIRROUNONG KNISH -III III -III III- I I -III -I I. GRADE III -_III -_III III III III -I e. CONTAINER PLANTS INSTALLED WITHIN LIMITS OF DISTURBANCE DO NO I-III=I I -III-III I I -III- I. REWIRE A LAYER OF MULCH. -III-III-III 111-11 11 11 1 I VARIES BACKFILL WITH APPROVED PLANTING SOIL OR ON-SITE STOCKPILED TOPSOIL. SEE CITY OF CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS, SECTION 32 9100 CONSTRUCTION SOIL MK� D ocornmursty InfrastrudW conadboara Transportation + Water Resources Urban Development . Geometica 720 Corporate Drrva Raleigh, NC 27807 IV) 919,782,0495 (f) 919.782.9872 WWW. WkdRkson.pam FULL SCALE y 1' =HALF SCAL Q Im Z O t= ZU fn = W 0 O w CID Z Q J J OLi J_ FQ = W W 0 a o = �V W LL O W Z W Q 0 Z o U F_2 W 3 a o PROD. DATE [AN 2018 O.C.: M G.C. DATE: AN 2018 DRAWING NUMBER: D1 PROJI. NO.: 20170225.00.RA a m 0 N a � U ¢ Z B O¢ O o Z � z O g S � Q Y ¢ Q I � O_ ratan � Y � W W U, FILE NAME: O:\Protects\RAM Redry Sarvices12017022500RA -Elliott Storage ¢ A SEE NOTE j+ 4-e= N �• N A N D Y K FOR JUNCTION BOX. DELETE d G SLOTS D D ., ' ISOMETRIC VIEW E E A'S REBARS-AONTIONAL AN OMBONALREIINFORCINO ISEE NOTER 1 PLAN VIEW T L NOTE,: M 8 1. SHOWN WITH EASE JORDAN IRON wORX5 FLUSH MOUNT MANHOLE MR CONCRETE COVER E USE WITH ALL YARD INLETS B AS AN ALTERNATE FOR JUNCTION N BOXES IN SIDEWALKS 0R YARD AREAS ONLY. FDR ALL OTHER JUNCTION BOXES USE 00".MANHOLES SPECIFIED IN STO. OFT. SO-4C.011ow A00". NO SCALE T 2. COVER TO BE 4000 PSI CONCRETE WITH RS REBAR® B• D.C. EACH WAY. TITLE REVISIONS ETNO 3. SEE STANDARD DETAIL SD -2A FOR SECTION 4•A'. �� T [YARUNCTI1,NLT,/ ONEBOX SD -21 SM IR12 CONCRETE COVER -YARD INLET/JUNCTION BOX D2 NOT TO SCALE 4 FLARED END SECTION p 2 NOT TO SCALE SEE NOTE 2 �'¢Txxs�u.ErrERuc C.� :easA pxE-re IK4 HA m 0 E SEE NATE I E E S T REINFORCED CONCRETE p G 8 E D R A (-STANDARD / FLARED ENO SECTION T 1. EAST JORDAN IRON WORKS 1 N '..8 ..' PL. RIdNT MANHOLES MH RING. SEE STO.CETAIL E R mme S• S• A G 8 D.C. EACH WAY R 2. RS REYR PLACED DIAGONALLT E N CEMENT S'-3• IRI STEP IS 2' FROM TOP. AROUND MANHOLE RING. SEE n DE 3TL s0-2. D B•SIAT OFENNes A G 3. MANHOLE STEPSQIS•O.C' E N r -B• RCJ1 IN SRP 19 2'-0 PROM TOP. E D D D 4. THIS DETAIL MAY BE USED AS E S AN ALTERWITE POR JUNCTION BOXES IN SIDEWALK OR YARD 3000 PSI CONCRETE SEE NOTE 3 AREAS ONLY. N D T L 8 1. T'PE3RNOBCWBI MBECASTNTID YAW INLET OR J NCFCH BOXTOPB, E 8 .•AG D 3'-O• D D NO SCALE T COVER SECTION 2. MATERLALTOBE GREY SOON OONFORMNO TO ASTM AN CLAW BE AM SIMLL BE UNCOAT®. TITLE IREVIBgNS DEMO. ., MINIMUM GROUT R.SR NIN[MON FLARED END rm SD-7 SECTION LOW AM ALL BE CLEAR. A A 4 FLARED END SECTION p 2 NOT TO SCALE SEE NOTE 2 �'¢Txxs�u.ErrERuc C.� :easA pxE-re IK4 HA m CONCRETE SLAB 4000 PSI SEE NATE I E E S T N NOTES: E D R A 8 ,_ ,•; I;, 1. .I *T• ...Y. 1. EAST JORDAN IRON WORKS E •S '..8 ..' PL. RIdNT MANHOLES MH RING. SEE STO.CETAIL N R mme S• S• SD -4C. G 8 D.C. EACH WAY —; 2. RS REYR PLACED DIAGONALLT E N CEMENT S'-3• IRI STEP IS 2' FROM TOP. AROUND MANHOLE RING. SEE n DE 3TL s0-2. N A B•SIAT OFENNes A G 3. MANHOLE STEPSQIS•O.C' E N IN WALLS FOR RCJ1 IN SRP 19 2'-0 PROM TOP. E D YARD INLET° 4. THIS DETAIL MAY BE USED AS R AR 4\7771 AN ALTERWITE POR JUNCTION BOXES IN SIDEWALK OR YARD SEE NOTE 3 AREAS ONLY. N D 8 1. T'PE3RNOBCWBI MBECASTNTID YAW INLET OR J NCFCH BOXTOPB, G .•AG D 3'-O• D D XNCRETE BIOCK Q COVER SECTION 2. MATERLALTOBE GREY SOON OONFORMNO TO ASTM AN CLAW BE AM SIMLL BE UNCOAT®. E W FEI ., MINIMUM GROUT R.SR NIN[MON 3. COVER TO MEET PROOF LOADRECAREIBIiSOF AASM 143".(4O.DDO UL PROOF LOAD) P CWTH LOW AM ALL BE CLEAR. A A PR�Y AM ME l33A.+1 R 1 & CASTNOMUBTBEMANIFACTINIEDNTHEUNRED 1_ BTATEB. MAMIFAC7UM MUST BE APPROVED BY N S .F..°�...�' •I�: THE rovJN aF cH1APEL NEL. ism: r CONCRETE T B. • SECTION A -Ar E 3000 PSI 'S 4:.' N NO SCALE T ° TITLE I REVISIONS DETAC I� -- 4'-eYARD INLET- "D TE S1>2) SH 2RI2 2 YARD INLET p 2 NOT TO SCALE SEE NOTE 1 �'¢Txxs�u.ErrERuc C.� :easA pxE-re IK4 HA m CONCRETE SLAB GROUT 3000 PSI E E S T N H 4qJ, nrocwlcxracs E D R A 8 ,_ ,•; I;, 1. .I *T• ...Y. Jq,F ` N GI Can W'3aM °L AE MANNORE RIND B SOLID COVER N T IN SIDEYMU[S B YARD AREAS. USE MANHOLE RING B SCUD E D JGaVA COVER IN STREETS. RA I.OF Irl SEE NOTE EMANNoLE STEPS Ib•O.C.. E N CEMENT S'-3• IRI STEP IS 2' FROM TOP. ,. "9 px[1TERDrG 80TTOMVIEW ER A A G ErTE- OFcoveR E RCJ1 .� R N D ^ GROUT ---y 2l�47!N°,)" TAPE 3 RING A COVER G 0 EASTJORDAN SIGN WONO WN3RN0 WRH W2MDar�ORAPPRDY®EONAL MERMwwD01D8: anq,OF NSB..fOJpt+Tt LBB E E 8 1. T'PE3RNOBCWBI MBECASTNTID YAW INLET OR J NCFCH BOXTOPB, P T W r A A �r--�- 4'-8• NO KALE COVER SECTION 2. MATERLALTOBE GREY SOON OONFORMNO TO ASTM AN CLAW BE AM SIMLL BE UNCOAT®. TITLE REVIBgF13DET.N0. 3. COVER TO MEET PROOF LOADRECAREIBIiSOF AASM 143".(4O.DDO UL PROOF LOAD) T I. 8 MFISH LOW AM ALL BE CLEAR. E PR�Y AM ME l33A.+1 & CASTNOMUBTBEMANIFACTINIEDNTHEUNRED 1_ BTATEB. MAMIFAC7UM MUST BE APPROVED BY N S THE rovJN aF cH1APEL NEL. ism: r nt3r'i�°S" DET. NO. TITLE REWSI RING SECTION MACHINED SURFACE (ANHO COVE-RINOA SD -410 COVER -TYPES SEE NOTE 1 IA riss�. 1 -1 cuX,.E .,r !RE[Lssn LETT[RRR -l! lETTTJD. b r" m CONCRETE SLAB GROUT 3000 PSI E E S T N i Hr '� JD0.03 E D R A 8 ,_ ,•; I;, 1. .I *T• ...Y. NOTES, OUSE FAST XJROVN IRON WORAS IT N A Can W'3aM °L AE MANNORE RIND B SOLID COVER N NRR PM IN SIDEYMU[S B YARD AREAS. USE MANHOLE RING B SCUD E D TYPE 2 RING R COVER EAB C OD G W H COVER IN STREETS. RA I.OF Irl SEE NOTE EMANNoLE STEPS Ib•O.C.. N D CEMENT S'-3• IRI STEP IS 2' FROM TOP. d .;)" A covet TO MEET PROOF LOAD PEOUEtBENT8 OF AABHTO M308410. (IB= UL PROOF LOAD) 4. RSH LOGO AFD ALLIETIERNO TO BE GLEAM. CRISP. AND CLEAMYLE3BLE )2,R 5. CASTING MUST BEYANUFACTURIED N THE SITED m t559w.] PM! STATES MANUFACRMHt MlSTIEAPFpOVWBY PLASTER MIN. lr -0, DEPTH , A G 00 .R 21PSI E RCJ1 E ^ GROUT PRABECT1011 MACHINED SUR=ACE � ryPE2 [SLOPE TO 0 � 8 �°-e• W r E �r--�- 4'-8• NO KALE T TITLE REVIBgF13DET.N0. JUNCTION BOX N0 YE DETAIL SD -3 3 JUNCTION BOX D2 NOT TO SCALE 5 MANHOLE RING AND COVER D2 NOT TO SCALE 3� ROCK SPLASH PAD D,2 NOT TO SCALE R— Pea z'J N S E N f '• . R A k N D -I n. m; G lin :c« Mb � ��• D D kt �dlE E P T L......i _ A A A AT L v , ..,• ,..... _ sr_�r,� :e» �� • E S N t 4- e< n TITLE. u[ DEH'. NO. F. $P1.4SH PAA U1VlJ IS SD -IJ DD&SON mmmunrly infrastructure ConsultW..s T,-pOrlati- + Water Resources Vrban Development , G- ti - 780 Corporate Drive Raleigh. NC 27607 (v) 919.782.0495 �tw919.782.9672 W .wkd,keo -. 2°- FULL SCALE 1. _= HALF SCALESI' Q Z 0 w Z< C7 0 Q O wZ < J J O 2 FQ W O a 0= �V LU O ii Z Iii z O LU ~ 2 LU 3 a o PROD. DATE IJAN 2018 O.C.. TM O.C. DATE AN 2018 DRAWING NUMBER: D2 PROJ. NO.: 20170225.00.RA IA riss�. 1 -1 cuX,.E .,r !RE[Lssn LETT[RRR -l! lETTTJD. b r" m �= JjQ ND I✓gfJ .bO,Ewlcwucs E S T O m i Hr '� JD0.03 E D R A a uwnrr A -VEIN OF COVER O N D RNOTOPVIEwc[suu'-E G U TYPE 2 RING R COVER EAB C OD G W H D D 7 Q PPI14 EQUAL V, NR4 COVER aR A,T W VED EE W. VISI -,. MMMW wEKNRS RN0,90188. COVHt l2pls3 �+ ,. TYPE2IBNGSCOVERTOBEU8EDN STREEM COVER BECKON ZAASSTMMAAR CLAGI 35 ANDSHALI. BE INCOATO BE OBEY IRON DTEED. TO P T A A T L d .;)" A covet TO MEET PROOF LOAD PEOUEtBENT8 OF AABHTO M308410. (IB= UL PROOF LOAD) 4. RSH LOGO AFD ALLIETIERNO TO BE GLEAM. CRISP. AND CLEAMYLE3BLE )2,R 5. CASTING MUST BEYANUFACTURIED N THE SITED m t559w.] PM! STATES MANUFACRMHt MlSTIEAPFpOVWBY M E N T THE TO'AN OF CHAPEL HILL DET. NO. TITLE IREWSIONA PRABECT1011 MACHINED SUR=ACE � ryPE2 SD -4B 5 MANHOLE RING AND COVER D2 NOT TO SCALE 3� ROCK SPLASH PAD D,2 NOT TO SCALE R— Pea z'J N S E N f '• . R A k N D -I n. m; G lin :c« Mb � ��• D D kt �dlE E P T L......i _ A A A AT L v , ..,• ,..... _ sr_�r,� :e» �� • E S N t 4- e< n TITLE. u[ DEH'. NO. F. $P1.4SH PAA U1VlJ IS SD -IJ DD&SON mmmunrly infrastructure ConsultW..s T,-pOrlati- + Water Resources Vrban Development , G- ti - 780 Corporate Drive Raleigh. NC 27607 (v) 919.782.0495 �tw919.782.9672 W .wkd,keo -. 2°- FULL SCALE 1. _= HALF SCALESI' Q Z 0 w Z< C7 0 Q O wZ < J J O 2 FQ W O a 0= �V LU O ii Z Iii z O LU ~ 2 LU 3 a o PROD. DATE IJAN 2018 O.C.. TM O.C. DATE AN 2018 DRAWING NUMBER: D2 PROJ. NO.: 20170225.00.RA m Q O m a 2 0 U 7 Q z 0 0 0 � 8 z g W o Q LL Q � O O N � ELEVATION GENERAL NOTES: USE PIPE COLLAR FOR EXTENDING EXISTING CONCRETE PIPE CULVERTS AT LOCATIONS SHOWN ON PLANS OR AS OI RECTED BY THE ENGINEER. THIS INCLUDES EXTENDING EXISTING PIPES WITH PIPES OF DIFFERENT MATERIALS. CONSTRUCT THE PIPE COLLAR WITH CLASS "B" OR BETTER CONCRETE. OBSERVE ALL REOI/IREMENTS OF SECTION 840 OF THE STANDARD SPECIFICATIONS. • USE 12 INCH DIAMETER VALUES FOR PIPE DIAMETERS LESS THAN 12 INCH. — — — — — — — — — — — — II i 11 i % EXIST. PIPE i PROP. PIPE 0 I I 1 I SIDE ELEVATION i PIPE COLLAR D.3 NOT TO SCALE UTILITY STRIP—HANDRAIL AS DIRECTED BY ENGINEER S `CONCRETE SIDEWALK) I I EXISTING ,� CURB ,FT.SUCFE 12 MAK. EXISTING GRADE •t' --3r —+ir• r F�IB"� A� UNREINFORCED SIDEWALK W/THICKENED EDGE UTILITY STRIP @@ HANDRAIL AS DIRECTED il� BY ENGINEER EXISTING (CONCRETE SIDEWALK) CURB CRS, LAP12 I) 14 -17T . -SLOPE I I O a °D 4" rlI EXISTING U H i ' 1 12 MIN. GRADE Z O 3JE 446018"EW U *4 CONTINUOUS (TYPICAL) �i NO SCALE o O Z LE SPECIAL SIDEWALK W/REINFORCED TMNDOWN U ESIDIEWALKDETAILS 5 THK;a(ENED EDGE o w ¢ a o Y LL ¢ TURNDOWN SPECIAL SIDEWALK D 3 NOT TO SCALE E N 3 G T E N E D R A I R N D G D D R 1 E 8 N T gn, KSON T7.qty Inffwwm cons�RanS Treresnsparlelion ♦ YVater Resources Vrben Development - G.-metics 720 Corporate Deva Raleigh, NC 27867 (v) 918.782.0495 (f) 919.782.9672 www.wkdicks—,. FULL SCALE ajQ LU Z O z V C7 2 W¢ aO W z J Q J ¢ J Q OJ N W D_ Oz ziU J W WO ii Z LU zz 0i O F- 0 Z W cr O ¢ a o PROJ. DATE: JAN 2018 O.C.:TM O.C. DATE: JAN 2018 DRAWING NUMBER: D3 PROJ. NO.: 20170225.00.RA Ili m H O O a °D z 0 U H Z O U O o O Z E U 5 I o w ¢ a o Y LL ¢ O O N � � � 2 ¢ a 0) m O N A m m O N A m O j_ . ..._... ........ __ _. _._. _.._.._, ,.._. _....__ .. _......... ._ _....___ .___._ -_-._. �A OI W O N A W W O N A W W C J o � _ N N N N N N N N N N N N 7 N N N N N N N N mom N m C J' o o m lion ...- $ / ___. OND OWD a [Aff m n n A [N m i; ndi S Jn m r W O N N N N N m N O MEME Ml MEMO M N N N N N N N N N N N N 7 N N N N N N N N N N m C J' o o m lion ...- $ / ___. OND OWD a [Aff m n n A [N m i; ndi S Jn m r N N N N N N N N N N N N N N N N N N N N N N N m C ..p....... ,_ 7 ' o o m lion ...- $ / ___. OND OWD O N N N m O N 0) w O N A W O N N N N N m N O N D Op O $ p O , bbo V Z OR O D p N c Z Z O O D � J : O p N D mm O NAm m C ..p....... ,_ 7 ' o o m lion ...