Loading...
HomeMy WebLinkAboutNCG030691_Compliance Evaluation_20180501Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY May 1, 2018 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 ROY COOPER Governor MICHAEL S. REGAN Secrelury WILLIAM E. [TOBY] VINSON, JR. Interim Director Subject: Compliance Evaluation Inspection Site Number WT002465 Pending NPDES Stormwater Certificate of Coverage- NCG030691 Gaston County, North Carolina Dear Mr. Bingham: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators Central Plant located on Chickasaw Road on April 4, 2018. The report should be self- explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Enclosed: Inspection report c: Stormwater Permitting Branch Sincerely, 3%�--.S. V6----- Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section RECEIVED MAY 08hid DENR-LAND QUALITY STQRMWATER PERMITTIN Compliance Inspection Report Permit: NCG030691 Effective: Expiration: Owner: Industrial Fabricators SOC: Effective: Expiration: Facility: Industrial Fabricators Central Plant County: Gaston 105 Chichasaw Rd Region: Mooresville Gastonia NC 28052 Contact Person: Jeff Knight Title: Phone: 704-864-3032 Directions to Facility: turn left on hwy 321 south onto forbes road, turn right at the second road on the right. System Classifications: Primary ORC: Certification: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/04/2018 Entry Time: 10:OOAM Exit Time: 11:OOAM Primary Inspector: Holliday Keen Secondary Inspector(s): Phone: Phone: Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG030691 Owner - Facility: Industrial Fabricators Inspection Date: 04/04/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: This inspection was conducted as a follow up to the Notice of Deficiency issued January 22, 2018 for Site Number WT002465 which has been assigned as NCG030691 which is still currently under review. This facility remains under Notice of Deficiency due to the absence of a Stormwater Pollution Prevention Plan and inadequate stormwater monitoring. Please complete the SWPPP as soon as possible and conduct analytical and qualitative monitoring by July 1, 2018. Contact our office at 704-663-1699 or by email at Holliday. Keen@NCDENR.gov with any questions. Page: 2 Permit: NCG030691 Owner - Facility: Industrial Fabricators Inspection Date: 04/04/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ N ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ N ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ N ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ■ ❑ ❑ Comment: The SWPPP has not been completed and remains in progress. Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ E ❑ ❑ Comment: Qualitative monitoring has not been conducted. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ E ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ S ❑ Comment: Analyitcal monitoring has not been conducted. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ E ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ N ❑ ❑ Comment: A copy of the permit and COC were available on site. Outfalls have been determined for this facility. Page: 3