HomeMy WebLinkAboutNCG590019_Compliance Evaluation Inspection_20190115 NORTH CAROLINA
ROY COOPER a!Quality
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
January 15, 2019
Mr. Danny Shaw, Mayor
City of Ramseur
P.O. Box 545
Ramseur, NC 27261
SUBJECT: Compliance Evaluation Inspection
Ramseur WTP
Certificate of Coverage NCG590019
Randolph County
Dear Mr. Shaw:
On January 10, 2019, Jenny Graznak and Kelli Park of this office, met with Mark Grose, Operator in
Responsible Charge (ORC), to perform a Compliance Evaluation Inspection at the Ramseur Water
Treatment Plant. This type of inspection consists of two basic parts: an in-office file review and an on-
site inspection of the treatment facility. The attached EPA inspection form details the areas that were
evaluated during this inspection.A few pertinent findings and issues from the inspection are described
in the inspection summary.
Overall, the inspection found the facility to be satisfactory. If you have any questions regarding the
inspection or this report, please contact Jenny Graznak or me at(336) 776-9800.
Sincerely,
Sherri V. Knight, P.E.
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments:EPA Water Compliance'Inspection Report
cc: Central Files
WSRO
INPDES Unit)
Q?)
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W.Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336-776-9800
United States Environmental Protection Agency Form Approved
E PA Washington,D C 20460 OMB No 2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day 'Inspection Type Inspector Fac Type
1 [N I 2 I—�5 I 3 I NCG590019 Ill 12I 19/01/10 117
18I, 19121 201
211
I111 11 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 I I 1 1 r6
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA —- Reserved
67I I 70 I I 711 I 72 1 ti 1 731 I 1" 751 I I I I I I 1
80
Section B'Facility Data LJ
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 01.00PM 19/01/10 17/08/01
Ramseur WTP
797 NC Hwy 22 N Exit Time/Date Permit Expiration Date
02 OOPM 19/01/10 19/07/31
Franklinville NC 27248
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
Daniel Mark Grose/ORC/336-824-8891/
Terry Cheyenne Lewallen/ORC/336-824-3939/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Danny R Shaw,PO Box 545 Ramseur NC
273160545/Mayor/336-824-8530/3368246624 No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
III Permit I Flow Measurement MI Operations&Maintenance Records/Reports
El Self-Monitoring Program • Sludge Handling Disposal III Facility Site Review • Effluent/Receiving Waters
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) ,Agency/Office/Phone and Fax Numbers Date
Jennifer F Graznak WSRO WQ//336-771-5000/ ' /IS-
201
Signature of Man ment Reviewer Agency/Office/Phone and Fax Numbers Date
f ! ( /5
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete
Page# 1
NPDES yr/mo/day Inspection Type (Cont.) 1
3I NCcs90019 in12I 19/01/10 117 18 Li
Section D.Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
The inspection found the facility to be satisfactory. However,there were a few paperwork issues
discovered during the inspection. Please note them as follows:
(1)The Town transports liquid sludge to the Ramseur\MNTP for surface disposal,in the sludge
lagoon. In future, DEQ requests that the facility have verification of gallons transported in the form or '
receipts from Overby's Septic Hauling Company. `
(2) Some paper copies of DMRs were missing during the inspectors'file review. Please make sure
that analytical lab results and DMRs are available for review during inspections.
Page# 2
Permit: NCG590019 Owner-Facility: Ramseur WTP
Inspection Date: 01/10/2019 Inspection Type: Compliance Evaluation ,
Permit ' Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 • 0
application'?
Is the facility as described in the permit? ❑ 0 0
#Are there any special conditions for the permit? 0 • 0 0
Is access to the plant site restricted to the general public? 0 0 ❑
Is the inspector granted access to all areas for inspection? • 0 ❑ ❑
Comment. This plant used to be permitted under NPDES permit#NC0074454, which has been -
rescinded.The general permit#NCG590019 became effective June 16, 2017.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping'? • ❑ ❑ ❑
Does the facility analyze process control parameters,for ex MLSS, MCRT, Settleable • ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable'?
Comment.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • ❑ 0 ❑
Is all required information readily available, complete and current'? ❑ II 0 0
Are all records maintained for 3 years(lab reg. required 5 years)? • ❑ 0 0
Are analytical results consistent with data reported on DMRs? • ❑ ❑ ❑
Is the chain-of-custody complete'? • ❑ ❑ ❑
Dates,times and location of samplingIN
Name of individual performing the sampling 111
Results of analysis and calibration •
Dates of analysis
Name of person performing analyses •
Transported COCs •
Are DMRs complete do they include all permit parameters'? • ❑ 0 ❑
Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ • ❑
(If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ M ❑
• on each shift'?
Is the ORC visitation log available and current'? • ❑- ❑ ❑
Is the ORC certified at grade equal to or higher than the facility classification'? E ❑ ❑ ❑
Is the backup operator certified at one grade less or greater than the facility classification'? • ❑ ❑ ❑
Is a copy of the current NPDES permit available on site'? • ❑ ❑ ❑
Page# 3
Permit: NCG590019 Owner-Facility: Ramseur WTP
Inspection Date: 01/10/2019 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ III ❑
Comment Some printed monthly DMRs were missing when the inspectors reviewed the analytical
results and data. Mr. Groce measures pH and total residual chlorine under field parameter
certification#5270. Meritech certified the lab's thermometer on December, 12. 2018 and
verification was provided during the inspection.All other parameters are analyzed by
Environment One.
De-chlorination Yes No NA NE
Type of system? Liquid
Is the feed ratio proportional to chlorine amount(1 to 1)? ❑ ❑ • ❑
Is storage appropriate for cylinders? ❑ ❑ • ❑
#Is de-chlorination substance stored away from chlorine containers? ❑ ❑ • ❑
Are the tablets the proper size and type? ❑ ❑ III ❑
Comment Liquid sodium bisulfate is added to the clarifier.
Are tablet de-chlorinators operational? ❑ ❑ • ❑
Number of tubes in use?
Comment:
Flow Measurement-Effluent Yes No NA NE
#Is flow meter used for reporting? ❑ ❑ ❑
Is flow meter calibrated annually? ❑ ❑ IN1 ❑
Is the flow meter operational? ❑ ❑ • ❑
(If units are separated) Does the chart recorder match the flow meter? ❑ ❑ • ❑
Comment. s The filter backwash discharge is estimated by calculating freeboard in the 132, 000-gallon
circular clarifier each time the supernatant is released.The operators estimate 9,395 gallons
per foot in the clarifier.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ • ❑
Is sample collected below all treatment units? • 0 ❑ ❑ •
Is proper volume collected? • ❑ ❑ ❑
Is the tubing clean'? ❑ ❑ ❑ •
#Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees ❑ 0 ❑
Celsius)?
Is the facility sampling performed as required by the permit(frequency,sampling type ❑ ❑ ❑
representative)?
Page# 4
•
Permit: NCG590019 Owner-Facility. Ramseur WTP
Inspection Date: 01/10/2019 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Comment: The facility collects all grab samples of the effluent except the annual Whole Effluent Toxicity
sample which is collected by a 24-hour composite sampler set up at the discharge point.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? • ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ ❑
If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ • ❑
Comment The effluent appeared clear at the time of the inspection. However, it was noted that the
rocks at the outfall are stained red from the use of ferric sulfate as the coagulant.
•
•
•
•
Page# 5