- $ / ___. __..._._ 7V N N N N N N N N N N N N f� N D Op O $ p O , bbo V Z OR O D p N c Z Z O O D � J : O p N D mm r PROJECTNAME: ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: CROSS-SECTIONS WAON o MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6112/2016 ' I O J : O p N mm O NAm m C ..p....... ,_ 7 ' o o m ...- $ / ___. __..._._ 7V N N N N N N N N N N N N f� r PROJECTNAME: ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: CROSS-SECTIONS 4V N N N N (N(nn (NNn N N N N N N N A yA A6 N a N 6 W � m m W W O N A W W O N A W W c Imm mossims .mmmmmmmmm WAON o MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6112/2016 C m y O O p N mm O NAm m C J o o m m $ / ....... ._._ 4V N N N N (N(nn (NNn N N N N N N N A yA A6 N a N 6 W � m m W W O N A W W O N A W W c Imm mossims .mmmmmmmmm W A A (NT N tNn tNtnn (Nn m m pN� pN1 V A W W O N A W W O N A W mc) O o MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6112/2016 W A A (NT N tNn tNtnn (Nn m m pN� pN1 V A W W O N A W W O N A W mc) O r 1 Sg 3� 3 � ammm mp��� RNAZa0 m 3$gg�j p„ aZ o 0 1 C m y O p N D I D D Fn o o m m $ / r 1 Sg 3� 3 � ammm mp��� RNAZa0 m 3$gg�j p„ aZ ' � N o° o o o a .Pa VZ oPZ DATE o m m REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION 9!12/2018 cnm z z g N ' PROJECT NAME: l ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: CROSS-SECTIONS m F I 0 O a N MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION 9!12/2018 m F I 0 O a N o� n D D a li o a m mlm �IIc m g O O O V O 0 O O O W O N A O O O O 0 O D En O D A O O O O N O W O A O N O O1 O ti 0 m 0 0 0 0 0 0 N O W O A O CN �N�aa N N N N N N N N N N N N N QJ N N N N N N N N N N N N N N NIi I I I 1 I I Il II I I 1 I A W W O N A 0) W O N W O N A m m O N A 0 ONO O N m m O N A m OAO O N A � ONO O N A W NN O N -IN 7 7 ... I .._ I T ]J N N N N N N N N N dNf ONE N N � d OA1 A o N a - - n �Ai A rA m n n � v D v MARK ND o0 DESCRIPTION a p O PP2 D o m M100101M 0 J Ozz on 0 PROJECTNAME: ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: CROSS-SECTIONS D 0 O MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/12/2018 D o m M100101M 0 J on 0 Olson son OEM mom on mom mm ME on -mm .00 MENNEN on BE E ONES on =mom son on PROJECTNAME: ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: CROSS-SECTIONS D C D 0 O MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/12/2018 D C D 0 O 0 � D n a D o m �m 0 J I aN yNy N N N (N(�� (N(�J� N N N QNB N N• N N A Ol OAD O N A OI W O N A m O N No (NT A N W w W O mmmmmmmmmm®®® NEI INE111101111101111 MMMMI N N N N N N J N m mrw7j JIM11191110111 N O- ... ----- - -- --- I F ---- -- N ElMEN m N I N N A W I W O Vt N W A 4) W N W W O MENEM W A ■ W W So V N V A A A A W A W W O Ut N N A Ill 4t co N W N I W W W W mommo-ol's V N f 8 I L mmoommum 7 moommmommon m j nommommonom - 77 .. O 0 N u W on O j 1 _ I 2.. O.. oT-7 I I V �®11119-Mill I 0 0 Monson on -8 111111111J 11111111101111111111 11011111110103111 nomimmommoME Y _ l MEY 1110111111101MI ME MENEM mouniffirlonNEEME I M 11=11 EM I won on I mommon 1111110111M 01110111 ME mommon momom 'no smonommms on _ on MENEM 0 0 111113111111111 son _ m®®®®m®®i®®®® �m .0000 aN yNy N N N (N(�� (N(�J� N N N QNB N N• N N A Ol OAD O N A OI W O N A m O N No (NT A N W w W O mmmmmmmmmm®®® NEI INE111101111101111 MMMMI N N N N N N J N m mrw7j JIM11191110111 N O- ... ----- - -- --- I F ---- -- N ElMEN m N I N N A W I W O Vt N W A 4) W N W W O W N W A ■ W W V O V N V A A A A W A W W O Ut N N A Ill 4t co N W N I W W W W V O V N f 8 I L mmoommum 7 � m aN yNy N N N (N(�� (N(�J� N N N QNB N N• N N A Ol OAD O N A OI W O N A m O N No (NT A N W w W O mmmmmmmmmm®®® NEI N MMMMI N N N N N N J N N N JIM11191110111 N O- ... ----- - -- --- I F ---- -- N J m N I N N A W I W O Vt N W A 4) W N W W O W N W A ■ W W V O V N V A A A A W A W W O Ut N N A Ill 4t co N W N I W W W W V O V N f 8 I L mmoommum 7 � m j - 77 .. O 0 N u W O j 1 _ I 2.. O.. oT-7 I I V �®11119-Mill I 0 0 a -8 aN yNy N N N (N(�� (N(�J� N N N QNB N N• N N A Ol OAD O N A OI W O N A m O N No (NT A N W w W O mmmmmmmmmm®®® NEI N MMMMI N N N N N N N N N N JIM11191110111 N O- ... ----- - -- --- I F ---- -- N m N N N N A W A W W O Vt N W A 4) W N W W O W N W A ■ W W V O V N V A A A A W A W W O Ut N N A Ill 4t co N W N BEEN W W W W V O V N f 8 I L mmoommum on � N , - 77 .. O 0 N u W O j 1 _ I 2.. O.. oT-7 I I �®11119-Mill I 0 0 a -8 11111111101111111111 11011111110103111 Y _ l 1110111111101MI ME MENEM mouniffirlonNEEME EM MENI I 1111110111M 01110111 ME mommon momom smonommms _ on MENEM mM 111113111111111 MEN MEN ®m \ ` MmMMMMM 1111101111111115 mmmmm=m=w=m==ml m A m OAD O N A O1 W O N A Ol WO N A W 0 u w W O N A � W O N A � W N O N A W m N N W O N A � W O N A W W O N A A 0 W W O (NT A N W w W O N W W O N A N N N N N N N N N N N N N N O- ... ----- - -- --- I F ---- -- N m N N N N A W A W W O Vt N W A 4) W N W W O W N W A � W W V O V N V A A A A W A W W O Ut N N A 4t W 4t co N W N W A W W W W V O V N 8 I L mmoommum C) N , - 77 .. O 0 N u W O j 1 _ I 2.. O.. oT-7 I I �®11119-Mill I 0 0 a -8 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N A W A W W O Vt N W A 4) W N W W O W N W A � W W V O V N V A A A A W A W W O Ut N N A 4t W 4t co W O W N W A W W W W V O V N J O O O.2 1 O � I X Z /\� m 1110111110 z ,CNI) PEI I m a I I IlIffillmosommoll l!111111111MENmmmME® mmoommum 2.. �®11119-Mill i N N N N N (N4�� N N N pN1 N N N N N N N N N N (. N N N N p. N N N N pNp N N N N (. N N N N N N N N N CAD O N W 0 O N A OW) CWo O N A 0) co O N A OI OWo O N A OI OWO O N N A (D w O N A 0 O N CC. O N r � 01O O O O.2 V Z O O m m REVISIONS: X Z /\� m 1110111110 z ,CNI) PEI c ti m a IlIffillmosommoll l!111111111MENmmmME® mmoommum �®11119-Mill 11011111110103111 ol111111111101 mouniffirlonNEEME MENI sommollEffiffill mommon smonommms _ ®®®lmwm N N N N N (N4�� N N N pN1 N N N N N N N N N N (. N N N N p. N N N N pNp N N N N (. N N N N N N N N N CAD O N W 0 O N A OW) CWo O N A 0) co O N A OI OWo O N A OI OWO O N N A (D w O N A 0 O N CC. O N r � 01O O O O.2 V Z O O m m REVISIONS: X Z /\� m z ,CNI) O c ti m a PROJECT NAME: ELLIOTT STORAGE DESIGN TOWN OF CHAPEL HILL, NORTH CAROLINA DRAWING TITLE: CROSS-SECTIONS I 11 8V) gg 3 55 � fmmm�4i �gh•� nmmz + hRgee OQ $ d 3 rod. C 0 lz o MARK DATE DESCRIPTION REVISIONS: RELEASED FOR: PLOT DATE: PRELIMINARY PLANS - NOT FOR CONSTRUCTION en2/2o)e I 11 8V) gg 3 55 � fmmm�4i �gh•� nmmz + hRgee OQ $ d 3 rod. C 0 lz o o N n II F m tNi m J ,I O li i m S � I 11 8V) gg 3 55 � fmmm�4i �gh•� nmmz + hRgee OQ $ d 3 rod. C 0 lz 1/U 268 266 264 262 260 258 256 254 252 250 7+50.00 AT STA 7+50.00 ME t I MEN ME ml MEMO I'm NIEMEN I 011"MINEEml I ME M IN MEMMEM INEENININI ME 3 io w �} O ¢ Q ¢ w � a 01 ME M M MEN 0 M 1 ME MENNEN M MOMMEMEM M ME Em ME 8.0 274 272 270 268 266 264 262 260 258 256 254 252 250 248 24S 7+25.00 AT STA 7+25.00 7+00.00 AT STA 7+00.00 274 272 270 268 266 264 262 260 258 256 254 252 250 248 1846 CanoX DMICSON comminity InhastrucWre cpte ttmis Transportation + Water Resources UrDen Development + Geomatics 720 Corporate Drive Raleigh. NC 27607 (v) 919.782.0495 (1) 919.782.9872 www.wkdickson.com —14 FULL SCALE: 0 20 40 HORZ. 1'= 20 0 4 e VERT. 1' = 4' HFULLALF SCALE 1' = SCALE 1'cr Q z O or z V z O 2 w 0 ¢ O z trU O x U? Wa 1n O 0= ¢ ._1 U O J W WO ui z zz 0 O 0 U F-2 O ¢ a o PRO'. DATE: JAN 2018 Q.C.: TM O.C. DATE: JAN 2018 DRAWING NUMBER: XS5 PROJ. No.: 20170225.00. RA o o a o z 0 U Z O U O o O z � u) FILE NAME: O:\Rolecis\RAM RealtyServites\20t 7 022 5 0 0 811- Elliott Storage Design\CADD\Pkn Set\Elliott SHT %S.tlwy -June 12,2018- Ben 3 io w �} O ¢ Q ¢ w � a • 8+25.00 AT STA 6+25.00 Z O 274 U r z 0 i Q i I ? 274 272 z 5 a rn O ¢ LL Q � i o Y N Z W J I � > LLl ¢ W W Q ¢ a 272 I 270 270 ! it jji ii 11 III 268 - 268 266 286 264 _ -- 1 - -t --- 1 - -i - - oo --too - ODrR--- - -too - --t - -100 - - t v�---- t - ---t - --t -- -i too - -t t' 264 262 _ L2 -- - -- �II -- zsvR - =25 -' 1 sYR -2 - III li - - IS -z -�' 25YR. -^ �-�; zsz 260 - I� 260 �gsnNc r;rrAoE � , I 258 F'44� 256 256 Existhg SSMR24' 1 256 254 OuctAe bon Pipe - 254 252 �!( 252 PROPOSED GRADE 250 i 250 248 ... - .. ... ,,.... ..:...., €._ . ..;.. ...i... , . 248 24280 ... ... .:. -270 -260 -250 -240 -230 -220 -210 -200 -190 -180 -170 -160 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 SO 1 . -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 28047 8+00.00 AT STA 8+00.00 274 274 l i i I 272 r 272 270 I 1270 I 268 I 268 266 I 266 264 II 264 - ,-1 0 - - w -- OD - .--� -- -oo - �� - -1 - --1 --1 - --t YR - 1 - -, - -- -- - - - =, -r - t3b - -1 --- ----1 - - 1 262 -- 25YR ----2 — —:— 25YR r -- — — -- —.—. —25 .----: 25YR--25 T- ---- r -----25 — 25YRJ -- --'SYR--- —2 --�-- SYR- — —25 -- �— S1R— ---25YR-- —:-2 YR— -- 25YR ! 260 EXISDNG GRADE 260 258 258 '.. ! 256 I ! - �r 256 Existing SSNR 24' C I 254 Ductds bm Ppe F j 254 I...I '�NT - ! - II - i�) 252 - _ r 252 , PROPOSED GRADE 250 I ' 250 248 248 ..: ... .... ..:... , .:.. .;. ... , .. .. ._. ..::.. , .:... ... .:... .. i . - 24 280 p 270 28646 -270 -260 250 -240 -230 -220 -210 -200 -190 -180 -170 -160 -150 -140 -130 -120 -110 -100 -90 -80 -70 EO -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 7+75.00 AT STA 7+75.00 274 274 i, ! i. 272 272 270 l l 270 268 (I ! ! 266 266 264 - —1 - - - - —1 - tOD - - - —1 - - - �1 - - - - -1 264 -� - '- - - 1 - - - 262 262 --25IiR -- ?S -- --: Sttt---! - -- '-- -2f' - —' ! - rt j -' -25 -- -- YR- - 25YR 1 - 2 Ht -- 266 I I I I I II I I�' III i I III j � ; 266 258 258 ' i� I ( .� ' I I �i EXISTING GRADE II i I 256 Existing SSItN 24' : _ 256 254 ! r Ductile Iron Pipe '. 