Loading...
HomeMy WebLinkAbout20190073 Ver 1_Shoreline Stabilization_20190114MY r State of North Carolina Department of Environment and Natue Division of Wa e u e i L Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization _a ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form 2 0 1 9 0 0 7$ Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 Arr'UN-n A. Applicant Information [15A NCAC 02H .0502(a)] SAN d fZ01$ 1. Owner Information Name: Y Mailing Address: Y Dc -neer- NC 2,R037 Telephone Number: Fax Number: E-mail Address: _4eF& Soo* c) -44 0 RqMQ l -Com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.miI/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ Name: 1 )C) Company Affiliation: Mailing Address: Telephone Number: E-mail Address: •.• 1wwor, B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 Inc - 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: L_ t v-\ co � ✓1 Nearest Town: De✓'V e. r Lake/ river/ ocean adjacent to property Property size (acres): /, IZ?5 QC : N 0Y'rnar) Subdivision name or site address (include phase/lot number): Lo+ 4 '0T7 N0►c&an EAni 5 ; v , !�eh v er NC ?A37 Directions to site - please include road names and numbers, landmarks, etc.: F,,o w A)C•/lQf3il6- Dr, Ve . Tro),-YYf y is o,7 *'Ye- teff : - (in decimal degrees). -35.,118553Z, Longitude (decimal degrees) -50.95 9 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): �e51dny?ho 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): SVInre-li h e refresh ,p l ace- (VQ55 P AzLrr�iyter Rochoyer eXlSfiem n0rapAy'GyOSiergearlLIFi 5haecliae'J I 5 ,(0� i7rt7/i�Y2, 7. Will work be conducted from land? FT From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent ` impacts (in�l�din all a cavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: f I oe li ve✓ed 61P/aced 10 �a e. 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): ! r' or ee reiwoya /. 11. Signature a sem%• - q -14 Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Levre Shoreline Plan View Lake (At full Porti/ Normal Water Leven Existing Dock 30ftx 7ft 3ft■1Wft Below full Pad/ NWL Full Pond/ Normal Water levelk e nrooreMne 4ftx 150ft A6uva full pond/NWL 2 R. x 150 ft. additional dearing ' if necessary 1 E AMP E FORM: SSGP 02-2017 Page 3 of 4 Plan View > �s J Lake S (At Full Pond/ Normal Water Level) , �- O C W i O C- N 0 C 0 Side View CL IJL 1C Side Vi 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing d necessary FORM: SSGP 02-2017 Page 4 of 4 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address•�a l /9/ D_r1& %CG_h5 D6 Ve, County: / en vc r, AIC Z8&37 Owner: Contract The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B.0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H.0502 and 15A NCAC 02B.0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification 1, 3e �Q j ►'� hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): �74,9 ��'— Date: I — q _ 1 "I • PAOOIr WT BLOW R010ED 011 DEDMON. PLS #3899 WA IN c - ZMMa' � A� M Z" �_A oon.o >ol lox ly 1lAtN.Al01R PROII A MF ftMA10 011 �� • gpOpO 00K ML 11011CIO IIICM OM tl! PIN fa50 IIOf < 70M0 D• MOMO �^_ I��O O[ .. - UNIM IOII 0001 a COIION1CIgll •+hart A IaD r O Oa01i �-- I9� �� AOrA�I • COm RS w a 71POSU MR FOIL IVDIOft 000\ II 0 PHONE: 704/483/4908 aar wo rR tm K wm ra omt FAX: 704/483/2170 • 10 OR/\ usm tmr rNr Olil MONO vCx lur IlL • xo as Iwll�f rwo RSR1 � a srRer rlolonr. - IAYM • � Ivs s tls Floralr ■ wm � • �'- tee 1RR Raps 11.R� MI OS•11® r 30. Aa N16 OSO ,,,AI1RI 90 a %1-30 '00� SITE g NODOMN �sn1Es ort (3j PB: 11-322 _ —M IOM •� ,r,lAc. aam uc "- - --_ O 1.426 AC +- (s` PH: 11-322 40 0 40 e0 19D GRAF= ac DEDMON SURVEYS T»E: 1-4-2079 w ONO C. PONEY. COMFY THAT THIS PLAT »w SCALE: 1 • _ 40' WANK FROM AN AMft SLIRWV MADE IN= W supEm 90M (00 2705. ro 3m" 11. PO THAT THE RkW of PPECON As CHUCK POOVEY. PLS #3762 i / LAKE NORMAN 04 — 2705 PO: ale PC: 11 PC: 322 aM�'iArOEO moms 1.10000, THAT 7w RNROBERT DEDMON. PLS #3899 CATAWBA SPRINGS TOWNSHIP IN PRFPAM M ACCOFAV" WRH OS 47-30 AS AMPOED. WOMM w ORNMAL M SMNMURF. f PWM MFIeEx AND SEAL TMs 4TH DAY 3704 NC HIGHWAY #16 BUSINESS NORTH LINCOLN COUNTY. NC OF lw#AwAD 2M9' P.O. BOX 494 — DENVER, NC 28037 Id.