254 252 I r ! I 252 III PROPOSED GRADE 250 ' r I 250 '248 TAL _ li I) r--' 777- -. - - ♦ * 248 ,I 24-280 -270 -260 -250 -240 -230 -220 -210 -200 -190 -180 -170 -160 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 III 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 28046 OWWK DI KSON Crommunity IMraetruotwe—ditanh Trensportetion + Water Resources Urban Development + Geomaties Raleigh, Corporate Drive Raleigh, N 27807 (v) g18.7822.04595 (f) 878.782.8872 W W W. W kd!ckson.com FULL SCALE: 0 20 40 HORZ. 1'= 20 0 4 8 VERT. 1' = 4' 2' - FULL SCALE 1' = HALF SCALE' Q Z O zLuU 2 F 0 ¢ Z O wZ O F- = ai F- in w U) 00= O JU U W LL to Z to 1- O L) ~ Z w 3 a o PROJ. DATE: JAN 2018 O.C: TM O.0 DATE: JAN 2018 DRAWING NUMBER: XS6 PROJ. NO.: 20170225.00.RA � m � o o J m IL Z O U z 0 Q o ? z 5 a rn O ¢ LL Q � i o Y N Z W J I � > LLl ¢ W W Q ¢ a 9+00.00 AT STA 9+00.00 8+75.00 AT STA 8+75.00 IN offfimmu-52901m IN IN IN IN 0 IN IN IN O O LL O O Z 5 W N O LL Q ■ IN � O � Z y � W ¢ a ME No IN 220 230 240 250 26D 270 9RR46 8+50.00 AT STA 8+50.00 DDICKSON urvty Inheafructura Caraukdnl5 Transportation + Water Resources Urban Development + Gaonatia 720 Corporate Drive Raleigh, NC 27007 (v) 919.782.0495 (0919,782. "672 www.wkdickson.com —14 FULL SCALE: 0 20 40 HORZ. 1"= 20 0 4 e VERT. 1 • = N 2• -- FULL SCALE HALF SCALE'cc Q Z O cc 0U M= W C O 0 Z O U O 2 VW) w c�i) O= O �U U cc J LL Lu LL W Z w < z p U ~ Z 'o a x a p PROJ. DATE: JAN 2018 O.C.: TM O.C. DATE: JAN 2018 DRAWING NUMBER,/`•'7 XS 1 PROJ. NO.: 20170225.00.RA � m � o H n O J m a Z O U l'— u) O O LL O O Z 5 W N O LL Q � O � Z y � W ¢ a 268 266 264 262 260 258 256 254 252 250 9+75.00 AT STA 9+75.00 9+50.00 AT STA 9+50.00 !72 am o N !i1 z 0 !70 O Z z o , z 5 O ¢ LL Q (i N � J J i w ¢ w ¢ ¢ a I i ,e ,66 i !64-- 180 190 200 210 220 230 240 250 260 270 28 !72 am o N O a m z 0 !70 O Z z o , z 5 O ¢ LL Q O fn N � J J w ¢ w ¢ ¢ a ,66 !64-- 100 — — 1 YR— -- — 4-10 YR— -- 0 — —t — 00 0 -- �-1 — —100 -- — —1 — 1 QYR- — —1 62 - - --2 YR – –25�•–---25YR -- –+2S ���-- SYR---'.'–2SYR--�-- SYR– �'-�-25 -- -- 5M– --25YR ---+=2 –---25YR -- –25 – --. 25YR -- –25 -- 1fi0 a : I 158 i PROPOSED GRADE – — – EVSnN0 GRA DE i 154 ,50El i i I !48 i ' 280 -270 -260 -250 -240 -230 -220 -210 -200 -190 -180 -170 -160 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 I kill 120 130 140 150 160 170 180 190 200 210 290 730 740 950 9R0 970 2F 9+25.00 AT STA 9+25.00 268 266 264 262 260 258 256 254 252 250 268 266 264 262 260 258 256 254 252 250 DDICKSON community Inha6'r`Z" eorrculfants Trareaportation + Water an Rasourwa .roDevelopment + Oeomeaes 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (Q 919.782.9672 www.wkdickson.com FULL SCALE: 0 20 40 HORZ. 1'= 20 0 4 8 VERT. 1' = 4' FULL SCALE 1' = UFS I' Q Z to O 2 Z U C7 Lu 2 0 CO Z W Z O U O2 � �w U) O 02 Q � U U w LL WO W Z w � 3 Z U ~ Z cc O ¢ a o PROJ. DATE: JAN 2016 O.C.: TM O.C. DATE: JAN 2018 DRAWING NUMBER: XS8 PROJ. NO.: 20170225.00. RA am o N O a m z 0 Z O O Z z o , z 5 O ¢ LL Q O fn N � J J w ¢ w ¢ ¢ a EROSION CONTROL NOTES: • 1. REFER TO GENERAL NOTES ON SHEET 2. 2. DISTURBED AREAS IMPROVEMENTS STORM ElUOT STORAGE 7 AC (283330 SF) 3. NO ON-SITE BURIAL OF VEGETATION OR CCNSTRUCTION DEBRIS WILL BE PERMITTED. 4. ANY DISTURBANCE BEYOND THE CONSTRUCTION LIMITS SHOWN ON THE PLANS IS A VIOLATION OF THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT AND THE CONTRACT SPECFICATIONS. 5. PLEASE REFERENCE THE TOWN OF CHAPEL HILL STANDARDS SHOWN ON SHEETS EC5 h ECB FOR EROSION CONTROL DETAILS 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL MEASURES RELATED TO THE CONSTRUCTION STE 7. AT A MINIMUM, EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE STATE AND LOCAL REGULATIONS ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY LOCAL GOVERNING AGENCIES IS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REMOVAL OF ANY SOIL TRACKED INTO THE PUBUC RIGHT-OF-WAY. 9. THE LOCATIONS OF SOME EROSION CONTROL MEASURES MAY HAVE TO BE ALTERED FROM THOSE SHOWN ON THE PLANS IF DRAINAGE PATTERNS CHANGE DURING CONSTRUCTION, SUBJECT TO THE RENEW AND APPROVAL OF THE PROJECT ENGINEER 10. NO STOCKPILING SHALL OCCUR OVERNIGHT. REMOVE AND PROPERLY DISPOSE OF ALL DEBRIS FROM STOCKPILE AT THE END OF EACH WORKING DAY. 11. THE CONTRACTOR SHALL INSTALL AND MAINTAIN PUMP AROUND AND IMPERVIOUS DIKE AS NEEDED. 12. SEE SHEET D1 FOR SEEDING AND STABILIZATION DETAILS CONSTRUCTION SEQUENCE: 1. REFER TO ABOVE NOTES AND GENERAL NOTES ON SHEET 2. 2 THE TOWN OF CHAPEL HILL SHALL CONDUCT THE PRE -CONSTRUCTION MEETING INCLUDING THE ENGINEER, THE CONTRACTOR'S SUPERINTENDENT, THE PROJECT INSPECTOR AND OTHER AFFECTED PARTIES 3. AT THE BEGINNING OF THE WORK, INSTALL AND STABILIZE THE GRAVEL CONSTRUCTION ENTRANCES/EXIT PATHS AT THE LOCATION OFTHE WORK SITE THE CONSTRUCTION ENTRANCES/EXIT PATHS SHALL BE INSTALLED AS SHOWN ON THE PLANS AND DETAILS OR AS DIRECTED BY THE PROJECT INSPECTOR 4. AFTER ESTABUSHIMENT OF THE CONSTRUCTION ENTRANCE/DOT. ALL PERIMETER EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CLEARING AND GRUBBING 5, PRIOR TO CLEARING AND GRUBBING/CONSTRUCTION, ME CONTRACTOR SHALL REQUEST AN ON-SITE INSPECTION FROM THE PROJECT INSPECTOR. UPON RECEIPT OF CERTIFICATE OF COMPLIANCE, GRUBBING/CONSTRUCTION MAY BEGIN. 6. PERFORM GRADING OPERATIONS IN A MANNER AND SEQUENCE SO AS TO REDUCE UNNECESSARY DISTURBANCE OF SURFACE COVER. 7. CONTRACTOR SHALL INSTALL SEWER UNE, CULVERTS, STORM STRUCTURES AND RETAINING WALLS ALLOWING BASE AND STORM FLOWS TO BE CONVEYED TO THE EXTENT POSSIBLE B. CONTRACTOR SHALL INSTALL IMPERVIOUS DIKES AND PUMP AROUND TO COMPLETE REMAINING CHANNEL WORK AND OTHER CONTRACT WORK ASSOCIATED WTH THE PEDESTRIAN CROSSINGS BEFORE DIVERTING ALLOWING FLOWS THROUGH THE NEW CROSSINGS. 9. CONTRACTOR SHALL COMPLETE REMAINING WORK ITEMS INCLUDING REMOVAL OF THE EXISTING CULVERTS, AND REQUIRED BACKFILL GRADING AND STABILIZATION. MAINTENANCE PLAN: 1. ALL TEMPORARY EROSION CONTROL AND SEDIMENT CONTROL PRACTICES WILL BE INSTALLED AS NOTED ON THE EROSION CONTROL DETAILS ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. TRAPPED SEDIMENT SHALL BE PROPERLY REMOVED FROM THE EROSION CONTROL MEASURES AND PROPERLY DISPOSED OF. VEGETATIVE PLAN: 1. EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. THE CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. 2. DISTURBED AREAS NOT AT FINAL GRADE AND LEFT IDLE SHALL SE TEMPORARILY VEGETATED PER THE GROUND COVER SCHEDULE SHOWNON THIS SHEET. UPON COMPLETION OF FINAL GRADING, PERMANENT VEGETATION SHALL BE ESTABLISHED PER THE GROUND COVER SCHEDULE SHOWN ON THIS SHEET. GRADED SLOPES SHALL BE ESTABLISHED PER THE GROUND COVER SCHEDULE SHOWN ON THIS SHEET. 3. ALL OTHER DISTURBED AREAS WILL BE STABILIZED BY PERMANENTLY VEGETATING WITH SEED AND MULCH AS RECOMMENDED BY THE PERMANENT SEEDING SPECIFICATIONS DUE TO THE RESTRAINTS ON THE LENGTH OF IMPROVEMENTS AND/OR DURATION OF EXPOSED DISTURBED AREAS 4. ONCE PERMANENT VEGETATION IS ESTABLISHED, THE CONTRACTOR SHALL SCHEDULE A FINAL INSPECTION IN ORDER TO OBTAIN A CERTIFICATE OF COMPLETION. AFTER APPROVAL, ALL REMAINING TEMPORARY EROSION CONTROL MEASURES SHOULD BE REMOVED. NOTES 1. GROUND COVER - WHEREVER LAND DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE L1) ACRE A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN BELOW. 2. GRADED SLOPES AND FILLS - PER THE GROUND COVER SCHEDULE SHOWN BELOW, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. TEMPORARY SEEDING AND MULCHING FOR STREAM BANK STABILIZATION alul" CCAVw "= WAa SEEDING ILLET MIXTURE 40 LBS/ACRE OF: (BBRRACHIARIA RRABROTOP NIOSA) PENNISEIW GLAUCUM) PEARL ( PELAU GROUND COYER SCHEDULE SITE AREA DIESCAP7XIII STANUZ4WN 7NE FRAME SW IL0 ZIM TAE FRAME EXCEP7IONS PE39METER DIKES. S11i DITCHES AND SLOPES 7 DAYS AVE MOI WAIIIY TIMER (TSAR ZONES 7 DAYS ALMS SLOPES STEEPER THAN &1 7 DAYS F 200 ARE 17 OR LES N LDA7131 MD ARE NOT S7EDEB IHW 21,14 DAIS ARE AUONFD SLOPES 3:1 OR FLATTER 14 DAM 7 DAM FDR SLOPES GEAER THAN FA FEET N LEWIN ALL DRIER AREAS WITH ROPES FLATTER 4:1 14 BIM "IE MRIPT RR PERI EERS AM HND ZONES)THAN NOTES 1. GROUND COVER - WHEREVER LAND DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE L1) ACRE A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN BELOW. 2. GRADED SLOPES AND FILLS - PER THE GROUND COVER SCHEDULE SHOWN BELOW, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. TEMPORARY SEEDING AND MULCHING FOR STREAM BANK STABILIZATION alul" CCAVw "= WAa SEEDING ILLET MIXTURE 40 LBS/ACRE OF: (BBRRACHIARIA RRABROTOP NIOSA) PENNISEIW GLAUCUM) PEARL ( PELAU 50 LBS/ARE ?: SIX I MILEY (ND®EIN WAGIRE) 50[ NNER RIE (ACNE MEW SEEDING DATES APRIL 1 - OCTOBER 1 OCILHA i - AFK SEEDING TEMPORARY SEEDING WILL BE REQUIRED ON ALL TEMPORARY SEEDING WILL BE REOURED ON ALL STREAM AMENDMENTS STREAM BANK STABIUZATION AREAS DISTURBED BANK STABILIZATION AREAS DISTURBED FOLLOWING ALL Z O FOLLOWING ALL LAND DISTURBING ACTIVITIES LAND DISTURBING ACTIVITIES U Q ALL SCIL IN PLANTING AREAS SHALL BE TESTED AND ALL SOL IN PLANTING AREAS SHALL BE TESTED AND 2 O THE RATE OF FERTILIZATION AND LIMING SHALL BE THE RATE OF FERTILIZATION AND LIMING SHALL BE IN IN ACCORDANCE WITH THE TEST RESULTS ACCORDANCE WITH THE TEST RESULTS O LL THE PLANTING OF ANY SPECIES OF FESCUE GRASS THE PLANTING OF ANY SPECIES OF FESCUE GRASS Z ALONG OR ADJACENT TO STREWS MIN CHANNELS ALONG OR ADJACENT TO STREAMS AND CHANNELS IS Z IS PROHIBITED UNLESS OTHERWISE APPROVED BY PROH187M UNLESS OTHERWISE APPROVED BY THE g THE ENGINEER. ENGINEER. ¢ a o } W Q p ALL AREAS SHALL BE MULCHED FOR EROSION ALL AREAS SHALL BE MULCHED FOR EROSION CONTROL O O CONTROL UPON COMPLETION OF CONSTRUCTION UPON COMPLETION OF CONSTRUCTION ACTIVITIES OR AS ACTIVITIES OR AS DIRECTED BY THE ENGINEER. DIRECTED BY THE EMONEER. TEMPORARY SEEDING SCHEDULE FOR OYERBANK AREAS � ffiE 9d�(e.BAIE BLENDED TALL FESCUE* zoo LBS/ACRE JAN 1 MAY 1 (AT LEAST 5 TYPES) KOBE IESPFDEZA 50 LBS/ACRE MAY 1 - AUG 1S GERMAN YILLET 40 LBS/ACRE AUG 15 - DEC 31 RYE (GRAIN) 120 LBS /ACRE -NOT TO BE USED ON CHANNEL BANKS APPLY 2,000 LBS/ACRE GROUND AGRICULTURAL UMESTONE; 1,0110 LBS/ACRE 10-10-10 FERTILIZER: AND 5DO LBS/ACRE OF 20 PERCENT SUPERPHOSPHATE OR EQUIVALENT IN ADDITION TO THE INDICATED FERTIUZER APPLY 4,000 LBS/ACRE GRAIN STRAW MULCH TO SERVE AS COVER FOR SEEDING. ANCHOR STRAW BY TACKING WITH UQUID ASPHALT AT A RATE OF 400 CAL/ACRE OR EMULSIFIED ASPHALT AT A RATE OF 300 CAL/ACRE; ROVING, OR NETTING. USE JUTE, EXCELSIOR MATTING, ENGINEER -APPROVED TURF RBNFORCING MATTING TO COVER THE BOTTOM OF CHANNELS AND DITCHES AS INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. SUCH PRODUCTS SHALL BE SECURED BY STAPLES OR STAKES AS INDICATED IN THE DRAWINGS OR AS DIRECTED BY THE ENGINEER. M&SON ity i frastr re 0—uh— Transportatio , Weter Resources Lkban Development - Ceoma.- 720 Corporate Drive Raleigh, NC 27607 (v) 019.782.0495 (f) 910.782.9672 www.wkd,pK n.c FULL SCALE: 1'=200' D 200 400 2' - FULL SCALE �1 • = HALF SCALE' Q Z 0 ED c7 V U) 2 W ¢ O 00 Z OZ O cr J_ ~ 0 x 0 U) LU U o Z 0Q 0 ziU 0 Wp w u Z W 0 1- Z 0 F- U ~ Z O ¢ a ❑ PROJ. DATE: IJµ 2018 O.C.: IIIJ'w��VJF, O.C. DATE: 2018 DRAWING NUMBER: EC1 PROJ. NO.: 20170225.00.RA m 0 0 H N O a m Z O U Q 2 O O LL Z O s Z � g I o W N ¢ a o } W Q p I O O ¢ W W ¢ ¢ a MpiGH� EE 1^\ 1 PROPOSED \ \ \ \ RETAINING WALL \\I N \\I \\\\ .t N P WT \ hFi'IV ILS E \ PLAZA CHAP 1,54 C 8 G, 154 1 \ I 1 P.R., 57, P 4, PIH 9]9924[3E1 ! m \ / cn 1E LEGEND UMITS OF DISTURBANCE LOD SILT FENCE (SEE SHEET EC5) RRP— i IJ SILT FENCE STONE OUTLETS 1 (SEE SHEET ECS) TEMPORARY DIVERSION DITCH D.E.I C 86162. G. 154 P.S.57, PG. 43 (SEE SHEET EC5) I CHECK DAM (SEE SHEET EC5) PIN 9799242351 TEMPORARY GRAVEL CONSTR. ENTRANCE/EXIT ,_— (SEE SHEET EC6) ROCK INLET SEDIMENT TRAP (SEE SHEET EC6) COIR MATTING (SEE SHEET EC6) \ RIM -264: \ K-257.7 O iT=256.: i PROPOSED I \ RETAINING WALL BY OTHERS — — SS SS—_� SS l \ S; PROPOSED RETAINING WALL I (d,' III \\ PINE 14' �'� 1 \ tf PINE• .. rytp0. RRP— i IJ e 1 a PR I D.E.I C 86162. G. 154 P.S.57, PG. 43 4 HM, 4'� I PIN 9799242351 \ RIM -264: \ K-257.7 O iT=256.: i PROPOSED I \ RETAINING WALL BY OTHERS — — SS SS—_� SS l \ S; PROPOSED RETAINING WALL I (d,' III /y/ TOC�3 *• 114'\ �\ E�IOWT�261.69' �._ T RRA D 60�R/' 0% a1�Bl,c R/w � o y � % CONSTRUCTION AT STREAM BANK NOTE: ® STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES: OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. T WD CKSON community inbaetr wre consultants Trensporta- + Weter Resources Urban Development + Grromafice 720 Corporate Drive Raleigh, NC 27607 () 919.782.0495 (1) 919.782.9672 www.wkdickson.com FULL SCALE: 1'=3P 0 30 60 FULL SCALE 1' _= HALF SCALE a z O cc ZV a _ J p 55 ¢ O Wcc O Z H- ¢- O 0= U N W =aQ N O U W J LL WO W Z w z 0 I— U H Z W Ira a o PROJ. DATE: IAN 2018 O.C.: �jIH O.C. DATE: N 2018 DRAWING NUMBER: EC2 PROJ. No.: 20170225.00.RA o� IL m Z O U H CD y7 r \ RRP— i IJ e 1 AA MILL I D.E.I C 86162. G. 154 P.S.57, PG. 43 l /y/ TOC�3 *• 114'\ �\ E�IOWT�261.69' �._ T RRA D 60�R/' 0% a1�Bl,c R/w � o y � % CONSTRUCTION AT STREAM BANK NOTE: ® STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES: OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. T WD CKSON community inbaetr wre consultants Trensporta- + Weter Resources Urban Development + Grromafice 720 Corporate Drive Raleigh, NC 27607 () 919.782.0495 (1) 919.782.9672 www.wkdickson.com FULL SCALE: 1'=3P 0 30 60 FULL SCALE 1' _= HALF SCALE a z O cc ZV a _ J p 55 ¢ O Wcc O Z H- ¢- O 0= U N W =aQ N O U W J LL WO W Z w z 0 I— U H Z W Ira a o PROJ. DATE: IAN 2018 O.C.: �jIH O.C. DATE: N 2018 DRAWING NUMBER: EC2 PROJ. No.: 20170225.00.RA o� IL m Z O U H CD y7 r a� RRP— i IJ e 1 AA MILL I D.E.I C 86162. G. 154 P.S.57, PG. 43 I PIN 9799242351 ,_— O 2 0 0 � Z /y/ TOC�3 *• 114'\ �\ E�IOWT�261.69' �._ T RRA D 60�R/' 0% a1�Bl,c R/w � o y � % CONSTRUCTION AT STREAM BANK NOTE: ® STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES: OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. T WD CKSON community inbaetr wre consultants Trensporta- + Weter Resources Urban Development + Grromafice 720 Corporate Drive Raleigh, NC 27607 () 919.782.0495 (1) 919.782.9672 www.wkdickson.com FULL SCALE: 1'=3P 0 30 60 FULL SCALE 1' _= HALF SCALE a z O cc ZV a _ J p 55 ¢ O Wcc O Z H- ¢- O 0= U N W =aQ N O U W J LL WO W Z w z 0 I— U H Z W Ira a o PROJ. DATE: IAN 2018 O.C.: �jIH O.C. DATE: N 2018 DRAWING NUMBER: EC2 PROJ. No.: 20170225.00.RA o� IL m Z O U H CD ,_— /y/ TOC�3 *• 114'\ �\ E�IOWT�261.69' �._ T RRA D 60�R/' 0% a1�Bl,c R/w � o y � % CONSTRUCTION AT STREAM BANK NOTE: ® STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES: OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. T WD CKSON community inbaetr wre consultants Trensporta- + Weter Resources Urban Development + Grromafice 720 Corporate Drive Raleigh, NC 27607 () 919.782.0495 (1) 919.782.9672 www.wkdickson.com FULL SCALE: 1'=3P 0 30 60 FULL SCALE 1' _= HALF SCALE a z O cc ZV a _ J p 55 ¢ O Wcc O Z H- ¢- O 0= U N W =aQ N O U W J LL WO W Z w z 0 I— U H Z W Ira a o PROJ. DATE: IAN 2018 O.C.: �jIH O.C. DATE: N 2018 DRAWING NUMBER: EC2 PROJ. No.: 20170225.00.RA o� IL m Z O U H CD O 2 0 0 � Z O OWii Y W J I � � S � a f ( / [n a bTRE N N/F FVF. TMF14T ALTY INVFSTM1 P TRUST O D.B. 621. PO PIN 97992_552] y � -- N RIM=28068 1 r. OUT -268.E u,REMOVE 4 LF / OF 15 RCP a 111 I RiM-27'.42• IN 257 92' \� 7UT-267 82' TOC=276.75 / IN=271.40 / OU T=264.10'--/ LEGEND UMITS OF DISTURBANCE LOD SILT FENCE (SEE SHEET EC5) HW 23' SILT FENCE STONE OUTLETS (SEE SHEET EC5) om a TEMPORARY DIVERSION DITCH (SEE SHEET EC5) E E E E E CHECK DAM (SEE SHEET EC5) U TEMPORARY GRAVEL CIXJSTR. ENIRANCE�XIT 7 (SEE SHEET EC6) f W 1T" I ROCK INLET SEDIMENT TRAP El (SEE SHEET EC6) d COIR MATTING (SEE SHEET EC6) HIT I 4A • it�Q \ \\ 11 \ A 20" � e PINE 21" IA 'REMOVE 24 LF \\ l�, xw la` Hw tfi' OF 15" RCP ( \ PINE HW NE o 21' II HW i6 \ \ 1 hR C `, DOYR\ MATCH LINE 7+40 SEE SHEET #EC4 I (4259.79' 254 39' \ \ \ - - -�`=:TL-�-��_ �J• 0217=ki_.79. ej ' d5 PINE�� HK 13. A.' / ` HW 13' HW 15- H 5 PINE 1" I HWM - _L D L'F'-Ob '� �� `\ \ \I q 1 252.7p B 1i rl •^1 `- _- 2'• E' ,1M&ti pC5?IT I .F '/ i. -I/ _';z:--( •I r LLQ Y e7 RI),1-2, .11 IN 0 HW 23' 0 �V H- N M(24>25 3 om a M. WT -2501' � U 7 z O f W 1T" I I 5 '1 HW Y 1 d \\ HIT I o4 r 1 u y I'a I k N / �1 z i1 \\ I d 8' i (I / B. 62 PC 117 ! I P 6.998 PC.528 i 4 N N � 41. i � ¢ a \ / I PINE / y \ 1•\ �I `_X151110 11R(A.B STORM Dr1At. MID # \ 1pV• 4A • it�Q \ \\ 11 \ A 20" � e PINE 21" IA 'REMOVE 24 LF \\ l�, xw la` Hw tfi' OF 15" RCP ( \ PINE HW NE o 21' II HW i6 \ \ 1 hR C `, DOYR\ MATCH LINE 7+40 SEE SHEET #EC4 I (4259.79' 254 39' \ \ \ - - -�`=:TL-�-��_ �J• 0217=ki_.79. ej ' d5 PINE�� HK 13. A.' / ` HW 13' HW 15- H 5 PINE 1" I HWM - _L D L'F'-Ob '� �� `\ \ \I q 1 252.7p B 1i rl •^1 `- _- 2'• E' ,1M&ti pC5?IT I .F '/ i. -I/ _';z:--( •I r LLQ dRW a8'j+ J 1 4 SE7SJILIgtfi `SIM 13' I 1Fz' �1 E1 L ZS -DIP 47' HWC3� 244 p0. 1-9 I P- 87'+5697 3' HW .I / s� _- 1z'I a / INN 16 I ` HW DBL 1 Hw `6" HW 15" FM 15- I I Ioa NW 12' 1 i ^ HW 14• / Na, 1' r �T iHw 12- 'j` Mr la' � i ILL HW 12 HW 1 iTT `T' 73" PHI ...,1,Y e ms. Ij,. 1 � .� � W p Hw 15 h w11;;. MPSEE SH : # EC2 252. PROPOSED 1 1 RETAINING WALL I l i BY OTHERS I \ s y _ 4 \\ v- CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES£ OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. 1 I I II I I I I I . I I Ij 1 ,I I I . I I I I I f I ( I I 1 I I I I I • ! I I I I I I I 11 I I 1 f� I I !I II I 1 I I ! f I I I II ss� I I ! I II II I I I I I WD CKSON mwty Infrastructure consultants Transponaeon + Water Resources Urban Development + Geometios 720 Corporate Drive Raleigh, NC 27607 (V) 918.782.0485 (f) 978.782.9872 www.wkdlckson.com FULL SCALE: 1'=30' 0 30 80 2' -FULL SCALE 1' =HALF SCALE �'ccCA a z 0 Z V S J W O cc Z �� O 0= U Z W O a Tn 3U w W Q W Z Q 2 0 H U ~ Z O ¢ ELI a O PROJ. DATE: JIAN 2016 CLC. TM O.C. DATE: JAN 2018 DRAWING NUMBER: EC3 PROJ. NO.: 20170225.00.RA ----------------------- Y e7 40 HW 23' 0 �V H- N om a M. I � U z O G PINE 1 '1 HW Y 1 dRW a8'j+ J 1 4 SE7SJILIgtfi `SIM 13' I 1Fz' �1 E1 L ZS -DIP 47' HWC3� 244 p0. 1-9 I P- 87'+5697 3' HW .I / s� _- 1z'I a / INN 16 I ` HW DBL 1 Hw `6" HW 15" FM 15- I I Ioa NW 12' 1 i ^ HW 14• / Na, 1' r �T iHw 12- 'j` Mr la' � i ILL HW 12 HW 1 iTT `T' 73" PHI ...,1,Y e ms. Ij,. 1 � .� � W p Hw 15 h w11;;. MPSEE SH : # EC2 252. PROPOSED 1 1 RETAINING WALL I l i BY OTHERS I \ s y _ 4 \\ v- CONSTRUCTION AT STREAM BANK NOTE: STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLES£ OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. 1 I I II I I I I I . I I Ij 1 ,I I I . I I I I I f I ( I I 1 I I I I I • ! I I I I I I I 11 I I 1 f� I I !I II I 1 I I ! f I I I II ss� I I ! I II II I I I I I WD CKSON mwty Infrastructure consultants Transponaeon + Water Resources Urban Development + Geometios 720 Corporate Drive Raleigh, NC 27607 (V) 918.782.0485 (f) 978.782.9872 www.wkdlckson.com FULL SCALE: 1'=30' 0 30 80 2' -FULL SCALE 1' =HALF SCALE �'ccCA a z 0 Z V S J W O cc Z �� O 0= U Z W O a Tn 3U w W Q W Z Q 2 0 H U ~ Z O ¢ ELI a O PROJ. DATE: JIAN 2016 CLC. TM O.C. DATE: JAN 2018 DRAWING NUMBER: EC3 PROJ. NO.: 20170225.00.RA ----------------------- e7 0 �V H- N om a 0 U z O U Q O z o w ¢ a o¢ O O N � i � ¢ a ¢ N/f LEGEND FEDERAL FEEL':" s� LOD INVESTMENT TRUST EXISTING VAP,IABLE MDTH SILT FENCE STONE OUTLETS STORM DRAINAGE (SEE SHEET EC5) tASEMENT P.B. 90, PG. 26 s RIM=268. \ \ INV -254.8' \ HW 13• r \ 48" RCP N/f LEGEND FEDERAL FEEL':" f LOD INVESTMENT TRUST O SILT FENCE STONE OUTLETS D.B. 621, Ff., 127 (SEE SHEET EC5) I I I I I i P.B. 90, PG. 26 s (SEE SHEET EC5) PIN 9799255527 K I I I HW 13• r TEMPORARY GRAVEL CONSTR. ENTRANCE/DOT I I - ROCK INLET SEDIMENT TRAP DOL I8"1 RIM -259.70' -- MATCH LINE 7+40 COIR MATTING IIJ(8•PVC)-255.1D ' .c - 1\ OUT=252.30' NIS "UP) -253.2 R!M=278.57I IN(24")=251.95' r� INV=271.67 II, I$ f OUT®251,90' + RIM -259,82' 1 \ \\ \ OUT -257,271 RIM=277.27' 1 ( I I I I \ 1 •" N •� IN(N)=271,27' Ni�1 �'— SS SS �\ IN(W)=271.27' \ \ t \ _ \ \ SS \ \ c1 IN(SW)=271.^_T 1\ �\ �- SS\�___,�• OUT= 271.22'bA 41 --SS �• \ \ \ \ I \\\� \(- R!M=259.89•... �7 � p, IN=256.04' -2x.94'_ \ \`\I. jHw 16 -- (A �� � v v IvIIII�II1,il (� 111,y v �v \\\ i��ll)1I �iIIII I w3\ \ \I l� 11 lil \ \\ \ `rs j�-E%STING VARIABLE MOTH'\ \"' STORM DRAINAGE RIM=276.25' \ I \ \\ \ ( �� L \ EASEMENT IN= 270.25' Ily\` 1 `� \ \\\ \ \ (P B 90 28) \ , CLT=270.20' 44 1 ` \ NI \ \ \ \ \ GENERALRE LTY t� T INYL., +..Elxr._SH�aT.. `^✓ IN`:FGTMENT TP.I!ST I I � \•1 \ \ \ \\ \ \ 'PJy 9'93255527 IL/ C.B. 621, PC. 1Z7 P.E. 90. PG. "8 % PIN 9794255527 j f I �1 ,t \ \ \ \ \ • \ , \ .� s r. Y I If it I \ '�% N/r Q FEDERAL REALTY T'Y,j' AI T'Y 2s� INLr ti62 O.B. 621. jyriFE$21. G. 12 P7 . PG 28 `.7 PIN 9799255527 ( I I Hw I6 4'DIP IN -261.]q'\\ \'\\ 00=266 \1( 1 ND4- 29-- =4 - —¢ LEGEND He 1 LIMITS OF DISTURBANCE LOD SILT FENCE (SEE SHEET ECS) SILT FENCE STONE OUTLETS \ rn 11 (SEE SHEET EC5) I I I I I i TEMPORARY DIVERSION DITCH (SEE SHEET EC5) E E F E E CHECK DAM (SEE SHEET EC5) HW 13• r TEMPORARY GRAVEL CONSTR. ENTRANCE/DOT HwI 14 (SEE SHEET EC6) ROCK INLET SEDIMENT TRAP DOL I8"1 (SEE SHEET EC6) -- MATCH LINE 7+40 COIR MATTING (SFE SHEET EC6) N/r Q FEDERAL REALTY T'Y,j' AI T'Y 2s� INLr ti62 O.B. 621. jyriFE$21. G. 12 P7 . PG 28 `.7 PIN 9799255527 ( I I Hw I6 4'DIP IN -261.]q'\\ \'\\ 00=266 \1( 1 ND4- 29-- =4 - —¢ CONSTRUCTION AT STREAM BANK NOTE: Em STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLESS OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. I I I /1 O 0 aF II N,%f I `1A.1.Ah ANIS ENTERPFISES D.E. 355, PG. 2-4 �S P.8. 