�(!7•:::� L'. PHONE: 704/483/4908 "OE"SE N0' FAX: 704/483/2170 SURV. Ott: HL DRAWN. KPJ JOB# SPAIN AC11NL 747A"AFn01At L. FWIDC�RD t-3-M/f PHYSICAL SURVEY FOR JEFF SPAIN & MELANIE SPAIN ALL OF IDT 4 OF NORMAN ESTATES 0 8397 NORMAN ESTATES OR. DENVER. NC 2018 Tax Values Parcel 79925 Map 4613 Pin 4613-77-2423 Zone Code Jurisdiction Acres 1.428 Subdivision #4 LOT NORMAN ESTATES Acres Plat Book -Page 11 - 322 OWNER INFORMATION 1.428 Owner Name: SPAIN JEFFERY E Deed: 2705-336 SPAIN MELANIE L East Lincoln Development District Mailing Address: 8397 NORMAN ESTATES DR Deed Year: 2017 DENVER NC 28037 Acres Account: 0265088 Deed Acres: 1.428 Fire District: EAST LINCOLN Mapped Acres: 1.428 Township: CATAWBA SPRINGS 1.428 Soil Types Neighborhood: 0513N Land Market Value: $891,956 Description: #4 LOT NORMAN ESTATES Improvement Market Value: $1,203,630 Category: REAL Total Market Value: $2,095,586 Zoning Zone Code Jurisdiction Acres R -CR COUNTY 1.428 1.428 East Lincoln Development District District Acres Not In a District 1.428 1.428 Soil Types Soil Type Agriculture Forestry Horticulture Acres Gaston sandy clay loam: 2-8 Pct slopes(Eroded) (GnB2) Class 2 Class 2 Class 2 1.351 Pacolet sandy clay loam: 8-15 Pct slopes(Eroded) (PeC2) Class 3 Class 2 Class 2 0.077 1.428 Flood Zones Flood Zone Description Panel Acres AE SPECIAL FLOOD HAZARD AREA BASE ELEVATION DETERMINED - 100 YEAR 3710461300 0.256 X NO FLOOD HAZARD 3710461300 1.172 1.428 2010 Census Block County Tract Block Acres 37109 071202 1000 0.015 37109 071202 1002 1.413 1.428 Sewer Districts District Acres SEWER 1.428 1.428 Watersheds Watershed Class Acres WS -IV 1.428 1.428 Voting Precincts Precinct Acres TA37_TRIANGLE A (TA37) 1.428 1.428 January 9, 2019 0 100 200 Feet 1 inch = 130 feet Gmail - Spain. Norman estates 10/15/18,10:20 AM https://mail.google.com/mail/u/0?ik=49de9lalc8&view=pt&search=...read-f%3A1614384856356039218&simpl=msg-f%3A1614384856356039218 Page 2 of 6 Gmail - Spain. Norman estates 10/15/18,10:20 AM https://mail.google.com/mail/u/0?ik=49de9lalc8&view=pt&search=...read-f%3A7614384856356039218&simpl=msg-f%3A7614384856356039218 Page 3 of 6 Gmail - Spain. Norman estates 10/15/18, 10:20 AM https://mail.google.com/mail/u/0?ik=49de9lalc8&view=pt&search=...read-f%3A7614384856356039218&simpl=msg-f%3A1614384856356039218 Page 4 of 6 L .�, �� #v ..+rte"^" �•>w. ... _• '. 0�' . „. rte._ '-. .' '��• M +� Gmail - Spain. Norman estates 10/15/18, 10:20 AM Note: The information contained in this transmission may contain privileged and confidential information. It is intended only for the use of the person(s) named above. If you are not the intended recipient,you are hereby notified that any review, dissemination, distribution or duplication of this communication is strictly prohibited. If you are not the intended recipient, please contact the sender by reply email (Lancasterdock2@icloud.com)destroy all copies of the original message and any attachments. Best Regards, Mark Lancaster https://mail.google.com/mail/u/0?ik=49de9lalc8&view=pt&search=... read-f%3A1614384856356039218&simpl=msg-f%3A1614384856356039218 Page 6 of 6