33, PG. 13 PIN 9799246919 Wvw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh NC 27607 (V) 919.782.0495 (t) 919.782.9672 www.wkdlckson.com FULL SCALE: 1-30' 0 30 e0 2' -FULL SCALE HALF SCALE �'Cc a LU z 0 Q Z55V 0 2 W 0 H Z O 02 U Z U) �j 0 0 = DOC �U LU J LL w0 Ili Z Iy z 0 G U ~ Z cc O cc a o PROJ. DATE: JAN 2018 O.C.: n O.C. DATE: JAN 2018 DRAWING NUMBER: EC4 PROJ. NO.: 20170225.00. RA � o O J m a Z O F- 0 O Q H 0 W LL Q65 L�L1 Y cc U) He 1 2 cam,. \ \ \ rn 11 I I I I I i I I I I II III HW 177 %i I I I F HW 13• r ( 1 I h HwI 14 DOL I8"1 -- MATCH LINE 7+40 SEE SHEET #EC3 CONSTRUCTION AT STREAM BANK NOTE: Em STREAM CHANNEL CONTRACTOR SHALL NOT PERFORM ANY WORK WITHIN STREAM BANK BELOW ORDINARY HIGH WATER MARK UNLESS OTHERWISE DIRECTED BY ENGINEER. ORDINARY HIGH WATER MARK ELEVATION IS NOTED AS PROPOSED TOP OF BANK ELEVATION ON THIS SHEET. I I I /1 O 0 aF II N,%f I `1A.1.Ah ANIS ENTERPFISES D.E. 355, PG. 2-4 �S P.8. 33, PG. 13 PIN 9799246919 Wvw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh NC 27607 (V) 919.782.0495 (t) 919.782.9672 www.wkdlckson.com FULL SCALE: 1-30' 0 30 e0 2' -FULL SCALE HALF SCALE �'Cc a LU z 0 Q Z55V 0 2 W 0 H Z O 02 U Z U) �j 0 0 = DOC �U LU J LL w0 Ili Z Iy z 0 G U ~ Z cc O cc a o PROJ. DATE: JAN 2018 O.C.: n O.C. DATE: JAN 2018 DRAWING NUMBER: EC4 PROJ. NO.: 20170225.00. RA � o O J m a Z O F- 0 O Q H 0 W LL Q65 L�L1 Y cc U) W J 11>l ¢ W ¢ � a WWK DICKSON community Infrastructure consuftants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (t) 8T 9.782.9872 www.wkdickson.com NG MgENaE NO aaaaaal 2' -FULL SCALE HALF SCALE �I'Z UJ Q Z O cc 0 U N F W ¢ LIl Lu 0 W Z J Q J S Oz z N W Q a Z p= O �LL O W LL is O W ii Z tii z p � U ~ Z O a o PROJ. DATE: JAN 2018 O.C.: TM G.C. DATE: JAN 2018 DRAWING NUMBER: EC5 PROJ. NO.: 20170225.00.RA 0 � N O a m z 0 Check Darn SILT FENCE • Z O tt O o O Z � rn I o a W a ¢ o Q>Q LL Z a � J W is a e ,e< geo,nw.�rs.2:mrz ,:, sire ._I A LB E n.1.4) N N _ � — _= G S w. G S z ar NGOOT e ,ST I T T wa,h<d ,tPne ,., N A N A E NE N E D ° E D w� A ' R A o 0 0 R o I R D D E E E �.. E sectioc view P T --------------- 1E RAL NOTES: JAAf�N�IN Pirrce It°n< to the Ines 4 ( and tlmensions shown in the 1 � A R T A I L � rd qn y j/` P b,N , 1 1 1 Ue TT} q R L plans an a 11 1., fobrc fw d.U., M p j�.�_ J R m;n °per` M S z K,,, the dente, St.— ..at,an It ...t g .abet bR aw E J a aA E C.1. .mond level whero the dmn abut. tie channel banks ` S 1.5 feet N( N E, 11C some atone It least beyond the Cl ­Dank t< \ to keep water Iron c,ttlTg around the ends of Ell chest dam T 1y T 4. Set sped., (L) Uel . dams to asare nal the elewliPn Plon VIE. 1 It the top or tie ower dam (9) isegaal to IT, tae cewtbn of the upper dam (A). 5. Protect the channel it,, the --t check I— Irmo heavy flow that could coos. a ­an. GENERAL NOTES: & MWe sure that the channel reach above the most upelream dam NOTE: DRAWING NOT TO SCALE 1. Us, silt fence only when drainage ores aces not <kceed Y acre is stoma. z Ensv.e mat ether area of m. channel, .ash IS --t .,.frena.. TITLE: Rensrorvs and n , in areas of _an<emrated now. TfT'LE: REVISIONS DET. NO. DBT. NO. below the Check doms,fare not suhiact to damage o, blockage rrem displaced .len<>. CHECK DAM - 08113 IS 2. silt Fence shall not be removed unless alta -nspeal<a by Town or chap<� Fal ,mre is stobdized and NOTE: DRAWING NOT TO SCA -E SILT FENCE 08/13 l3 SD-13 SD -18 0 TEMPORARY ROCK CHECK DAM 2 TEMPORARY SILT FENCE ECS NOT TO SCALE ECS NOT TO SCALE Diversion Ditch SILT FENCE OUTLET "E;CNE GS SILT FENCE FABRIC TO -RLP �F G S TN A STEEL FENCE POST N A IRE FENCE -SIL, a E N IN, E D ENCE FABRIC" ES«M L FENCE POST IRE FENCE E D 2' FACIE. V WIN. R A NARB 1.E o_0TN` R A I R FILTER OF 1' DAIRETE,R NA Plan View NsiE: AILA �� °z1.1 "_1"U1�E'« I R 2r N D NED STONE .. ti> � A aw ARA E A, A REPAIR OF SLT N D I i. N4x m 18 FENCE FAILURES. STEEP CUT OR FILLE SLOPE T� _ - - ------------ ------ M1� IrJI 'r G F,OW OI ON s� -J G 6 —ICA L— =— cr+Aoe s m1 m a T9 D D AROwARE CLOTH, M,Na� z ARRISEFENCE D D �1CI ORIGINAL [RAGE 'r E E E E A side View A A CrFlSs_Section View R I - {{ R M S aLT;B E �� Ii M g E _0.ADE T T T LI ,i lel �ND,E u u RE u BURY FENCE. HAG 6'IN GLOM. GENERAL NOTES: F AND SET fENCE F.ABRIL 6- INTO 'RENON ET Front View NOTE: DRAWING NOT t. AL a inlnum, sled. strove, h tack required for slle TO SCALE DET. NO. 'n.,lCli n IOP—I TITLE- REVISIONS I DET. NO. TITLE:REvlslorva 2. SEIM,, diversion aitch based on design v,1-4 Diversion Ditch 08/13 15 1 SD -20 NOTE: CRANING NOT TO SCA].. SILT FENCE OUTLET 08/13 15 1 SD -19 TEMPORARY DIVERSION DITCH 4 TEMPORARY SILT FENCE OUTLET ECS NOT TO SCALE w EC5 NOT TO SCALE WWK DICKSON community Infrastructure consuftants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (t) 8T 9.782.9872 www.wkdickson.com NG MgENaE NO aaaaaal 2' -FULL SCALE HALF SCALE �I'Z UJ Q Z O cc 0 U N F W ¢ LIl Lu 0 W Z J Q J S Oz z N W Q a Z p= O �LL O W LL is O W ii Z tii z p � U ~ Z O a o PROJ. DATE: JAN 2018 O.C.: TM G.C. DATE: JAN 2018 DRAWING NUMBER: EC5 PROJ. NO.: 20170225.00.RA 0 � N O a m z 0 U Z O tt O o O Z � rn I o a W a ¢ o Q>Q LL Z a � J W is a '�.. INU. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT: ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K DICKSON & CO. INC IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BEV UE COP June 122018 -Oen Carroll AUD, TR IES. D CKSON community InfraYfrucf,m consultants Trensgnation + Wafer Resources Urban Development + Geomafics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 w .kdickson. 2' —FULL SCALE 1' =HALF SCALE' Q Z 0 CZ7 U U) CD = F III CCLU LLl LU0 Z J J F- 02 Z �W O 0CL O W0 ¢ w W Z � z O 1= U ~ Z W O ¢ a o PROJ. DATE: JAN 2018 O.C.: IM O.C. DATE: JAN 2018 DRAWING NUMBER: EC6 PROJ. NO.: 20170225.00. RA FlLE NAME:O:\Proleets\RAM Beatty Sarviees12017022500RA-Elliott Storage Design\CADD\PIen Set\Elliott SHT EC.dwg- lu m Q H N 0 � a 0 z O U 7 WIRE MESH Z O U O W 0 O QF3 . Z � rn b. ,.V 5 B W fN LL Q ❑ I � O N E o CQ: 0°:0 857 STONE N ® � e I 3 ���5 A o ca'. -, A �o p:: Y '° YDr7 $¢ wo o _ �< A Op .o.o m III;, e.— -;E-.- - E N .- . 'O,' N" WIRE MESH "a am �� S p„ SURGE STONE R A C ; d', ., 0 a 1 R ".b, o' • o:b tom" WIRE MESH �e 4P 1' m a N p :oo.o.:a: �:' -..:.o.,,...:. :: a...:. o:o.'a....o:o.'o' d uv a NON-WDVEN G "� '• SEE NOTE FOR POST DESCRIPTION o ~ GEOTEXTILE D D MAXIMUM POST SPACING 4 FT. 00'. o;:� p- Z s z TO, �� o� P T Variables 12" Variable Ia NOTES O A B C D E {A� A t$ o5 • • 1 I.A"• RESIDENTIAL yIN. YIN. YIN. YIM. MIN. 'r L 2 --'r-- ' USE N0. 5 OR NO. 57 STONE FLOW+2 FOR SEDIMENT CONTROL STONE.HE3 11 24 ECL�OTHMWITHUM IRE _—___ FLOW Z ¢ f 0 N � � Cd�RC IAL 21' m a' e• aq' % YIN. YIN 4I N. YIN. YIx. S SEDIMENT 8" Yq" CONTROL STONE I 2' WIRE MESH 1•.B"11 MESHEHARDWARESEDIMENT INCH MESH OPENINGS. CONTROL STONE S" Z O a =II y E * PLACE TOP OF WIRE MESH 1 6" Eq tlI N A MINIMUM OF ONE FOOT BELOW THE SHOULDER OR ANY DIVERSION POINT. Q W J TITLE REVISION$ �ETND AVERAGE BOX DIMENSION VARIABLE ATTACH HARDWARE CLOTH TO POSTS WITH PLASTIC TIES, WIRE AVERAGE BOX DIMENSION VARIABLE Q Z O N ¢ GRAVEL tbTE TREATED WATER FASTENERS, OR OTHER APPROVED ATTACHMENT DEVICE. TREATED �[ CONSTRUCTION ENTRANCE SECTION A -A INSTALL WIRE MESH UNDER SEDIMENT CONTROL STONE. WATER SECTION Y -Y V O USE 5' STEEL POST, INSTALLED 2' DEEP MINIMUM, AND Q 1 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MULTI -DIRECTIONAL FLOW OF THE SELF -FASTENER ANGLECSTEELPOSYPE. SINGLE -DIRECTIONAL FLOW MAXIMUY OF 4 SHEET 1 OF 1 ECB NOTTOSCALE 1632.03 ROCK INLET SEDIMENT TRAP EC6 NOT TO SCALE z oy ¢'Q ......... 18" EXISTING _ (MIN.) —�" GROUND / Qr zO O 0¢Nxz FBAKFILL A f_ 3aSTAPLES ONh' A, >, 1' CENTERS, �, /G I� pQ IN TRENCH OOrq� `^" MIN TAPL.C�EC \ l _` MATTING SHALL BE STAPLES ON MATTING IN DITCHES PUKED IN TRENCH 1' CENTERS AND BACKFILLED IN TRENCH DIA SRA, (H� o Q Staple Chcc;; Pattern g FF ti T F V, / - —: DIAGRAMI- O MATTING ON SLOPES DIAGRAM iB; xares ¢ THIS DETAIL LIES TO STRAW, E ELSION, COIN FIBES SAT ANp P -ENT SOIL NEIN-ENT WT (PDW,f INSTALLATION ANO Ae OINECTED, STAPLES SNALL BE –.ED INTO A u —I NI. A –1— THROAT WIT OF I INGx AND NOT LESS nNAx a INCHES Ix LE—`. NE NOT TO SCALE SHEET 1 OF 1 1631.01 J C3) COIR MATTING ECB NOT TO SCALE '�.. INU. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT: ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K DICKSON & CO. INC IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BEV UE COP June 122018 -Oen Carroll AUD, TR IES. D CKSON community InfraYfrucf,m consultants Trensgnation + Wafer Resources Urban Development + Geomafics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 w .kdickson. 2' —FULL SCALE 1' =HALF SCALE' Q Z 0 CZ7 U U) CD = F III CCLU LLl LU0 Z J J F- 02 Z �W O 0CL O W0 ¢ w W Z � z O 1= U ~ Z W O ¢ a o PROJ. DATE: JAN 2018 O.C.: IM O.C. DATE: JAN 2018 DRAWING NUMBER: EC6 PROJ. NO.: 20170225.00. RA FlLE NAME:O:\Proleets\RAM Beatty Sarviees12017022500RA-Elliott Storage Design\CADD\PIen Set\Elliott SHT EC.dwg- lu m Q H N 0 � a z O U 7 Z O U O W O Z � rn 5 O Y W fN LL Q ❑ I � O N 1. THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE SPECIFICATIONS. SEE SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO GENERAL NOTES. 2. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE, AND, EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT INDICATE THE METHOD OR MEANS OF CONSTRUCTION. THE CONTRACTOR SWILL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, PROCEDURES, TECHNIQUES, AND SEQUENCE. ALL APPLICABLE SAFETY REGULATIONS TO BE FOLLOWED STRICTLY. 3. THE STRUCTURE WAS BEEN DESIGNED TO RESIST DESIGN LOADS ONLY AS A COMPLETED STRUCTURE. APPLICATIONS OF CONSTRUCTION LOADS TO THE PARTIALLY COMPLETED STRUCTURE SHALL BE CONSIDERED BY THE CONTRACTOR AND SO INCLUDED IN THE DESIGN OF SHORING, BRACING, FORMWORK, AND ANY OTHER SUPPORTING ELEMENTS PROVIDED FOR CONSTRUCTION OF THE STRUCTURE. DURING ERECTION AND UNTIL ALL PERMANENT CONNECTIONS ARE MADE, THE CONTRACTOR MUST PROVIDE TEMPORARY BRACING FOR THE STRUCTURE IN ALL DIRECTIONS. 4. THE GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND GRADE CONDITIONS (BOTH NEW AND EXISTING), REPORTING ANY DISCREPANCIES TO THE ENGINEER PRIOR TO ORDERING MATERIALS OR PROCEEDING WITH ANY PHASE OF THE WORK. 5. THE CONTRACTOR SHALL COMPARE STRUCTURAL SECTIONS WITH ENGINEERURAL SECTIONS AND REPORT ANY DISCREPANCY TO THE ENGINEER PRIOR TO FABRICATION OR INSTALLATION OF STRUCTURAL MEMBERS. 6. DO NOT SCALE DIMENSIONS FROM DRAWINGS. THE CONTRACTOR SHALL REQUEST, FROM THE ENGINEER, NECESSARY DIMENSIONS NOT SHOWN ON THE DRAWINGS. 7. IF ANY BIDDER IS IN DOUBT AS TO THE INTENT OF THE PLANS OR SPECIFICATIONS, THEY SHALL REQUEST AN INTERPRETATION FROM THE ENGINEER IN WRITING AT LEAST TEN (10) DAYS PRIOR TO THE SCHEDULED BID DATE. 8. PRINCIPAL OPENINGS IN THE STRUCTURE ARE SHOWN ON THESE DRAWINGS. THE GENERAL CONTRACTOR SHALL EXAMINE THE ENGINEERURAL MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR REQUIRED OPENINGS AS THEY SHALL BE PROVIDED FOR WHETHER SHOWN ON THESE DRAWINGS OR NOT. GENERAL CONTRACTOR SHALL VERIFY SIZE AND LOCATION OF ALL OPENINGS WITH ALL SUBCONTRACTORS PRIOR TO CONSTRUCTION. 9.SEE ENGINEERURAL DRAWINGS FOR FLOOR ELEVATIONS, FLOOR SLOPES, AND THE LOCATION OF DEPRESSED FLOOR AREAS. 10.WHERE A CONFLICT BETWEEN DRAWINGS AND SPECIFICATIONS OCCUR THE MORE STRINGENT REQUIREMENT SHALL APPLY. 11. WHERE A DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL APPLY FOR ALL LIKE OR SIMILAR CONDITIONS EVEN THOUGH NOT SPECIFICALLY REFERENCED ON THE DRAWINGS. DESIGN CRITERIA 1. APPLICABLE CODES: A, 2012 NORTH CAROLINA STATE BUILDING CODE (2009 INTERNATIONAL BUILDING CODE WITH REVISIONS) B. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES (ASCE 7-05) C. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-08) D. STEEL CONSTRUCTION MANUAL, 13TH EDITION (AISC 325-05) E. SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS (AISC 360-05) F. AMERICAN WELDING SOCIETY STRUCTURAL WELDING CODE (DI.1-04) 2. LIVE LOADS UNIFORM (PSF) CONCENTRATED(LB) TERRACE, PEDESTRIAN 100 N/A STAIRS 100 300 OCCUPANCY CATEGORY II 3. SNOW LOAD: GROUND SNOW LOAD Pg = Pf + 5 PSF IMPORTANCE FACTOR Is = 1.0 SNOW EXPOSURE FACTOR Ce = 1.0 THERMAL FACTOR Ct = 1.2 FLAT SNOW ROOF LOAD Pf = 15 PSF 4. WIND LOAD: BASIC DESIGN WIND VELOCITY V = 90 MPH IMPORTANCE FACTOR I. = 1.0 EXPOSURE CATEGORY B INTERNAL PRESSURE COEFFICIENTS 0.00 BASE SHEAR Vx = 5k Vy = 5k COMPONENTS AND CLADDING - ALL BUILDING COMPONENTS AND CLADDING ENGINEERED BY THE COMPONENT MANUFACTURER ARE TO BE DESIGNED BY THE MANUFACTURER'S ENGINEER FOR WIND LOADS DETERMINED PER THE NORTH CAROLINA STATE BUILDING CODE FOR THE BASIC DESIGN WIND VELOCITY, IMPORTANCE FACTOR, AND EXPOSURE LISTED ABOVE. S. SEISMIC LOAD (2008 USGS SEISMIC DESIGN IMPS): DESIGN METHOD - EQUIVALENT LATERAL FORCE PROCEDURE Ss 20.7 %g SS 8.0 %g SdS 22.1 %g Sill 12.8%9 IMPORTANCE FACTOR Ie = 1.0 SITE CLASS D(ASSUMED) SEISMC RESPONSE COEFFICIENT Csx = 0.074 CSy = 0.074 SEISMIC DESIGN CATEGORY B SEISMIC FORCE -RESISTING SYSTEM - STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC RESISTANCE, EXCLUDING CANTILEVER COLUMN SYSTEMS RESPONSE MODIFICATION COEFFIECIENT Rx = 3.0 Ry = 3.0 DEFLECTION AMPLIFICATION FACTOR Cdx = 3.0 CdY = 3.0 BASE SHEAR Vx = lk Vy = Ik FUTURE LOADS: UNLESS SPECIFICALLY NOTED, THERE ARE NO PROVISIONS MADE FOR FUTURE FLOORS, ROOFS, OR OTHER LOADS. FOUNDATIONS 1. FOUNDATION DESIGN IS BASED ON A PRESUMPTIVE ALLOWABLE SOIL BEARING PRESSURE OF 1,500 PSF, ACCORDING TO IBC TABLE 1806.2. THIS PRESUMPTIVE BEARING PRESSURE MUST BE FIELD VERIFIED BY A GEOTECHNICAL ENGINEER PRIOR TO FOUNDATION CONCRETE PLACEMENT. 2. FOOTINGS SHALL BE CARRIED TO LOWER ELEVATIONS THAN THOSE SHOWN ON THE DRAWINGS IF REQUIRED BY THE GEOTECHNICAL ENGINEER OR TESTING IAB TO REACH SOIL CAPABLE OF PROVIDING THE DESIGN ALLOWABLE SOIL BEARING PRESSURE. 3. THE SUBGRADE AND UNDERFLOOR FILL SHALL BE PREPARED TO A POINT THAT EXTENDS 3'-0" MINIMUM BEYOND THE LIMITS OF THE FOUNDATION. 4. MINIMUM SUBGRADE PREPARATION REQUIREMENTS ARE AS FOLLOWS: COMPACT ALL FILL UNDER BUILDING TO 98% MAXIMUM DENSITY AS DETERMINED BY ASTM D698. PLACE IN LAYERS OF 8" MAXIMUM LOOSE THICKNESS. VERIFY FIELD DENSITY, ASTM D1556, WITH AT LEAST ONE TEST PER 2,000 SQUARE FEET PER LAYER. SEE SPECIFICATIONS FOR OTHER TESTING REQUIREMENTS. S. WALLS RETAINING SOIL SHALL BE TEMPORARILY BRACED DURING BACKFILLING AND UNTIL ALL SUPPORTING SOIL AND SLABS ARE IN PLACE AND ARE AT DESIGN STRENGTH UNLESS NOTED OTHERWISE ON PIANS AND DETAILS. 6. UTILITY LINES SHALL NOT BE PLACED THROUGH OR BELOW FOUNDATIONS WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER. CONTRACTOR SHALL SUBMIT DETAILED DRAWINGS OF ALL SUCH CONDITIONS PRIOR TO CONSTRUCTION. CONCRETE / REINFORCING STEEL 1. CONCRETE COMPRESSIVE STRENGTH IN 28 DAYS: ELEVATED SLABS ON METAL DECK 4,500 PSI, NORMAL WEIGHT CONCRETE STAIR ON GRADE 4,500 PSI, NORMAL WEIGHT REINFORCING: TYPICAL - ASTM A615, GRADE 60 REINFORCING TO BE WELDED - ASTM A706 DEFORMED BAR ANCHORS - ASTM A 496 WELDED WIRE FABRIC - ASTM A1064 (FLAT SHEETS ONLY) 2. REFER TO THE DRAWINGS FOR REINFORCING LAP REQUIREMENTS. WHERE LAP SPLICES ARE NOT SHOWN, LAP PER ACI 318 OR CRSI STANDARDS. 3.LAP WELDED WIRE FABRIC SHEETS 8" MINIMUM. 4. CLEAR COVER FROM FACE OF CONCRETE: CAST IN PLACE CONCRETE (MEASURE TO OUTERMOST REINFORCING) - CONCRETE DIST AGAINST AND EXPOSED TO EARTH 3" CONCRETE EXPOSED TO EARTH/WFATHER 2" FOR 46 BARS AND LARGER 11/2" ELSE CONCRETE NOT EXPOSED TO EARTH/WEATHER 3/4" FOR SLABS AND WALLS 11/2" FOR BEAMS AND COLUMNS (TO TIES) S. FOOTING REINFORCING SHALL BE HELD IN PLACE BY BAR SUPPORTS WITH SAND PLATES, OR PRECAST CONCRETE BAR SUPPORTS AS DESCRIBED IN CHAPTER 3 OF THE CRSI MANUAL OF STANDARD PRACTICE. BAR SUPPORTS SHALL BE SPACED AT A MAXIMUM OF 4'-0"OC BOTH WAYS. ROCKS, CMU, OR CLAY BRICK WILL NOT BE USED AS SUPPORTS. 6. THE CONTRACTOR SHALL ASSUME CONCRETE OVERAGES IN ELEVATED DECK POURS DUE TO MEMBER AND DECK DEFLECTIONS. UNLESS SHOWN ON PUNS, BEAMS ARE NOT CAMBERED. CONCRETE OVERAGES MAY BE CALCULATED BY THE CONTRACTOR FOR BEAM DEFLECTIONS EQUALING L1300 INCLUDING ADDITIONAL DEFLECTIONS DUE TO PONDING AND DECK DEFLECTIONS PER SDI. 7. REBAR SHALL NOT BE HEATED WITH ATORCH IN THE FIELD. 8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER/ENGINEER FAR ENOUGH IN ADVANCE (48 HOURS) OF EACH CONCRETE POUR TO ALLOW AMPLE TIME TO CHECK THE LAYOUT OF THE STEEL BEFORE THE BEGINNING OF THE ACTUAL POUR, BUT NOT PRIOR TO 9D% OF THE STEEL HAVING BEEN PLACED. CONCRETE CONSTRUCTION JOINTS 1. CONTRACTOR SHALL PROVIDE NECESSARY CONSTRUCTION )DINTS IN MONOLITHIC CONCRETE POURS 50 THAT THE QUALITY OF PLACEMENT AND FINISH MEETS THE REQUIREMENTS OF PLANS AND SPECIFICATIONS. THE CONTRACTOR SHALL SUBMIT A PLAN SHOWING THE LOCATION OF ALL CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER FOR APPROVAL 2. THERE SHALL BE NO HORIZONTAL CONSTRUCTION JOINTS IN CONCRETE POURS. ALL VERTICAL CONSTRUCTION JOINTS IN SLABS AND BEAMS SHALL BE MADE WITH BULKHEADS. ADDITIONAL REINFORCING AT CONSTRUCTION JOINTS SWILL BE AS SPECIFIED BY THE STRUCTURAL ENGINEER. SEE TYPICAL CONSTRUCTION JOINT DETAILS. STRUCTURAL STEEL 1. STRUCTURAL STEEL: WIDE FLANGE SHAPES (W SECTIONS) - ASTM A992, GRADE 50 (FY=50 KSI) PLATES - ASTM A572, GRADE 50 (FY=50 KSI) OR ASTM A36 (FY=36 KSI) 2. ANCHOR BOLTS AND THREADED RODS SHALL CONFORM TO ASTM F1554, GRADE 36. 3. DESIGN, FABRICATION AND ERECTION SHALL BE AS PER SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS (AISC 360-05). 4. BEAM SIMPLE SHEAR AND BRACED FRAME CONNECTIONS NOT DETAILED ON STRUCTURAL DRAWINGS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER RETAINED BY THE STEEL SUPPLIER AND REGISTERED IN THE STATE IN WHICH THE PROJECT IS LOCATED. THE CONNECTIONS FOR NON - COMPOSITE BEAMS SHALL BE DESIGNED FOR REACTIONS SHOWN ON DRAWINGS OR FOR REACTIONS DETERMINED BY USING THE ALLOWABLE UNIFORM LOAD AS TABULATED IN PART 3 OF THE AISC STEEL CONSTRUCTION MANUAL FOR THE SECTION, SPAN AND STRENGTH OF STEEL SPECIFIED. CONNECTIONS SHALL BE MADE WITH ASTM A325 3/4"0 BOLTS (MINIMUM), TIGHTENED TO A SNUG -TIGHT CONDITION PER AISC REQUIREMENTS. S. REACTIONS MAY BE OMITTED ON PLANS FOR CLARITY. REACTIONS CAN BE PROVIDED ONCE A CONTRACT IS AWARDED. NOTIFY ENGINEER OF REQUEST. 6. THE CONNECTION ENGINEER SHALL SUBMIT A SIGNED AND SEALED LETTER STATING THEY HAVE REVIEWED THE STEEL SHOP DRAWINGS AND THE CONNECTIONS ARE CONSISTENT WITH THEIR CALCULATIONS AND INTENT. 7. WHERE STEEL MEMBERS ARE WELDED AND NO SIZE IS SPECIFIED, PROVIDE FULL LENGTH FILLET WELDS BOTH SIDES OF MEMBER. WELD SIZES SHALL BE AS FOLLOWS UNLESS NOTED OTHERWISE: MEMBER THICKNESS WELD SIZE 3/16" 3/16" 1/4" 3/16" 5/16" 3/16" 3/8" 1/4" 7/16" 1/4" 1/2" 5/16" 9/16" 3/8" 5/8" 7/16" 8. SPLICING OF STRUCTURAL STEEL MEMBERS IS PROHIBITED WITHOUT PRIOR APPROVAL OF THE ENGINEER AS TO LOCATION AND TYPE OF SPLICE TO BE MADE. ANY MEMBER HAVING A SPLICE NOT SHOWN AND DETAILED ON SHOP DRAWINGS WILL BE REJECTED. 9. ALL WELDING SHALL CONFORM TO THE AMERICAN WELDING SOCIETY CODE. USE E70 SERIES ELECTRODES FOR ALL STRUCTURAL STEEL WELDS. 10. SEE THE ENGINEERURAL AND STRUCTURAL DRAWINGS FOR ALL ITEMS REQUIRED TO BE HOT -DIP GALVANIZED AFTER FABRICATION. 1. ANCHOR BOLTS, REINFORCING STEEL, THREADED RODS, STAIR HANDRAILS, AND OTHER EMBEDDED STEEL ITEMS SHALL BE SET INTO HARDENED CONCRETE WITH ADHESIVE OR MECHANICAL POST -INSTALLED ANCHOR ONLY WHERE DETAILED ON THE DRAWINGS OR WHERE APPROVED BY THE ENGINEER. 2. PRE -APPROVED MANUFACTURERS ARE HILTI, SIMPSON STRONG -TIE, AND DEWALT. WHERE DETAILS INDICATE SPECIFIC ADHESIVE OR MECHANICAL POST -INSTALLED ANCHORS, IT IS ACCEPTABLE AT THE CONTRACTOR'S OPTION TO SUBMIT AN ALTERNATE SIMILAR PRODUCT PROVIDED BY A DIFFERENT MANUFACTURER AS LONG AS THE MANUFACTURER'S DATA PROVIDES EQUIVALENT LOAD CAPACITY TO THE ANCHOR SPECIFIED. 3. MANUFACTURER'S DATA FOR ALL ADHESIVE AND MECHANICAL POST -INSTALLED ANCHORS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO INSTALLATION. SUBMITTALS FOR ADHESIVE ANCHOR PRODUCTS SHALL INCLUDE ICC -ES EVALUATION REPORTS. STRICTLY FOLLOW THE MANUFACTURER'S SPECIFICATIONS AND INSTALLATION INSTRUCTIONS. HEED ALL LABEL WARNINGS. INSTALL IN ACCORDANCE WITH APPLICABLE SAFETY LAWS. 4. ALL HOLES SHALL BE DRILLED WITH A DIAMETER NO LARGER THAN 1/8" GREATER THAN THE DIAMETER OF THE STEEL MEMBER BEING INSTALLED. 5. ALL HOLES SHALL BE CLEANED WITH COMPRESSED AIR AND SHALL BE DRY PRIOR TO INSTALLATION OF ADHESIVE. HOLES SHALL BE FREE OF ALL DELETERIOUS MATERIAL SUCH AS LAITANCE, DUST, DIRT, AND OIL 5. CONTRACTOR PERFORMING ADHESIVE WORK SHALL BE AN APPROVED CONTRACTOR BY THE MANUFACTURER FURNISHING THE ADHESIVE MATERIALS, AND STALL HAVE NO LESS THAN FIVE YEARS EXPERIENCE IN THE VARIOUS TYPES OFADHESIVE RELATED WORK REQUIRED IN THIS PROJECT. A CERTIFICATION FROM THE MANUFACTURER ATTESTING TO THE TRAINING SHALL BE SUBMITTED TO THE ENGINEERIENGINEER ALONG WITH THE PROPOSAL TO DO THE WORK. REPRODUCTION 1. THE USE OF REPRODUCTIONS OF THESE CONTRACT DRAWINGS BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR, OR MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS SIGNIFIES HIS ACCEPTANCE OF ALL INFORMATION SHOWN HEREIN AS CORRECT, AND OBLIGATES HIMSELF TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO ANY ERRORS THAT MAY OCCUR HERE ON. ABBREVIATION LIST ld AT & AND 0 DIAMETER AB ANCHOR BOLTS ACI AMERICAN CONCRETE INSTITUTE ADDL ADDITIONAL ADH ADHESIVE AFF ABOVE FINISHED FLOOR AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION AISI AMERICAN IRON AND STEEL INSTITUTE ALT ALTERNATE ARCH ARCHITECT'S/ARCHITECTURAL ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS AWS AMERICAN WELDING SOCIETY S/ or BOT BOTTOM BRG BEARING BTWN BETWEEN CANT CANTILEVER CJ CONTROL JOINT CL CENTERLINE CLR CLEAR COL COLUMN CONIC CONCRETE CONN CONNECTION CONST JT CONSTRUCTION JOINT CONT CONTINUOUS CONTR CONTRACTOR COORD COORDINATE CTRD CENTERED DBA DEFORMED BAR ANCHOR DET DETAIL DIM DMENSION DST DISTANCE DWG(S) DRAWING(S) DWL(S) DOWEL(S) EA EACH EE EACH END E) EXPANSION )DINT ELEV ELEVATION EMBED EMBEDDED/EMBEDMENT ENGR ENGINEER EOD EDGE OF DECK EOS EDGE OF SLAB EQ EQUAL EQUIP EQUIPMENT EW EACH WAY EXIST EXISTING EXP EXPANSION EXT EXTERIOR FON FOUNDATION FFE FINISHED FLOOR ELEVATION ROW FACE OF WALL FS FAR SIDE FTG FOOTING GCI GAUGE GALV GALVANIZED HD HEADED HORIZ HORIZONTAL HSS HOLLOW STRUCTURAL SECTION INT INTERIOR IT JOINT K KIP(S) KSI KIPS PER SQUARE INCH LB LONG BAR LBS POUNDS LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LOC LOCATION LSH LONG SIDE HORIZONTAL LSV LONG SIDE VERTICAL LWC LIGHT WEIGHT CONCRETE MAX MAXIMUM MFR MANUFACTURER MID MIDDLE MN MINIMUM MISC MISCELLANEOUS MOWMIDDLE OF WALL No or 0 NUMBER NTS NOT TO SCALE NWC NORMAL WEIGHT CONCRETE OC ON CENTER OPNG OPENING OPP OPPOSITE HAND PAF POWDER ACTUATED FASTENER PL PLATE PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH REF REFERENCE REINF REINFORCING REQD REQUIRED SB SHORT BAR SCHD SCHEDULE SIM SIMILAR SOG SLAB ON GRADE SPEC(S) SPECIFICATION(S) SQ SQUARE STD STANDARD STIFF STIFFENER STIRR STIRRUP(S) STL STEEL SIR STRUCTURAL T/ TOP TCX TOP CHORD EXTENSION TOC TDP CHORD CONCRETE TOF TOP OF FOOTING IDS TOPOF STEEL TOW TOP OF WALL TYP TYPICAL UNO UNLESS NOTED OTHERWISE VERT VERTICAL VIF VERIFY IN FIELD W/ WITH WWF WELDED WIRE FABRIC WP WORK POINT DDICKSON mmunity inirmtmcl,m mnwkanN Transponation + Water Resources Urban Develop -rt + Geomati- 720 Corporate Drive Raleigh, NC 27807 (v) 919.782.0495 (0 919.782.9072 W W W.W kdickson.com uceres r+o STEWART SEAL: �t ot4x OR -AL + v rw- m O a o Z O U F 2 Oz 0Er0 _ � O 'dl' LL O w o Z C1 Z g o a Y > OIr O Z w w Y W_ Z $ CC Z U H a Wo u') Lu Lu O C) z J 0 VW �0 z O W O V w J z W F wz a � a t,. o PRN. DATE: pPRING 2018 O.C.: (Approver O.C. DATE: 01/192018 DRAWING NUMBER: S1 PROJ. NO.: Project Number DDICKSON munily intraswmure consuuants Transponation Resources + Wata, Urban Development + Ge—ocs 720 Corporate Drive Raleigh, NC 27807 (v) 919.782.0495 (f) 919.782.9872 www.wkdtckson.com STEWART —c , W 27WI PRO -1711-0 i SEAL Fs :"�ociRQi, y ^� W" EXISTING RETAINING / WALL, VII EQR REvO'L5834 - w,0, 2 l w m / S3 WI°x1 0 S } a o zPAVING, SEE e '� � z O CIVIL DWGS H \—� Cc U) z O OEr_ O W U N O p D z 0 z W n Z N EL _ - PAVING, SEE W EL ¢ T '-_ CIVIL DWGS p p Z � = _ Y v W z w a - - CONC STEPS ON GRADE, SEE 3/S3 z � Z 4 o Cc S3 LIJ J (7 o a z 1--1 w LL z J _ LLJ U W O z ¢ FRAMING PLAN 52 i/4" =: D" PROJ.DATE SPRING 2018 NOTES: I.FOR GENERAL NOTES AND ABBREVIATIONS, SEE Sl. o.c.: Q.C. DATE: Approver 01/19/201 B DRAWING NUMBER. 2. FINISHED FLOOR ELEVATION, SEE CIVIL DRAWINGS. 3. TOP OF STEEL ELEVATION 6 1/2" BELOW FINISHED FLOOR ELEVATION, UNO. (No) INDICATES TOP OF STEEL ELEVATION. 4. S, 1 INDICATES STEEL DECK SPAN DIRECTION. CONSTRUCTION SHALL BE 4 1/2' NORMAL WEIGHT CONCRETE ON C 1 20GA COMPOSITE STEEL DECK. TOTAL THICKNESS = 6 1/2". SEE TYPICAL SLAB CONSTRUCTION DETAILS ON S3. J 5. MINIMUM BEAM REACTION TO BE 10k, UNO. 6. FOR TYPICAL SLAB CONSTRUCTION DETAILS, SEE S3. PROJ. NO.: 7. ALL STEEL AND CONNECTION SHALL BE GALVANIZED. Project Number WK SEE PLAN SEE PLAN DD TYP ; CONT CHAIRS SCREED SUPPORT mmmuniry Inhaetwce consultants 3/16 2-12 � of SUPPORTING STRAP AS REQD Tranaponaaon + Water Resources WWF @4'-0"OC, Urban Development + Geomarim RAILING, SEE EW 720 Corporate Drive CIVIL DWGS Raleigh, NC 27607 #4@8"OC EA WAY _ - (v) 919.782.0495 18" ' SEE CIVIL DWGS " (f) 919.782.9672 #5 DOWE� 24" FOR ATTACHMENT SLAB ON GRADE, 3/8" BENT P4 TYP O O O www.wkdickson.com @18"OC SEE PLAN 0 O O "0'10EAaE NO #5@18"OC A a 6z6-W2.1xW2.1 WWF °p v e -. • • • #5 DOWELS @18"OC "� - SEE CIVIL DWGS FOR TREAD AND RISER DIMENSIONS MEMBER PERPENDICULAR TO DECK SPAN (BEAM) MEMBER PERPENDICULAR Q MEMBER PARALLEL TO MEMBER PARALLEL TO TO DECK SPAN (BEAM) FINISH GRADE, #3 NOSING BAR, TYP DECK SPAN (GIRDER) DECK SPAN (GIRDER) SEE CIVIL DWGS FINISH GRADE, V-0 S T E WA RT SEE CIVIL DWGS (2)#4 CONT PAVING, SEE STEEL DECK, SEE NOTE 3 CIVIL DWGS rn neo' — 919.380.1— ox, rAro ,r1nar, ' RE<� COMPOSITE COMPOSITE FLOOR CONSTRUCTION DETAIL E cn nr ot1 vaoT #4@8"OC EA WAY - NOTES: TOF SEE PLAN (2)#5 a A a 1. THIS DETAIL APPLIES TO DECK SUPPORTED COMPOSITE SLABS, AS INDICATED ON PUNS. 2. WELD DECK TO SUPPORTS PER FLOOR DECKING ATTACHMENT DETAIL. 3. MINIMUM STEEL DECK PROPERTIES: 2"-20 GAGE COMPOSITE DECK WITH Ip=0.409 in4/R, In=0.406 in4/R, Sp=0.341 in3/R, Sn=0.346 in3/R, AND Fy=50 ksi. o E CONT, TYP o HAVE BEEN DESIGNED "UNSHORED CONSTRUCTION". 4. COMPOSITE SLABSCONTRACTOR SEAL: ^' • • • TE S. THE CONTRACTOR SHALL ASSUME CONCRETE OVERAGES IN ELEVATED DECK POURS DUE TO MEMBER AND DECK DEFLECTIONS. UNLESS SHOWN ON PLANS, BEAMS ARE NOT CAMBERED, CONCRETE OVERAGES MAY BE CALCULATED WTED BY THE CONTRACTOR FOR BEAM s."'�s,,,t �!o• v -- ti DEFLECTIONS EQUALING U300 INCLUDING ADDITIONAL DEFLECTIONS DUE TO PONDING AND DECK DEFLECTIONS PER SDI. s•``�'�N ee ( ONty #a@z4"oc, TYP (2)#4 CONT 5.. 8.. 5.. 5,. 8.. 5„ j- SECTIONA-A '''•�,rP',a``'�,,, 36• wlDm w o' FASTENING PATTERN o a COMPOSITE TYPE, o FINISH IS GALVANIZED SIDELAP CONNECTORS Z O (3)#10-16 SCREWS PER BEAM U SPACING, OR 36" MAXIMUM 0 DECK SUPPORTS cc �1 DETAIL DETAIL 5/8"0 PUDDLE WELD O 53 STEPS ON GRADE WITH CONCRETE WALLS 53 TYPICAL COMPOSITE SLAB DETAILS (3614 PATTERN) U NTS NTS FLOOR DECK ATTACHMENT DETAIL O DE d9 LL w O O ? PAVING, SEE CIVIL DWGS BASE PL & BRG PAD PER 5/53 5 SLAB, SEE PLAN GUARDRAIL, SEE & 1/53 CML DWGS 53 g g FFE o EL SEE _Q ¢ > \ 1 0 O o Z O ¢ N p Z W z 3/4" CHAMFER, TYP (2)#4 HORIZ 0 �/�aUVHSUP z W w¢ Lu SLAB, SEE PLAN1� & 1LAN TOW IQ #4 VERT @ 1z m, , EE PLAN #4032"OC SEE CML MOW #5012" OC, VERT = DWGS BEAM, SEE PLAN \'o #4@12" OC, HORIZ >'� _ BEAM, SEE PIAN • PROVIDE 1112"0 WEEPS .. ,: . , ,. @8'-0"OC IF FDN DRAIN - #3 STIRRUPS @ e f (8)#7 BARS z .. IS NOT PROVIDED .., .. 12"OC, MAX __________ _______ ________ PAVING, SEE CIVIL DWGS `l. -' .. 2'-0"WIDE GRANULAR . Lf) 2 `. FILL W/ FILTER CLOTH (3)#5 CONT 7 L1J ¢ - 11/2" (2)3/4"0 ANCHOR . .. . s OR DRAINAGE BOARD TOP & BOT 6" 1'-6" -- - #3 TIES @12"OC 0 v z TYF RODS, EMBED=9" -� -. 10 CONT 2X4 KEYWAY LU ;EO 3/16 1/2"x6"z12" BEARING PL W/ 1/2" ELASTOMERIC f z I? f • FDN DRAIN, SEE CIVIL DWGS Z J BEARING PAD O = LU Q FINISH GRADE, SEE CIVIL DWGS (n �� O ..LLJ O d 94@12" OC #5@12" GC .. ADDL 13 BAR (3)#4 CONT DOWELS TO MATCH -- Z J F SIZE AND SPACING - W OF VERT REINF W - U w 2 N PROJ. DATE: (SPRING 2018 O.C.: I CPL C O.. DATE: 01/192018 DRAWING NUMBER: S3 5 DETAIL r4� DETAIL �1 SECTION PROD. NO.: 53 11/2" = 1'-0" 53CONCRETE RETAINING WALL o• © Project Number S3 3/4" = 1'-0" 3/4" = 1'-0" GENERAL NOTES 1. This structure has been designed in accordance with the project architects plan layout and guidelines. Suitability for access and intended usage shall be the responsibility of the architect. 2. Vehicular access larger than the design live load shall be limited by permanent physical means. 3. Prior to construction the contractor shall verify all elevations through the project architect. 4. Only PermaTrak North America may provide the precast structure shown on these plans. DESIGN DATA 1. Boardwalk shall be designed in accordance with the AASHTO LRFD bridge design specifications and the LRFD guide specification for the design of pedestrian bridges. Design Live Load: Pedestrian Loading - 90 psf Uniform Vehicular Loading - H-5 Truck - 10,000 lbs total load 2. Abutments and piers shall be designed for lateral earth pressure, live load surcharge and structure loads. Recommended allowable bearing pressure: Unknown psf per geotechnical report referenced below. 3. At the time these drawings were created, no geotechnical information was available. Assumptions have been made regarding foundation design. MATERIALS 1. All bolts, nuts, washers, and hardware shall be hot dipped galvanized after fabrication in accordance with ASTM A153. 02014 by PermaTrak@ this PROJECT COMPONENTS drawing contains information that is proprietary to and 5 4 property of PermaTrak@ and shag be kept confidential. No dupication or distribution of this 3 drawing may be made without the express written consent of 2 PermaTrak@ except for the limited purposes set forth in the 1 contract between PermaTrak@ and pafor whom this NO. DATE DESCRIPTION BY: drawing was made. ELLIOT STORAGE DESIGN PREPARED FOR: STEWART ENGINEERING PRELIMINARY FOR DISCUSSION ONLY Per'"matirak- The Concrete Boardwalk Company OFFICE LOCATIONS t-LUKIUA GEORGIA LOUISIANA NORTH CAROLINA www.permatrak.com TEL: 877-332-7862 OHIO Patented Product: U.S. Patent PROJECT TITLE: ELLIOT STORAGE DESIGN CHAPEL HILL, INC JOB NUMBER: PROJECT COMPONENTS DATE: PRECAST CONCRETE TREADS m PRECAST CONCRETE ABUTMENTS W ¢ PRECAST CONCRETE BEAMS i JVP D a PRECAST CONCRETE CURBS PT01 RUBBER LEVELING PADS SHIM AND GROUT (LEVELING FOR BEAM TO ABUTMENT) Wm O UNREINFORCED CONCRETE (2000 PSI MINIMUM COMPRESSIVE STRENGTH) W U W 3/4" x 10" LONG THREADED RODS WITH NUTS AND OVERSIZED WASHERS (ALL GALVANIZED) (CURB TO TREAD CONNECTION) 95 p to SIKAFLEX-11 FC EXPANSIVE FILLER MATERIAL (CURB TO TREAD CONNECTION) U Per'"matirak- The Concrete Boardwalk Company OFFICE LOCATIONS t-LUKIUA GEORGIA LOUISIANA NORTH CAROLINA www.permatrak.com TEL: 877-332-7862 OHIO Patented Product: U.S. Patent PROJECT TITLE: ELLIOT STORAGE DESIGN CHAPEL HILL, INC JOB NUMBER: 2018-1014 DATE: 01/25/18 DESIGNED BY: JVP DRAWN BY: AJW CHECKED BY: JVP SHEET NO. PT01 Begin Boardwalk Sta. X+XX.XX± 10 r ZD yr 1 io PT02 0 i+r 29'-117/8" 15 - 5 1/2" Thick x 23 7/8" Wide x 9'-D" Long Precast Concrete PermaTrak"' Treads Plus 14 Joints @ 1/8"± Per Joint PermaTrak 1 J I End Boardwalk ak Sta. X+XX.XX± Curb (Trak Boardwalk — — J PermaTrak Beam (Typ.) N a 30' SPAN BOARDWALK PLAN Unreinforced Concrete Pad (2000 PSI Min. Compressive Strength) Scale: 1/4" = 1'-0" Total Boardwalk Length = 29'-11 7/8" (Along Centerline) PermaTrak Curb (Typ.) PermaTrak Tread (Typ.) PermaTrak Beam (Typ. SECTION \PT02 Scale: 1/2"=1'-0" PermaTrak Abutment (Typ.) Slope Protection Approximate As Required By Ground Civil Engineer Line 4" (Typ.) DETAIL ' ' I 13"x1'-6" PermaTrak Beam (Typ.) 9'-0" 7'-10" Clear 5 1/2"x23 7/8" PermaTrak Tread I 1'-6" CL Beam PermaTrak Curb (Typ.) Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ©2014 by PermaTrak® this Approximate PREPARED FOR: OFFICE LOCATIONS PROJECT TITLE: JOB NUMBER: 2018-1014 5 Ground drawingcontains information ����� that prop -ft tary to property of PermaTrak®and Line STEWART ENGINEERING � FLORIDA 2 SECTION shall be kept confidential. No duplication or distribution of this 4 PT02 Scale: 1/2" = 1'-0" ELLIOT STORAGE DESIGN DESIGNED BY: JVP Notes: 3 Beginning Or Ending the express written consent of Curb Not Shown For Clarity. CHAPEL HILL, NC PermaTrak® except for the Of Boardwalk PRELIMINARY CHECKED BY: JVP limited purposes set forth in the PermaTrak® contract between who and a for whom this FOR DISCUSSION ONLY NORTH CAROLINA 1 PermaTrak Tread (Typ.) drawing was made. www.permaVak.com TEL:877-332-7862 OHIO r NO. DATE DESCRIPTION By. 1/8" Rubber Leveling Pad Proposed Path Proposed Path (Supplied By PermaTrak) (By Others)(Typ.) (By Others) Rubber Leveling Pad (Supplied By PermaTrak) PermaTrak PermaTrak Beam Abutment Approximate Ground Line PermaTrak Abutment (Typ.) Unreinforced Concrete Pad c (2000 PSI Min. Compressive Strength) �peQ TYPICAL PRECAST ABUTMENT DETAIL Scale: 1" = ,'-0" Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ©2014 by PermaTrak® this 6 PREPARED FOR: OFFICE LOCATIONS PROJECT TITLE: JOB NUMBER: 2018-1014 5 DATE: 01/25/18 drawingcontains information ����� that prop -ft tary to property of PermaTrak®and STEWART ENGINEERING � FLORIDA shall be kept confidential. No duplication or distribution of this 4 erma ra GEORGIA ELLIOT STORAGE DESIGN DESIGNED BY: JVP drawing may be made without 3 DRAWN BY: AJW the express written consent of The Concrete Boardwalk Company LOUISIANA CHAPEL HILL, NC PermaTrak® except for the 2 PRELIMINARY CHECKED BY: JVP limited purposes set forth in the PermaTrak® contract between who and a for whom this FOR DISCUSSION ONLY NORTH CAROLINA 1 SHEET NO. drawing was made. www.permaVak.com TEL:877-332-7862 OHIO r NO. DATE DESCRIPTION By. 15'-11 7/8" 8 - 5 1/2" Thick x 23 7/8" Wide x 9'-0" Long Precast Concrete PermaTrak'"' Treads Plus 7 Joints @ 1/8"± Per Joint PermaTrak Begin Boardwalk I Curb (Typ.) End Boardwalk Sta. X+XX.XXt Sta. X+XX.XX± "� v� 3 io PT03 Ck Boardwalk n 0 PermaTrak Abutment .Typ.) ro PermaTrak v Beam (Typ.) a TYPICAL 16' SPAN BOARDWALK PLAN Scale: 1/4" = V-0" 4" (Typ.) I I " Total Boardwalk Length = 15'-11 7/8" (Along Centedine) PermaTrak Curb (Typ.) g v PermaTrak ,'.. Tread(Typ.): •..:;. �:': • PermaTrak Beam (Typ.) I1=1I1-1I1= j���i�� Unreinforced Concrete Pad Slope Protection " (2000 PSI Min. Compressive Strength) Approximate As Required By Ground Civil Engineer Line 3 SECTION PT03 Scale: 1/2"= 1'-0" Proposed Path (By Others)(Typ.) PermaTrak Abutment (Typ.) q Beam Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 02014 by PermaTrak® this T-10" Clear DETAIL OFFICE LOCATIONS PROJECT TITLE: JOB NUMBER: 2018-1014 5 PToa drawing contains information 51/2"x23 7/8" ������ �� that is proprietary to and property of PermaTrak® and PermaTrak Tread ® FLORIDA LE shall be 4 11„x1,_2„ Pe DESIGNED BY JVP PermaTrak Beam (Typ.) GEORGIA rm a ra ELLIOT STORAGE DESIGN I I Approximate ay be drawing may be made without 3 Ground DRAWN BY: AJW Line eexpresswrittenwnsentof forthe2 Permd rakO exceptpurposes The Concrete Boardwalk Company LOUISIANA p y CHAPEL HILL, NC 4 SECTION PT03 Scale: 1/2” = V-0" Total Boardwalk Length = 15'-11 7/8" (Along Centedine) PermaTrak Curb (Typ.) g v PermaTrak ,'.. Tread(Typ.): •..:;. �:': • PermaTrak Beam (Typ.) I1=1I1-1I1= j���i�� Unreinforced Concrete Pad Slope Protection " (2000 PSI Min. Compressive Strength) Approximate As Required By Ground Civil Engineer Line 3 SECTION PT03 Scale: 1/2"= 1'-0" Proposed Path (By Others)(Typ.) PermaTrak Abutment (Typ.) q Beam Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 02014 by PermaTrak® this 6 PREPARED FOR: OFFICE LOCATIONS PROJECT TITLE: JOB NUMBER: 2018-1014 5 drawing contains information ������ �� that is proprietary to and property of PermaTrak® and STEWART ENGINEERING ® FLORIDA DATE: 01/25/18 shall be 4 Pe DESIGNED BY JVP duplicatio atkeptconfidential. ft distribution of this GEORGIA rm a ra ELLIOT STORAGE DESIGN ay be drawing may be made without 3 DRAWN BY: AJW eexpresswrittenwnsentof forthe2 Permd rakO exceptpurposes The Concrete Boardwalk Company LOUISIANA p y CHAPEL HILL, NC limited purposes set forth in the PRELIMINARY CHECKED BY: JVP 1 SHEET NO. contractbetween PermaTrak® and parry for whom this and FOR DISCUSSION ONLY NORTH CAROLINA NO. DATE DESCRIPTION BY: drawing was made. www.permatrak.com TEL: 877-332-7862 OHIO PT03 q PermaTrak Curb Notes: 1. 2" diameter preformed holes supplied by PermaTrak. 2. Connection hardware supplied by others. 3. Fill oversized dowel holes with Sikaflex-11 FC or approved equal. 4. After tightening nut, deform threads on rod to prevent loosening. 2"t Gap 5. Threaded rod shall be galvanized PermaTrak Curb and have NC (National Coarse) commonly called Coarse Threads. A fine thread rod is NOTcompatible with the insert in the precast curb. o I I � J B DETAIL PT02 Scale: 1 1/2" = 1'-0" io i I I iv 3/4" Dia. x 10" Threaded Rod w/ Nut and Oversized Washer Sikaflex -11 FC (Galvanized) (See Notes) Expansive Filler Material (Typ.) 4 SECTION PT03 Scale: 1 1/2" = 1'-0" PermaTrak 1/2" Max Tread (Typ.) Spacing 1/8"t 1/8" Rubber Leveling Pad (Supplied By PermaTrak) PermaTrak Beam TYPICAL TREAD SPACING DETAIL Scale: Not To Scale PermaTrak 1/8" Rubber Leveling Pad Tread (Typ.) (Supplied By PermaTrak) PermaTrak 'Shim & Grout i Beam As Required 'Note: Due to tolerances and variance in precast production and installation accuracy, shimming and grouting may be required. Where required the entire bearing area and void shall be shim and grouted. TYPICAL SHIM/GROUT DETAIL Scale: Not To Scale (UNDER TREAD) Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ©ayon by Permsinfor® this drawing contains information that is proprietary to and 1 .hall beof P kpteff confidrek®and shag be kept confidential. ft duplication my a maddon h this drawing may be made without e express written consent of PermaTrak®excepttorfhe limited purposes set forth in the cornract between PermaTrak® and party for whom this drawing Was Md.. 6 PREPARED FOR: STEWART ENGINEERING �� .�����• OFFICE LOCATIONS �� �� Permiffra*k® FLORIDA GEORGIA The Concrete Boardwalk Company LOUISIANA P y NORTH CAROLINA www.permaVak.com TEL:877-332-7862 OHIO PROJECT TITLE: ELLIOT STORAGE DESIGN CHAPEL HILL, NC JOB NUMBER: 2018-1014 5 DATE: 01/25/18 4 DESIGNED BY: JVP 3 DRAWN BY: AJW PRELIMINARY FOR DISCUSSION ONLY 2 CHECKED BY: JVP , SHEET NO. PT04 NO. DATE DESCRIPTION BY. NOTES: PermaTrak Installation Diagrams This document is intended to provide the installer guidelines for typical PermaTrak applications. It is not meant to be all inclusive and may be adjusted based upon encountered field conditions. o Light Lifting Equipment Beginning Of Boardwalk Plans) (See Pier PermaTrak PermaTrak I Beam Beginning Of Boardwalk Abutment Proposed Path (See Plans) (At Grade) I I I I _ PermaTrak Abutment Bearing Elevation (See Plans)---- ----_J I I � Pier -�� STEP 2: STEP 3: STEP 1: Survey center of pier control points. Excavate subgrade to bearing elevation. Position beam over pier and abutment and ensure uniform bearing. Survey begin station, excavate in-situ soil, set unreinforced concrete pad, Set pier supplied by contractor. Check horizontal and vertical control. set abutment, check horizontal and vertical control. Beginning Of Boardwalk PermaTrak o 4Light 0 (See Plans) Tread (Typ.) Light Lifting Lifting Equipment Equipment PermaTrak Tread PermaTrak PermaTrak Beam Tread (Typ.) Beginning Of Boardwalk PermaTrak ISPlans) 1/8" Rubber Abutment Leveling Pad PermaTrak PermaTrak Beam L_ _J �_— I#_J Abutment PermaTrak Pier Pier �I Beam _ J STEP 6: Pier STEP 4: STEP 5: Continue installing piers, beams and treads at design locations until reaching ending abutment. If'Top Down Construction" is Set 2nd tread ahead of 1st tread, aligning tongues with grooves, check joint spacing, desired then PermaTrak engineering must be contacted for approval. Top surface of boardwalk must be protected with plywood Lay rubber leveling pad on top of beam, position precast tread adjust tread position if needed, continue setting treads until 1/3 span reached. or other means while operating machinery on the boardwalk. on top of beam, be sure tread fits snug against abutment. PermaTrak Beginning Tread (Typ.) PermaTrak Of Boardwalk Abutment (See Plans) PermaTrak Beginning Tread (Typ.) PermaTrak Of Boardwalk PermaTrak Abutment (See Plans) Beam Bearing Elevation Proposed Path (At Grade) Proposed Path (See Plans) At Grade) I I =_J CL Pier=_J I Qk Pier------���111 STEP 7: STEP 8: Establish end of boardwalk (may need adjustment based upon accuracy of installed portion in steps 1 - 6). Position beam over pier and abutment and ensure uniform bearing. Excavate in-situ soil at abutment, set unreinforced concrete pad beneath abutment to bearing elevation. Install treads on top of beams (per steps 4 - 5) until complete. Place abutment, check squareness with boardwalk alignment and adjust if necessary. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 02014 by PermaTrak® this 6 PREPARED FOR: OFFICE LOCATIONS ��. PROJECT TITLE: JOB NUMBER: 2018-1014 5 DATE: DATE: 01 /25/18 drawing contains information 010 i �■ Mat is proprietary to and property of PermaTraA@ and STEWART ENGINEERING FLORIDA shall be kept confidential. No dupficationordistributionofthis GEORGIA Pe rmaTra ELLIOT STORAGE DESIGN DESIGNED BY: JVP 3 DRAWN BY: AJW drawing may be made without of the Trak® The Concrete Boardwalk Company LOUISIANA CHAPEL HILL, NC Perm except for Met 2 PRELIMINARY CHECKED BY: JVP limited purposes thin Ma NORTH CAROLINA contract between PermaTrak® Parr end for whom this , FOR DISCUSSION ONLY SHEET NO. party drawing wasmade. www.permatrak.com TEL: 877-332-7862 OHIO PT05 NO. DATE DESCRIPTION gY.